ADDENDUM 3 Attachment C - Revised Drawings Package 1 Day Use Parking Lot Improvements.pdf

PDF 7 MB Posted

Attached to
ITB 13440 Cape Lookout State Park Parkwide Improvements Project
Solicitation number
S-63400-00016792
Issued by
Tillamook County, Oregon

About this file

This is an addendum to a revised drawings package for the Oregon Parks and Recreation Department's (OPRD) Invitation to Bid (ITB) 13440 for Cape Lookout State Park Parkwide Improvements Project. The addendum provides updated technical drawings for Package 1, which encompasses day use parking lot improvements including 55 line items covering mobilization, demolition, asphalt and concrete paving, curbing, sidewalks, stormwater management infrastructure, utilities installation, electrical work, landscaping, and site amenities such as bollards, picnic tables, signs, pay stations, and electric vehicle charging stations. The project scope requires 132,500 square feet of asphalt excavation, 3,350 cubic yards of general excavation, 1,950 tons of asphalt paving, 15,560 square feet of concrete sidewalk, 5,700 square feet of stormwater planter area, and 4,700 linear feet of 3-inch waterline. A voluntary pre-bid conference was scheduled for May 18, 2026, at Cape Lookout State Park in Tillamook, Oregon. Requests for clarifications and proposed changes were required by May 27, 2026, at 2:00 PM, with electronic bid submissions due through the OregonBuys system by June 3, 2026, at 2:00 PM. Substantial completion is required by December 1, 2026, with final completion by December 31, 2026, upon Notice to Proceed.

Award will be made to the lowest responsive and responsible bidder, with bid security equal to 10% of the total bid amount required. Upon award, the successful bidder must provide performance and payment bonds each equal to 100% of the contract amount, proof of insurance, and a completed W-9 form within seven days of award notification. The OPRD is exempt from Oregon's Public Contracting Code, including prevailing wage requirements. While no formal set-asides are mandated, bidders are encouraged to utilize certified disadvantaged businesses, minority-owned businesses, women-owned businesses, emerging small businesses, and veteran-owned businesses as subcontractors. All bidders and subcontractors must be registered with the Oregon Construction Contractors Board (CCB) prior to bid submission and work commencement, respectively. Liquidated damages are set at $1,000 per calendar day for each day beyond the substantial completion date. The project is anticipated to be funded with state funds, contingent upon the agency's receipt of sufficient project funding, with no specific budget amount disclosed.

View the file

Other files

File Type Posted
Attachment A-2 Pricing Form~2.xlsx XLSX spreadsheet
Addendum 4 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 5 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf PDF
ADDENDUM 5 Attachment A-2 Pricing Form.xlsx XLSX spreadsheet
ADDENDUM 5 Attachment C - Revised Drawings Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment C Plans and Drawings_Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment B Technical Specifications - Cape Lookout State Park Parkwide Improvements.pdf PDF
ADDENDUM 3 Attachment A-2 Pricing Form.xlsx XLSX spreadsheet
Attachment C Plans and Drawings_Package 4 Loop C and D Utilities.pdf PDF
Addendum 1 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 2 Attachment E-3 Geotechnical Report.pdf PDF
ITB 13440 Cape Lookout Parkwide Improvements~1.docx DOCX document
Addendum 2 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 3 Attachment C - Revised Drawings Package 3 Loop D Paving.pdf PDF
Addendum 5 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project_.docx DOCX document
Addendum 3 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project-2.docx DOCX document
Attachment E-1 Inadvertent Discovery Plan .pdf PDF
ADDENDUM 2 Attachment E-2 Project Permits.pdf PDF
13440 Pre-bid sign in.pdf PDF
ADDENDUM 3 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf PDF
Attachment C Plans and Drawings_Package 3 Loop D Paving.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO

PA

RK

ING

EV

EV

T

M

J

(9�&+$5*,1*�6T$T,21

3$<�6T$T,21�/2&$T,21�2

3$<�6T$T,21�/2&$T,21�1

(;,6T,1* 81'(5*5281' )(('(5

2����&8��1��1��&8�*1'���,1�2��&

T5$6+�&2M3$&T25 6T8%%('�83 &21'8,T

2��1��&8��1��12�&8�*1'���,1�1��&

3����&8���1��&8�*1'��,1�2�&�

3��&�2�

J

J

J

J�%2;��12��;�16�

38//�%2;

WETLAND

E1

WETLAND

E2

F

F

F

F

F

F

F

F

F F F

F

F

F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

D2 D3

D5 D7

D4

D6

D9

D8

D11

D10

D13

D12

D15

D14 D16

D17

D19

D18

D20

D21

D23

D22

D25

D24

D26

D27

D29

D28

D30 D31

D33

D32

D34

D39

D38

D37

D36

D35

D40

D41

D42

D43

D44

D45

D52

D51

D53

D54

D55

D56

D46

D50

D47

D49 D48

D57

D58

D59

D60

D61

D63

D62

D64

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

E

EC

EH

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

ES

SW

SW

SW

SW

SWV

V

V

V V

V

V

V

S

D D D D

D D

D

D D

D

D

D

D D

D

D

F

SD

TR

DOG

WASTE

BAGS

NO

CAMPING

EVACUATION

ROUTE

EXIT

B

B

B

B

B

B

F

F

F

F

F

F

F

F

F

F

F

F

D72

D71

D70

D69

D68

D67

D66

D65

A38

A37

A36

A35

A34

A33

A32

A31

A30

A29

A27

A26

A25

A24

A21

A20

EXTRA VEHICLE

PARKING

CAMPING

RULES

KEEP OFF

DUNE

NO BIKES

ON TR

AIL

N O

BIKES

O

N

TRAIL

N O

B

IK

ES

O

N T

RA

IL

NO BIKES

ON TRAIL

INFO

BOOTH

CONEX

YURT

YURT

YURT

YURT

YURT

YURT

YURT

YURT

YURT

YURT

YURT

YURT

YURT

REGISTRATION

BOOTH

FIREWOODSHED

STORAGE

SHED

SPEED BUMP

SPEED BUMP

SPEED BUMP

LB

LB

LB

B

B

B

B

LB

GATE

GATE

GATE

B

IC

E

DI

SP

EN

SE

R

F

F

F

F

F F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F

F

F F

F F

F

F F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F F

FF

F

FF

F

F

WOOF

WASTE

STOP

CAMP

INFO

STOP

CAMP

CAPACITY

STOP

INFO

MPH

PED

XING

SLOW

NO

PARKING

33B

CAPE

LOOKOUT

X-WALK

KEEP OFF

DUNE

NO

PARKING

NO

PARKING

SPEED

PED XING

NO

PARKING

PET

WASTE

CAPE

LOOKOUT NO

PARKING

33A

NO

PARKING

EVACUATION

ROUTE

KEEP OFF

DUNE NO

PARKING

SPEED

REGISTERED

PARKING

NO

PARKING

TENT

LOOPS

MAX SITE

OCCUPANCY

C1

C2

C3

C4

C5

C71

C72 C70

C69

D1

C7

C6

C8

C9

C10

C11

C13

C12

C15

C14

C17

C16

C19

C18

C21

C20

C23

C22

C24

C58

C57

C25

C26

C28

C27

C30

C29 C32

C31 C33

C34

C35

C37

C36

C38

C39

C40

C41

C42

C43

C44

C45

C47

C46 C48

C49

C51

C50

C52

C53

C55

C54

C61

C62

C63

C64

C66

C65

C68

C67

C60

C56

C59

EVACUATION

ROUTE

TRAIL TO

REGISTRATION

EVACUATION

ROUTE

CAMP

HOST

CAMP

HOST

CAMP

HOST

CAMP

HOST

CAMP

HOST

TSUNAMI

EVACUATION

ROUTE

TRASH CANS

TRASH

COMPACTOR

EC

ES

COMPACTOR M

OTOR

EC

TRAN

JB

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OHU

OH

U

O

HU

O

HU

O

HU

O

HU

O

HU

O

HU

O

HU

OH

U

OH

U

OH

U

OH

U

O

HU

OH

U

OH

U

OH

U

OH

U

O

HU

OH

U

OH

U

OH

U

OH

U

OH

U

O

HU

O

HU

O

HU

O

HU

O

HU

O

HU

O

HU

O

HU

OH

U

OH

U

O

HU

O

HU

OH

U

OH

U

O

HU

O

HU

OH

U

O

HU

O

HU

O

HU

OH

U

O

HU

O

HU

O

HU

OH

U

O

HU

O

HU

O

HU

OH

U

OH

U

O

HU

O

HU

O

HU

O

HU

OH

U

O

HU

O

HU

OH

U

OH

U

OH

U

O

HU

O

HU

OH

U

OH

U

OH

U

OH

U

O

HU

O

HU

O

HU

O

HU

O

HU

O

HU

O

HU

OH

U

OH

U

OH

U

O

HU

O

HU

OH

U

OH

U

OH

U

OH

U

O

HU

O

HU

OH

U

OH

U

OH

U

O

HU

OHU

EC

E

ES

EC

EC

EC

EC

EC

EC

EC

EC

EC

EC

EC

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH

EH EO

EVLT

SW

SW

SW

SW

SW

SW

CO

CO

CO

V

V

V

V

V

V

CO

CO

CO

CO

V

V

D

D

D

DV

D

CO

D

D

D

D

D

D

DD

V

D

T

T

TT

T

T

TR

TR

TR

TR

TR

#18

#19

#7

#8

#21

#25

#29

CAPE L

OOKOUT R

OAD

SAND DUNE

SAND DUNE

SAND DUNE

16''SD

16''SD

''S

D

''S

D

''S

D

''S

D

''S D

''S

D

12''SD

12''SD

12''SD

RD

CORD

RD

RD

''S

D

''S

D

''S

D

''S

D

''S

D

''S

D

''S

D

RDRD

CO

SHOWERS

GAS TANK

UVLT

U

SW

RESTROOM

UTILITY

BUILDING

SAND DUNE

#42

#44

#80

#84

#87

#101

SP

EE

D

BU

M P

SP

EED BUMP

12''SD

12''SD

12''SD

12''SD

12''SD

8' W

ID

E D

IT

CH

5' WIDE DITCH

15 MIN

PARKING

STOP

E

PB

PB

OHU

OHU

B

B

B

WOOD

RAMP

ONE WAY

EC

TRAN

E

F

WOOD

AND

T-POST

RETAINING

WALL

ONE WAY

B

B

B

LOOP

DIRECTIONS

B

SAND

NO

PARKING

ROCK

RETAINING

WALL

CONC

BLOCK

WALL

TR

MAX SITE

OCCUPANCY

F

SW

V

JB

GAS TANK

F

B27

DOG

WASTE

COURTESY

GUIDE

SEPTIC FIELD

JB

ET

T

TT

T T

T

CO

V

T

CO

EC

EC

E

COURTESY

GUIDE

DOG

WASTE

RD

RD

RD

RD

SP

EE

D BUMP

SP

EE

D BUM

P

NO BIKES

ON TRAIL

NO BIKES

ON TRAIL

NO BIKES

ON TRAIL

NO BIKES

ON TRAIL

NO BIKES

ON TRAIL

N O

B

IK

ES

O

N

TR

AI

L

NO BIKES

ON TRAIL

N O

BIKES

O

N

TRAIL

PACIFIC OCEAN

CONEX

AREA NOT

MAPPED

AREA NOT

MAPPED

AREA NOT

MAPPED

AREA NOT

MAPPED

AREA NOT

MAPPED

PACIFIC OCEAN

PACIFIC OCEAN

''S

D

''S

D

''S

D

''S

D

''S

D

18''S D

18''S D

''S

D

TRAN

TR

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

ER

OHU

OHU

OHU

OHU

OHU

OHU

E

E

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

EEEE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

EEEE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E E

E

E E

E E

E E

E

E

E

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

CO

CO

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SSSSSSSS

SS

SS

SS

SS

SS

SSSSSSSSSSSSSSSSSSSSSSSS

SS

SS

SS

SS

SS

SS

SS

SS

E

E

E

E

E

E

E

E

E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E E E E E E E E E

E

E

E

E

E

E

E

E

E

E

E

E

JB

E

E

E

E

E E

E E

E

E

E

E

E

E

E

SS

SS

SS

SS

RESTROOM

NO

PA

RK

ING

EV

EV

T

M

J

(9�&+$5*,1*�6T$T,21

3$<�6T$T,21�/2&$T,21�2

3$<�6T$T,21�/2&$T,21�1

(;,6T,1* 81'(5*5281' )(('(5

2����&8��1��1��&8�*1'���,1�2��&

T5$6+�&2M3$&T25 6T8%%('�83 &21'8,T

2��1��&8��1��12�&8�*1'���,1�1��&

3����&8���1��&8�*1'��,1�2�&�

3��&�2�

J

J

J

J�%2;��12��;�16�

38//�%2;

WETLAND

A2

WETLAND

A1

WETLAND

A3

WETLAND

C4

WETLAND

C5

WETLAND

D1

WETLAND

C14

WETLAND

C14

WETLAND

C13

WETLAND

C15

WETLAND

C16

WETLAND

C3

WETLAND

C6

WETLAND

C7

WETLAND

C12

WETLAND

C3

WETLAND

C1

WETLAND

LINE

B13

WETLAND

C11

WETLAND

C8

WETLAND

C9

WETLAND

C10

WETLAND

B12

WETLAND

B11

WETLAND

B9

WETLAND

B8

WETLAND

B10

WETLAND

B2

WETLAND

B3

WETLAND

B5

WETLAND

B7

WETLAND

B6

WETLAND

B4

WETLAND

C2

WETLAND

B9

WETLAND

E1

WETLAND

E2

WETLAND

C14 WETLAND

C13

WETLAND

B1

WETLAND

B1

WETLAND

B1

WETLAND

B1

WETLAND

C11

WETLAND

C11

1 (;,6T,1*�3$'�M281T�T5$16)25M(5�

2 (;,6T,1*�2��$�3$1(/� �T2�5(M$,1�

3 (;,6T,1*�M(T(5�T2�5(M$,1�

4 3529,'(�1(:�&,5&8,T�$1'�2�$�%5($.(5�,1 3$1(/�

5� 5(86(��(��&,5&8,T�%5($.(5�,1�3$1(/�

6� 5(/2&$T(�(;,6T,1*�(9�&+$5*,1*�6T$T,21 T2�1(:�/2&$T,21�$6�6+2:1�

111 SW Fifth Ave., Suite 2400 Portland, OR 97204 O: 503.227.3251 F: 503.274.4681 www.kpff.com

CONTACT

PROJECT

www.interfaceengineering.com

I N T E R F A C E E N G I N E E R I N G

TEL

Mark Jackson 2022-1109

100 SW Main Street, Suite 1600 Portland, OR 97204

503.382.2266

SHEET KEYNOTES

KEY MAP:

SHEET

SHEET

12"x16"

5/

/2

M

JADDENDUM #3

ADDENDUM 3 Attachment B - Revised Drawings Package 1 Day Use Parking Lot Improvments.pdf
ADDENDUM 3 Attachment B - Revised Drawings Package 1 Day Use Parking Lot Improvments.pdf

ORPD Cape Lookout PKG 1 - Electrical E0.01_Add3.pdf

File details come from the government source that posted it. Updated .