ATTACHMENT 10 - Drawings VOL 2 - 3 of 7.pdf

PDF 14 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
Solicitation number
36C77622B0018
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This federal contract opportunity solicitation involves infrastructure upgrades at the Iron Mountain VA Medical Center in Michigan. The scope of work includes electrical upgrades, building management system interfaces, HVAC reconfiguration and expansion, communication infrastructure upgrades including new data outlets and Cat 6A cabling, physical security upgrades, and fiber optic backbone upgrades across campus. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin as number 36C77622B0018 for the Y1AZ--EHRM Infrastructure Upgrades Construction project. The upgrades will support a new Electronic Health Record Modernization system.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain, newest first.
File Type Posted
36C77622B0018 0003.pdf PDF
09 69 00 Access Flooring-Addenda 2.pdf PDF
Technical Questions - FINAL - Iron Mtn. 6-27-22.pdf PDF
EHRM Asbestos Report.pdf PDF
Addendum 1.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 6-17-22.pdf PDF
36C77622B0018 0002.pdf PDF
Site Visit Sign-in Sheet - Iron Mtn. 5-18-22.pdf PDF
36C77622B0018 0001.pdf PDF
ATTACHMENT 2 - Specifications VOL 2 of 2.pdf PDF
ATTACHMENT 3 - Drawings VOL 1 - 1 of 5.pdf PDF
ATTACHMENT 15 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 19 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Drawings VOL 2 - 1 of 7.pdf PDF
ATTACHMENT 9 - Drawings VOL 2 - 2 of 7.pdf PDF
ATTACHMENT 12 - Drawings VOL 2 - 5 of 7.pdf PDF
ATTACHMENT 14 - Drawings VOL 2 - 7 of 7.pdf PDF
ATTACHMENT 1 - Specifications VOL 1 of 2.pdf PDF
ATTACHMENT 13 - Drawings VOL 2 - 6 of 7.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 2-25-22.pdf PDF
36C77622B0018 - 5-5-22.pdf PDF
ATTACHMENT 4 - Drawings VOL 1 - 2 of 5.pdf PDF
ATTACHMENT 5 - Drawings VOL 1 - 3 of 5.pdf PDF
ATTACHMENT 6 - Drawings VOL 1 - 4 of 5.pdf PDF
ATTACHMENT 7 - Drawings VOL 1 - 5 of 5.pdf PDF
ATTACHMENT 11 - Drawings VOL 2 - 4 of 7.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 18 - Contractor Safety - Environmental Form.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE/SMOKE DAMPER

ACTUATOR 120V

COMM.

RACK

COMM.

RACK

COMM.

RACK

NL

C

WAP

48" AFF

42" AFF

48" AFF

42" AFF 42" AFF 42" AFF 42" AFF

C

WAP

48" AFF

48" AFF

48" AFF

48" AFF

48" AFF 48" AFF

48" AFF

48" AFF

SEE PACU

HEADWALL

DETAIL

FIRE/SMOKE DAMPER

ACTUATOR 120V

COMM.

RACK

COMM.

RACK

COMM.

RACK

NL

COMM.

RACK

COMM.

RACK

COMM.

RACK

(E)FIBER OPTIC

PANEL

(E)BONDING

BUSBAR

(E)FIBER OPTIC

PANEL

(E) 2" SLEEVE

(E)BONDING

BUSBAR

(E)BONDING

BUSBAR

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SECOND FLOOR

NORTH

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L

I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2306

NORTH

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2218

NORTH

001-TD-022

001-TD-022

NO CATEGORY CABLE WORK THIS AREA

DEMO PLAN NOTES

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON SHEET TS-002 FOR FIBER TYPE, STRAND COUNT,

AND TERMINATION POINT.

REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK

TO SOURCE BONDING POINT.

REMOVE EXISTING FLOOR SLEEVE. PROPERLY CAP / SEAL HOLE AS PER

FIRE CODE.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

4. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

5. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY

TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E

TEAM.

6. GE HEALTHCARE "OCC" RACK MOUNT FIBER OPTIC PANEL AND ASSOCIATED

MM FIBER OPTIC CABLE TO REMAIN.

D3

D4

D5

RSDC

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2215A

NORTH

001-TD-022

001-TD-022

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL SECOND FLOOR

D4

D4

D4

D3

D3

REFERENCE ONLY

NO CATEGORY CABLE WORK THIS AREA

D5

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO

FIELD VERIFY ALL CONDITIONS.

NO CATEGORY CABLE WORK THIS AREA

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

(E)COMM RACK

(E)FIBER

OPTIC PANEL

(E) PATCH

PANELS

(E)BONDING

BUSBAR

(E)COMM RACK

(E)FIBER OPTIC

PANELS

(E) PATCH

PANELS

(E)BONDING

BUSBAR

WALL BEING

DEMOLISHED

(E)COMM RACKS,

CABLE MANAGERS

(E) CABLE LADDERS

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL THIRD FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL THIRD FLOOR

NORTH

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 3122

NORTH

001-TD-031

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 3216

NORTH

001-TD-031

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1 D1

D1 D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE

DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK

TO SOURCE BONDING POINT.

EXISTING RACKS, CABLE MANAGERS TO BE REMOVED, EXISTING PATCH

PANELS, AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON

CABLE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION. RACKS AND

CABLE MANAGERS TO BE TURNED OVER TO VA FOR REUSE.

SEE "OTHER SYSTEM" MIGRATION, SHEET 001-TN-031 DETAIL 4.

REMOVE EXISTING CABLE LADDERS.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY

TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E

TEAM.

10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

11. REMOVE ALL CATEGORY 3 COMMUNICATIONS CABLING AND 110 BLOCKS

MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION, FROM TR TO

DEVICE LOCATIONS. CONTRACTOR TO PROVIDE BLANK FACE PLATES.

COORDINATE WITH VA COR AND A/E TEAM.

D2

D3

D4

D2

D4

D4

D2

D5

D5

D2

D3

D3

D2

RSDC

001-TD-031

D6

D6

D6

D1

D1

D10

D10

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO

6X DATA COILED

IN CEILING

3X DATA COILED

IN CEILING

6X DATA COILED

IN CEILING

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL THIRD FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL THIRD FLOOR

NORTH0

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

D1

D1

D1

D1 D1

D1 D1

D1 D1

D1 D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1 D1

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

CABLE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY

TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E

TEAM.

10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

11. REMOVE ALL CATEGORY 3 COMMUNICATIONS RISER, STATION CABLING AND

110 BLOCKS MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION,

FROM TR TO SOURCE AND DEVICE LOCATIONS. CONTRACTOR TO PROVIDE

BLANK FACE PLATES. COORDINATE WITH VA COR AND A/E TEAM.

RSDC

001-TD-032

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

(E)FIBER OPTIC

PANEL

(E)SLEEVE TO

CORRIDOR

(E)COMM RACKS,

CABLE MANAGERS

(E)110 BLOCKS, CAT3

CABLES, RISER CABLES

WALL BEING

DEMOLISHED

(E) CABLE LADDER

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL FOURTH FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FOURTH FLOOR

NORTH

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L I N

E

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 4122

NORTH

001-TD-041

SCALE: NTS

KEY PLAN

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

EXISTING RACKS, CABLE MANAGERS TO BE REMOVED, EXISTING PATCH

PANELS, AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON

SHEETS TJ-006 AN TJ-007 FOR ADDITIONAL INFORMATION. RACKS AND

CABLE MANAGERS TO BE TURNED OVER TO VA FOR REUSE.

REMOVE EXISTING CORRIDOR SLEEVE. PROPERLY CAP / SEAL HOLE AS

PER FIRE CODE.

EXISTING CATEGORY 3 TELECOMMUNICATION DEVICES IN THIS ROOM TO

BE REMOVED. REMOVE REMOTE FACE PLATE, JACKS, AND CABLING BACK

TO 110 BLOCKS. CONTRACTOR TO PROVIDE BLANK FACE PLATES.

REMOVE CUT AND DISCONNECTED TR RISER CABLE BACK TO SOURCE.

SEE "OTHER SYSTEM" MIGRATION, SHEET 001-TN-041 DETAIL 3.

REMOVE EXISTING CABLE LADDER

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY

TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E

TEAM.

10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

11. REMOVE ALL CATEGORY 3 COMMUNICATIONS RISER, STATION CABLING AND

110 BLOCKS MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION,

FROM TR TO SOURCE AND DEVICE LOCATIONS. CONTRACTOR TO PROVIDE

BLANK FACE PLATES. COORDINATE WITH VA COR AND A/E TEAM.

D3

D5

D6

D3 D6

D5

RSDC

D7

D7

001-TD-041

D8

D8

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1 D1

D1 D1 D1 D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D10

D10

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

(E)COMM RACK

AND CABINET

(E)FIBER

OPTIC PANELS

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL FOURTH FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FOURTH FLOOR

NORTH

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L

I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 4218

NORTH

001-TD-042

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICE IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEET TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE SHEET TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

EXISTING WALL RACK, GE HEALTHCARE EQUIPMENT TO REMAIN.

EXISTING FLOOR CABINET, CAMPUS NETWORK PATCH PANELS AND

CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON SHEET TJ-006

AND TJ-007 FOR ADDITIONAL INFORMATION. COORDINATE WITH VA COR

/ AE ON GE EQUIPMENT PRIOR TO ANY DEMOLITION.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

10. GE HEALTHCARE ACTIVE EQUIPMENT, PATCH PANELS, ASSOCIATED

CATEGORY CABLE TO REMAIN. "OCC" WALL MOUNT LIU AND ASSOCIATED MM

FIBER OPTIC CABLE TO REMAIN.

D3

D5

D3

D5

RSDC

001-TD-042

D1

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

(E)FIBER OPTIC

PANEL

(E)4" SLEEVES

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL FIFTH FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIFTH FLOOR

NORTH

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L I N

E

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 5122

NORTH

001-TD-051

SCALE: NTS

KEY PLAN

NO CATEGORY CABLE WORK THIS AREA

D1

D1 D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

CABLE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON CABLE DEMOLITION SHEETS FOR FIBER TYPE,

STRAND COUNT, AND TERMINATION POINT.

REMOVE EXISTING FLOOR SLEEVE. PROPERLY CAP / SEAL HOLE AS PER

FIRE CODE.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

D3

D5

D5

D3

RSDC

001-TD-051

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

(E)FIBER OPTIC

PANEL

(E)4" SLEEVES

(E) PATCH

PANELS

(E)BONDING

BUSBAR

(E)110 BLOCKS, CAT3

CABLES, RISER CABLES

WALL BEING

DEMOLISHED

(E)COMM RACK AND

CABLE MANAGERS

(E)4" SLEEVES

(E) CABLE LADDER

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL FIFTH FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIFTH FLOOR

NORTH

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 5222

NORTH

001-TD-052

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE

DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK TO

SOURCE BONDING POINT.

REMOVE EXISTING FLOOR SLEEVES. PROPERLY CAP / SEAL HOLE AS PER

FIRE CODE.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE

DEMOLITION SHEETS FOR ADDITIONAL INFORMATION. RETURN RACK AND

CABLE MANAGERS TO VA FOR REUSE.

SHORTEN OR REMOVE EXISTING VERTICAL SLEEVES. PROPERLY CAP /

SEAL HOLE AS PER FIRE CODE. COORDINATE WITH VA ITOPS TO IDENTIFY

SLEEVES. TWO CATEGORY CABLES PASSING THROUGH TR NEED TO

REMAIN AFTER DEMOLITION. COORDINATE WITH FIELD CONDITIONS AND

VA ITOPS TO IDENTIFY CABLES PRIOR TO DEMOLITION.

EXISTING CATEGORY 3 TELECOMMUNICATION DEVICES IN THIS ROOM TO

BE REMOVED. REMOVE REMOTE FACE PLATE, JACKS, AND CABLING BACK

TO 110 BLOCKS. CONTRACTOR TO PROVIDE BLANK FACE PLATES.

REMOVE CUT AND DISCONNECTED TR RISER CABLE BACK TO SOURCE.

SEE "OTHER SYSTEM" MIGRATION, SHEET 001-TN-052 DETAIL 3.

REMOVE EXISTING CABLE LADDERS

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY

TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E

TEAM.

10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

11. REMOVE ALL CATEGORY 3 COMMUNICATIONS RISER, STATION CABLING AND

110 BLOCKS MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION,

FROM TR TO SOURCE AND DEVICE LOCATIONS. CONTRACTOR TO PROVIDE

BLANK FACE PLATES. COORDINATE WITH VA COR AND A/E TEAM.

D2

D3

D4

D5

D5

D4

D3

D2

D6

D6

D7

D7

RSDC

D8

D8

001-TD-052

D9

D9

D1

D1

D1

D1

D1

D1

D1

D1

D10

D10

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

(E)BONDING

BUSBAR

(E)COMM RACK AND

CABLE MANAGER

(E) CABLE LADDER

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

1 1 /4"

C . T

O

ER

U-

EA

ST

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL SIXTH FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SIXTH FLOOR

NORTH

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 6122

NORTH

001-TD-061

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L I N

E

SCALE: NTS

KEY PLAN

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D4

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK

TO SOURCE BONDING POINT.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE

DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

RETURN RACK AND CABLE MANAGERS TO VA FOR REUSE.

REMOVE EXISTING CABLE LADDER

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY

TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E

TEAM.

10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

D3

D4

D6

D6D3

RSDC

001-TD-061

D1

D10

D1

D10

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

1 1 /4"

C . T

O

ER

U-

EA

ST

1 1 /4"

C . T

O

ER

U-

EA

ST

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

(E)BONDING

BUSBAR

(E)COMM RACK AND

CABLE MANAGER

(E)110 BLOCKS, CAT3

CABLES, RISER CABLES

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 6222B

NORTH

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

PARTIAL SIXTH FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SIXTH FLOOR

NORTH

SCALE: NTS

KEY PLAN

T

D

M A

T C

H

L I N

E

T

D

M A

T C

H

L I N

E

001-TD-062

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK TO

SOURCE BONDING POINT.

REMOVE EXISTING FLOOR SLEEVES. PROPERLY CAP / SEAL HOLE AS PER

FIRE CODE.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE

DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

RETURN RACK AND CABLE MANAGERS TO VA FOR REUSE.

EXISTING CATEGORY 3 TELECOMMUNICATION DEVICES IN THIS ROOM TO

BE REMOVED. REMOVE REMOTE FACE PLATE, JACKS, AND CABLING BACK

TO 110 BLOCKS. CONTRACTOR TO PROVIDE BLANK FACE PLATES.

REMOVE CUT AND DISCONNECTED TR RISER CABLE BACK TO SOURCE.

REMOVE EXISTING CABLE LADDER.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY

TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E

TEAM.

10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

11. REMOVE ALL CATEGORY 3 COMMUNICATIONS RISER, STATION CABLING AND

110 BLOCKS MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION,

FROM TR TO SOURCE AND DEVICE LOCATIONS. CONTRACTOR TO PROVIDE

BLANK FACE PLATES. COORDINATE WITH VA COR AND A/E TEAM.

D3

D4

D5

D6

D4

D6 D3

RSDC

D7

D7

001-TD-062

D10

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

LEADS INTO CHASE

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

SEVENTH FLOOR

1/4"=1'-0"

2' 4' 8'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 SEVENTH FLOOR

NORTH

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

001-TD-071

RSDC

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG 1

EIGHTH FLOOR

1/4"=1'-0"

2' 4' 8'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 1 EIGHTH FLOOR

NORTH

D1

D1D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICE IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

CABLE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

D1

RSDC

001-TD-081

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

(E)COMM

CABINET

(E)FIBER OPTIC

PANELS

(E)BONDING

BUSBAR

NO CATEGORY CABLE

WORK THIS AREA

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM DEMOLITION PLAN - BLDG

2 BASEMENT

DEMO PLAN NOTES

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK

TO SOURCE BONDING POINT.

EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,

AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON SHEET

TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION. RETURN RACK AND

CABLE MANAGERS TO VA FOR REUSE.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO

OTHERWISE BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

6. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE

PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY

TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E

TEAM.

7. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

D3

D4

D6

D3

D6

D4

RSDC

002-TD-0B1

1/4"=1'-0"

2' 4' 8'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 2 BASEMENT

NORTH

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

ELECTRICAL

CABINET

ELECTRICAL

CABINET

ELECTRICAL

CABINET

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 2 FIRST FLOOR

NORTH

TELECOMM DEMOLITION PLAN - BLDG

2 FIRST FLOOR

D1

D1

D1

D1

D1D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM DEVICES

TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

RSDC

002-TD-011

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

1/4"=1'-0"

2' 4' 8'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 2 SECOND FLOOR

NORTH

TELECOMM DEMOLITION PLAN - BLDG

2 SECOND FLOOR

D1

D1

DEMO PLAN NOTES

EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.

REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.

CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON

SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE

BY OWNER.

3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM

DEVICES TO BE ABANDONED.

4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.

EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.

6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR

"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR

PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH

OUTLET.

7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.

CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE

8. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING

WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE

AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.

RSDC

002-TD-021

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

NO CATEGORY CABLE

WORK THIS AREA

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

1/4"=1'-0"

2' 4' 8'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 2 THIRD FLOOR

NORTH

TELECOMM DEMOLITION PLAN - BLDG

2 THIRD FLOOR

RSDC

002-TD-031

REFERENCE ONLY

NO CATEGORY CABLE WORK THIS AREA

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

(E) FIBER OPTIC

PANEL

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

1/4"=1'-0"

2' 4' 8'

SCALE:

TELECOMM DEMOLITION PLAN - BLDG 4 BASEMENT

NORTH

TRUE

NORTH

TELECOMM DEMOLITION PLAN - BLDG

4 BASEMENT

D3

DEMO PLAN NOTES

REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC

CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.

SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND

TERMINATION POINT.

GENERAL NOTES

1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN

THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.

2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO

OTHERWISE BY OWNER.

3. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH

ARCHITECTURAL.

4. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND

EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,

TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW

INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.

D3

RSDC

004-TD-0B1

THIS DRAWING WAS PRODUCED FROM ORIGINAL

AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND

MAY NOT REPRESENT AN ACCURATE AS-BUILT

CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100%…