ATTACHMENT 9 - Drawings VOL 2 - 2 of 7.pdf
PDF 12 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
- Solicitation number
- 36C77622B0018
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks upgrades to the facilities electric and IT infrastructure at Iron Mountain to allow for a new Electronic Health Record Modernization system. The scope of work includes electrical upgrades, bonding, uninterruptible power supply systems, building management system interfaces, HVAC upgrades and expansions, communication infrastructure upgrades including new data outlets and Cat 6A cabling, physical security upgrades, and fiber infrastructure upgrades across campus. Offerors are to provide all labor, materials, equipment and supervision to complete the infrastructure improvements as specified. The response deadline and award date are not included in this attachment.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EP-021
EP-021
EP-021
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
BASEMENT ROOF
FIRST FLOOR ROOF
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 2140
1/4"=1'-0" 3 ENLARGED ROOM - 2218
1/4"=1'-0" 4 ENLARGED ROOM - 2306
1/4"=1'-0"
1 ELECTRICAL REMODEL PLAN - BLDG 1 SECOND FLOOR
1/16"=1'-0"
001-EP-021
ELECTRICAL REMODEL PLAN -
BLDG 1 SECOND FLOOR
DB LKA
GENERAL NOTES
EP-031
EP-031
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 3163
1/4"=1'-0" 3 ENLARGED ROOM - 3216
1/4"=1'-0"
1 ELECTRICAL REMODEL PLAN - BLDG 1 THIRD FLOOR
1/16"=1'-0"
001-EP-031
ELECTRICAL REMODEL PLAN -
BLDG 1 THIRD FLOOR
EP-041
EP-041
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 4122
1/4"=1'-0" 3 ENLARGED ROOM - 4246
1/4"=1'-0"
1 ELECTRICAL REMODEL PLAN - BLDG 1 FOURTH FLOOR
1/16"=1'-0"
001-EP-041
ELECTRICAL REMODEL PLAN -
BLDG 1 FOURTH FLOOR
EP-051
EP-051
4,5
EP-051
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 5122
1/4"=1'-0" 3 ENLARGED ROOM - 5222
1/4"=1'-0"
1 ELECTRICAL REMODEL PLAN - BLDG 1 FIFTH FLOOR
1/16"=1'-0"
001-EP-051
ELECTRICAL REMODEL PLAN -
BLDG 1 FIFTH FLOOR
DB LKA
GENERAL NOTES
4 ENLARGED ROOM - 5281 - POWER PLAN
1/4"=1'-0"
5 ENLARGED ROOM - 5281 - LIGHTING PLAN
1/4"=1'-0"
EP-061
EP-061
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 6122
1/4"=1'-0"
1 ELECTRICAL REMODEL PLAN - BLDG 1 SIXTH FLOOR
1/16"=1'-0"
3 ENLARGED ROOM - 6222A
1/4"=1'-0"
001-EP-061
ELECTRICAL REMODEL PLAN -
BLDG 1 SIXTH FLOOR
3RD FLOOR ROOF
2ND FLOOR ROOF
2ND FLOOR ROOF
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
4TH FLOOR ROOF
5TH FLOOR ROOF5TH FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
1 ELECTRICAL REMODEL PLAN - BLDG 1 SEVENTH FLOOR
1/8"=1'-0"
001-EP-071
ELECTRICAL REMODEL PLAN -
BLDG 1 SEVENTH FLOOR
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
1 ELECTRICAL REMODEL PLAN - BLDG 1 EIGHTH FLOOR (SHOWN FOR REFERENCE ONLY)
1/4"=1'-0"
001-EP-081
ELECTRICAL REMODEL PLAN -
BLDG 1 EIGHTH FLOOR
EP-0B1
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
1 BLDG 2 BASEMENT
1/8"=1'-0" 2 ELECTRICAL REMODEL PLAN - BLDG 2 FIRST FLOOR
1/8"=1'-0"
ELECTRICAL REMODEL PLAN -
002-EP-0B1
ELECTRICAL REMODEL PLAN -
BLDG 2
DB LKA
GENERAL NOTES
3 ENLARGED ROOM 001-3
1/4"=1'-0"
EQUIPMENT SCHEDULE - BUILDING 2
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
1 ELECTRICAL REMODEL PLAN - BLDG 4 BASEMENT
1/8"=1'-0" 2 ELECTRICAL REMODEL PLAN - BLDG 4 FIRST FLOOR
1/8"=1'-0" 3 ELECTRICAL REMODEL PLAN - BLDG 4 SECOND FLOOR
1/8"=1'-0"
004-EP-0B1
ELECTRICAL REMODEL PLAN -
BLDG 4
DB LKA
GENERAL NOTES
(SHOWN FOR REFERENCE ONLY)
4 ENLARGED ROOM - 001
1/4"=1'-0"
EQUIPMENT SCHEDULE - BUILDING 4
5 BUILDING 4 ONE-LINE DIAGRAM
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
1 ELECTRICAL REMODEL PLAN - BLDG 6 BASEMENT
1/8"=1'-0" 2 ELECTRICAL REMODEL PLAN - BLDG 6 FIRST FLOOR
1/8"=1'-0"
006-EP-0B1
ELECTRICAL REMODEL PLAN -
BLDG 6
DB LKA
3 ELECTRICAL REMODEL PLAN - BLDG 6 SECOND FLOOR
1/8"=1'-0"
GENERAL NOTES
4 ENLARGED ROOM - 107
1/4"=1'-0"
(SHOWN FOR REFERENCE ONLY)
(SHOWN FOR REFERENCE ONLY)
EQUIPMENT SCHEDULE - BUILDING 6
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
1 ELECTRICAL REMODEL PLAN - BLDG 11 GROUND FLOOR
1/4"=1'-0"
011-EP-0B1
ELECTRICAL REMODEL PLAN -
BLDG 11
GENERAL NOTESEQUIPMENT SCHEDULE - BUILDING 6
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
A, AMP AMPERE
ACP ACCESSIBLE CARD PATH
ADA AMERICAN DISABILITY ACT
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AG ABOVE GROUND
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AL ALUMINUM
BCT BONDING CONDUCTOR FOR TLECOMMUNICATIONS
BKR BREAKER
C CONDUIT
CKT CIRCUIT
CO CONDUIT AND PULL-ROPE ONLY
COMM COMMUNICATION
CTRL CONTROL
CU COPPER
(E) EXISTING
EC, E.C. ELECTRICAL CONTRACTOR
ELEC ELECTRICAL
EM EMERGENCY
EQPT EQUIPMENT
(F) FUTURE
FA FIRE ALARM
FDR FEEDER
G, GND GROUND
GC, G.C. GENERAL CONTRACTOR
HH HANDHOLE
J-BOX JUNCTION BOX
LCP LIGHTING CONTROL PANEL
LIU LINE INTERFACE UNIT
LTG LIGHTING
LTS LIGHTS
LV LOW-VOLTAGE
MH MANHOLE
MM MULTI-MODE
MPLS LOW VOLTAGE MOUNTING PLATE-1 GANG
MPLS2 LOW VOLTAGE MOUNTING PLATE-2 GANG
N NEUTRAL
(N) NEW
NEC NATIONAL ELECTRICAL CODE
OC ON-CENTER
OFCI OWNER-FURNISHED CONTRACTOR-INSTALLED
OFOI OWNER-FURNISHED OWNER-INSTALLED
OL OVERLOAD
P POLE
PB PULLBOX, PUSHBUTTON
PRI PRIMARY
(O) REVISED
REF REFERENCE, REFRIGERATOR
SEC SECONDARY
SM SINGLE-MODE
SOW SCOPE OF WORK
SPECS SPECIFICATIONS
SS STAINLESS STEEL
SW SWITCH
TEL TELEPHONE
TC TELECOMMUNICATION
TGB TELECOMMUNICATIONS BUS BAR
TMGB TELECOMMUNICATIONS MAIN GROUNDING BUS BAR
THRU THROUGH
TR TELECOMMUNICATIONS ROOM
(TYP) TYPICAL
UG UNDERGROUND
UNO UNLESS NOTED OTHERWISE
VLT VAULT
W WIRE, WATT
WP WEATHERPROOF
ABBREVIATION LIST
1. PROVIDE COMPLETE WORK FOR REQUIREMENTS AS DESCRIBED ON
LEGEND. REFER TO OTHER DISCIPLINE DRAWINGS FOR LOCATIONS
OF EQUIPMENT AND DEVICES REQUIRED TO BE SUPPLIED WITH
POWER.
2. INSTALLATION SHALL COMPLY WITH APPLICABLE CODES, INCLUDING,
BUT NOT LIMITED TO THE FOLLOWING: 2020 NATIONAL ELECTRICAL
CODE (NEC), VA STANDARDS AND REQUIREMENTS, LOCAL, STATE,
AND FEDERAL CODES AND ORDINANCES. AS WELL AS ALL BICSI
STANDARDS.
3. PRIOR TO PREPARATION OF BID, VISIT JOBSITE AND EXAMINE
EXISTING CONDITIONS. WORK SCOPE SHALL INCLUDE ALL COSTS FOR
CUTTING, PATCHING AND CORE DRILLING REQUIRED TO INSTALL
CONDUIT AND OTHER WIRING METHODS THROUGH EXISTING WALLS,
FLOORS AND OTHER BUILDING ELEMENTS (NOT SHOWN ON
DRAWINGS).
4. PROVIDE SEPARATE AS BUILT SITE DRAWINGS, SHOWING ALL
EXISTING UNDERGROUND UTILITIES, AND ALL NEW UNDERGROUND
UTILITIES.
5. PROVIDE TEMPORARY POWER FOR CONSTRUCTION. TEMPORARY
POWER MAY BE IN THE FORM OF PORTABLE GENERATOR SET;
CONNECTION TO UTILITY COMPANY'S POWER SYSTEM OR EXISTING
FACILITY'S ELECTRICAL SYSTEM UPON VA APPROVAL.
6. DO NOT TAKE MEASUREMENTS FROM PLANS FOR DEVICE LOCATIONS.
FIELD VERIFY EXACT DEVICE, EQUIPMENT LOCATIONS, AND
MOUNTING HEIGHTS WITH FIELD CONDITIONS FOR PROPER
INSTALLATION.
7. SCHEMATIC DIAGRAMS AND RACEWAY ROUTING ARE SCHEMATIC
AND DO NOT SHOW EXACT PHYSICAL ARRANGEMENT OF EQUIPMENT.
WHERE INDICATED ON DRAWINGS, JUNCTION BOXES AND PULLBOXES
ARE MINIMUM REQUIREMENTS. PROVIDE FITTINGS AND PULLBOXES
OF ADEQUATE SIZE IN RACEWAY SYSTEMS WHEREVER NECESSARY
OR REQUIRED BY THE NEC OR LOCAL CODES. PROVIDE EXPANSION
JOINT FITTINGS FOR RACEWAY PASSING THROUGH NEW OR EXISTING
EXPANSION JOINTS INSTALLED BETWEEN BUILDINGS. VERIFY EXACT
LOCATIONS AND DETAILS OF EXPANSION JOINTS PRIOR TO WORK.
COORDINATE ALL RACEWAY ROUTING, PULLBOXES, AND EQUIPMENT
LOCATIONS WITH OTHER TRADES TO AVOID CONFLICTS OF
EQUIPMENT INSTALLATIONS.
8. RACEWAYS, CABLE SIZES AND ROUTES AS SHOWN REPRESENT
INTENT OF INSTALLATION, BUT MAY NOT NECESSARILY REPRESENT
THE COMPLETE WIRING COUNTS AND MINIMUM SIZES FOR
CONNECTING THE CIRCUITS SHOWN. CONTRACTOR SHALL INCLUDE
IN THE BID, ALL REQUIRED RACEWAY SIZES AND NUMBER OF CABLES
IN ORDER TO PROVIDE ALL CABLES AS SHOWN.
9. REFER TO SCHEDULES FOR CABLING REQUIREMENTS NOT INDICATED
ON PLANS.
10. CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL OBSOLETE,
ABANDONED, DEAD-ENDED, AND CUTOFF CATEGORY CABLES, IN
THEIR ENTIRETY, LOCATED DURING ALL PHASES OF WORK
PERFORMED.
11. INSTALLATION OF UNDERGROUND CABLING SYSTEMS SHALL INCLUDE
EXCAVATION, CUTTING, PATCHING, BACKFILL, AND COMPACTION. DO
NOT CUT OR DAMAGE ANY EXISTING UTILITIES, STRUCTURAL
MEMBERS, OR BUILDING FOUNDATIONS. VERIFY EXISTING
CONDITIONS PRIOR TO EXCAVATION WORK. INCLUDE COST FOR
UNDERGROUND LOCATOR SERVICE TO IDENTIFY LOCATIONS OF
EXISTING COMPONENTS. HAND EXCAVATE IN LOCATIONS WHERE
EXISTING UNDERGROUND COMPONENTS ARE SUBJECT TO DAMAGE.
REPAIR DAMAGE TO EXISTING UTILITIES OR BUILDING STRUCTURE TO
OWNER'S SATISFACTION AT THE CONTRACTORS EXPENSE.
12. PROVIDE MINIMUM PULL-ROPES IN ALL EMPTY CONDUITS.
13. CONDUIT OR OTHER ELECTRICAL COMPONENTS SHALL NOT BE
INSTALLED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY
INDICATED ON THE DRAWINGS OR APPROVED BY A STRUCTURAL
ENGINEER. ALL CORE DRILLING FOR RACEWAY INSTALLATION, SHALL
BE THE RESPONSIBILITY OF THE E.C.
14. COORDINATE PAINTING WORK OF ELECTRICAL ITEMS WITH GENERAL
CONTRACTOR. SEE PAINTING SPECIFICATIONS FOR REQUIREMENTS.
15. CONTRACTOR TO PROVIDE ADDITIONAL CABLE LENGTH, ADDED TO
FIELD MEASURED LENGTH, OF COPPER AND FIBER OPTIC CABLE
FOR ONE 10' SERVICE LOOP AT EACH END WITHIN EACH
TELECOMMUNICATIONS SPACE. IN ADDITION TO THE SERVICE LOOPS,
CONTRACTOR SHALL ALSO SUPPLY ADDITIONAL LENGTH FOR SITE
BACKBONE CABLING AS NOTED IN CABLING SCHEDULES SHOWN ON
TELECOM SHEETS FOR FUTURE RELOCATION OF CABLING TO NEW
BUILDING LOCATION AND SERVICE LOOP IN EACH VAULT OF AT LEAST
16'.
16. ALL NEW INTERIOR AND EXTERIOR EXPOSED CONDUIT, BOXES AND
SUPPORTS TO BE PAINTED TO MATCH EXISTING SURFACE.
GENERAL NOTES
PRIMARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE
SECONDARY FIBER TAG. SEE NEW CAMPUS FIBER SCHEDULE
(N)TMH-#X
xxxP
NEW MANHOLE
xxxS
(E)TMH-#X EXISTING MANHOLE
SYMBOL
SYMBOL LEGEND - TELECOMM
DESCRIPTION
P
S SECONDARY FIBER LOOP
PRIMARY FIBER LOOP
FIBER ROUTING, SUPPORTED WITH J-HOOKS
FIBER ROUTING IN CONDUIT
J
C
TELECOMMUNICATIONS OUTLET, SUBNUMBER=QUANTITY OF DROPS
FUSED DISCONNECT SWITCH
EQUIPMENT CALLOUT.
EQUIPMENT CONNECTION, SEE EQUIPMENT CONNECTION
SCHEDULES FOR SPECIFIC REQUIREMENTS.
F
HOME RUN
AHU-01
SPECIAL PURPOSE RECEPTACLE
4 PLEX RECEPTACLE
AXX
RK-XXX RACK/CABINET NAME
PORT NUMBER
PATCH PANEL LABEL
C C C
CJ CJ
CAT 6A ROUTING IN CONDUIT
CAT 6A ROUTING, SUPPORTED WITH NEW J-HOOKS
MOTOR RATED SWITCHMR
TELECOMM LEGEND, SCHEDULES,
ABBREVIATIONS, GENERAL NOTES
C
WAP
TELECOMMUNICATIONS OUTLET, WIRELESS ACCESS POINT
TG-001
RSDC
ACCESS CONTROL KEY PAD / CARD READER
WALL MOUNTED FIRE ALARM HORN-STROBE DEVICE
PLAN LEGEND
FIBER ROUTING IN INNERDUCT, SUPPORTED WITH NEW J-HOOKS
SYMBOL
FIBER ROUTING IN INNERDUCT WITHIN NEW CONDUIT
DESCRIPTION
J
CAT 6A ROUTING, SUPPORTED WITH NEW J-HOOKS
CJ
PRIMARY FIBER ROUTING IN INNERDUCT, SUPPORTED WITH NEW
J-HOOKS FROM ROOM 5281 TO TRs
P
SECONDARY FIBER ROUTING IN INNERDUCT, SUPPORTED WITH
NEW J-HOOKS FROM ROOM B105 TO TRs
S
CAT 6A ROUTING IN CONDUIT
C
2-POST RACK
ACCESS CONTROL MORTISE POWER SUPPLY
A B
D
E
C
G
C
F
C C
NO P
ARKIN
G
NO PARKING
1. ALL MANHOLES SHOWN ARE EXISTING
GENERAL NOTES
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM EXISTING SITE PLAN
SCALE:
TELECOMM EXISTING SITE PLAN
NORTH
1"=40'-0"
40'20' 80'
RSDC
TS-001
E
C
G
C
F
C C
NO P
ARKIN
G
NO PARKING
WAN ROOM
B105
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMO FIBER OPTIC SITE
PLAN
SCALE:
TELECOMM DEMO FIBER OPTIC
SITE PLAN
NORTH
1"=40'-0"
40'20' 80'
1. EVERYTHING SHOWN IS EXISTING TO REMAIN, UNLESS NOTED
OTHERWISE.
2. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES TO BE
PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
3. SEE DEMOLITION SCHEDULE THIS PAGE FOR DETAILS.
4. ALL MANHOLES SHOWN ARE EXISTING.
GENERAL NOTES
DEMO PLAN NOTES
EXISTING CONDUIT TO REMAIN. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE, THIS SHEET, FOR FIBER TYPE, STRAND COUNT,
AND TERMINATION POINT.
REMOVE EXISTING CONDUIT, REMOVE EXISTING FIBER OPTIC
CABLES ROUTING THROUGH TUNNEL FROM BUILDING BACK TO
SOURCE TERMINATION POINT. SEE SCHEDULE, THIS SHEET, FOR
FIBER TYPE, STRAND COUNT, AND TERMINATION POINT.
EXISTING FIBER COUNTS FOR DEMOLITION
BLDG / ROOM
FIBER
(E)TERMINATION
POINT
APPROXIMATE
DISTANCE (FT)
(E)SINGLE-MODE (E)MULTI-MODE
BLDG 1 / RM RM B085 0 6 BLDG 1 / B105 350
BLDG 1 / RM RM B085 0 6 BLDG 1 / B105 350
BLDG 1 / RM B091 0 12 BLDG 1 / B105 450
BLDG 1 / RM B091 0 12 BLDG 1 / 5128 300
BLDG 1 / RM B117 0 12 BLDG 1 / B105 150
BLDG 1 / RM B296 0 12 BLDG 1 / B105 175
BLDG 1 / RM 1116 0 6 BLDG 1 / B105 350
BLDG 1 / RM 1218A 4 0 BLDG 1 / 2218 100
BLDG 1 / RM 1243 0 4 BLDG 1 / 2218 150
BLDG 1 / RM 1243 0 12 BLDG 1 / B105 300
BLDG 1 / RM 2140 12 12 BLDG 1 / B105 300
BLDG 1 / RM 2218 12 12 BLDG 1 / B105 275
BLDG 1 / RM 2306 6 12 BLDG 1 / B105 400
BLDG 1 / RM 2306 6 12 BLDG 1 / B105 400
BLDG 1 / RM 3122 12 12 BLDG 1 / B105 300
BLDG 1 / RM 3216 0 12 BLDG 1 / B105 350
BLDG 1 / RM 3216 12 12 BLDG 1 / B105 350
BLDG 1 / RM 3216 12 0 BLDG 1 / B105 350
BLDG 1 / RM 3216 12 0 BLDG 1 / B105 350
BLDG 1 / RM 4122 12 12 BLDG 1 / B105 375
BLDG 1 / RM 4218 12 12 BLDG 1 / B105 425
BLDG 1 / RM 4218 0 12 BLDG 1 / 5222 100
BLDG 1 / RM 5122 12 12 BLDG 1 / B105 400
BLDG 1 / RM 5222 12 0 BLDG 1 / 4218 100
BLDG 1 / RM 5222 12 12 BLDG 1 / B105 400
BLDG 1 / RM 6122 12 12 BLDG 1 / B105 425
BLDG 1 / RM 6222B 0 6 BLDG 1 / B105 425
BLDG 2 / RM 001-2 0 12 BLDG 1 / B105 650
BLDG 4 / RM 002 0 6 BLDG 1 / B105 1100
BLDG 6 / RM 001 0 12 BLDG 1 / B105 600
BLDG 11 0 6 BLDG 1 / B105 350
Notes:
1. Verify cabling and/or termination point with VA COR and IT staff.
RSDC
TS-002
E
C
G
C
F
C C
NO P
ARKIN
G
NO PARKING
(E) (1)4"C
RESERVED FOR POWER
FROM CENTRAL UPS
(E) (1)4"C
PRIMARY FIBER
CABLE PATH
PROPOSED NEW
EXTERIOR TR
(E) 4"C
SECONDARY FIBER
CABLE PATH
(E) 4"C
PRIMARY FIBER
CABLE PATH
P P
P
P
P
P
P
P
P
P
P
S S
S
P
P
P
P P
P P P P P
S
S
S
S S
S
S
S S
P P
P P
P P
P P
P P P P P P P
S S
S S
S S
S S
S
S S S S S S
P P
P P
P P
P P
P P
P P
P P
P P
P P P P P P
S S
S S
S S
S S
S S
S S
S S
S S S S S S
(N) INNER DUCT THROUGH
EXISTING STEAM TUNNEL
(N) INNER DUCT THROUGH
EXISTING 4' CONDUIT / TUNNEL
S
(N) INNER DUCT FROM B105
TO MEET EXISTING CONDUIT
PATH OUTSIDE RM B117
(N) (1)2"C TO EXTEND FROM
EXISTING ENTRY JUNCTION
BOX TO NEW TR.
A A
R K
11P
11S
2P2S
11P
4S
6P6S
6P6S
4S
4S
CAR-P
CAR-P4P
CAR-P4P
MCR
RM 5281
P P
P P
FIBER HUB
RM B105
CAR-P4P
S
S
S
S
2P
2S
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM NEW FIBER OPTIC SITE
PLAN
SCALE:
TELECOMM NEW FIBER OPTIC
SITE PLAN
NORTH
1"=40'-0"
40'20' 80'
FIBER OPTIC CABLE - SYMBOL LEGEND
NEW PRIMARY INTRANET SERVICE FIBER OPTIC
FROM ROOM 5281 TO COMMUNICATION ROOMS
IN BLDGS 2,4,6,11. NEW DIVERSE FIBER OPTIC
CARRIER CABLE FROM SITE PERIMETER TO
BLDG 1 RM 5281.
NEW SECONDARY INTRANET SERVICE FIBER OPTIC
FROM ROOM 5281 TO COMMUNICATION ROOMS
IN BLDGS 2,4,6,11
P P
S S
GENERAL NOTES
1. REFER TO NEW CAMPUS FIBER LOOP SCHEDULES THIS PAGE
FOR MORE INFORMATION.
2. ALL FIBER CABLING ROUTED IN 3-CELL INNERDUCT.
3. THERE SHALL BE (3)3 INCH 3-CELL INNERDUCT PER 4"
CONDUIT (TOTAL OF 9 PATHWAYS PER 4" CONDUIT).
4. ALL CABLE LENGTHS LISTED ARE APPROXIMATE. SEE FIBER
SCHEDULES ON SHEET TJ-004 AND GENERAL NOTES ON THIS
SHEET. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO
VERIFY REQUIRED LENGTHS PRIOR TO PURCHASE OF
FACTORY TERMINATED CABLES. CONTRACTOR SHALL
PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16'
WITHIN EACH VAULT FOR SERVICE LOOPS AS WELL AS ANY
ADDITIONAL LENGTH AS NOTED IN TN-xxx DRAWINGS.
5. DEMOLITION OF ALL EXISTING CABLES TO BE PERFORMED
ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND
VA HAS CUT SYSTEMS OVER TO NEW INFRASTRUCTURE.
COORDINATE WITH VA COR AND A/E TEAM.
6. CONTRACTOR SHALL MAKE ALL NEW CONDUITS AND
MANHOLES WATER TIGHT.
7. CONTRACTOR SHALL MAKE ALL PENETRATIONS INTO EXISTING
MANHOLES AND TUNNELS WATER TIGHT. THIS IS TO INCLUDE
EXISTING CONDUIT PENETRATIONS.
8. EXISTING CONDUIT PATHWAYS AS DEPICTED ARE INTENDED
TO BE DIAGRAMMATIC. CONTRACTOR IS RESPONSIBLE FOR
VERIFYING PATHWAYS AND LOCATIONS OF ALL PULL BOXES
AND MANHOLES.
9. NEW CONDUIT PATHWAYS AS DEPICTED ARE INTENDED TO BE
DIAGRAMMATIC. THE PATHWAYS AS SHOWN INDICATE
CONNECTIONS BETWEEN BUILDINGS AND/OR STRUCTURES.
ACTUAL FIELD INSTALLATION SHALL AVOID ALL AREAS WITHIN
TREE DRIP LINES AND ANY DEVIATION FROM STRAIGHT
CONDUIT RUNS MUST UTILIZE ELBOWS WITH RADIUS AS
ALLOWED BY SPECIFICATIONS.
10. ALL NEW CONDUIT SHALL BE LABELED AT BOTH ENDS AND
NEAREST TO BUILDING ENTRANCE.
11. ALL NEW FIBER RUNS SHALL BE LABELED IN EACH MANHOLE.
12. ALL NEW CONDUIT DUCTBANK TO BE ENCASED IN 3000PSI
CONCRETE DYED ORANGE.
PLAN NOTES
PROVIDE NEW MANHOLE, TYPE 504-LA, WITH DRIVE OVER COVER.
PROVIDE NEW CONDUIT DUCTBANK. PROVIDE NEW CONDUIT SPACERS
AND NEW CONDUIT, CONCRETE ENCASE, BACKFILL, COMPACT, AND
RESTORE EXISTING SURFACE OF NEW TRENCH AS REQUIRED.
PROVIDE 4" SMART LB CONDUIT BODY #KBLB401 AS ENTRY FITTING.
PROVIDE QTY:3 MAXCELL EDGE DETECTABLE 3.00” 3-CELL FABRIC
INNERDUCT #MXED64283 OR APPROVED EQUAL WITHIN 4' CONDUIT FOR
A TOTAL OF 9 PULL PATHS.
PROVIDE 4" CONDUIT AS SHOWN FOR CARRIER FIBER OPTIC CABLE
PATH. PROVIDE QTY:3 MAXCELL EDGE DETECTABLE 3.00” 3-CELL FABRIC
INNERDUCT #MXED64283 OR APPROVED EQUAL FOR A TOTAL OF 9 PULL
PATHS. CARRIER CABLE TO TRANSIT, UNINTERRUPTED THROUGH BLDG
4 BASEMENT TO BLDG 1 VIA PRIMARY FO PATH TO TERMINATE IN MCR
5281.
RSDC
TS-003
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
FD
UP
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
FD
UP
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
ELECTRICAL DEMOLITION PLAN - BLDG
1 SUB BASEMENT
1/8"=1'-0"
4' 8' 16'
SCALE:
ELECTRICAL DEMOLITION PLAN - BLDG 1 SUB BASEMENT
NORTH
TRUE
NORTH
001-ED-SB1
RSDC
SCALE: N.T.S.
KEYPLAN
D1
DEMO PLAN NOTES
EXISTING 100KVA UPS TO BE REMOVED. DEMOLITION WORK TO START ONLY AFTER
NEW, N+1 REDUNDANT 100KVA UPS IS OPERATIONAL. COORDINATE WITH VA COR
AND A/E TEAM.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
D1
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
CHWP-1
CHWP-2
HP Chiller
HX'S 3&4
H X
's
P U
M P
FD
CHWP-1
CHWP-2
HP Chiller
HX'S 3&4
H X
's
P U
M P
TUNNEL ACCESS
TUNNEL ACCESS
4' CONDUIT TO
BLDG 6
TUNNEL ACCESS
TUNNEL ACCESS
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
FD
UP
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM FIBER OPTIC DEMO PLAN -
BLDG 1 PARTIAL SUB BASEMENT
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM FIBER OPTIC DEMO PLAN - BLDG 1 PARTIAL SUB BASEMENT
NORTH
TRUE
NORTH
001-TD-SB1
RSDC
T
N S
B
M A
T C
H
L I N
E
T
N S
B
M A
T C
H
L
I N
E
SCALE: N.T.S.
KEYPLAN
D1
D1 D1
D1
D1D1
D1
PLAN NOTES
D1
REMOVE EXISTING FIBER OPTIC CABLES AND INNERDUCT FROM
BUILDING BACK TO SOURCE TERMINATION POINT. SEE SCHEDULE
ON SHEET TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO
OTHERWISE BY OWNER.
3. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
4. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
FD
UP
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
(E) FO JUNCTION
BOX TO BLDG 11
STEAM TUNNEL TO BLDG 2,11
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
FD
UP
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM FIBER OPTIC DEMO PLAN -
BLDG 1 PARTIAL SUB BASEMENT
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM FIBER OPTIC DEMO PLAN - BLDG 1 PARTIAL SUB BASEMENT
NORTH
TRUE
NORTH
001-TD-SB2
RSDC
T
N S
B
M A
T C
H
L I N
E
T
N S
B
M A
T C
H
L I N
E
SCALE: N.T.S.
KEYPLAN
SEE SHEET TS-002
FOR CONTINUATION
D1
D1
D1
D1
PLAN NOTES
D1
REMOVE EXISTING FIBER OPTIC CABLES AND INNERDUCT FROM
BUILDING BACK TO SOURCE TERMINATION POINT. SEE SCHEDULE
ON SHEET TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO
OTHERWISE BY OWNER.
3. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
4. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
UH-1
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL BASEMENT
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT
NORTH
001-TD-012
MATCH LINE
001-TD-012
MATCH LINE
SCALE: N.T.S.
KEYPLAN
NO CATEGORY CABLE WORK THIS AREA
RSDC
001-TD-0B1
REFERENCE ONLY
NO CATEGORY CABLE WORK THIS AREA
C
WAP C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
UH-1
(E)FIBER OPTIC
PANEL
(E)COMM CABINET
(E)FIBER OPTIC
PANEL
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL BASEMENT
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT
NORTH
001-TD-011
MATCH LINE
001-TD-011
MATCH LINE
T
D
M A
T C
H
L
I N
E
T
D
M A
T C
H
L I N
E
SCALE: N.T.S.
KEYPLAN
001-TD-0B2
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - B117
NORTH
TRUE
NORTH
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - B085
NORTH
TRUE
NORTH
D3
D2
001-TD-0B2
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D3
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE
DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO
OTHERWISE BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS
ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
D2
D3
RSDC
001-TD-0B2
D1
D1
D1
D1
D1
D1
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
UH-1
(E) PATCH PANEL(E)FIBER OPTIC
PANEL
(E) PATCH
PANELS
(E)COMM CABINET
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL BASEMENT
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT
NORTH
T
D
M A
T C
H
L
I N
E
T
D
M A
T C
H
L I N
E
SCALE: N.T.S.
KEYPLAN
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - B296
NORTH
001-TD-0B3
001-TD-0B3
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - B202
NORTH
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE
DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
D2
D3
D2
D2 D3
RSDC
001-TD-0B3
D2
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
SMOKING SHELTER
(20/1 EACH, 4#10,#10G,1"C.)
C1
L1A-82,84
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL FIRST FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIRST FLOOR
NORTH
001-TD-012
MATCH LINE
001-TD-012
MATCH LINE
SCALE: N.T.S.
KEYPLAN
NO CATEGORY CABLE WORK THIS AREA
RSDC
001-TD-011
REFERENCE ONLY
NO CATEGORY CABLE WORK THIS AREA
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
SMOKING SHELTER
(20/1 EACH, 4#10,#10G,1"C.)
C1
L1A-82,84
(E)COMM RACK,
CABLE MANAGERS
(E)PATCH PANELS(E)FIBER OPTIC
PANEL
(E)BONDING BUSBAR
WALL BEING
DEMOLISHED
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL FIRST FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIRST FLOOR
NORTH
001-TD-011
MATCH LINE
001-TD-011
MATCH LINE
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L I N
E
SCALE: N.T.S.
KEYPLAN
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 1161
NORTH
001-TD-012
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE
DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK TO
SOURCE BONDING POINT.
SEE "OTHER SYSTEM" MIGRATION, SHEET 001-TN-012 DETAIL 3.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO
ASCERTAIN THE CONDITIONS AND LIMITS OF DEMOLITION AND
CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO
OTHERWISE BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES
WITH ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE
SERVED. EXACT LOCATION OF DROPS IN EACH AREA SHALL BE
CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN"
OR "BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET.
FOR PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING
TO EACH OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS
ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES
AND EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS
INSTALLED, TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER
TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED,
PROPERLY TESTED, AND CONNECTED FOR USE . COORDINATE WITH
VA COR AND A/E TEAM.
10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS
OBSTRUCTING WORK. COR AND CONTRACTOR TO DOCUMENT
CONDITION PRIOR TO MOVE AND FOLLOWING CONTRACTOR
REPLACEMENT OF ITEMS.
D2
D3
D4
D2
D3
D4
D2
RSDC
001-TD-012
D5
D5
D1
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
C1
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
SMOKING SHELTER
(20/1 EACH, 4#10,#10G,1"C.)
C1
L1A-82,84
(E)COMM
RACK
(E)COMM
RACK
(E)PATCH PANELS
(E)FIBER OPTIC
PANEL
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODER…