ATTACHMENT 12 - Drawings VOL 2 - 5 of 7.pdf

PDF 15 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
Solicitation number
36C77622B0018
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal solicitation to upgrade infrastructure at the Iron Mountain VA Medical Center in Michigan. The solicitation seeks offers for electrical, IT, HVAC, communications, security, and fiber optic infrastructure upgrades to support a new Electronic Health Record Modernization system. Specifically, upgrades are needed for electrical systems, bonding and grounding, uninterruptible power supplies, building management system interfaces, HVAC configuration and expansion of closets and communication spaces, additional data outlets and fiber backbone improvements campus wide. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. Offerors should respond by the date listed on the solicitation for consideration.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain, newest first.
File Type Posted
36C77622B0018 0003.pdf PDF
09 69 00 Access Flooring-Addenda 2.pdf PDF
Technical Questions - FINAL - Iron Mtn. 6-27-22.pdf PDF
EHRM Asbestos Report.pdf PDF
Addendum 1.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 6-17-22.pdf PDF
36C77622B0018 0002.pdf PDF
Site Visit Sign-in Sheet - Iron Mtn. 5-18-22.pdf PDF
36C77622B0018 0001.pdf PDF
ATTACHMENT 2 - Specifications VOL 2 of 2.pdf PDF
ATTACHMENT 3 - Drawings VOL 1 - 1 of 5.pdf PDF
ATTACHMENT 15 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 19 - Site Visit Instructions.pdf PDF
ATTACHMENT 1 - Specifications VOL 1 of 2.pdf PDF
ATTACHMENT 13 - Drawings VOL 2 - 6 of 7.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 2-25-22.pdf PDF
ATTACHMENT 8 - Drawings VOL 2 - 1 of 7.pdf PDF
ATTACHMENT 9 - Drawings VOL 2 - 2 of 7.pdf PDF
ATTACHMENT 14 - Drawings VOL 2 - 7 of 7.pdf PDF
36C77622B0018 - 5-5-22.pdf PDF
ATTACHMENT 4 - Drawings VOL 1 - 2 of 5.pdf PDF
ATTACHMENT 5 - Drawings VOL 1 - 3 of 5.pdf PDF
ATTACHMENT 6 - Drawings VOL 1 - 4 of 5.pdf PDF
ATTACHMENT 7 - Drawings VOL 1 - 5 of 5.pdf PDF
ATTACHMENT 10 - Drawings VOL 2 - 3 of 7.pdf PDF
ATTACHMENT 11 - Drawings VOL 2 - 4 of 7.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 18 - Contractor Safety - Environmental Form.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM BONDING DETAILS

SECONDARY BONDING BUSBAR (SBB)

OVERHEAD LADDER TRAY

BACK TO BUILDING PRIMARY BONDING BUSBAR (PBB) AT MAIN COMPUTER ROOM.

IT/DATA CONDUITS

CONTINUOUS BONDING CABLE

CONTINUOUS

BONDING CABLE

CONTINUOUS

BONDING CABLE

OVERHEAD LADDER TRAY

TYPICAL BONDING

BUSHING

TYPICAL BONDING LUG

TYPICAL BONDING LUG

TYPICAL BONDING BUS

CONTINUOUS

BONDING CABLE

CONTINUOUS BONDING CABLE

NOTES:

1. SEE DRAWING SHEETS TJ-008 THROUGH TJ-010 FOR WIRE SIZES AND ADDITIONAL INFORMATION.

TYPICAL TELECOMMUNICATIONS EQUIPMENT BONDING DETAIL

TO SBB IN TR'S TYPICAL

TELECOM BONDING BACKBONE (TBB)

BACK TO BUILDING PRIMARY BONDING BUSBAR (PBB) AT MAIN ELECTRICAL ROOM.

SECONDARY BONDING BUSBAR (SBB)

BONDING TO CABLE TRAYS (TYP.)

BONDING TO METALLIC

RACEWAY CONDUITS FOR

COMM CABLES (TYP.)

BONDING TO EACH CHANNEL RACK (TYP.)

CONTINUOUS BONDING TO

ALL CHANNEL RACK (TYP.)

MAIN COMPUTER ROOM (MCR)

BONDING TO CABLE TRAYS (TYP.)

BONDING TO METALLIC RACEWAY CONDUITS

FOR COMM CABLES (TYP.)

BONDING TO EACH CHANNEL RACK (TYP.)

CONTINUOUS BONDING CABLE TO ALL CABINET /

RACK BONDING BARS (TYP.)

SECONDARY BONDING BUSBAR (SBB)

TR

(TBB)

GENERAL NOTES:

ALL BONDING CONDUCTORS TO BE INSULATED.

ABBREVIATIONS:

-MBB MAIN BONDING BUS

-PBB PRIMARY BONDING BUSBAR

-TBB TELECOM BOUNDING BACK BONE

-SBB SECONDARY BONDING BUSBAR

-RBB RACK BONDING BUSBAR

-TEBC TELECOMM EQUIPMENT BONDING CONDUCTOR

-TYP TYPICAL

1.

2.

NOTES:

1. SEE DRAWING SHEET TJ-008 THROUGH TJ-010 FOR WIRE SIZES AND ADDITIONAL INFORMATION.

2. STATIC DISSIPATIVE FLOOR TILE IN IT SPACES: CONNECT COPPER GROUND-CONNECTION STRIPS

TO GROUNDING BUSBAR. SOLDER A WIRE (#12 OR #14) TO THE COPPER STRIP AND CONNECT THIS

WIRE TO A GROUND BUS IN ACCORDANCE WITH APPLICABLE BUILDING OR ELECTRICAL CODES.

REFER TO MANUFACTURER SPECIFICATIONS.

TELECOMMUNICATIONS BONDING DETAIL

BONDING BUSBAR ASSEMBLY

PBB

4"H x 20"W x .025"D COPPER BONDING BAR WITH

WALL MOUNTING BRACKETS AND INSULATORS

CPI#40153-020

SBB

4"H x 12"W x .025"D COPPER BONDING BAR WITH

WALL MOUNTING BRACKETS AND INSULATORS

CPI#40153-012

INTERCONNECT SBB

4"H x 20"W x .025"D COPPER BONDING BAR WITH

WALL MOUNTING BRACKETS AND INSULATORS

CPI#40153-020

RBB

3/4"H x19"W x 3/16"D

CPI #10610-019

PROVIDE PLASTIC BUSHING AND

CLAMP TO TRAY

PROVIDE CPC-UPC STYLE PIPE

CLAMP SIZES AS REQUIRED.

PROVIDE #10 BONDING CONDUCTOR TO CABLE TRAY.

PROVIDE HYDRAULIC COMPRESSION TWO HOLE LUG AND

CARRIAGE TYPE BOLT WITH HEAD INSIDE TRAY.

PROVIDE TELECOM CONDUIT TO

OUTLET. SEE DETAIL 2/E1.2

1.

GENERAL:

ONLY HORIZONTAL RUN CONDUIT SHOWN FOR CLARITY. CONDUIT MAY ENTER FROM ABOVE OR VARIOUS

ANGLES NOT SHOWN. CONTRACTOR TO FIELD COORDINATE ENTRY LOCATIONS AND REQUIREMENTS WITH

BUILDING CONDITIONS.

PROVIDE NEW CABLE TRAY

WHERE SHOWN ON

DRAWINGS.

COMPRESSION FITTING

#6 AWG TO BONDING BAR

(SBB)

BONDING JUMPER

BETWEEN SECTIONS #6

AWG (TYP)

PROVIDE CUSTOM FABRICATED

SPLICE PLATES BETWEEN NEW AND

EXISTING FOR SMOOTH TRANSITION.

CABLE TRAY BONDING DETAIL

CABLE TRAY TO CONDUIT BONDING DETAIL

RSDC

TJ-001

NOTES:

1. ALL CONNECTIONS SHALL USE 2-HOLE LUGS WITH THE EXCEPTION OF THE RBB.

RACK BONDING BUSBAR (RBB)

LOCATE IN TRs AND DATA LOCATIONS.

SEE FLOOR PLANS FOR LOCATIONS.

TYPICAL BONDING STUD

TELECOMM EQUIPMENT

BONDING CONDUCTOR (TEBC)

STATIC DISSIPATIVE FLOOR TILE

STATIC DISSIPATIVE FLOOR TILE

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DETAILS

1.

GENERAL:

FIELD VERIFY AND COORDINATE INSTALLATION WITH OTHER

TRADES FOR ROUTING AND INSTALLATION HEIGHT.

CABLES CAN BE RUN FREE IN WALLS.

CONTRACTOR IS RESPONSIBLE FOR VERIFYING CLEAR AND

VIABLE VERTICAL CABLE PATH PRIOR TO CUTTING IN MPLS.

CONTRACTOR SHALL ENSURE TRUE LEVEL OF MPLS.

PROVIDE CABLES, FACEPLATES, AND JACKS PER SPEC.

COMMUNICATION OUTLET WITH

JACKS. LOCATIONS AND CABLE

QUANTITIES SHOWN ON PLANS.

LOCATE COMMUNICATION OUTLET WITHIN

2"-24" FROM AC POWER OUTLET. FIELD

COORDINATE PRIOR TO ROUGH-IN. ADJUST

LOCATION AS NECESSARY AT NO ADDITIONAL

COST.

B117-1 / A03 - A04

IDENTIFICATION FORMAT (TYPICAL)

TELECOMMUNICATIONS OUTLET LABEL

COMMUNICATIONS AND AC OUTLET DETAIL

TELECOMMUNICATIONS OUTLET ROUGH-IN DETAIL

CADDY MLPS

RN

LOW VOLTAGE

CLASS 2 ONLY

2.

3.

4.

CABLE TO BE RUN FREE IN WALLS.

LOW VOLTAGE SINGLE GANG MOUNTING

PLATE, CADDY MPLS

PROVIDE STAINLESS STEEL FACEPLATE, ORTRONICS #OR-403STJ14

(4-PORT) . PROVIDE ADAPTER BEZEL, ORTRONICS #OR-HDJTJA20 FOR USE

WITH HIGH DENSITY JACKS. PROVIDE BLANK COVER, ORTRONICS #

OR-HDJB20 ON UNPOPULATED PORTS.

CONTRACTOR TO VERIFY VIABLE PATH

PRIOR TO CUTTING WALLBOARD.

1. OR-403STJ14 TRACJACK FACEPLATE, STAINLESS STEEL,

HOLDS 4 TRACJACK MODULES. REQUIRES BEZEL

ADAPTER #OR-HDJTJA20 FOR USE WITH HIGH DENSITY

JACKS.

2. NUMBER OF DATA AND MEDIA JACKS MAY VARY. ALL

UNPOPULATED POSITIONS WILL HAVE BLANK COVER

#OR-HDJB20

POSITION BLANK

#OR-HDJB20

BEZEL ADAPTER

#OR-HDJTJA20

COMMUNICATIONS FACEPLATE DETAIL

GENERAL:

LABEL WINDOW

(TYPICAL ACCESSIBLE CEILING)

TELECOMM AP CABLE TERMINATION

1. PROVIDE CAT6A FIELD TERM 8 POSITION MODULAR

PLUGS # FTPUC6A OR APPROVED EQUAL FOR USE WITH

WIRELESS ACCESS POINTS, CAMERAS, AND OTHER

DEVICES ABOVE ACCESSIBLE CEILINGS.

2. PROVIDE A 10' SERVICE LOOP AT EACH LOCATION TO

FACILITATE MINOR RELOCATION OF ACCESS POINTS.

SERVICE LOOP SHALL BE CONTROLLED BY HOOK AND

LOOP STRAPS.

3. CABLE SHALL BE TESTED USING CURRENT TIA CAT6A

MPTL (+PoE) STANDARD.

4. CABLE SHALL BE LABELED AS PER TYPICAL OUTLET

DETAIL THIS SHEET.

GENERAL:

B117-1-A38

HORIZONTAL CABLE LABEL TYPICAL

PROVIDE A MACHINE PRINTED

LABEL WITH 1/8" FONT HEIGHT,

BLACK TEXT, WHITE

BACKGROUND. LABEL SHALL

BE INSTALLED WITHIN 6" OF

TERMINATION POINTS ON

EACH END OF CABLE. EXAMPLE

SHOWS CABLE IN TR B117,

RACK 1, PANEL A, PORT 38.

TYPICAL PATCH PANEL LABELING FORMAT

5.

CADDY # MPLS

RSDC

TJ-002

TELECOMM ROOM PDU SCHEDULE

AL2400C - COVER

1 9/32"

2"

2 1/4" D

4 5/8" L

3 1/16" W

AL2044 - DEEP DEVICE BOX

AL2400B - BASE

TELECOMMUNICATIONS SURFACE MOUNTED RACEWAY DETAIL

1.

GENERAL:

BASE AND COVER TO BE 6063-T5 EXTRUDED ALUMINUM, .060"

NOMINAL THICKNESS.

PROVIDE WIREMOLD ALUMINUM SURFACE RACEWAY OR

APPROVED EQUAL. PROVIDE WIREMOLD ALUMINUM DEEP

DEVICE BOX OR APPROVED EQUAL. PROVIDE ALL

NECESSARY WIREMOLD COUPLERS, MOUNTING CLIPS,

JUNCTION COVERS, END CAPS, AND MOUNTING HARDWARE.

FIELD VERIFY AND COORDINATE INSTALLATION WITH OTHER

TRADES AND REMAINING SURFACE MOUNTED RACEWAYS

FOR ROUTING, LOCATIONS, AND INSTALLATION HEIGHT.

CABLES TO BE ROUTED TO RACEWAY BY CEILING PATH.

CONTRACTOR SHALL ENSURE TRUE LEVEL OF RACEWAY AND

BOXES.

PROVIDE CABLES, FACEPLATES, AND JACKS PER SPEC.

2.

3.

4.

5.

6.

TOP FRONT

BOTTOM FRONT

B117-1

TOP REAR

BOTTOM REAR

CABINET AND RACK LABELING DETAIL

TELECOMMUNICATIONS ROOM

GENERAL:

1. EACH CABINET AND RACK SHALL BE LABELED ON THE

FRONT AND REAR IN PLAIN VIEW THE ROOM NUMBER

AND RACK NUMBER FOR TRs. EXAMPLE SHOWS TR

B117 RACK 1.

2. LABEL SHALL BE ATTACHED ON A PERMANENT PART

OF THE CABINET, RACK, AND PATCH PANELS.

3. TEXT ON LABELS SHALL BE A FONT WITHOUT SERIFS,

UPPER CASE, AND LARGE ENOUGH TO BE EASILY

READ WHILE STANDING NEAR THE CABINET OR RACK.

TEXT SHALL BE MACHINE PRINTED AND SHALL

CONTRAST WITH THE BACKGROUND UPON WHICH

THEY ARE AFFIXED.

B117-1

B117-1

B117-1

PATCH PANEL

AND PORT

TR AND RACK

NUMBER

B117-1 / A01 - A02UPPER LABEL

LOWER LABEL

1. LABEL LOCATION WITHOUT NOMENCLATURE SHALL BE

FILLED WITH BLANK LABEL STRIP.

GENERAL:

A A 1 2 23 24

47 4825 26

GENERAL:

1. PATCH PANELS SHALL BE LABELED ON BOTH RACK

EARS WITH ALPHA CHARACTERS AS NOTED ON

COPPER INSTALLATION SCHEDULES, SHEET TJ-011.

2. TEXT ON PANEL AND PORT LABELS SHALL BE A FONT

WITHOUT SERIFS, UPPER CASE. TEXT SHALL BE

MACHINE PRINTED AND SHALL CONTRAST WITH THE

BACKGROUND UPON WHICH THEY ARE AFFIXED.

3. RACK EAR ALPHA LABEL FONT SHALL BE BOLD, AND

AS LARGE AS POSSIBLE WITHIN THE AVAILABLE

SPACE.

TRACJACK STAINLESS SINGLE

GANG FACEPLATE #OR-403STJ14

TELECOMM RM PDUs

Building

Room PDU M/N PDU QTY BRACKET M/N BKT QTY ZONE PDU M/N Z-PDU QTY ENVIRON.SENSOR SENSOR QTY

1 B091 EA-3013-E 4 10559-500 8 -----

14665-001 1

1 B117 EA-3013-E 4 10559-500 4 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 1

1 B296A EA-3013-E 2 39221-E03 2 ----- ----- 14665-001 1

1 1161 EA-3013-E 4 39221-E03 4 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 2

1 1216 EA-3013-E 2 39221-E03 2 ----- ----- 14665-001 1

1 2140 EA-3013-E 4 39221-E03 4 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 1

1 2218 EA-3013-E 4 39221-E03 4 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 1

1 2306 EA-3013-E 4 39221-E03 2 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 1

1 3163 EA-3013-E 2 39221-E03 2 ----- ----- 14665-001 1

1 3216 EA-3013-E 4 39221-E03 4 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 2

1 4122 EA-3013-E 2 39221-E03 2 ----- ----- 14665-001 1

1 4246 EA-3013-E 2 39221-E03 2 ----- ----- 14665-001 1

1 5122 EA-3013-E 4 39221-E03 4 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 2

1 5222 EA-3013-E 4 39221-E03 4 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 2

1 5281

EA-3013-E 32 39221-E03 32 ZPDS-208V30A-L21-4L21-20R-CR 2 14665-001 16

----- ----- ----- ----- ZPDS-208V60A-HW-6L21-20R 4 ----- -----

1 6120B EA-3013-E 2 39221-E03 2 ----- ----- 14665-001 1

1 6222B EA-3013-E 4 39221-E03 4 ZPDS-208V30A-L21-4L21-20R-CR 1 14665-001 2

2 001-2 EA-3013-E 2 39221-E03 2 ----- ----- 14665-001 1

4 001-2 EA-3087-E 2 39221-E03 2 ----- ----- 14665-001 1

6 TBD EA-3087-E 2 39221-E03 2 ----- ----- 14665-001 1

11 2001 EA-3013-E 2 39221-E03 2 ----- ----- 14665-001 1

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DETAILS

UNIVERSAL PATCH PANEL TERMINATION DETAIL

PROVIDE ORTRONICS HDJ SERIES 48

PORT UNLOADED ANGLED PANEL

#OR-PHAHJU48 OR APPROVED EQUAL

AS PER DETAIL.

HIGH DENSITYJACK INSTALLATION

JACK

CABLE MANAGEMENT INSTRUCTIONS (TOP VIEW-SHOWN FLAT FOR SPACE)

HOOK LOOP TIES WIRE

MANAGEMENT BAR

BEND

RADIUS*

PROVIDE ORTRONICS HIGH DENSITY

JACK #OR-HDJ6A FOR WALL PLATES AND

UNLOADED, HIGH DENSITY PATCH

PANELS OR APPROVED EQUAL

SEE ORTRONICS INSTRUCTIONS FOR

PROPER TERMINATION TECHNIQUES.

REQUIRES CRIMPING / TERMINATION

TOOL #OR-HDJHC.

CABINETS AND CHANNEL RACKS

PDU BRACKET MOUNTING-

2-POST RACKS

PDU BRACKET MOUNTING-

1.

GENERAL:

DRAWING SHOWS TYPICAL MOUNTING METHOD ON REAR OF

RACK.

BRACKETS SHALL BE MOUNTED ON BOTH SIDES OF RACKS

FOR EACH A AND B ELECTRICAL BUSES.

NUMBER OF PDUs VARY BY ROOM. SEE PDU SCHEDULE ON

SHEET TJ-002 FOR MODEL, BRACKET TYPE, AND QUANTITIES.

2.

3.

1.

GENERAL:

DRAWING SHOWS TYPICAL MOUNTING METHOD IN REAR OF

CABINETS AND CHANNEL RACK.

BRACKETS SHALL BE MOUNTED ON BOTH SIDES OF RACKS

FOR EACH A AND B ELECTRICAL BUSES.

NUMBER OF PDUs VARY BY ROOM. SEE PDU SCHEDULE ON

SHEET TJ-002 FOR MODEL, BRACKET TYPE, AND QUANTITIES.

2.

3.

UTP CABLE SCHEDULE

SYMBOL DESCRIPTION

FOUR PAIR UTP CATEGORY 6A CABLE FOR DATA. PART# SUPERIOR ESSEX

'PW6H-H72-2B' OR APPROVED EQUAL. QUANTITY PER DEVICE AS NOTED ON

FLOOR PLANS AND CABLE SCHEDULES.

REMARKS

1,2

NOTES:

1. UTP CABLE TO BE ROUTED IN FREE IN WALLS FROM OUTLETS TO J-HOOKS IN ACCESSIBLE

CEILING SPACE .

2. ALL TELECOMMUNICATION CABLES SHALL BE TERMINATED IN TR ON PATCH PANELS.

PATCH PANEL DETAILS - TYPICAL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

GENERAL:

SEE FLOOR PLANS FOR LOCATIONS OF TELECOMMUNICATION

OUTLETS. PROVIDE QUANTITY OF CAT 6A DROPS PER OUTLET

AS INDICATED INSIDE TELECOM SYMBOL ON FLOOR PLANS.

ALL CABLING WILL PUNCH DOWN ON PATCH PANELS IN THE

TELECOMM RACK/CABINET AND THEN WILL BE PATCHED FOR

DATA WITH PATCH CORDS. SEE THIS SHEET AND

SPECIFICATION FOR ADDITIONAL OUTLET REQUIREMENTS.

PROVIDE RACK MOUNTED CAT 6A MODULAR TO 110 UTP

48-PORT PATCH PANEL AND TERMINATE ALL UTP CABLES.

SEE THIS SHEET FOR DETAILS.

1.

2.

CABLE J-HOOK DETAILS - TYPICAL

GENERAL:

PROVIDE CADDY CAT HP J-HOOK SYSTEM #CATXXHP OR

APPROVED EQUAL WHERE XX IS APPROPRIATE HOOK SIZE

FOR QUANTITY OF CABLE COUNT.

NUMBER OF CABLES SHALL NOT EXCEED MFG

RECOMMENDATIONS FOR HOOK CAPACITY.

INSTALL HOOKS INDIVIDUALLY OR IN TREES TO PROPERLY

SUPPORT CABLES.

PROVIDE ALL NECESSARY ALL-THREAD ROD, BRACKETS,

CLAMPS, COUPLES, CONNECTOR AND HARDWARE TO

PROPERLY INSTALL J-HOOK SYSTEM BASED ON CONDITIONS.

J-HOOKS SHALL BE NO FURTHER THAN 5' APART,

OR SHORTER AS CONDITIONS DICTATE.

CABLE GRAVITY DROOP SHALL NOT EXCEED 12"

1.

2.

3.

4.

5.

6.

TRAY AND FIBER CHANNEL

MAIN COMPUTER ROOM BASKET

GENERAL:

PROVIDE CABLOFIL BASKET TRAY AND COVERED PANDUIT

FIBERRUNNER CHANNEL.

PROVIDE ALL NECESSARY BRACKETS, FASTENERS, SPLICES,

THREADED ROD, SUSPENSION HARDWARE, CONNECTORS,

FASTENERS, AND ANCHORS REQUIRED FOR PROPER

INSTALLATION OF A 2 STEEL THREADED ROD TRAPEZE.

BASE OF BASKET TRAY TO BE INSTALLED 6" ABOVE TOP OF

CABINETS. FIBER CHANNEL TO BE INSTALLED 4" ABOVE TOP

OF BASKET TRAY SIDE RAIL.

SEE SHEET 001-TN-053 FOR DETAILS AND PART NUMBERS

1.

2.

3.

4.

FIBER OPTIC ENTRY CHANNEL

MAIN COMPUTER ROOM

GENERAL:

PROVIDE COVERED PANDUIT FIBERRUNNER CHANNEL

PROVIDE ALL NECESSARY BRACKETS, FASTENERS, SPLICES,

THREADED ROD, SUSPENSION HARDWARE, CONNECTORS,

FASTENERS, AND ANCHORS REQUIRED FOR PROPER

INSTALLATION OF A 2 STEEL THREADED ROD TRAPEZE.

FIBER CHANNEL TO BE INSTALLED AT THE SAME HEIGHT AS

FIBER CHANNEL MOUNTED WITH BASKET TRAY.

SEE SHEET 001-TN-053 FOR DETAILS AND PART NUMBERS

1.

2.

3.

4.

FOR ALL IT SPACES

EMT WATERFALLS AND BUSHINGS

GENERAL:

ALL CONDUITS AND SLEEVES SHALL BE DEBURRED.

PROVIDE PANDUIT TAK-TY CONDUIT WATERFALL #CWF400 OR

APPROVED EQUAL ON BOTH ENDS ALL 4" EMT SLEEVES AND

CONDUITS ENTERING IT SPACES AND PASSING THROUGH

FIRE RATED WALLS.

PROVIDE PUSH-ON BUSHINGS FOR ALL OTHER SIZE SLEEVES

AND CONDUITS NOT CONNECTED TO A BOX FITTING.

APPLY FIRESTOP TO BOTH ENDS OF SLEEVES AND CONDUITS

AS PER CODE AND AHJ. APPLY MANUFACTURER FIRE RATED

ASSEMBLY STICKER TO BOTH SIDES OF ALL PENETRATIONS.

1.

2.

3.

4.

TELECOMM DETAILS

RSDC

TJ-003

TELECOMM FIBER OPTICS ONE-LINE

TELECOMM FIBER OPTICS ONE-LINE

24-STRAND INDOOR/OUTDOOR PLENUM RATED OS2

SINGLEMODE LOOSE TUBE FIBER OPTIC CABLE WITH

FIELD TERMINATED MPO CONNECTORS

24-STRAND RISER RATED OM4 MULTIMODE LOOSE TUBE

FIBER OPTIC CABLE WITH FIELD TERMINATED MPO

CONNECTORS

PART NUMBER

SUPERIOR ESSEX

SUPERIOR ESSEX

F462-024U13-E991

F462-024U32-E991

NOTE: LISTED MANUFACTURER IS BASIS OF DESIGN. ALTERNATE MANUFACTURERS ARE ALLOWED ON AN

APPROVED EQUAL BASIS.

TELECOMM. RM 2215

TELECOMM. RM 2140

TELECOMM. RM 1216

TELECOMM. RM 1161

TELECOMM. RM B296

TELECOMM. RM B117

TELECOMM. RM B091

BLDG 1

MCR 5128

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM. RM 2218

TELECOMM. RM 6122

TELECOMM. RM 5222

TELECOMM. RM 5122

TELECOMM. RM 4246

TELECOMM. RM 4122

TELECOMM. RM 3216

TELECOMM. RM 3163

TELECOMM. RM 6222B

TELECOMM. RM 2306

BLDG 2

TELECOMM. RM 001A-2

BLDG 4

TELECOMM. RM 001

BLDG 6

TELECOMM. RM TBD

BLDG 11

TELECOMM. RM 2001

PLAN NOTES

PROVIDE LEGRAND INFINIUM HD ENCLOSURE #INFC01U-M4 WITH

(2) M4LCQ24-50EA3A2 LC-MPO CASSETTES. OR APPROVED EQUAL.

PROVIDE LEGRAND INFINIUM HD ENCLOSURE #INFC04U-M4 WITH

(16) M4LCQ24-50EA3A2 LC-MPO CASSETTES. OR APPROVED

EQUAL.

PROVIDE LEGRAND INFINIUM HD ENCLOSURE #INFC02U-M4 WITH

(4) M4LCQ24-09A1A2 LC-MPO CASSETTES. OR APPROVED EQUAL.

PROVIDE LEGRAND INFINIUM HD ENCLOSURE #INFC02U-M4 WITH

(4) M4LCQ24-50EA3A2 LC-MPO CASSETTES. OR APPROVED EQUAL.

PROVIDE LEGRAND INFINIUM HD ENCLOSURE #INFC01U-M4 WITH

(2) M4LCQ24-09A1A2 LC-MPO CASSETTES. OR APPROVED EQUAL.

PROVIDE LEGRAND INFINIUM HD ENCLOSURE #INFC04U-M4 WITH

(4) M4LCQ24-50EA3A2 LC-MPO CASSETTES. OR APPROVED EQUAL.

1. SEE SITE AND FLOOR PLANS FOR ADDITIONAL INFORMATION

AND REQUIREMENTS.

2. ALL FIBER OPTIC CABLES RAN IN BLDG 1 FROM MCR 5281 AND

ENTRANCE RM B105 TO ALL TR TO BE FACTORY TERMINATED

WITH MPO CONNECTORS. ALL BUILDING TO BUILDING FIBER

OPTIC CABLES ARE TO BE FIELD TERMINATED WITH MPO

CONNECTORS. ALL LENGTHS SHOWN ON THIS SHEET ARE

APPROXIMATE. IT IS THE CONTRACTOR'S SOLE

RESPONSIBILITY TO VERIFY REQUIRED LENGTHS PRIOR TO

PURCHASE OF FACTORY TERMINATED CABLES. CONTRACTOR

SHALL PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND

16' WITHIN EACH VAULT FOR SERVICE LOOPS.

3. SEE FLOOR PLANS FOR SUGGESTED LOCATION OF FIBER

CABINET. COORDINATE ALTERNATE MOUNTING LOCATIONS

WITH COR AND A/E TEAM.

GENERAL NOTES

RSDC

TJ-004

ENTRANCE RM B105

MCRSMCRP

FIBER OPTIC CABLE SCHEDULE

MANUFACTURERDESCRIPTIONSYMBOL

NEW BUILDING 1 FIBER - MULTI-MODE - PRIMARY

CABLE

TAG

FIBER MAIN TERMINATION

POINT

FAR END

TERMINATION POINT

APPROXIMATE

DISTANCE (FT)MULTI-MODE - OM4

B091P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM B091 650

B117P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM B117 325

B296AP 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM B296A 375

1161P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 1161 350

1216P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 1216 325

2140P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 2140 325

2115AP 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 2215A 325

2218P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 2218 325

2306P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 2306 400

3163P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 3163 325

3216P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 3216 265

4122P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 4122 290

4246P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 4246 350

5122P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 5122 180

5222P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 5222 175

6122P 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 6122 290

6222BP 24-STRAND BLDG 1 / RM 5281 BLDG 1 / RM 6222B 310

MCRP 48-STRAND BLDG 1 / RM 5281 BLDG 1 / RM B105 375

Notes:

1. LENGTHS ARE APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED LENGTHS

PRIOR TO PURCHASE OF FACTORY TERMINATED CABLES.

NEW BUILDING 1 FIBER - MULTI-MODE - SECONDARY

CABLE

TAG

FIBER MAIN TERMINATION

POINT

FAR END

TERMINATION POINT

APPROXIMATE

DISTANCE (FT)MIULTI-MODE - OM4

B091S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM B091 548

B117S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM B117 258

B296AS 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM B296A 248

1161S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 1161 313

1216S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 1216 198

2140S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 2140 343

2115AS 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 2215A 208

2218S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 2218 223

2306S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 2306 318

3163S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 3163 383

3216S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 3216 208

4122S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 4122 368

4246S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 4246 338

5122S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 5122 403

5222S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 5222 308

6122S 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 6122 443

6222BS 24-STRAND BLDG 1 / RM B105 BLDG 1 / RM 6222B 368

MCRS 48-STRAND BLDG 1 / RM B105 BLDG 1 / RM 5281 400

Notes:

1. LENGTHS ARE APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED LENGTHS

PRIOR TO PURCHASE OF FACTORY TERMINATED CABLES.

NEW CAMPUS FIBER - PRIMARY LOOP

CABLE

TAG

FIBER MAIN TERMINATION

POINT

FAR END

TERMINATION POINT

APPROXIMATE

DISTANCE(FT)SINGLE-MODE - OS2

2P 24-STRAND BLDG 1 / RM 5281 BLDG 2 / RM 001-2 965

4P 24-STRAND BLDG 1 / RM 5281 BLDG 4 / RM #TBD 1105

6P 24-STRAND BLDG 1 / RM 5281 BLDG 6 / RM #TBD 855

11P 24-STRAND BLDG 1 / RM 5281 BLDG 11 / RM #TBD 750

CAR-P 24-STRAND BLDG 1 / RM 5281 CARRIER VAULT NW 1300

Notes:

1. LENGTHS ARE APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED LENGTHS

PRIOR TO PURCHASE OF FACTORY TERMINATED CABLES.

NEW CAMPUS FIBER - SECONDARY LOOP

CABLE

TAG

FIBER MAIN TERMINATION

POINT

FAR END

TERMINATION POINT

APPROXIMATE

DISTANCE(FT)SINGLE-MODE - OS2

2S 24-STRAND BLDG 1 / RM B105 BLDG 2 / RM 001-2 900

4S 24-STRAND BLDG 1 / RM B105 BLDG 4 / RM #TBD 1100

6S 24-STRAND BLDG 1 / RM B105 BLDG 6 / RM #TBD 700

11S 24-STRAND BLDG 1 / RM B105 BLDG 11 / RM #TBD 450

Notes:

1. LENGTHS ARE APPROXIMATE. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO VERIFY REQUIRED LENGTHS

PRIOR TO PURCHASE OF FACTORY TERMINATED CABLES.

48 PORT PATCH PANEL

110 PUNCH BLOCKS

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

24 PORT PATCH PANEL

SWITCH

SWITCH

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

SWITCH

SWITCH

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

VIDEO DEVICE

VIDEO DEVICE

SWITCH

SWITCH

SWITCH

SWITCH

PDU

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

SWITCH

SWITCH

48 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

48 PORT PATCH PANEL

VOIP MEDIA GATEWAY

SWITCH

VOIP MEDIA GATEWAY

SWITCH

VOIP MEDIA GATEWAY

SWITCH

24 PORT PATCH PANEL

48 PORT PATCH PANEL

SWITCH

MANAGER

PDU

48 PORT PATCH PANEL

FIBER OPTIC PANEL

VOIP MEDIA GATEWAY

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

BONDING BAR

PDU

LANTRONICS DEVICE

SWITCH

MANAGER

SWITCH

SWITCH

24 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

SWITCH

SWITCH

RACK 1

SWITCH

SWITCH

SWITCH

24 PORT PATCH PANEL

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

VOIP MEDIA GATEWAY

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

RACK 1 RACK 2

VOIP MEDIA GATEWAY

SWITCH

SWITCH

SWITCH

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

48 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

MANAGER

SWITCH

PDU

PDU

GE HEALTHCARE SVR

48 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

SWITCH

VOIP MEDIA GATEWAY

VOIP MEDIA GATEWAY

SWITCH

SWITCH

WALL RACK

24 PORT PATCH PANEL

24 PORT PATCH PANEL

24 PORT PATCH PANEL

FLR CABINET

48 PORT PATCH PANEL

FIBER OPTIC PANEL

24 PORT PATCH PANEL

SWITCH

SWITCH

SWITCH

CABINET 1

FIBER OPTIC PANEL

SWITCH

MANAGER

24 PORT PATCH PANEL

24 PORT PATCH PANEL

EXTERNAL BATT. CAB.

UPS

SWITCH

SWITCH

SWITCH

48 PORT PATCH PANEL

MANAGER

48 PORT PATCH PANEL

MANAGER

24 PORT PATCH PANEL

MANAGER

SCALE:

TJ-005

NTS

BLDG 1 RM B085 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM B296 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 1161 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 1218A RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 1243 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 3122 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 3216 FRONT RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 4122 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 4218 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 5222 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 6122 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM 6222B RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 2 RM 001-2 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 4 RM 002 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 6 RM 107 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 11 RACK ELEVATION

SCALE:

TJ-005

NTS

BLDG 1 RM BACK 3216 RACK ELEVATION

PLAN NOTES

NOT USED.

1. RACK ELEVATIONS CREATED FROM AS-BUILT DRAWINGS AND

SITE SURVEY. TO BE USED FOR REFERENCE ONLY.

GENERAL NOTES

TO BE USED FOR

REFERENCE ONLY.

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM EXISTING RACK

ELEVATIONS

RSDC

TJ-005

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM EXISTING PATCH PANEL

SCHEDULES

RSDC

TJ-006

EXISTING CATEGORY CABLES FOR DEMOLITION - SHELF MOUNT CABINET

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

24-PORT PP - RM B202 1-6 1 (NOTE 1) 6

24-PORT PP - RM B202 7-11 1 B201 5

24-PORT PP - RM B202 12-16 1 B101 5

24-PORT PP - RM B202 17-18 1 (NOTE 1) 2

24-PORT PP - RM B202 19-24 1

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - WALL MOUNT

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

48-PORT PP - RM 1161 1-35 1

48-PORT PP - RM 1161 36 1 (NOTE 1) 1

48-PORT PP - RM 1161 37-38 1

48-PORT PP - RM 1161 39-41 1 (NOTE 1) 3

48-PORT PP - RM 1161 42-43 1

48-PORT PP - RM 1161 44 1 (NOTE 1) 1

48-PORT PP - RM 1161 45-48 1

48-PORT PP - RM 1161 49-50 1 (NOTE 1) 2

24-PORT PP - RM 1161 51-72 1

48-PORT PP - RM 1161 73-76 1 (NOTE 1) 4

48-PORT PP - RM 1161 77 1 PIP SPARE 1

48-PORT PP - RM 1161 78 1 (NOTE 1) 1

48-PORT PP - RM 1161 79 1 PIP FEED 1

48-PORT PP - RM 1161 80 1 (NOTE 1) 1

48-PORT PP - RM 1161 81-90 1

48-PORT PP - RM 1161 91 1 (NOTE 1) 1

48-PORT PP - RM 1161 20-48 1

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - RACK 1

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

48-PORT PP - RM 1161 1-6 1 (NOTE 1) 6

48-PORT PP - RM 1161 7-15 1 1003 9

48-PORT PP - RM 1161 16-18 1 1028 3

48-PORT PP - RM 1161 19-21 1 (NOTE 1) 3

48-PORT PP - RM 1161 22-24 1 1024 3

48-PORT PP - RM 1161 25-30 1 (NOTE 1) 6

48-PORT PP - RM 1161 31-35 1 1010 5

48-PORT PP - RM 1161 36 1 1182 1

48-PORT PP - RM 1161 37-39 1 1008 3

48-PORT PP - RM 1161 40-42 1 (NOTE 1) 3

48-PORT PP - RM 1161 43-45 1 1006 3

48-PORT PP - RM 1161 46-48 1 1002 3

48-PORT PP - RM 1161 49-54 1 1003 6

48-PORT PP - RM 1161 55-57 1 (NOTE 1) 3

48-PORT PP - RM 1161 58-60 1 1055 3

48-PORT PP - RM 1161 61-63 1 1051 3

48-PORT PP - RM 1161 64-66 1 (NOTE 1) 3

48-PORT PP - RM 1161 67-69 1 1052 3

48-PORT PP - RM 1161 70-75 1 1050 6

48-PORT PP - RM 1161 76-78 1 (NOTE 1) 3

48-PORT PP - RM 1161 79-81 1 1044 3

48-PORT PP - RM 1161 82-84 1 1042 3

48-PORT PP - RM 1161 85-87 1 (NOTE 1) 3

48-PORT PP - RM 1161 88-90 1 1040 3

48-PORT PP - RM 1161 91-93 1 (NOTE 1) 3

48-PORT PP - RM 1161 94-96 1 1038 3

48-PORT PP - RM 1161 97-99 1 (NOTE 1) 3

48-PORT PP - RM 1161 100-102 1 1036 3

48-PORT PP - RM 1161 103-105 1 (NOTE 1) 3

48-PORT PP - RM 1161 106-114 1 1147A 9

48-PORT PP - RM 1161 115-116 1 (NOTE 1) 2

48-PORT PP - RM 1161 117 1 1147 1

48-PORT PP - RM 1161 118-123 1 1148 6

48-PORT PP - RM 1161 124-126 1 1144 3

48-PORT PP - RM 1161 127-141 1 (NOTE 1) 15

48-PORT PP - RM 1161 142-147 1 1164 6

48-PORT PP - RM 1161 148-150 1 1166 3

48-PORT PP - RM 1161 151-153 1 (NOTE 1) 3

48-PORT PP - RM 1161 154-156 1 1170 3

48-PORT PP - RM 1161 157-161 1 1177 5

48-PORT PP - RM 1161 162 1 WIRELESS 1

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - RACK 1

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

48-PORT PP - RM 1161 163-165 1 1177 3

48-PORT PP - RM 1161 166-168 1 (NOTE 1) 3

48-PORT PP - RM 1161 169-171 1 1175 3

48-PORT PP - RM 1161 172-174 1 1171 3

48-PORT PP - RM 1161 175-177 1 1165A 3

48-PORT PP - RM 1161 178-180 1 1165 3

48-PORT PP - RM 1161 181-189 1 1163 9

48-PORT PP - RM 1161 190-192 1 1109A 3

48-PORT PP - RM 1161 193-195 1 1111A 3

48-PORT PP - RM 1161 196-198 1 1109A 3

48-PORT PP - RM 1161 199-201 1 (NOTE 1) 3

48-PORT PP - RM 1161 202-207 1 1117 6

48-PORT PP - RM 1161 208-210 1 (NOTE 1) 3

48-PORT PP - RM 1161 211-213 1 1127 3

48-PORT PP - RM 1161 214-215 1 1131 2

48-PORT PP - RM 1161 216 1 (NOTE 1) 1

48-PORT PP - RM 1161 217-222 1 1133 6

48-PORT PP - RM 1161 223-225 1 1135 3

48-PORT PP - RM 1161 226-228 1 1137 3

48-PORT PP - RM 1161 229-231 1 1136 3

48-PORT PP - RM 1161 232-234 1 1132 3

48-PORT PP - RM 1161 235-237 1 1128 3

48-PORT PP - RM 1161 238-241 1 (NOTE 1) 4

48-PORT PP - RM 1161 242 1 1147 1

48-PORT PP - RM 1161 243-252 1 (NOTE 1) 10

48-PORT PP - RM 1161 253 1 1233 1

48-PORT PP - RM 1161 254-255 1 (NOTE 1) 2

48-PORT PP - RM 1161 256 1 CORR 1

48-PORT PP - RM 1161 257 1 (NOTE 1) 1

48-PORT PP - RM 1161 258 1 CORR 1

48-PORT PP - RM 1161 259-264 1 (NOTE 1) 6

48-PORT PP - RM 1161 265-288 1

48-PORT PP - RM 1161 289-292 1 (NOTE 1) 4

48-PORT PP - RM 1161 293-296 1 1056 4

48-PORT PP - RM 1161 297-299 1 (NOTE 1) 3

48-PORT PP - RM 1161 300-336 1

48-PORT PP - RM 1161 337-339 1 1104 3

48-PORT PP - RM 1161 340-342 1 1103 3

48-PORT PP - RM 1161 343-344 1 2

48-PORT PP - RM 1161 345-350 1 1201 6

48-PORT PP - RM 1161 351-353 1 (NOTE 1) 1

48-PORT PP - RM 1161 354-356 1 1102 3

48-PORT PP - RM 1161 357-358 1 1201 2

48-PORT PP - RM 1161 359 1 (NOTE 1) 1

48-PORT PP - RM 1161 360-365 1 1200 6

48-PORT PP - RM 1161 366 1 LOBBY 1

48-PORT PP - RM 1161 367 1 (NOTE 1) 1

48-PORT PP - RM 1161 368-373 1 1101 6

48-PORT PP - RM 1161 374 1 LOBBY 1

48-PORT PP - RM 1161 375-377 1 1101 3

48-PORT PP - RM 1161 378-384 1 (NOTE 1) 7

48-PORT PP - RM 1161 385-387 1 1104 3

48-PORT PP - RM 1161 388-390 1 (NOTE 1) 3

48-PORT PP - RM 1161 391-396 1 1103 6

48-PORT PP - RM 1161 397-399 1 1102 3

48-PORT PP - RM 1161 400-408 1 (NOTE 1) 9

48-PORT PP - RM 1161 409-410 1 1029 2

48-PORT PP - RM 1161 411-414 1 1029 4

48-PORT PP - RM 1161 415-419 1 1025 5

48-PORT PP - RM 1161 420 1 (NOTE 1) 1

48-PORT PP - RM 1161 421-426 1 1009 6

48-PORT PP - RM 1161 427-432 1 1005 6

PATCH PANEL - A - RM 1161 1-16 1 1160 16

PATCH PANEL - A - RM 1161 17-18 1 (NOTE 1) 2

PATCH PANEL - A - RM 1161 AP15 1 CR1100A 1

PATCH PANEL - A - RM 1161 AP16 1 1104 1

PATCH PANEL - A - RM 1161 AP17 1 1201 1

PATCH PANEL - A - RM 1161 AP18 1 CR1207 1

PATCH PANEL - A - RM 1161 AP28 1 CR1288 1

PATCH PANEL - A - RM 1161 AP29 1 CR031 1

PATCH PANEL - A - RM 1161 AP30 1 1038 1

PATCH PANEL - A - RM 1161 AP31 1 CR1044 1

PATCH PANEL - A - RM 1161 AP32 1 1012 1

PATCH PANEL - A - RM 1161 AP33 1 1009 1

PATCH PANEL - A - RM 1161 AP34 1 1008 1

PATCH PANEL - A - RM 1161 AP35 1 1002 1

PATCH PANEL - A - RM 1161 AP36 1 1147A 1

PATCH PANEL - A - RM 1161 AP37 1 1148 1

PATCH PANEL - A - RM 1161 AP38 1 1145 1

PATCH PANEL - A - RM 1161 AP39 1 1175 1

PATCH PANEL - A - RM 1161 AP40 1 1170 1

PATCH PANEL - A - RM 1161 AP41 1 1166 1

PATCH PANEL - A - RM 1161 AP42 1 1165A 1

PATCH PANEL - A - RM 1161 AP43 1 1137 1

PATCH PANEL - A - RM 1161 AP44 1 1133 1

PATCH PANEL - A - RM 1161 AP45 1 1128 1

PATCH PANEL - A - RM 1161 AP46 1 1117 1

PATCH PANEL - A - RM 1161 AP47 1 CR1161 1

PATCH PANEL - A - RM 1161 AP48 1 1182A 1

PATCH PANEL - A - RM 1161 AP49 1 1116 1

PATCH PANEL - A - RM 1161 AP50 1 1042 1

PATCH PANEL - A - RM 1161 AP52 1 STW1 1

PATCH PANEL - A - RM 1161 47-48 1

24-PORT PP - RM 1161 481 1 1002 1

24-PORT PP - RM 1161 482-483 1 1005 2

24-PORT PP - RM 1161 484 1 1006 1

24-PORT PP - RM 1161 485 1 1009 2

24-PORT PP - RM 1161 487-488 1 1008 2

24-PORT PP - RM 1161 489 1 (NOTE 1) 1

24-PORT PP - RM 1161 490 1 1020 1

24-PORT PP - RM 1161 491 1 1024 1

24-PORT PP - RM 1161 492 1 1025 1

24-PORT PP - RM 1161 493-494 1 1028 2

24-PORT PP - RM 1161 495 1 1029 1

24-PORT PP - RM 1161 496-497 1 1034 2

24-PORT PP - RM 1161 498-499 1 1036 2

24-PORT PP - RM 1161 500 1 1037 1

24-PORT PP - RM 1161 501 1 1038 1

24-PORT PP - RM 1161 502 1 1029 1

24-PORT PP - RM 1161 503-504 1 1040 2

24-PORT PP - RM 1161 505-506 1 1044 2

24-PORT PP - RM 1161 507-508 1 1042 2

24-PORT PP - RM 1161 509 1 1052 1

24-PORT PP - RM 1161 510 1 1051 1

24-PORT PP - RM 1161 511 1 1051 1

24-PORT PP - RM 1161 512-513 1 1055 2

24-PORT PP - RM 1161 514 1 (NOTE 1) 1

24-PORT PP - RM 1161 515 1 1127 1

24-PORT PP - RM 1161 516 1 1128 1

24-PORT PP - RM 1161 517 1 1131 1

24-PORT PP - RM 1161 518 1 1117 1

24-PORT PP - RM 1161 519 1 1132 1

24-PORT PP - RM 1161 520 1 1135 1

24-PORT PP - RM 1161 521 1 1136 1

24-PORT PP - RM 1161 522 1 1138 1

24-PORT PP - RM 1161 523-524 1 1175 2

24-PORT PP - RM 1161 525 1 1170 1

24-PORT PP - RM 1161 526 1 1171 1

24-PORT PP - RM 1161 527 1 1025 1

24-PORT PP - RM 1161 528 1 1166 1

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - RACK

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

PATCH PANEL - A - RM 1218A 1 1 (NOTE 1) 1

PATCH PANEL - A - RM 1218A 2-3 1 1228A 2

PATCH PANEL - A - RM 1218A 4-5 1 (NOTE 1) 2

PATCH PANEL - A - RM 1218A 6 1 1469 1

PATCH PANEL - A - RM 1218A 7 1 1468 1

PATCH PANEL - A - RM 1218A 8 1 1481 1

PATCH PANEL - A - RM 1218A 9 1 1482 1

PATCH PANEL - A - RM 1218A 10-11 1 1286 2

PATCH PANEL - A - RM 1218A 12-14 1 1220 2

PATCH PANEL - A - RM 1218A 15-16 1 1294 2

PATCH PANEL - A - RM 1218A 17-18 1 1234 2

PATCH PANEL - A - RM 1218A 19 1 1229 1

PATCH PANEL - A - RM 1218A 20 1 PHAR FEED? 1

PATCH PANEL - A - RM 1218A 21 1 NS 1

PATCH PANEL - A - RM 1218A 22 1 1220 1

PATCH PANEL - A - RM 1218A 23 1 1294 1

PATCH PANEL - A - RM 1218A 24 1 (NOTE 1) 2

PATCH PANEL - A - RM 1218A 26 1 1229 1

PATCH PANEL - A - RM 1218A 27-28 1 (NOTE 1) 2

PATCH PANEL - A - RM 1218A 29 1 1270 1

PATCH PANEL - A - RM 1218A 30 1 1271 1

PATCH PANEL - A - RM 1218A 31 1 1251 1

PATCH PANEL - A - RM 1218A 32 1 1252 1

PATCH PANEL - A - RM 1218A 33-34 1 1268 2

PATCH PANEL - A - RM 1218A 35-36 1 (NOTE 1) 2

PATCH PANEL - A - RM 1218A 37 1 1296 1

PATCH PANEL - A - RM 1218A 38 1 (NOTE 1) 2

PATCH PANEL - A - RM 1218A 39 1 (NOTE 1) 1

PATCH PANEL - A - RM 1218A 40-42 1 1217 3

PATCH PANEL - A - RM 1218A 43 1 1218B 1

PATCH PANEL - A - RM 1218A 44 1 12131 1

PATCH PANEL - A - RM 1218A 45 1 13215 1

PATCH PANEL - A - RM 1218A 46 1 1213 1

PATCH PANEL - A - RM 1218A 47 1 1218C 1

PATCH PANEL - A - RM 1218A 48 1 1217 1

24-PORT PP - RM 1218A 49-50 1 1218B 2

24-PORT PP - RM 1218A 51 1 1218C 1

24-PORT PP - RM 1218A 52 1 1209 1

24-PORT PP - RM 1218A 53 1 1203 1

24-PORT PP - RM 1218A 54-57 1 1294 4

24-PORT PP - RM 1218A 58 1 1234 1

24-PORT PP - RM 1218A 59 1 PHAR 1

24-PORT PP - RM 1218A 60 1 1217 1

24-PORT PP - RM 1218A 61 1 (NOTE 1) 1

24-PORT PP - RM 1218A 62 1 PHAR 1

24-PORT PP - RM 1218A 63-64 1 1238 2

24-PORT PP - RM 1218A 65 1 1288 1

24-PORT PP - RM 1218A 66-68 1 (NOTE 1) 3

24-PORT PP - RM 1218A 69 1 1203 1

24-PORT PP - RM 1218A 70 1 1262 1

24-PORT PP - RM 1218A 71-72 1 1286 2

24-PORT PP - RM 1218A 73-74 1 1215 2

24-PORT PP - RM 1218A 75-76 1 (NOTE 1) 2

24-PORT PP - RM 1218A 77 1 1213 1

24-PORT PP - RM 1218A 78 1 1229 1

24-PORT PP - RM 1218A 79 1 1217 1

24-PORT PP - RM 1218A 80-82 1 1213 3

24-PORT PP - RM 1218A 83 1 1217 1

24-PORT PP - RM 1218A 84-87 1 1213 4

24-PORT PP - RM 1218A 85 1 1234 1

24-PORT PP - RM 1218A 86-88 1 (NOTE 1) 3

24-PORT PP - RM 1218A 89-96 1

24-PORT PP - RM 1218A 97-103 1 (NOTE 1) 7

24-PORT PP - RM 1218A 104-107 1 1237 4

24-PORT PP - RM 1218A 108 1 (NOTE 1) 1

24-PORT PP - RM 1218A 109-112 1 1234 4

24-PORT PP - RM 1218A 113-114 1 1224 2

24-PORT PP - RM 1218A 115 1 1228 1

24-PORT PP - RM 1218A 116-118 1 1226 3

24-PORT PP - RM 1218A 119 1 (NOTE 1) 1

24-PORT PP - RM 1218A 120 1 1228 1

24-PORT PP - RM 1218A 121-128 1 (NOTE 1) 8

24-PORT PP - RM 1218A 129-131 1 1217 3

24-PORT PP - RM 1218A 132 1 (NOTE 1) 1

24-PORT PP - RM 1218A 133 1 1217 1

24-PORT PP - RM 1218A 134 1 (NOTE 1) 1

24-PORT PP - RM 1218A 135 1 1229 1

24-PORT PP - RM 1218A 136 1 1229 1

24-PORT PP - RM 1218A 137-138 1 (NOTE 1) 2

24-PORT PP - RM 1218A 139-140 1 1217 2

24-PORT PP - RM 1218A 141-144 1 (NOTE 1) 4

PATCH PANEL - F - RM 1218A 1-4 1 (NOTE 1) 4

PATCH PANEL - F - RM 1218A 5-24 1

PATCH PANEL - F - RM 1218A 25 1 (NOTE 1) 1

PATCH PANEL - F - RM 1218A 26-35 1

PATCH PANEL - F - RM 1218A 36 1 1286 1

PATCH PANEL - F - RM 1218A 37-38 1 (NOTE 1) 2

PATCH PANEL - F - RM 1218A 39-48 1

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - WALL MOUNT LEFT

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

PATCH PANEL - A - RM 1243 1-3 1 1228 3

PATCH PANEL - A - RM 1243 4 1 47 1

PATCH PANEL - A - RM 1243 5-6 1 1316 2

PATCH PANEL - A - RM 1243 7-8 1 1317 2

PATCH PANEL - A - RM 1243 9-10 1 1320 2

PATCH PANEL - A - RM 1243 11-12 1 1323 2

PATCH PANEL - A - RM 1243 13-15 1 (NOTE 1) 3

PATCH PANEL - A - RM 1243 16 1 1217 1

PATCH PANEL - A - RM 1243 17-18 1 1324 2

PATCH PANEL - A - RM 1243 19-20 1 1325 2

PATCH PANEL - A - RM 1243 21-22 1 1326 2

PATCH PANEL - A - RM 1243 23 1 1340 1

PATCH PANEL - A - RM 1243 24 1 1355 1

PATCH PANEL - B - RM 1243 25-26 1 (NOTE 1) 2

PATCH PANEL - B - RM 1243 27-28 1 1382 2

PATCH PANEL - B - RM 1243 29-32 1 1340 4

PATCH PANEL - B - RM 1243 33-34 1 1342 2

PATCH PANEL - B - RM 1243 35-36 1 1345 2

PATCH PANEL - B - RM 1243 37-38 1 1344 2

PATCH PANEL - B - RM 1243 39-40 1 1347 2

PATCH PANEL - B - RM 1243 41-42 1 1346 2

PATCH PANEL - B - RM 1243 43-44 1 1348 2

PATCH PANEL - B - RM 1243 45-46 1 1350 2

PATCH PANEL - B - RM 1243 47-48 1 1352 2

PATCH PANEL - C - RM 1243 49-52 1 (NOTE 1) 4

PATCH PANEL - C - RM 1243 53-58 1 1301 6

PATCH PANEL - C - RM 1243 59-66 1 1302 8

PATCH PANEL - C - RM 1243 67-72 1 1311 6

PATCH PANEL - D - RM 1243 73-76 1 1311 4

PATCH PANEL - D - RM 1243 77-80 1 1303 4

PATCH PANEL - D - RM 1243 81-84 1 1305 4

PATCH PANEL - D - RM 1243 85-96 1 1370 12

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - WALL MOUNT RIGHT

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

PATCH PANEL - E - RM 1243 1-2 1 1354 2

PATCH PANEL - E - RM 1243 3-6 1 1355 5

PATCH PANEL - E - RM 1243 7-8 1 1356 2

PATCH PANEL - E - RM 1243 9-10 1 1358 2

PATCH PANEL - E - RM 1243 11-12 1 1360 2

PATCH PANEL - E - RM 1243 13-14 1 1359 2

PATCH PANEL - E - RM 1243 15-16 1 DIAL 2

PATCH PANEL - E - RM 1243 17-18 1 1362 2

PATCH PANEL - E - RM 1243 19-20 1 DIAL 2

PATCH PANEL - E - RM 1243 21-22 1 1385 2

PATCH PANEL - E - RM 1243 23-24 1 1384 2

PATCH PANEL - F - RM 1243 25-26 1 1383 2

PATCH PANEL - F - RM 1243 27-28 1 1382 2

PATCH PANEL - F - RM 1243 29-30 1 1378 2

PATCH PANEL - F - RM 1243 31-32 1 1379 2

PATCH PANEL - F - RM 1243 33-34 1 1376 2

PATCH PANEL - F - RM 1243 35-36 1 1377 2

PATCH PANEL - F - RM 1243 37-38 1 1375 2

PATCH PANEL - F - RM 1243 39-40 1 1347 2

PATCH PANEL - F - RM 1243 41-42 1 1373 2

PATCH PANEL - F - RM 1243 43-48 1 1304 6

PATCH PANEL - G - RM 1243 49-54 1 1306 6

PATCH PANEL - G - RM 1243 55-58 1 1331 4

PATCH PANEL - G - RM 1243 59-62 1 1333 4

PATCH PANEL - G - RM 1243 63 1 1393 1

PATCH PANEL - G - RM 1243 64-65 1 1391 2

PATCH PANEL - G - RM 1243 66 1 1393 1

PATCH PANEL - G - RM 1243 67 1 1330 1

PATCH PANEL - G - RM 1243 68-72 1 (NOTE 1) 5

PATCH PANEL - H - RM 1243 1 1 AP1 1

PATCH PANEL - H - RM 1243 2 1 AP2 1

PATCH PANEL - H - RM 1243 3 1 AP3 1

PATCH PANEL - H - RM 1243 4 1 AP4 1

PATCH PANEL - H - RM 1243 5 1 AP5 1

PATCH PANEL - H - RM 1243 6 1 AP6 1

PATCH PANEL - H - RM 1243 7-9 1 (NOTE 1) 3

PATCH PANEL - H - RM 1243 10 1 1266 1

PATCH PANEL - H - RM 1243 11 1 1395ED 1

PATCH PANEL - H - RM 1243 12 1 1395OPC 1

PATCH PANEL - H - RM 1243 13-14 1 (NOTE 1) 2

PATCH PANEL - H - RM 1243 15 1 1 1

PATCH PANEL - H - RM 1243 16 1 2 1

PATCH PANEL - H - RM 1243 17-24 1 (NOTE 1) 8

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - AP PATCH PANEL

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

PATCH PANEL - AP - RM 1243 AP01 1 1340 1

PATCH PANEL - AP - RM 1243 AP02 1 1316 1

PATCH PANEL - AP - RM 1243 AP03 1 1304 1

PATCH PANEL - AP - RM 1243 AP04 1 1300A 1

PATCH PANEL - AP - RM 1243 AP05 1 1300 1

PATCH PANEL - AP - RM 1243 AP06 1 1372 1

PATCH PANEL - AP - RM 1243 AP07 1 1348 1

PATCH PANEL - AP - RM 1243 AP08 1 1330 1

PATCH PANEL - AP - RM 1243 AP09 1 1312 1

PATCH PANEL - AP - RM 1243 AP10 1 1362 1

PATCH PANEL - AP - RM 1243 AP11 1 1277 1

PATCH PANEL - AP - RM 1243 AP12 1 1267A 1

PATCH PANEL - AP - RM 1243 AP13 1 CR1359 1

PATCH PANEL - AP - RM 1243 AP14 1 1262 1

PATCH PANEL - AP - RM 1243 AP19 1 1294 1

PATCH PANEL - AP - RM 1243 AP20 1 1286A 1

PATCH PANEL - AP - RM 1243 AP21 1 1243 1

PATCH PANEL - AP - RM 1243 AP22 1 1237 1

PATCH PANEL - AP - RM 1243 AP23 1 CR1229 1

PATCH PANEL - AP - RM 1243 AP24 1 1234 1

PATCH PANEL - AP - RM 1243 AP25 1 1226 1

PATCH PANEL - AP - RM 1243 AP26 1 1217 1

PATCH PANEL - AP - RM 1243 AP27 1 1213 1

PATCH PANEL - AP - RM 1243 AP51 1 OS ELEV 1

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - WALL MOUNT

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

48-PORT PP - RM 3122 1-2 1 3112 2

48-PORT PP - RM 3122 3-6 1 3113 4

48-PORT PP - RM 3122 7-9 1 3115 3

48-PORT PP - RM 3122 10-13 1 3116 4

48-PORT PP - RM 3122 14-17 1 3118 4

48-PORT PP - RM 3122 18-29 1 3123 12

48-PORT PP - RM 3122 30 1 3145 1

48-PORT PP - RM 3122 31-32 1 3148 2

48-PORT PP - RM 3122 33-34 1 3149 2

48-PORT PP - RM 3122 35 1 3167 1

48-PORT PP - RM 3122 36-37 1 3168 2

48-PORT PP - RM 3122 38-39 1 3170 2

48-PORT PP - RM 3122 40-41 1 3171 2

48-PORT PP - RM 3122 42-44 1 3176 3

48-PORT PP - RM 3122 45-46 1 3115 2

48-PORT PP - RM 3122 47 1 (NOTE 1) 2

24-PORT PP - RM 3122 49 1 3137 1

24-PORT PP - RM 3122 50-51 1 3138 2

24-PORT PP - RM 3122 52 1 3144 1

24-PORT PP - RM 3122 53 1 3145 1

24-PORT PP - RM 3122 54-55 1 3148 2

24-PORT PP - RM 3122 56-57 1 3149 2

24-PORT PP - RM 3122 58-59 1 3167 2

24-PORT PP - RM 3122 60 1 3168 1

24-PORT PP - RM 3122 61 1 3169 1

24-PORT PP - RM 3122 62-63 1 3170 2

24-PORT PP - RM 3122 64-65 1 3171 2

24-PORT PP - RM 3122 66-68 1 3176 3

24-PORT PP - RM 3122 69-70 1 3115 2

24-PORT PP - RM 3122 71 1 (NOTE 1) 4

24-PORT PP - RM 3122 74-75 1 3118 2

24-PORT PP - RM 3122 76 1 WIRELESS 1

24-PORT PP - RM 3122 77-78 1 3112 2

24-PORT PP - RM 3122 79 1 RECEPT. 1

24-PORT PP - RM 3122 80-81 1 3184A 2

24-PORT PP - RM 3122 82 1 3184B 1

24-PORT PP - RM 3122 83 1 3280 1

24-PORT PP - RM 3122 84 1 3282 1

24-PORT PP - RM 3122 85 1 3082 1

24-PORT PP - RM 3122 86 1 3184B 1

24-PORT PP - RM 3122 87-89 1 3162 3

24-PORT PP - RM 3122 90-91 1 3128 2

24-PORT PP - RM 3122 92 1 (NOTE 1) 1

24-PORT PP - RM 3122 93 1 3137 1

24-PORT PP - RM 3122 94-95 1 (NOTE 1) 2

24-PORT PP - RM 3122 96 1 3115 1

24-PORT PP - RM 3122 97-98 1 (NOTE 1) 2

24-PORT PP - RM 3122 99-100 1 3163 2

24-PORT PP - RM 3122 101-102 1 (NOTE 1) 2

24-PORT PP - RM 3122 103-104 1 3178 2

24-PORT PP - RM 3122 105-108 1 3177 4

24-PORT PP - RM 3122 109-112 1 3175 4

24-PORT PP - RM 3122 113-116 1 3174 4

24-PORT PP - RM 3122 117-120 1 3173 4

24-PORT PP - RM 3122 121-124 1 3172 4

24-PORT PP - RM 3122 125-128 1 3171 4

24-PORT PP - RM 3122 129-132 1 3170 4

24-PORT PP - RM 3122 133-136 1 3169 4

24-PORT PP - RM 3122 137-140 1 3186 4

24-PORT PP - RM 3122 141-144 1 3151 4

24-PORT PP - RM 3122 145-148 1 3150 4

24-PORT PP - RM 3122 149-152 1 3149 4

24-PORT PP - RM 3122 153-156 1 3148 4

24-PORT PP - RM 3122 157-160 1 3147 4

24-PORT PP - RM 3122 161-164 1 3146 4

24-PORT PP - RM 3122 165 1 (NOTE 1) 4

24-PORT PP - RM 3122 169 1 3144 4

24-PORT PP - RM 3122 173 1 3179 4

24-PORT PP - RM 3122 177-178 1 3178 2

PATCH PANEL - AP - RM 3122 AP01 1 3113 1

PATCH PANEL - AP - RM 3122 AP02 1 3118 1

PATCH PANEL - AP - RM 3122 AP03 1 3137 1

PATCH PANEL - AP - RM 3122 AP04 1 3138 1

PATCH PANEL - AP - RM 3122 AP05 1 3128 1

PATCH PANEL - AP - RM 3122 AP06 1 3131 1

PATCH PANEL - AP - RM 3122 AP07 1 CR3151 1

PATCH PANEL - AP - RM 3122 AP08 1 3147 1

PATCH PANEL - AP - RM 3122 AP09 1 3144 1

PATCH PANEL - AP - RM 3122 AP10 1 3162 1

PATCH PANEL - AP - RM 3122 AP11 1 CR3123 1

PATCH PANEL - AP - RM 3122 AP12 1 3179 1

PATCH PANEL - AP - RM 3122 AP13 1 CR3174 1

PATCH PANEL - AP - RM 3122 AP14 1 3171 1

PATCH PANEL - AP - RM 3122 AP15 1 STAIR1 1

PATCH PANEL - AP - RM 3122 AP16 1 STAIR5 1

PATCH PANEL - AP - RM 3122 17-24 1

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - WALL MOUNT FRONT

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

PATCH PANEL - E- RM B296 1 1 B298 1

PATCH PANEL - E- RM B296 2 1 B267 1

PATCH PANEL - E- RM B296 3-5 1 (NOTE 1) 3

PATCH PANEL - E- RM B296 6 1 B267 1

PATCH PANEL - E- RM B296 7-12 1 (NOTE 1) 6

PATCH PANEL - E- RM B296 13-14 1 B298 2

PATCH PANEL - E- RM B296 15-17 1 (NOTE 1) 3

PATCH PANEL - E- RM B296 18 1 B231 1

PATCH PANEL - E- RM B296 19-24 1 (NOTE 1) 6

PATCH PANEL - E - RM B296 25-26 1 B201 2

PATCH PANEL - E - RM B296 27-28 1 B231 2

PATCH PANEL - E - RM B296 29 1 SUB 1

PATCH PANEL - E - RM B296 30 1 B298 1

PATCH PANEL - E - RM B296 31-34 1 (NOTE 1) 4

PATCH PANEL - E - RM B296 35 1 B224B 1

PATCH PANEL - E - RM B296 36 1 B224A 1

PATCH PANEL - E - RM B296 37 1 SUB BAS 1

PATCH PANEL - E - RM B296 38-41 1 168D 4

PATCH PANEL - E - RM B296 42-44 1 (NOTE 1) 3

PATCH PANEL - E - RM B296 45 1 SUB BAS 1

PATCH PANEL - E - RM B296 46-48 1 (NOTE 1) 3

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION - WALL MOUNT RIGHT

PATCH PANEL - LOCATION # BLDG RM CABLE

COUNT

PATCH PANEL - A - RM B296 1-24 1 (NOTE 1) 24

PATCH PANEL - B - RM B296 1-24 1 (NOTE 1) 24

PATCH PANEL - C - RM B296 1-15 1 (NOTE 1) 15

PATCH PANEL - C - RM B296 16-24 1

PATCH PANEL - A - RM B296 1-24 1 (NOTE 1) 24

PATCH PANEL - B - RM B296 1-24 1 (NOTE 1) 24

PATCH PANEL - C - RM B296 1-15 1 (NOTE 1) 24

PATCH PANEL - C - RM B296 16-17 1 B107 2

PATCH PANEL - C - RM B296 18-24 1 (NOTE 1) 7

PATCH PANEL - D - RM B296 1-6 1 (NOTE 1) 6

PATCH PANEL - D - RM B296 7-24 1

24-PORT PP - RM B296 1 1 (NOTE 1) 20

24-PORT PP - RM B296 21-24 1

PATCH PANEL - F- RM B296 1 1 B188E 1

PATCH PANEL - F- RM B296 2 1 CR/B267 1

PATCH PANEL - F- RM B296 3 1 CR/B186 1

PATCH PANEL - F- RM B296 4 1 B278 1

PATCH PANEL - F- RM B296 5 1 B298 1

PATCH PANEL - F- RM B296 6 1 B231D 1

PATCH PANEL - F- RM B296 7 1 B231D 1

PATCH PANEL - F- RM B296 8 1 B226A 1

PATCH PANEL - F- RM B296 9 1 B226B 1

PATCH PANEL - F- RM B296 10 1 B226 1

PATCH PANEL - F- RM B296 11 1 CR/B224 1

PATCH PANEL - F- RM B296 12 1 B291 1

PATCH PANEL - F- RM B296 13 1 B291B 1

PATCH PANEL - F- RM B296 14 1 B297 1

PATCH PANEL - F- RM B296 15 1 B274 1

PATCH PANEL - F- RM B296 16 1 B231D 1

PATCH PANEL - F- RM B296 17 1 STW2 1

PATCH PANEL - F- RM B296 18 1 STW3 1

PATCH PANEL - F- RM B296 19 1 ELEV 1

PATCH PANEL - F- RM B296 20 1 1

PATCH PANEL - F- RM B296 21-24 1

PATCH PANEL - G - RM B296 1 1 (NOTE 1) 20

PATCH PANEL - G - RM B296 21-22 1 B228 2

PATCH PANEL - G - RM B296 23-24 1

Notes:

1. CONTRACTOR TO TRACE CABLING AND CONFIRM LOCATION OF OUTLET.

ASSUME APPROX. 200FT OF CABLE. CONTRACTOR TO REMOVE EXISTING FACE

PLATE, JACKS, AND CABLING BACK TO PATCH PANELS. CONTRACTOR TO

PROVIDE BLANK FACE PLATES.

EXISTING CATEGORY CABLES FOR DEMOLITION

PATC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .