ATTACHMENT 10 - Drawings VOL 2 - 3 of 7.pdf
PDF 14 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
- Solicitation number
- 36C77622B0018
About this file
This federal contract opportunity solicitation involves infrastructure upgrades at the Iron Mountain VA Medical Center in Michigan. The scope of work includes electrical upgrades, building management system interfaces, HVAC reconfiguration and expansion, communication infrastructure upgrades including new data outlets and Cat 6A cabling, physical security upgrades, and fiber optic backbone upgrades across campus. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin as number 36C77622B0018 for the Y1AZ--EHRM Infrastructure Upgrades Construction project. The upgrades will support a new Electronic Health Record Modernization system.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE/SMOKE DAMPER
ACTUATOR 120V
COMM.
RACK
COMM.
RACK
COMM.
RACK
NL
C
WAP
48" AFF
42" AFF
48" AFF
42" AFF 42" AFF 42" AFF 42" AFF
C
WAP
48" AFF
48" AFF
48" AFF
48" AFF
48" AFF 48" AFF
48" AFF
48" AFF
SEE PACU
HEADWALL
DETAIL
FIRE/SMOKE DAMPER
ACTUATOR 120V
COMM.
RACK
COMM.
RACK
COMM.
RACK
NL
COMM.
RACK
COMM.
RACK
COMM.
RACK
(E)FIBER OPTIC
PANEL
(E)BONDING
BUSBAR
(E)FIBER OPTIC
PANEL
(E) 2" SLEEVE
(E)BONDING
BUSBAR
(E)BONDING
BUSBAR
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SECOND FLOOR
NORTH
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L
I N
E
SCALE: N.T.S.
KEYPLAN
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 2306
NORTH
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 2218
NORTH
001-TD-022
001-TD-022
NO CATEGORY CABLE WORK THIS AREA
DEMO PLAN NOTES
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON SHEET TS-002 FOR FIBER TYPE, STRAND COUNT,
AND TERMINATION POINT.
REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK
TO SOURCE BONDING POINT.
REMOVE EXISTING FLOOR SLEEVE. PROPERLY CAP / SEAL HOLE AS PER
FIRE CODE.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
4. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
5. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY
TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E
TEAM.
6. GE HEALTHCARE "OCC" RACK MOUNT FIBER OPTIC PANEL AND ASSOCIATED
MM FIBER OPTIC CABLE TO REMAIN.
D3
D4
D5
RSDC
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 2215A
NORTH
001-TD-022
001-TD-022
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL SECOND FLOOR
D4
D4
D4
D3
D3
REFERENCE ONLY
NO CATEGORY CABLE WORK THIS AREA
D5
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
FIELD VERIFY ALL CONDITIONS.
NO CATEGORY CABLE WORK THIS AREA
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
(E)COMM RACK
(E)FIBER
OPTIC PANEL
(E) PATCH
PANELS
(E)BONDING
BUSBAR
(E)COMM RACK
(E)FIBER OPTIC
PANELS
(E) PATCH
PANELS
(E)BONDING
BUSBAR
WALL BEING
DEMOLISHED
(E)COMM RACKS,
CABLE MANAGERS
(E) CABLE LADDERS
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL THIRD FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL THIRD FLOOR
NORTH
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L I N
E
SCALE: N.T.S.
KEYPLAN
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 3122
NORTH
001-TD-031
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 3216
NORTH
001-TD-031
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1 D1
D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE
DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK
TO SOURCE BONDING POINT.
EXISTING RACKS, CABLE MANAGERS TO BE REMOVED, EXISTING PATCH
PANELS, AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON
CABLE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION. RACKS AND
CABLE MANAGERS TO BE TURNED OVER TO VA FOR REUSE.
SEE "OTHER SYSTEM" MIGRATION, SHEET 001-TN-031 DETAIL 4.
REMOVE EXISTING CABLE LADDERS.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY
TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E
TEAM.
10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
11. REMOVE ALL CATEGORY 3 COMMUNICATIONS CABLING AND 110 BLOCKS
MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION, FROM TR TO
DEVICE LOCATIONS. CONTRACTOR TO PROVIDE BLANK FACE PLATES.
COORDINATE WITH VA COR AND A/E TEAM.
D2
D3
D4
D2
D4
D4
D2
D5
D5
D2
D3
D3
D2
RSDC
001-TD-031
D6
D6
D6
D1
D1
D10
D10
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO
6X DATA COILED
IN CEILING
3X DATA COILED
IN CEILING
6X DATA COILED
IN CEILING
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL THIRD FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL THIRD FLOOR
NORTH0
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L I N
E
SCALE: N.T.S.
KEYPLAN
D1
D1
D1
D1 D1
D1 D1
D1 D1
D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1 D1
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
CABLE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY
TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E
TEAM.
10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
11. REMOVE ALL CATEGORY 3 COMMUNICATIONS RISER, STATION CABLING AND
110 BLOCKS MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION,
FROM TR TO SOURCE AND DEVICE LOCATIONS. CONTRACTOR TO PROVIDE
BLANK FACE PLATES. COORDINATE WITH VA COR AND A/E TEAM.
RSDC
001-TD-032
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
(E)FIBER OPTIC
PANEL
(E)SLEEVE TO
CORRIDOR
(E)COMM RACKS,
CABLE MANAGERS
(E)110 BLOCKS, CAT3
CABLES, RISER CABLES
WALL BEING
DEMOLISHED
(E) CABLE LADDER
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL FOURTH FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FOURTH FLOOR
NORTH
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L I N
E
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 4122
NORTH
001-TD-041
SCALE: NTS
KEY PLAN
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
EXISTING RACKS, CABLE MANAGERS TO BE REMOVED, EXISTING PATCH
PANELS, AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON
SHEETS TJ-006 AN TJ-007 FOR ADDITIONAL INFORMATION. RACKS AND
CABLE MANAGERS TO BE TURNED OVER TO VA FOR REUSE.
REMOVE EXISTING CORRIDOR SLEEVE. PROPERLY CAP / SEAL HOLE AS
PER FIRE CODE.
EXISTING CATEGORY 3 TELECOMMUNICATION DEVICES IN THIS ROOM TO
BE REMOVED. REMOVE REMOTE FACE PLATE, JACKS, AND CABLING BACK
TO 110 BLOCKS. CONTRACTOR TO PROVIDE BLANK FACE PLATES.
REMOVE CUT AND DISCONNECTED TR RISER CABLE BACK TO SOURCE.
SEE "OTHER SYSTEM" MIGRATION, SHEET 001-TN-041 DETAIL 3.
REMOVE EXISTING CABLE LADDER
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY
TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E
TEAM.
10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
11. REMOVE ALL CATEGORY 3 COMMUNICATIONS RISER, STATION CABLING AND
110 BLOCKS MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION,
FROM TR TO SOURCE AND DEVICE LOCATIONS. CONTRACTOR TO PROVIDE
BLANK FACE PLATES. COORDINATE WITH VA COR AND A/E TEAM.
D3
D5
D6
D3 D6
D5
RSDC
D7
D7
001-TD-041
D8
D8
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1 D1
D1 D1 D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D10
D10
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
(E)COMM RACK
AND CABINET
(E)FIBER
OPTIC PANELS
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL FOURTH FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FOURTH FLOOR
NORTH
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L
I N
E
SCALE: N.T.S.
KEYPLAN
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 4218
NORTH
001-TD-042
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICE IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEET TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE SHEET TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
EXISTING WALL RACK, GE HEALTHCARE EQUIPMENT TO REMAIN.
EXISTING FLOOR CABINET, CAMPUS NETWORK PATCH PANELS AND
CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON SHEET TJ-006
AND TJ-007 FOR ADDITIONAL INFORMATION. COORDINATE WITH VA COR
/ AE ON GE EQUIPMENT PRIOR TO ANY DEMOLITION.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
10. GE HEALTHCARE ACTIVE EQUIPMENT, PATCH PANELS, ASSOCIATED
CATEGORY CABLE TO REMAIN. "OCC" WALL MOUNT LIU AND ASSOCIATED MM
FIBER OPTIC CABLE TO REMAIN.
D3
D5
D3
D5
RSDC
001-TD-042
D1
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
(E)FIBER OPTIC
PANEL
(E)4" SLEEVES
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL FIFTH FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIFTH FLOOR
NORTH
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L I N
E
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 5122
NORTH
001-TD-051
SCALE: NTS
KEY PLAN
NO CATEGORY CABLE WORK THIS AREA
D1
D1 D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
CABLE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON CABLE DEMOLITION SHEETS FOR FIBER TYPE,
STRAND COUNT, AND TERMINATION POINT.
REMOVE EXISTING FLOOR SLEEVE. PROPERLY CAP / SEAL HOLE AS PER
FIRE CODE.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
D3
D5
D5
D3
RSDC
001-TD-051
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
(E)FIBER OPTIC
PANEL
(E)4" SLEEVES
(E) PATCH
PANELS
(E)BONDING
BUSBAR
(E)110 BLOCKS, CAT3
CABLES, RISER CABLES
WALL BEING
DEMOLISHED
(E)COMM RACK AND
CABLE MANAGERS
(E)4" SLEEVES
(E) CABLE LADDER
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL FIFTH FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIFTH FLOOR
NORTH
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L I N
E
SCALE: N.T.S.
KEYPLAN
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 5222
NORTH
001-TD-052
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE
DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK TO
SOURCE BONDING POINT.
REMOVE EXISTING FLOOR SLEEVES. PROPERLY CAP / SEAL HOLE AS PER
FIRE CODE.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE
DEMOLITION SHEETS FOR ADDITIONAL INFORMATION. RETURN RACK AND
CABLE MANAGERS TO VA FOR REUSE.
SHORTEN OR REMOVE EXISTING VERTICAL SLEEVES. PROPERLY CAP /
SEAL HOLE AS PER FIRE CODE. COORDINATE WITH VA ITOPS TO IDENTIFY
SLEEVES. TWO CATEGORY CABLES PASSING THROUGH TR NEED TO
REMAIN AFTER DEMOLITION. COORDINATE WITH FIELD CONDITIONS AND
VA ITOPS TO IDENTIFY CABLES PRIOR TO DEMOLITION.
EXISTING CATEGORY 3 TELECOMMUNICATION DEVICES IN THIS ROOM TO
BE REMOVED. REMOVE REMOTE FACE PLATE, JACKS, AND CABLING BACK
TO 110 BLOCKS. CONTRACTOR TO PROVIDE BLANK FACE PLATES.
REMOVE CUT AND DISCONNECTED TR RISER CABLE BACK TO SOURCE.
SEE "OTHER SYSTEM" MIGRATION, SHEET 001-TN-052 DETAIL 3.
REMOVE EXISTING CABLE LADDERS
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY
TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E
TEAM.
10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
11. REMOVE ALL CATEGORY 3 COMMUNICATIONS RISER, STATION CABLING AND
110 BLOCKS MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION,
FROM TR TO SOURCE AND DEVICE LOCATIONS. CONTRACTOR TO PROVIDE
BLANK FACE PLATES. COORDINATE WITH VA COR AND A/E TEAM.
D2
D3
D4
D5
D5
D4
D3
D2
D6
D6
D7
D7
RSDC
D8
D8
001-TD-052
D9
D9
D1
D1
D1
D1
D1
D1
D1
D1
D10
D10
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
(E)BONDING
BUSBAR
(E)COMM RACK AND
CABLE MANAGER
(E) CABLE LADDER
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
1 1 /4"
C . T
O
ER
U-
EA
ST
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL SIXTH FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SIXTH FLOOR
NORTH
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 6122
NORTH
001-TD-061
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L I N
E
SCALE: NTS
KEY PLAN
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D4
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK
TO SOURCE BONDING POINT.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE
DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
RETURN RACK AND CABLE MANAGERS TO VA FOR REUSE.
REMOVE EXISTING CABLE LADDER
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY
TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E
TEAM.
10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
D3
D4
D6
D6D3
RSDC
001-TD-061
D1
D10
D1
D10
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
1 1 /4"
C . T
O
ER
U-
EA
ST
1 1 /4"
C . T
O
ER
U-
EA
ST
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
(E)BONDING
BUSBAR
(E)COMM RACK AND
CABLE MANAGER
(E)110 BLOCKS, CAT3
CABLES, RISER CABLES
1/4"=1'-0"
2' 4' 8'
SCALE:
ENLARGED ROOM - 6222B
NORTH
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
PARTIAL SIXTH FLOOR
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SIXTH FLOOR
NORTH
SCALE: NTS
KEY PLAN
T
D
M A
T C
H
L I N
E
T
D
M A
T C
H
L I N
E
001-TD-062
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK TO
SOURCE BONDING POINT.
REMOVE EXISTING FLOOR SLEEVES. PROPERLY CAP / SEAL HOLE AS PER
FIRE CODE.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON CABLE
DEMOLITION SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
RETURN RACK AND CABLE MANAGERS TO VA FOR REUSE.
EXISTING CATEGORY 3 TELECOMMUNICATION DEVICES IN THIS ROOM TO
BE REMOVED. REMOVE REMOTE FACE PLATE, JACKS, AND CABLING BACK
TO 110 BLOCKS. CONTRACTOR TO PROVIDE BLANK FACE PLATES.
REMOVE CUT AND DISCONNECTED TR RISER CABLE BACK TO SOURCE.
REMOVE EXISTING CABLE LADDER.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY
TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E
TEAM.
10. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
11. REMOVE ALL CATEGORY 3 COMMUNICATIONS RISER, STATION CABLING AND
110 BLOCKS MADE OBSOLETE AS PART OF TR EXPANSION WALL DEMOLITION,
FROM TR TO SOURCE AND DEVICE LOCATIONS. CONTRACTOR TO PROVIDE
BLANK FACE PLATES. COORDINATE WITH VA COR AND A/E TEAM.
D3
D4
D5
D6
D4
D6 D3
RSDC
D7
D7
001-TD-062
D10
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
LEADS INTO CHASE
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
SEVENTH FLOOR
1/4"=1'-0"
2' 4' 8'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 SEVENTH FLOOR
NORTH
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
9. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
001-TD-071
RSDC
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG 1
EIGHTH FLOOR
1/4"=1'-0"
2' 4' 8'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 1 EIGHTH FLOOR
NORTH
D1
D1D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICE IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
CABLE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
D1
RSDC
001-TD-081
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
(E)COMM
CABINET
(E)FIBER OPTIC
PANELS
(E)BONDING
BUSBAR
NO CATEGORY CABLE
WORK THIS AREA
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
TELECOMM DEMOLITION PLAN - BLDG
2 BASEMENT
DEMO PLAN NOTES
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
REMOVE EXISTING BONDING BUSBAR. REMOVE BONDING CABLE BACK
TO SOURCE BONDING POINT.
EXISTING CABINET / RACK TO BE REMOVED, EXISTING PATCH PANELS,
AND CATEGORY CABLES TO BE REMOVED. SEE SCHEDULE ON SHEET
TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION. RETURN RACK AND
CABLE MANAGERS TO VA FOR REUSE.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO
OTHERWISE BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
6. DEMOLITION OF EXISTING BONDING BUSBAR AND CABLING TO BE
PERFORMED ONLY AFTER NEW BONDING SYSTEM IS INSTALLED, PROPERLY
TESTED, AND CONNECTED FOR USE. COORDINATE WITH VA COR AND A/E
TEAM.
7. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
D3
D4
D6
D3
D6
D4
RSDC
002-TD-0B1
1/4"=1'-0"
2' 4' 8'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 2 BASEMENT
NORTH
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
ELECTRICAL
CABINET
ELECTRICAL
CABINET
ELECTRICAL
CABINET
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
C
WAP
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
1/8"=1'-0"
4' 8' 16'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 2 FIRST FLOOR
NORTH
TELECOMM DEMOLITION PLAN - BLDG
2 FIRST FLOOR
D1
D1
D1
D1
D1D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM DEVICES
TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
RSDC
002-TD-011
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
1/4"=1'-0"
2' 4' 8'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 2 SECOND FLOOR
NORTH
TELECOMM DEMOLITION PLAN - BLDG
2 SECOND FLOOR
D1
D1
DEMO PLAN NOTES
EXISTING TELECOMMUNICATION DEVICES IN THIS ROOM TO BE REMOVED.
REMOVE FACE PLATE, JACKS, AND CABLING BACK TO PATCH PANELS.
CONTRACTOR TO PROVIDE BLANK FACE PLATES. SEE SCHEDULE ON
SHEETS TJ-006 AND TJ-007 FOR ADDITIONAL INFORMATION.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO OTHERWISE
BY OWNER.
3. EXISTING RACEWAY ASSOCIATED WITH THE REMOVAL OF TELECOMM
DEVICES TO BE ABANDONED.
4. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
5. DRAWING PLANS INDICATE NUMBER OF DROPS IN AREAS THAT ARE SERVED.
EXACT LOCATION OF DROPS IN EACH AREA SHALL BE CONFIRMED ONSITE.
6. CONTRACTOR SHALL TRACK ALL PORTS LABELED "BLANK" OR "OPEN" OR
"BAD", ANY PORTS WITHOUT AN ADDRESS, AND VERIFY AN OUTLET. FOR
PRICING PURPOSES, ASSUME A MINIMUM OF 200FT OF CABLING TO EACH
OUTLET.
7. IN GENERAL, DROP LOCATIONS ARE PROVIDED FOR GUIDANCE ONLY.
CONTRACTOR IS RESPONSIBLE TO CONFIRM ALL OUTLET LOCATIONS ONSITE
8. CONTRACTOR TO MOVE VA FURNITURE AND SIMILAR ITEMS OBSTRUCTING
WORK. COR AND CONTRACTOR TO DOCUMENT CONDITION PRIOR TO MOVE
AND FOLLOWING CONTRACTOR REPLACEMENT OF ITEMS.
RSDC
002-TD-021
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
NO CATEGORY CABLE
WORK THIS AREA
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
1/4"=1'-0"
2' 4' 8'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 2 THIRD FLOOR
NORTH
TELECOMM DEMOLITION PLAN - BLDG
2 THIRD FLOOR
RSDC
002-TD-031
REFERENCE ONLY
NO CATEGORY CABLE WORK THIS AREA
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
(E) FIBER OPTIC
PANEL
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
1/4"=1'-0"
2' 4' 8'
SCALE:
TELECOMM DEMOLITION PLAN - BLDG 4 BASEMENT
NORTH
TRUE
NORTH
TELECOMM DEMOLITION PLAN - BLDG
4 BASEMENT
D3
DEMO PLAN NOTES
REMOVE EXISTING FIBER OPTIC PANEL. REMOVE EXISTING FIBER OPTIC
CABLES FROM BUILDING BACK TO SOURCE TERMINATION POINT.
SEE SCHEDULE ON TS-002 FOR FIBER TYPE, STRAND COUNT, AND
TERMINATION POINT.
GENERAL NOTES
1. VISIT AND EXAMINE THE SITE PRIOR TO INITIATION OF WORK TO ASCERTAIN
THE CONDITIONS AND LIMITS OF DEMOLITION AND CONSTRUCTION.
2. DISPOSE OF REMOVED EQUIPMENT UNLESS DIRECTED TO DO SO
OTHERWISE BY OWNER.
3. COORDINATE EXTENT AND SCOPE OF DEMOLITION IN ALL SPACES WITH
ARCHITECTURAL.
4. DEMOLITION OF ALL EXISTING FIBER OPTIC CABLES, COPPER CABLES AND
EQUIPMENT TO BE PERFORMED ONLY AFTER NEW CABLING IS INSTALLED,
TERMINATED, TESTED AND VA HAS CUT SYSTEMS OVER TO NEW
INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E TEAM.
D3
RSDC
004-TD-0B1
THIS DRAWING WAS PRODUCED FROM ORIGINAL
AS-BUILT DRAWINGS AND FIELD OBSERVATIONS, AND
MAY NOT REPRESENT AN ACCURATE AS-BUILT
CONDITION. DISCREPANCIES MAY BE ENCOUNTERED,
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100%…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .