ATTACHMENT 9 - Drawings VOL 2 - 2 of 7.pdf

PDF 12 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
Solicitation number
36C77622B0018
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks upgrades to the facilities electric and IT infrastructure at Iron Mountain to allow for a new Electronic Health Record Modernization system. The scope of work includes electrical upgrades, bonding, uninterruptible power supply systems, building management system interfaces, HVAC upgrades and expansions, communication infrastructure upgrades including new data outlets and Cat 6A cabling, physical security upgrades, and fiber infrastructure upgrades across campus. Offerors are to provide all labor, materials, equipment and supervision to complete the infrastructure improvements as specified. The response deadline and award date are not included in this attachment.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain, newest first.
File Type Posted
36C77622B0018 0003.pdf PDF
09 69 00 Access Flooring-Addenda 2.pdf PDF
Addendum 1.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 6-17-22.pdf PDF
Technical Questions - FINAL - Iron Mtn. 6-27-22.pdf PDF
EHRM Asbestos Report.pdf PDF
36C77622B0018 0002.pdf PDF
36C77622B0018 0001.pdf PDF
Site Visit Sign-in Sheet - Iron Mtn. 5-18-22.pdf PDF
ATTACHMENT 2 - Specifications VOL 2 of 2.pdf PDF
ATTACHMENT 3 - Drawings VOL 1 - 1 of 5.pdf PDF
ATTACHMENT 15 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 19 - Site Visit Instructions.pdf PDF
36C77622B0018 - 5-5-22.pdf PDF
ATTACHMENT 4 - Drawings VOL 1 - 2 of 5.pdf PDF
ATTACHMENT 5 - Drawings VOL 1 - 3 of 5.pdf PDF
ATTACHMENT 6 - Drawings VOL 1 - 4 of 5.pdf PDF
ATTACHMENT 7 - Drawings VOL 1 - 5 of 5.pdf PDF
ATTACHMENT 10 - Drawings VOL 2 - 3 of 7.pdf PDF
ATTACHMENT 11 - Drawings VOL 2 - 4 of 7.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 18 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 8 - Drawings VOL 2 - 1 of 7.pdf PDF
ATTACHMENT 12 - Drawings VOL 2 - 5 of 7.pdf PDF
ATTACHMENT 14 - Drawings VOL 2 - 7 of 7.pdf PDF
ATTACHMENT 1 - Specifications VOL 1 of 2.pdf PDF
ATTACHMENT 13 - Drawings VOL 2 - 6 of 7.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 2-25-22.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EP-021

EP-021

EP-021

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

FIRST FLOOR ROOF

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

2 ENLARGED ROOM - 2140

1/4"=1'-0" 3 ENLARGED ROOM - 2218

1/4"=1'-0" 4 ENLARGED ROOM - 2306

1/4"=1'-0"

1 ELECTRICAL REMODEL PLAN - BLDG 1 SECOND FLOOR

1/16"=1'-0"

001-EP-021

ELECTRICAL REMODEL PLAN -

BLDG 1 SECOND FLOOR

DB LKA

GENERAL NOTES

EP-031

EP-031

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

2 ENLARGED ROOM - 3163

1/4"=1'-0" 3 ENLARGED ROOM - 3216

1/4"=1'-0"

1 ELECTRICAL REMODEL PLAN - BLDG 1 THIRD FLOOR

1/16"=1'-0"

001-EP-031

ELECTRICAL REMODEL PLAN -

BLDG 1 THIRD FLOOR

EP-041

EP-041

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

2 ENLARGED ROOM - 4122

1/4"=1'-0" 3 ENLARGED ROOM - 4246

1/4"=1'-0"

1 ELECTRICAL REMODEL PLAN - BLDG 1 FOURTH FLOOR

1/16"=1'-0"

001-EP-041

ELECTRICAL REMODEL PLAN -

BLDG 1 FOURTH FLOOR

EP-051

EP-051

4,5

EP-051

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

2 ENLARGED ROOM - 5122

1/4"=1'-0" 3 ENLARGED ROOM - 5222

1/4"=1'-0"

1 ELECTRICAL REMODEL PLAN - BLDG 1 FIFTH FLOOR

1/16"=1'-0"

001-EP-051

ELECTRICAL REMODEL PLAN -

BLDG 1 FIFTH FLOOR

DB LKA

GENERAL NOTES

4 ENLARGED ROOM - 5281 - POWER PLAN

1/4"=1'-0"

5 ENLARGED ROOM - 5281 - LIGHTING PLAN

1/4"=1'-0"

EP-061

EP-061

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

2 ENLARGED ROOM - 6122

1/4"=1'-0"

1 ELECTRICAL REMODEL PLAN - BLDG 1 SIXTH FLOOR

1/16"=1'-0"

3 ENLARGED ROOM - 6222A

1/4"=1'-0"

001-EP-061

ELECTRICAL REMODEL PLAN -

BLDG 1 SIXTH FLOOR

3RD FLOOR ROOF

2ND FLOOR ROOF

2ND FLOOR ROOF

2ND FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

4TH FLOOR ROOF

5TH FLOOR ROOF5TH FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

1 ELECTRICAL REMODEL PLAN - BLDG 1 SEVENTH FLOOR

1/8"=1'-0"

001-EP-071

ELECTRICAL REMODEL PLAN -

BLDG 1 SEVENTH FLOOR

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

1 ELECTRICAL REMODEL PLAN - BLDG 1 EIGHTH FLOOR (SHOWN FOR REFERENCE ONLY)

1/4"=1'-0"

001-EP-081

ELECTRICAL REMODEL PLAN -

BLDG 1 EIGHTH FLOOR

EP-0B1

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

1 BLDG 2 BASEMENT

1/8"=1'-0" 2 ELECTRICAL REMODEL PLAN - BLDG 2 FIRST FLOOR

1/8"=1'-0"

ELECTRICAL REMODEL PLAN -

002-EP-0B1

ELECTRICAL REMODEL PLAN -

BLDG 2

DB LKA

GENERAL NOTES

3 ENLARGED ROOM 001-3

1/4"=1'-0"

EQUIPMENT SCHEDULE - BUILDING 2

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

1 ELECTRICAL REMODEL PLAN - BLDG 4 BASEMENT

1/8"=1'-0" 2 ELECTRICAL REMODEL PLAN - BLDG 4 FIRST FLOOR

1/8"=1'-0" 3 ELECTRICAL REMODEL PLAN - BLDG 4 SECOND FLOOR

1/8"=1'-0"

004-EP-0B1

ELECTRICAL REMODEL PLAN -

BLDG 4

DB LKA

GENERAL NOTES

(SHOWN FOR REFERENCE ONLY)

4 ENLARGED ROOM - 001

1/4"=1'-0"

EQUIPMENT SCHEDULE - BUILDING 4

5 BUILDING 4 ONE-LINE DIAGRAM

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

1 ELECTRICAL REMODEL PLAN - BLDG 6 BASEMENT

1/8"=1'-0" 2 ELECTRICAL REMODEL PLAN - BLDG 6 FIRST FLOOR

1/8"=1'-0"

006-EP-0B1

ELECTRICAL REMODEL PLAN -

BLDG 6

DB LKA

3 ELECTRICAL REMODEL PLAN - BLDG 6 SECOND FLOOR

1/8"=1'-0"

GENERAL NOTES

4 ENLARGED ROOM - 107

1/4"=1'-0"

(SHOWN FOR REFERENCE ONLY)

(SHOWN FOR REFERENCE ONLY)

EQUIPMENT SCHEDULE - BUILDING 6

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542

670 West Fireweed Lane, Suite 200

S

MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS

Engineering, Inc.

R A

10-29-2021

100% DESIGN DOCUMENTS 10.29.2021

10/29/21

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION

DOCUMENTS

SHEET NOTES

1 ELECTRICAL REMODEL PLAN - BLDG 11 GROUND FLOOR

1/4"=1'-0"

011-EP-0B1

ELECTRICAL REMODEL PLAN -

BLDG 11

GENERAL NOTESEQUIPMENT SCHEDULE - BUILDING 6

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

A, AMP AMPERE

ACP ACCESSIBLE CARD PATH

ADA AMERICAN DISABILITY ACT

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT

AFCI ARC FAULT CIRCUIT INTERRUPTER

AFF ABOVE FINISHED FLOOR

AG ABOVE GROUND

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AL ALUMINUM

BCT BONDING CONDUCTOR FOR TLECOMMUNICATIONS

BKR BREAKER

C CONDUIT

CKT CIRCUIT

CO CONDUIT AND PULL-ROPE ONLY

COMM COMMUNICATION

CTRL CONTROL

CU COPPER

(E) EXISTING

EC, E.C. ELECTRICAL CONTRACTOR

ELEC ELECTRICAL

EM EMERGENCY

EQPT EQUIPMENT

(F) FUTURE

FA FIRE ALARM

FDR FEEDER

G, GND GROUND

GC, G.C. GENERAL CONTRACTOR

HH HANDHOLE

J-BOX JUNCTION BOX

LCP LIGHTING CONTROL PANEL

LIU LINE INTERFACE UNIT

LTG LIGHTING

LTS LIGHTS

LV LOW-VOLTAGE

MH MANHOLE

MM MULTI-MODE

MPLS LOW VOLTAGE MOUNTING PLATE-1 GANG

MPLS2 LOW VOLTAGE MOUNTING PLATE-2 GANG

N NEUTRAL

(N) NEW

NEC NATIONAL ELECTRICAL CODE

OC ON-CENTER

OFCI OWNER-FURNISHED CONTRACTOR-INSTALLED

OFOI OWNER-FURNISHED OWNER-INSTALLED

OL OVERLOAD

P POLE

PB PULLBOX, PUSHBUTTON

PRI PRIMARY

(O) REVISED

REF REFERENCE, REFRIGERATOR

SEC SECONDARY

SM SINGLE-MODE

SOW SCOPE OF WORK

SPECS SPECIFICATIONS

SS STAINLESS STEEL

SW SWITCH

TEL TELEPHONE

TC TELECOMMUNICATION

TGB TELECOMMUNICATIONS BUS BAR

TMGB TELECOMMUNICATIONS MAIN GROUNDING BUS BAR

THRU THROUGH

TR TELECOMMUNICATIONS ROOM

(TYP) TYPICAL

UG UNDERGROUND

UNO UNLESS NOTED OTHERWISE

VLT VAULT

W WIRE, WATT

WP WEATHERPROOF

ABBREVIATION LIST

1. PROVIDE COMPLETE WORK FOR REQUIREMENTS AS DESCRIBED ON

LEGEND. REFER TO OTHER DISCIPLINE DRAWINGS FOR LOCATIONS

OF EQUIPMENT AND DEVICES REQUIRED TO BE SUPPLIED WITH

POWER.

2. INSTALLATION SHALL COMPLY WITH APPLICABLE CODES, INCLUDING,

BUT NOT LIMITED TO THE FOLLOWING: 2020 NATIONAL ELECTRICAL

CODE (NEC), VA STANDARDS AND REQUIREMENTS, LOCAL, STATE,

AND FEDERAL CODES AND ORDINANCES. AS WELL AS ALL BICSI

STANDARDS.

3. PRIOR TO PREPARATION OF BID, VISIT JOBSITE AND EXAMINE

EXISTING CONDITIONS. WORK SCOPE SHALL INCLUDE ALL COSTS FOR

CUTTING, PATCHING AND CORE DRILLING REQUIRED TO INSTALL

CONDUIT AND OTHER WIRING METHODS THROUGH EXISTING WALLS,

FLOORS AND OTHER BUILDING ELEMENTS (NOT SHOWN ON

DRAWINGS).

4. PROVIDE SEPARATE AS BUILT SITE DRAWINGS, SHOWING ALL

EXISTING UNDERGROUND UTILITIES, AND ALL NEW UNDERGROUND

UTILITIES.

5. PROVIDE TEMPORARY POWER FOR CONSTRUCTION. TEMPORARY

POWER MAY BE IN THE FORM OF PORTABLE GENERATOR SET;

CONNECTION TO UTILITY COMPANY'S POWER SYSTEM OR EXISTING

FACILITY'S ELECTRICAL SYSTEM UPON VA APPROVAL.

6. DO NOT TAKE MEASUREMENTS FROM PLANS FOR DEVICE LOCATIONS.

FIELD VERIFY EXACT DEVICE, EQUIPMENT LOCATIONS, AND

MOUNTING HEIGHTS WITH FIELD CONDITIONS FOR PROPER

INSTALLATION.

7. SCHEMATIC DIAGRAMS AND RACEWAY ROUTING ARE SCHEMATIC

AND DO NOT SHOW EXACT PHYSICAL ARRANGEMENT OF EQUIPMENT.

WHERE INDICATED ON DRAWINGS, JUNCTION BOXES AND PULLBOXES

ARE MINIMUM REQUIREMENTS. PROVIDE FITTINGS AND PULLBOXES

OF ADEQUATE SIZE IN RACEWAY SYSTEMS WHEREVER NECESSARY

OR REQUIRED BY THE NEC OR LOCAL CODES. PROVIDE EXPANSION

JOINT FITTINGS FOR RACEWAY PASSING THROUGH NEW OR EXISTING

EXPANSION JOINTS INSTALLED BETWEEN BUILDINGS. VERIFY EXACT

LOCATIONS AND DETAILS OF EXPANSION JOINTS PRIOR TO WORK.

COORDINATE ALL RACEWAY ROUTING, PULLBOXES, AND EQUIPMENT

LOCATIONS WITH OTHER TRADES TO AVOID CONFLICTS OF

EQUIPMENT INSTALLATIONS.

8. RACEWAYS, CABLE SIZES AND ROUTES AS SHOWN REPRESENT

INTENT OF INSTALLATION, BUT MAY NOT NECESSARILY REPRESENT

THE COMPLETE WIRING COUNTS AND MINIMUM SIZES FOR

CONNECTING THE CIRCUITS SHOWN. CONTRACTOR SHALL INCLUDE

IN THE BID, ALL REQUIRED RACEWAY SIZES AND NUMBER OF CABLES

IN ORDER TO PROVIDE ALL CABLES AS SHOWN.

9. REFER TO SCHEDULES FOR CABLING REQUIREMENTS NOT INDICATED

ON PLANS.

10. CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL OBSOLETE,

ABANDONED, DEAD-ENDED, AND CUTOFF CATEGORY CABLES, IN

THEIR ENTIRETY, LOCATED DURING ALL PHASES OF WORK

PERFORMED.

11. INSTALLATION OF UNDERGROUND CABLING SYSTEMS SHALL INCLUDE

EXCAVATION, CUTTING, PATCHING, BACKFILL, AND COMPACTION. DO

NOT CUT OR DAMAGE ANY EXISTING UTILITIES, STRUCTURAL

MEMBERS, OR BUILDING FOUNDATIONS. VERIFY EXISTING

CONDITIONS PRIOR TO EXCAVATION WORK. INCLUDE COST FOR

UNDERGROUND LOCATOR SERVICE TO IDENTIFY LOCATIONS OF

EXISTING COMPONENTS. HAND EXCAVATE IN LOCATIONS WHERE

EXISTING UNDERGROUND COMPONENTS ARE SUBJECT TO DAMAGE.

REPAIR DAMAGE TO EXISTING UTILITIES OR BUILDING STRUCTURE TO

OWNER'S SATISFACTION AT THE CONTRACTORS EXPENSE.

12. PROVIDE MINIMUM PULL-ROPES IN ALL EMPTY CONDUITS.

13. CONDUIT OR OTHER ELECTRICAL COMPONENTS SHALL NOT BE

INSTALLED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY

INDICATED ON THE DRAWINGS OR APPROVED BY A STRUCTURAL

ENGINEER. ALL CORE DRILLING FOR RACEWAY INSTALLATION, SHALL

BE THE RESPONSIBILITY OF THE E.C.

14. COORDINATE PAINTING WORK OF ELECTRICAL ITEMS WITH GENERAL

CONTRACTOR. SEE PAINTING SPECIFICATIONS FOR REQUIREMENTS.

15. CONTRACTOR TO PROVIDE ADDITIONAL CABLE LENGTH, ADDED TO

FIELD MEASURED LENGTH, OF COPPER AND FIBER OPTIC CABLE

FOR ONE 10' SERVICE LOOP AT EACH END WITHIN EACH

TELECOMMUNICATIONS SPACE. IN ADDITION TO THE SERVICE LOOPS,

CONTRACTOR SHALL ALSO SUPPLY ADDITIONAL LENGTH FOR SITE

BACKBONE CABLING AS NOTED IN CABLING SCHEDULES SHOWN ON

TELECOM SHEETS FOR FUTURE RELOCATION OF CABLING TO NEW

BUILDING LOCATION AND SERVICE LOOP IN EACH VAULT OF AT LEAST

16'.

16. ALL NEW INTERIOR AND EXTERIOR EXPOSED CONDUIT, BOXES AND

SUPPORTS TO BE PAINTED TO MATCH EXISTING SURFACE.

GENERAL NOTES

PRIMARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE

SECONDARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE

(N)TMH-#X

xxxP

NEW MANHOLE

xxxS

(E)TMH-#X EXISTING MANHOLE

SYMBOL

SYMBOL LEGEND - TELECOMM

DESCRIPTION

P

S SECONDARY FIBER LOOP

PRIMARY FIBER LOOP

FIBER ROUTING, SUPPORTED WITH J-HOOKS

FIBER ROUTING IN CONDUIT

J

C

TELECOMMUNICATIONS OUTLET, SUBNUMBER=QUANTITY OF DROPS

FUSED DISCONNECT SWITCH

EQUIPMENT CALLOUT.

EQUIPMENT CONNECTION, SEE EQUIPMENT CONNECTION

SCHEDULES FOR SPECIFIC REQUIREMENTS.

F

HOME RUN

AHU-01

SPECIAL PURPOSE RECEPTACLE

4 PLEX RECEPTACLE

AXX

RK-XXX RACK/CABINET NAME

PORT NUMBER

PATCH PANEL LABEL

C C C

CJ CJ

CAT 6A ROUTING IN CONDUIT

CAT 6A ROUTING, SUPPORTED WITH NEW J-HOOKS

MOTOR RATED SWITCHMR

TELECOMM LEGEND, SCHEDULES,

ABBREVIATIONS, GENERAL NOTES

C

WAP

TELECOMMUNICATIONS OUTLET, WIRELESS ACCESS POINT

TG-001

RSDC

ACCESS CONTROL KEY PAD / CARD READER

WALL MOUNTED FIRE ALARM HORN-STROBE DEVICE

PLAN LEGEND

FIBER ROUTING IN INNERDUCT, SUPPORTED WITH NEW J-HOOKS

SYMBOL

FIBER ROUTING IN INNERDUCT WITHIN NEW CONDUIT

DESCRIPTION

J

CAT 6A ROUTING, SUPPORTED WITH NEW J-HOOKS

CJ

PRIMARY FIBER ROUTING IN INNERDUCT, SUPPORTED WITH NEW

J-HOOKS FROM ROOM 5281 TO TRs

P

SECONDARY FIBER ROUTING IN INNERDUCT, SUPPORTED WITH

NEW J-HOOKS FROM ROOM B105 TO TRs

S

CAT 6A ROUTING IN CONDUIT

C

2-POST RACK

ACCESS CONTROL MORTISE POWER SUPPLY

A B

D

E

C

G

C

F

C C

NO P

ARKIN

G

NO PARKING

1. ALL MANHOLES SHOWN ARE EXISTING

GENERAL NOTES

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM EXISTING SITE PLAN

SCALE:

TELECOMM EXISTING SITE PLAN

NORTH

1"=40'-0"

40'20' 80'

RSDC

TS-001

E

C

G

C

F

C C

NO P

ARKIN

G

NO PARKING

WAN ROOM

B105

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMO FIBER OPTIC SITE

PLAN

SCALE:

TELECOMM DEMO FIBER OPTIC

SITE PLAN

NORTH

1"=40'-0"

40'20' 80'

1. EVERYTHING SHOWN IS EXISTING TO REMAIN, UNLESS NOTED

OTHERWISE.

2. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES TO BE

PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

3. SEE DEMOLITION SCHEDULE THIS PAGE FOR DETAILS.

4. ALL MANHOLES SHOWN ARE EXISTING.

GENERAL NOTES

DEMO PLAN NOTES

EXISTING CONDUIT TO REMAIN. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE, THIS SHEET, FOR FIBER TYPE, STRAND COUNT,

AND TERMINATION POINT.

REMOVE EXISTING CONDUIT, REMOVE EXISTING FIBER OPTIC

CABLES ROUTING THROUGH TUNNEL FROM BUILDING BACK TO

SOURCE TERMINATION POINT. SEE SCHEDULE, THIS SHEET, FOR

FIBER TYPE, STRAND COUNT, AND TERMINATION POINT.

EXISTING FIBER COUNTS FOR DEMOLITION

BLDG / ROOM

FIBER

(E)TERMINATION

POINT

APPROXIMATE

DISTANCE (FT)

(E)SINGLE-MODE (E)MULTI-MODE

BLDG 1 / RM RM B085 0 6 BLDG 1 / B105 350

BLDG 1 / RM RM B085 0 6 BLDG 1 / B105 350

BLDG 1 / RM B091 0 12 BLDG 1 / B105 450

BLDG 1 / RM B091 0 12 BLDG 1 / 5128 300

BLDG 1 / RM B117 0 12 BLDG 1 / B105 150

BLDG 1 / RM B296 0 12 BLDG 1 / B105 175

BLDG 1 / RM 1116 0 6 BLDG 1 / B105 350

BLDG 1 / RM 1218A 4 0 BLDG 1 / 2218 100

BLDG 1 / RM 1243 0 4 BLDG 1 / 2218 150

BLDG 1 / RM 1243 0 12 BLDG 1 / B105 300

BLDG 1 / RM 2140 12 12 BLDG 1 / B105 300

BLDG 1 / RM 2218 12 12 BLDG 1 / B105 275

BLDG 1 / RM 2306 6 12 BLDG 1 / B105 400

BLDG 1 / RM 2306 6 12 BLDG 1 / B105 400

BLDG 1 / RM 3122 12 12 BLDG 1 / B105 300

BLDG 1 / RM 3216 0 12 BLDG 1 / B105 350

BLDG 1 / RM 3216 12 12 BLDG 1 / B105 350

BLDG 1 / RM 3216 12 0 BLDG 1 / B105 350

BLDG 1 / RM 3216 12 0 BLDG 1 / B105 350

BLDG 1 / RM 4122 12 12 BLDG 1 / B105 375

BLDG 1 / RM 4218 12 12 BLDG 1 / B105 425

BLDG 1 / RM 4218 0 12 BLDG 1 / 5222 100

BLDG 1 / RM 5122 12 12 BLDG 1 / B105 400

BLDG 1 / RM 5222 12 0 BLDG 1 / 4218 100

BLDG 1 / RM 5222 12 12 BLDG 1 / B105 400

BLDG 1 / RM 6122 12 12 BLDG 1 / B105 425

BLDG 1 / RM 6222B 0 6 BLDG 1 / B105 425

BLDG 2 / RM 001-2 0 12 BLDG 1 / B105 650

BLDG 4 / RM 002 0 6 BLDG 1 / B105 1100

BLDG 6 / RM 001 0 12 BLDG 1 / B105 600

BLDG 11 0 6 BLDG 1 / B105 350

Notes:

1. Verify cabling and/or termination point with VA COR and IT staff.

RSDC

TS-002

E

C

G

C

F

C C

NO P

ARKIN

G

NO PARKING

(E) (1)4"C

RESERVED FOR POWER

FROM CENTRAL UPS

(E) (1)4"C

PRIMARY FIBER

CABLE PATH

PROPOSED NEW

EXTERIOR TR

(E) 4"C

SECONDARY FIBER

CABLE PATH

(E) 4"C

PRIMARY FIBER

CABLE PATH

P P

P

P

P

P

P

P

P

P

P

S S

S

P

P

P

P P

P P P P P

S

S

S

S S

S

S

S S

P P

P P

P P

P P

P P P P P P P

S S

S S

S S

S S

S

S S S S S S

P P

P P

P P

P P

P P

P P

P P

P P

P P P P P P

S S

S S

S S

S S

S S

S S

S S

S S S S S S

(N) INNER DUCT THROUGH

EXISTING STEAM TUNNEL

(N) INNER DUCT THROUGH

EXISTING 4' CONDUIT / TUNNEL

S

(N) INNER DUCT FROM B105

TO MEET EXISTING CONDUIT

PATH OUTSIDE RM B117

(N) (1)2"C TO EXTEND FROM

EXISTING ENTRY JUNCTION

BOX TO NEW TR.

A A

R K

11P

11S

2P2S

11P

4S

6P6S

6P6S

4S

4S

CAR-P

CAR-P4P

CAR-P4P

MCR

RM 5281

P P

P P

FIBER HUB

RM B105

CAR-P4P

S

S

S

S

2P

2S

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM NEW FIBER OPTIC SITE

PLAN

SCALE:

TELECOMM NEW FIBER OPTIC

SITE PLAN

NORTH

1"=40'-0"

40'20' 80'

FIBER OPTIC CABLE - SYMBOL LEGEND

NEW PRIMARY INTRANET SERVICE FIBER OPTIC

FROM ROOM 5281 TO COMMUNICATION ROOMS

IN BLDGS 2,4,6,11. NEW DIVERSE FIBER OPTIC

CARRIER CABLE FROM SITE PERIMETER TO

BLDG 1 RM 5281.

NEW SECONDARY INTRANET SERVICE FIBER OPTIC

FROM ROOM 5281 TO COMMUNICATION ROOMS

IN BLDGS 2,4,6,11

P P

S S

GENERAL NOTES

1. REFER TO NEW CAMPUS FIBER LOOP SCHEDULES THIS PAGE

FOR MORE INFORMATION.

2. ALL FIBER CABLING ROUTED IN 3-CELL INNERDUCT.

3. THERE SHALL BE (3)3 INCH 3-CELL INNERDUCT PER 4"

CONDUIT (TOTAL OF 9 PATHWAYS PER 4" CONDUIT).

4. ALL CABLE LENGTHS LISTED ARE APPROXIMATE. SEE FIBER

SCHEDULES ON SHEET TJ-004 AND GENERAL NOTES ON THIS

SHEET. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO

VERIFY REQUIRED LENGTHS PRIOR TO PURCHASE OF

FACTORY TERMINATED CABLES. CONTRACTOR SHALL

PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16'

WITHIN EACH VAULT FOR SERVICE LOOPS AS WELL AS ANY

ADDITIONAL LENGTH AS NOTED IN TN-xxx DRAWINGS.

5. DEMOLITION OF ALL EXISTING CABLES TO BE PERFORMED

ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND

VA HAS CUT SYSTEMS OVER TO NEW INFRASTRUCTURE.

COORDINATE WITH VA COR AND A/E TEAM.

6. CONTRACTOR SHALL MAKE ALL NEW CONDUITS AND

MANHOLES WATER TIGHT.

7. CONTRACTOR SHALL MAKE ALL PENETRATIONS INTO EXISTING

MANHOLES AND TUNNELS WATER TIGHT. THIS IS TO INCLUDE

EXISTING CONDUIT PENETRATIONS.

8. EXISTING CONDUIT PATHWAYS AS DEPICTED ARE INTENDED

TO BE DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE FOR

VERIFYING PATHWAYS AND LOCATIONS OF ALL PULL BOXES

AND MANHOLES.

9. NEW CONDUIT PATHWAYS AS DEPICTED ARE INTENDED TO BE

DIAGRAMMATIC. THE PATHWAYS AS SHOWN INDICATE

CONNECTIONS BETWEEN BUILDINGS AND/OR STRUCTURES.

ACTUAL FIELD INSTALLATION SHALL AVOID ALL AREAS WITHIN

TREE DRIP LINES AND ANY DEVIATION FROM STRAIGHT

CONDUIT RUNS MUST UTILIZE ELBOWS WITH RADIUS AS

ALLOWED BY SPECIFICATIONS.

10. ALL NEW CONDUIT SHALL BE LABELED AT BOTH ENDS AND

NEAREST TO BUILDING ENTRANCE.

11. ALL NEW FIBER RUNS SHALL BE LABELED IN EACH MANHOLE.

12. ALL NEW CONDUIT DUCTBANK TO BE ENCASED IN 3000PSI

CONCRETE DYED ORANGE.

PLAN NOTES

PROVIDE NEW MANHOLE, TYPE 504-LA, WITH DRIVE OVER COVER.

PROVIDE NEW CONDUIT DUCTBANK. PROVIDE NEW CONDUIT SPACERS

AND NEW CONDUIT, CONCRETE ENCASE, BACKFILL, COMPACT, AND

RESTORE EXISTING SURFACE OF NEW TRENCH AS REQUIRED.

PROVIDE 4" SMART LB CONDUIT BODY #KBLB401 AS ENTRY FITTING.

PROVIDE QTY:3 MAXCELL EDGE DETECTABLE 3.00” 3-CELL FABRIC

INNERDUCT #MXED64283 OR APPROVED EQUAL WITHIN 4' CONDUIT FOR

A TOTAL OF 9 PULL PATHS.

PROVIDE 4" CONDUIT AS SHOWN FOR CARRIER FIBER OPTIC CABLE

PATH. PROVIDE QTY:3 MAXCELL EDGE DETECTABLE 3.00” 3-CELL FABRIC

INNERDUCT #MXED64283 OR APPROVED EQUAL FOR A TOTAL OF 9 PULL

PATHS. CARRIER CABLE TO TRANSIT, UNINTERRUPTED THROUGH BLDG

4 BASEMENT TO BLDG 1 VIA PRIMARY FO PATH TO TERMINATE IN MCR

5281.

RSDC

TS-003

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

FD

UP

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

HP Chiller

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

FD

UP

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

HP Chiller

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

ELECTRICAL DEMOLITION PLAN - BLDG

1 SUB BASEMENT

1/8"=1'-0"

4' 8' 16'

SCALE:

ELECTRICAL DEMOLITION PLAN - BLDG 1 SUB BASEMENT

NORTH

TRUE

NORTH

001-ED-SB1

RSDC

SCALE: N.T.S.

KEYPLAN

D1

DEMO PLAN NOTES

EXISTING 100KVA UPS TO BE REMOVED. DEMOLITION WORK TO START ONLY AFTER

NEW, N+1 REDUNDANT 100KVA UPS IS OPERATIONAL. COORDINATE WITH VA COR

AND A/E TEAM.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

D1

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO

FIELD VERIFY ALL CONDITIONS.

CHWP-1

CHWP-2

HP Chiller

HX'S 3&4

H X

's

P U

M P

FD

CHWP-1

CHWP-2

HP Chiller

HX'S 3&4

H X

's

P U

M P

TUNNEL ACCESS

TUNNEL ACCESS

4' CONDUIT TO

BLDG 6

TUNNEL ACCESS

TUNNEL ACCESS

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

HP Chiller

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

FD

UP

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

HP Chiller

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FIBER OPTIC DEMO PLAN -

BLDG 1 PARTIAL SUB BASEMENT

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FIBER OPTIC DEMO PLAN - BLDG 1 PARTIAL SUB BASEMENT

NORTH

TRUE

NORTH

001-TD-SB1

RSDC

T

N S

B

M A

T C

H

L I N

E

T

N S

B

M A

T C

H

L

I N

E

SCALE: N.T.S.

KEYPLAN

D1

D1 D1

D1

D1D1

D1

PLAN NOTES

D1

REMOVE EXISTING FIBER OPTIC CABLES AND INNERDUCT FROM

BUILDING BACK TO SOURCE TERMINATION POINT. SEE SCHEDULE

ON SHEET TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO

OTHERWISE BY OWNER.

3. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

4. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

FD

UP

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

(E) FO JUNCTION

BOX TO BLDG 11

STEAM TUNNEL TO BLDG 2,11

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

HP Chiller

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

FD

UP

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

Fire Pump System

ERV-4

W or k S in k

M at er ia l S to ra ge

LiquiTech System

C on de ns at io n

P it

CHWP-1

CHWP-2

Steam Piping

HP Chiller

Pump

Pump

Pump

Pump

HX'S 3&4

C H

W P

-2 A

H X

's

P U

M P

LIFT

STATION

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FIBER OPTIC DEMO PLAN -

BLDG 1 PARTIAL SUB BASEMENT

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FIBER OPTIC DEMO PLAN - BLDG 1 PARTIAL SUB BASEMENT

NORTH

TRUE

NORTH

001-TD-SB2

RSDC

T

N S

B

M A

T C

H

L I N

E

T

N S

B

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

SEE SHEET TS-002

FOR CONTINUATION

D1

D1

D1

D1

PLAN NOTES

D1

REMOVE EXISTING FIBER OPTIC CABLES AND INNERDUCT FROM

BUILDING BACK TO SOURCE TERMINATION POINT. SEE SCHEDULE

ON SHEET TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO

OTHERWISE BY OWNER.

3. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

4. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO

FIELD VERIFY ALL CONDITIONS.

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

UH-1

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL BASEMENT

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT

NORTH

001-TD-012

MATCH LINE

001-TD-012

MATCH LINE

SCALE: N.T.S.

KEYPLAN

NO CATEGORY CABLE WORK THIS AREA

RSDC

001-TD-0B1

REFERENCE ONLY

NO CATEGORY CABLE WORK THIS AREA

C

WAP C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

UH-1

(E)FIBER OPTIC

PANEL

(E)COMM CABINET

(E)FIBER OPTIC

PANEL

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL BASEMENT

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT

NORTH

001-TD-011

MATCH LINE

001-TD-011

MATCH LINE

T

D

M A

T C

H

L

I N

E

T

D

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

001-TD-0B2

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - B117

NORTH

TRUE

NORTH

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - B085

NORTH

TRUE

NORTH

D3

D2

001-TD-0B2

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D3

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE

DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO

OTHERWISE BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS

ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

D2

D3

RSDC

001-TD-0B2

D1

D1

D1

D1

D1

D1

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

UH-1

(E) PATCH PANEL(E)FIBER OPTIC

PANEL

(E) PATCH

PANELS

(E)COMM CABINET

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL BASEMENT

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT

NORTH

T

D

M A

T C

H

L

I N

E

T

D

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - B296

NORTH

001-TD-0B3

001-TD-0B3

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - B202

NORTH

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE

DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

D2

D3

D2

D2 D3

RSDC

001-TD-0B3

D2

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

SMOKING SHELTER

(20/1 EACH, 4#10,#10G,1"C.)

C1

L1A-82,84

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL FIRST FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIRST FLOOR

NORTH

001-TD-012

MATCH LINE

001-TD-012

MATCH LINE

SCALE: N.T.S.

KEYPLAN

NO CATEGORY CABLE WORK THIS AREA

RSDC

001-TD-011

REFERENCE ONLY

NO CATEGORY CABLE WORK THIS AREA

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

SMOKING SHELTER

(20/1 EACH, 4#10,#10G,1"C.)

C1

L1A-82,84

(E)COMM RACK,

CABLE MANAGERS

(E)PATCH PANELS(E)FIBER OPTIC

PANEL

(E)BONDING BUSBAR

WALL BEING

DEMOLISHED

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL FIRST FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIRST FLOOR

NORTH

001-TD-011

MATCH LINE

001-TD-011

MATCH LINE

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 1161

NORTH

001-TD-012

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1 D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE

DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK TO

SOURCE BONDING POINT.

SEE "OTHER SYSTEM" MIGRATION, SHEET 001-TN-012 DETAIL 3.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO

ASCERTAIN THE CONDITIONS AND LIMITS OF DEMOLITION AND

CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO

OTHERWISE BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES

WITH ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE

SERVED. EXACT LOCATION OF DROPS IN EACH AREA SHALL BE

CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN"

OR "BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET.

FOR PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING

TO EACH OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS

ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES

AND EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS

INSTALLED, TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER

TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED,

PROPERLY TESTED, AND CONNECTED FOR USE . COORDINATE WITH

VA COR AND A/E TEAM.

10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS

OBSTRUCTING WORK. COR AND CONTRACTOR TO DOCUMENT

CONDITION PRIOR TO MOVE AND FOLLOWING CONTRACTOR

REPLACEMENT OF ITEMS.

D2

D3

D4

D2

D3

D4

D2

RSDC

001-TD-012

D5

D5

D1

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

C1

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

SMOKING SHELTER

(20/1 EACH, 4#10,#10G,1"C.)

C1

L1A-82,84

(E)COMM

RACK

(E)COMM

RACK

(E)PATCH PANELS

(E)FIBER OPTIC

PANEL

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .