ATTACHMENT 8 - Drawings VOL 2 - 1 of 7.pdf
PDF 12 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
- Solicitation number
- 36C77622B0018
About this file
This federal contract opportunity is a solicitation seeking proposals for infrastructure upgrades at the Iron Mountain VA Medical Center in Michigan. The scope of work involves electrical, IT, HVAC, communications, security, and fiber optic infrastructure improvements to enable the implementation of a new Electronic Health Record Modernization system. Upgrades are required to electrical systems, bonding and grounding, uninterruptible power supplies, the building management system, closet spaces, data and fiber optic cabling. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. Offerors are invited to submit proposals in response to solicitation number 36C77622B0018 by the specified deadline to be considered for the award of a contract to complete the infrastructure upgrades.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NO P
ARKIN
G
NO PARKING
PROJECT DESCRIPTION
THIS CONSTRUCTION UPGRADES THE FACILITIES ELECTRIC AND ITS INFRASTRUCTURE IN SUPPORT OF THE NEW ELECTRONIC HEALTH RECORDS MODERNIZATION (EHRM) SYSTEM, TO BE IMPLEMENTED UNDER A SEPARATE PROJECT. THE SCOPE OF THIS PROJECT INCLUDES, BUT NOT LIMITED TO, THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL PANEL UPGRADE, POWER (NORMAL AND EMERGENCY), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES; RECONFIGURATION, EXPANSION, AND RENOVATION OF EXISTING TELECOMMUNICATION SPACES; HVAC; COMMUNICATION (NEW DATA OUTLETS, PATCH PANELS, UPGRADES TO CAT 6A CABLE); PHYSICAL SECURITY UPGRADES, FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS; DIVERSIFIED PATH TO DATACENTER TO WAN; ASBESTOS ABATEMENT. PROJECT WORK LOCATIONS INCLUDE:
BUILDING 1, 2, 4, 6, 11 AND SITE EXTERIOR.
TAW
COVER SHEET - VOLUME 2
000-GI-001
OSCAR G. JOHNSON VAMC
325 EAST H STREET
IRON MOUNTAIN, MICHIGAN
SCALE: NTS
CS
VA 585-21-700 IRON MOUNTAIN, MI 49801
100% DESIGN DOCUMENTS - VOLUME 2
BASIC DEFINITIONS
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT -
DEPT. OF VETERANS AFFAIRS AND IS REFERRED TO
THROUGHOUT THE CONTRACT DOCUMENTS AS IF
SINGULAR IN NUMBER. THE TERM "OWNER" MEANS THE
OWNER OR THE OWNER'S CONTRACTING OFFICER'S
AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S
AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR
ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL
CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN
AUTHORIZED REPRESENTATIVES OF THE CONTRACTING
OFFICER ACTING WITHIN THE LIMITS OF THEIR
AUTHORITY AS DELEGATED BY THE CONTRACTING
OFFICER.
"CONTRACTING OFFICER'S REPRESENTATIVE", COR:
MEANS THE CONTRACTING OFFICER'S AUTHORIZED
REPRESENTATIVE, IN PART, RESPONSIBLE FOR
MONITORING THE CONTRACTOR'S (PLURAL)
PERFORMANCE.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION
AND SERVICES REQUIRED BY THE CONTRACT
DOCUMENTS, WHETHER COMPLETED OR PARTIALLY
COMPLETED, AND INCLUDES ALL OTHER LABOR,
MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE
CONTRACTOR TO FULFILL THE CONTRACTOR'S
OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE
OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE
WORK PERFORMED UNDER THE CONTRACT DOCUMENTS
"DRAWINGS", "SHOP DRAWINGS" OR "PLANS" THE
GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT
DOCUMENTS, WHENEVER LOCATED AND WHENEVER
ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS
OF THE WORK, GENERALLY INCLUDING PLANS,
ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND
DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE
ON-SITE SUPERVISION REPRESENTATIVE OF THE
PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE VA'S
ARCHITECTS, ENGINEERS AND OTHER DESIGN AND
ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND
REFERRED THROUGHOUT THE DRAWINGS AS IF SINGULAR
IN NUMBER.
OSCAR G. JOHNSON VA MEDICAL CENTER
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES DESIGN PROJECT
CONTRACT NO. 36C77621C0029
"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE
ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL
CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND
OR SPECIALTY WORK IN CONNECTION WITH THIS PROJECT.
"FURNISH" OR "FURNISHED": MEANS PROVIDING ALL
MATERIALS, SHOP DRAWINGS, TRANSPORTATION,
INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING,
HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS,
OWNER'S MANUALS, TRAINING AND ANY OTHER
ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK
AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING,
HOISTING, STORAGE, HANGERS, SUPPORTS,SLEEVES,
SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS,
EXCAVATION, BACKFILL, DEWATERING, INSTALLATION,
CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP,
INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF
WORK AND ALL ACCESSORIES, SERVICE AND FACILITIES
REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND
INSTALL AND SHALL INCLUDE, WITHOUT LIMITATION, ALL
LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION
SERVICES, AND OTHER ITEMS REQUIRED TO COMPLETE THE
REFERENCED TASK.
"BY OWNER"; "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE
ORDERED, PAID FOR, SHIPPED TO THE JOB SITE AND
INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR
EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE
PROVISIONS IN THE CONSTRUCTION FOR FUTURE
INSTALLATION AS SPECIFIED OR SHOWN.
OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE
DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE
LEGENDS AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE
AND IN DIVISION 0 AND 1 OF THE PROJECT MANUAL.
GENERAL PROJECT NOTES
1. CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR
TO BIDDING TO BECOME FAMILIAR WITH THE
EXISTING SITE CONDITIONS, SECURITY PROVISIONS,
LAYDOWN AREA AND OTHER SITE SPECIFIC GENERAL
CONDITIONS WHICH MAY AFFECT THE BID VALUE FOR
THIS PROJECT.
2. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION
WITH THE TECHNICAL SPECIFICATIONS AND
CONDITIONS OF THE PROJECT INCLUDED IN THE
PROJECT MANUAL WHICH FORM A PART OF THE
CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL
INFORMATION REQUIRED TO CONSTRUCT THE WORK
OF THIS CONTRACT. IN THE EVENT OF A CONFLICT
BETWEEN THE DRAWINGS AND THE SPECIFICATION
NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS
BEFORE BEGINNING WORK ON THE AFFECTED
ACTIVITIES.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO THE START OF
WORK. NOTIFY THE COR OF ANY SIGNIFICANT
CHANGES IN DIMENSIONS OR CONDITIONS.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS,
TOOLS, EQUIPMENT AND NECESSARY FACILITIES,
AND PERFORM ALL LABOR AND SERVICES OF EVERY
DESCRIPTION AS MAY BE NECESSARY TO COMPLETE
THE SCOPE OF WORK DEFINED ON THE DRAWINGS
AND SPECIFICATIONS
5. THE CONTRACTOR SHALL ARRANGE FOR AND
OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA,
WEEKENDS, HOLIDAY'S, SHUTDOWN, ETC.),
CERTIFICATES, INSPECTIONS, DEPARTMENT
APPROVALS, ETC. FOR WORK PERFORMED UNDER
THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED
PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY
APPROVALS TO THE COR.
6. FABRICATE AND INSTALL ALL WORK IN STRICT
ACCORDANCE WITH THE SPECIFICATIONS, ALL
APPLICABLE STATE AND LOCAL CODES, AND THE
GENERAL AND SUPPLEMENTARY CONDITIONS OF
THE CONTRACT.
7. ALL CONTRACTORS AND SUBCONTRACTORS SHALL
BE RESPONSIBLE FOR THE PROPER PERFORMANCE
OF THEIR WORK, COORDINATING WITH OTHER
TRADES, MEANS AND METHODS OF CONSTRUCTION,
SAFETY AND SECURITY ON SITE.
8. CUTTING AND PATCHING SHALL BE PERFORMED BY
EACH TRADE AS NECESSARY FOR THE
PERFORMANCE AND INSTALLATION OF THE WORK.
CUTTING AND PATCHING SHALL BE PERFORMED IN A
WORKMANLIKE MANNER CONSISTENT WITH
INDUSTRY STANDARDS FOR FINISHES AND
SUBSTRATES AFFECTED.
9. THE CONTRACTOR SHALL PROTECT THE FACILITY
FROM WEATHER AND MAINTAIN SECURITY DURING
ALL CONSTRUCTION WORK.
10. PROTECT EXISTING PROPERTY DURING
CONSTRUCTION. REPAIR OR REPLACE, WITHOUT
ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING
WORK DAMAGED DURING THE COURSE OF
CONSTRUCTION.
11. THE WORK SHALL BE COORDINATED IN GOOD FAITH
WITH THE COR AND ALL GOVERNMENT EMPLOYEES
14 DAYS IN ADVANCE OF BEGINNING EACH
CONSTRUCTION ACTIVITY.
12. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK
ARE SPECIFICALLY NOTED TO BE PROVIDED OR
FURNISHED BY OTHERS, THEY SHALL BE PROVIDED
UNDER THIS CONTRACT.
13. ALL WORK SHALL BE PERFORMED BY SKILLED
WORKERS IN A WORKMANLIKE AND PROFESSIONAL
MANNER CONSISTENT WITH INDUSTRY STANDARDS.
14. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL
BUILDINGS AND STRUCTURES IN PROPER WORKING
ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE,
REPLACE ANY WORK, MATERIALS, OR EQUIPMENT
FURNISHED AND INSTALLED UNDER THE CONTRACT
WHICH DEVELOPS DEFECTS, EXCEPT FROM
ORDINARY WEAR AND TEAR, WITHIN ONE (1) YEAR
FROM THE DATE OF FINAL ACCEPTANCE BY THE
OWNER.
15. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND
FACILITATE ALL POWER OUTAGES AND SHUTDOWNS.
POWER OUTAGES AND SHUTDOWNS MUST BE
SCHEDULED WITH THE COR, 1-WEEK PRIOR TO
OUTAGE.
17 FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING
BUT NOT LIMITED TO REGULATED MATERIALS
ARCHITECTURAL, STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL
OTHER EXISTING SYSTEMS. MAKE NECESSARY
PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID
SYSTEMS PRIOR TO THE COMMENCEMENT OF
DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL,
TELECOMMUNICATIONS AND ARCHITECTURAL
DRAWINGS FOR ANY SYSTEM OR PORTIONS
THEREOF TO BE REMOVED, RELOCATED, REVISED
OR ABANDONED.
18. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH
THE CONTRACT DOCUMENTS SHALL BE CORRECTED
AT NO EXPENSE TO THE OWNER OR
ARCHITECT/ENGINEER OF RECORD (EOR).
19. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF
THE BUILDING MUST BE MAINTAINED AT ALL TIMES.
ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION
OF CONSTRUCTION PERSONNEL AND MATERIALS
THROUGH OCCUPIED PORTIONS OF THE BUILDING.
KEEP ALL AREAS ADJACENT TO THE WORK AREA
CLEAN.
20. PRIOR TO DELIVERY OF MATERIALS TO THE
CONSTRUCTION ZONE AND REMOVAL OF WASTE
FROM THE SITE, CHECK WITH THE COR FOR AN
ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO
CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE
CONSTRUCTION ZONE BE USED WITHOUT PRIOR
APPROVAL FROM THE COR. ALL BUILDING INTERIOR
STAGING AREAS SHALL BE PROTECTED WITH FIRE
RESISTANT PLYWOOD ENCLOSURES. ALL TRASH
SHALL BE REMOVED FROM THE BUILDING DAILY.
CONSTRUCTION MATERIALS SHALL NOT BE STORED
IN CORRIDORS AT ANY TIME.
21. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES,
AND POINTS OF CONNECTION PRIOR TO START OF
WORK.
22. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF
BRACING, SHORING, SCAFFOLDING, AND
TEMPORARY SUPPORTS AND RESTRAINS IN THE
SOLE RESPONSIBILITY OF THE CONTRACTOR.
23. NOTIFY THE FACILITY OF TIMES WHEN THE
CONSTRUCTION NOISE WILL BE EXCESSIVE.
RESCHEDULE SUCH WORK IF SO REQUIRED BY THE
FACILITY.
24. NOTIFY THE COR OF ANY DISCREPANCIES
DISCOVERED IN THE FIELD THAT REQUIRE
CORRECTIVE ACTION.
25. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND
SERVICES TO REMAIN, PROTECT ALL FINISHES AND
MATERIALS, AND REPAIR OR REPLACE ALL ITEMS
THAT ARE DAMAGED OR SOILED DURING THE
COURSE OF CONSTRUCTION.
26. ALL ITEMS TO BE REMOVED AND REPLACED SHALL
BE HANDLED WITH PROPER CARE AND STORED IN A
SAFE PLACE TO PREVENT DAMAGE; WHEN DAMAGED,
REPLACED AT NO EXPENSE TO THE OWNER.
27. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED
OR BRACED IN ACCORDANCE WITH PROVISIONS OF
THE TECHNICAL SPECIFICATIONS.
28. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR
ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS.
ITEMS WRONGLY LOCATED BY DRAWING SCALING
SHALL BE CORRECTED.
29. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE
CONSISTENT WITH THE FACILITY'S EXISTING
SIGNAGE SYSTEMS.
30. EXERCISE CARE DURING CONSTRUCTION TO
MINIMIZE DISRUPTION OF THE MEDICAL CENTER
ROUTINE, COORDINATE SEQUENCE OF WORK AND
PHASING WITH THE COR TO MINIMIZE DISRUPTION OF
THE MEDICAL CENTER. MANY OF THE WORK ITEMS
REQUIRE THE WORK TO BE PERFORMED ONLY AT
NIGHT, WEEKENDS, OR HOLIDAYS AT NO ADDITIONAL
COST TO THE GOVERNMENT.
31. PRIOR TO DRILLING OR CORING EXISTING
CONCRETE, CONTRACTOR SHALL LOCATE EXISTING
REINFORCEMENT TO MAINTAIN ADEQUATE
CLEARANCES FROM AND AVOID DAMAGE TO
EXISTING REINFORCEMENT. CONTRACTOR SHALL
USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE
REINFORCEMENT. WHENEVER FEASIBLE,
CONTRACTOR SHALL USE GROUND PENETRATING
RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE
X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE
WRITTEN REQUEST A LEAST THREE(3) WEEKS PRIOR
TO EVENT; WORK MAY BE REQUIRED TO BE
PERFORMED OUTSIDE NORMAL WOK HOURS AND
SHALL BE DOCUMENTED ON THE THREE(3) WEEK
LOOK AHEAD SCHEDULE.
32. PROTECT EXISTING FIRE SUPPRESSION SYSTEMS
DURING CONSTRUCTION.
33. IN THE EVENT THE CONTRACTOR DISCOVERS
HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY
REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED
IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE
COR AND THE A/E FOR DIFFERING SITE CONDITION
ACKNOWLEDGMENT. REMEDIATION WOULD BE
COMPENSATED BY ADDITIONAL MONEY AND ADDITIONAL
TIME FOR CRITICAL PATH ACTIVITIES.
TRUE
PLAN
NORTH
NORTH
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
000-GI-002
SHEET INDEX
INDEX OF DRAWINGS VOL.1
TAWCS
000-GI-001 COVER SHEET - VOLUME 1
000-GI-002 SHEET INDEX
001-TD-SB2 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SUB BASEMENT
001-TD-0B2 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT
001-TD-0B3 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT
001-TD-011 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIRST FLOOR
001-TD-012 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIRST FLOOR
001-TD-013 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIRST FLOOR
001-TD-021 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SECOND FLOOR
001-TD-022 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL SECOND FLOOR
001-TD-031 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL THIRD FLOOR
001-TD-032 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL THIRD FLOOR
001-TD-041 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FOURTH FLOOR
001-TD-042 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FOURTH FLOOR
001-TD-051 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIFTH FLOOR
001-TD-052 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL FIFTH FLOOR
001-TD-061 TELECOMM DEMOLITION PLAN - BLDG 1 SIXTH FLOOR
001-TD-062 TELECOMM DEMOLITION PLAN - BLDG 1 SIXTH FLOOR
001-TD-071 TELECOMM DEMOLITION PLAN - BLDG 1 SEVENTH FLOOR
001-TD-081 TELECOMM DEMOLITION PLAN - BLDG 1 EIGHTH FLOOR
002-TD-0B1 TELECOMM DEMOLITION PLAN - BLDG 2 BASEMENT
002-TD-011 TELECOMM DEMOLITION PLAN - BLDG 2 FIRST FLOOR
002-TD-021 TELECOMM DEMOLITION PLAN - BLDG 2 SECOND FLOOR
002-TD-031 TELECOMM DEMOLITION PLAN - BLDG 2 THIRD FLOOR
004-TD-0B1 TELECOMM DEMOLITION PLAN - BLDG 4 BASEMENT
006-TD-0B1 TELECOMM DEMOLITION PLAN - BLDG 6 BASEMENT
006-TD-011 TELECOMM DEMOLITION PLAN - BLDG 6 FIRST FLOOR
006-TD-021 TELECOMM DEMOLITION PLAN - BLDG 6 SECOND FLOOR
011-TD-011 TELECOMM DEMOLITION PLAN - BLDG 11 GROUND FLOOR
TG-001 TELECOMM LEGEND, SCHEDULES, ABBREVIATIONS, GENERAL NOTES
TS-001 TELECOMMUNICATIONS EXISTING SITE PLAN
TS-002 TELECOMM DEMOLITION FIBER OPTIC SITE PLAN
TS-003 TELECOMM NEW FIBER OPTIC SITE PLAN
TJ-001 TELECOMM DETAILS
TJ-002 TELECOMM DETAILS
TJ-003 TELECOMM DETAILS
001-TN-SB2 TELECOMM FLOOR PLAN - BLDG 1 SUB BASEMENT
001-TN-0B1 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL BASEMENT
001-TN-0B2 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL BASEMENT
001-TN-0B3 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL BASEMENT
001-TN-011 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL FIRST FLOOR
001-TN-012 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL FIRST FLOOR
001-TN-013 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL FIRST FLOOR
001-TN-021 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL SECOND FLOOR
001-TN-022 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL SECOND FLOOR
001-TN-031 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL THIRD FLOOR
001-TN-032 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL THIRD FLOOR
001-TN-041 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL FOURTH FLOOR
001-TN-042 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL FOURTH FLOOR
001-TN-051 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL FIFTH FLOOR
001-TN-052 TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL FIFTH FLOOR
001-TN-061 TELECOMM FLOOR PLAN - COPPER - BLDG 1 SIXTH FLOOR
001-TN-062 TELECOMM FLOOR PLAN - COPPER - BLDG 1 SIXTH FLOOR
001-TN-071 TELECOMM FLOOR PLAN - BLDG 1 SEVENTH FLOOR
001-TN-081 TELECOMM FLOOR PLAN - BLDG 1 EIGHTH FLOOR
002-TN-0B1 TELECOMM FLOOR PLAN - BLDG 2 BASEMENT
002-TN-011 TELECOMM FLOOR PLAN - BLDG 2 FIRST FLOOR
002-TN-021 TELECOMM FLOOR PLAN - BLDG 2 SECOND FLOOR
002-TN-031 TELECOMM FLOOR PLAN - BLDG 2 THIRD FLOOR
004-TN-0B1 TELECOMM FLOOR PLAN - BLDG 4 BASEMENT
006-TN-0B1 TELECOMM FLOOR PLAN - BLDG 6 BASEMENT
006-TN-011 TELECOMM FLOOR PLAN - BLDG 6 FIRST FLOOR
006-TN-021 TELECOMM FLOOR PLAN - BLDG 6 SECOND FLOOR
011-TN-011 TELECOMM FLOOR PLAN - BLDG 11 GROUND FLOOR
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
001-AE-0B1 ARCH FLOOR PLAN - BLDG 1 BASEMENT
001-AE-0B2 ARCH FLOOR PLAN - BLDG 1 BASEMENT
001-AE-011 ACAD FLOOR PLAN - BLDG 1 FIRST FLOOR
001-AE-012 ARCH FLOOR PLAN - BLDG 1 FIRST FLOOR
001-AE-021 ARCH FLOOR PLAN - BLDG 1 SECOND FLOOR
001-AE-022 ARCH FLOOR PLAN - BLDG 1 SECOND FLOOR
001-AE-031 ARCH FLOOR PLAN - BLDG 1 THIRD FLOOR
001-AE-032 ARCH FLOOR PLAN - BLDG 1 THIRD FLOOR
001-AE-041 ARCH FLOOR PLAN - BLDG 1 FOURTH FLOOR
001-AE-042 ARCH FLOOR PLAN - BLDG 1 FOURTH FLOOR
001-AE-051 ARCH FLOOR PLAN - BLDG 1 FIFTH FLOOR
001-AE-052 ARCH FLOOR PLAN - BLDG 1 FIFTH FLOOR
001-AE-061 ARCH FLOOR PLAN - BLDG 1 SIXTH FLOOR
002-AE-0B1 ARCH FLOOR PLAN - BLDG 2 BASEMENT
004-AE-0B1 ARCH FLOOR PLAN - BLDG 4 BASEMENT
006-AE-0B1 ARCH FLOOR PLAN - BLDG 6 BASEMENT
006-AE-011 ARCH FLOOR PLAN - BLDG 6 FIRST FLOOR
006-AE-021 ARCH FLOOR PLAN - BLDG 6 SECOND FLOOR
011-AE-021 ARCH FLOOR PLAN - BLDG 11 TELECOMM ROOM ADDITION
001-AJ-001 ARCH ENLARGED FLOOR PLANS
MG0001
001-MD-0B1
001-MD-0B2
001-MD-0B3
001-MD-011
001-MD-012
001-MD-021
001-MD-022
001-MD-031
001-MD-032
001-MD-041
001-MD-042
001-MD-051
001-MD-052
001-MD-061
004-MD-0B1
006-MD-011
011-MD-0B1
001-MH-0B1
001-MH-0B2
001-MH-0B3
001-MH-011
001-MH-012
001-MH-013
001-MH-021
001-MH-022
001-MH-023
001-MH-031
001-MH-032
001-MH-041
001-MH-042
001-MH-051
001-MH-052
001-MH-061
002-MH-0B1
002-MH-011
004-MH-0B1
004-MH-011
006-MH-011
011-MH-0B1
002-MD-0B1
001-MH-071
LEGEND ABBREVIATION LIST AND GENERAL NOTES
HVAC DEMOLITION PLAN - BLDG 1 BASEMENT
HVAC DEMOLITION PLAN - BLDG 1 BASEMENT
HVAC DEMOLITION PLAN - BLDG 1 BASEMENT
HVAC DEMOLITION PLAN - BLDG 1 FIRST FLOOR
HVAC DEMOLITION PLAN - BLDG 1 FIRST FLOOR
HVAC DEMOLITION PLAN - BLDG 1 SECOND FLOOR
HVAC DEMOLITION PLAN - BLDG 1 SECOND FLOOR
HVAC DEMOLITION PLAN - BLDG 1 THIRD FLOOR
HVAC DEMOLITION PLAN - BLDG 1 THIRD FLOOR
HVAC DEMOLITION PLAN - BLDG 1 FOURTH FLOOR
HVAC DEMOLITION PLAN - BLDG 1 FOURTH FLOOR
HVAC DEMOLITION PLAN - BLDG 1 FIFTH FLOOR
HVAC DEMOLITION PLAN - BLDG 1 FIFTH FLOOR
HVAC DEMOLITION PLAN - BLDG 1 SIXTH FLOOR
HVAC DEMOLITION PLAN - BLDG 4 BASEMENT
HVAC DEMOLITION PLAN - BLDG 6 FIRST FLOOR
HVAC DEMOLITION PLAN - BLDG 11 GROUND FLOOR
HVAC PLAN - BLDG 1 BASEMENT
HVAC PLAN - BLDG 1 BASEMENT
HVAC PLAN - BLDG 1 BASEMENT
HVAC PLAN - BLDG 1 FIRST FLOOR
HVAC PLAN - BLDG 1 FIRST FLOOR
HVAC PLAN - BLDG 1 FIRST FLOOR
HVAC PLAN - BLDG 1 SECOND FLOOR
HVAC PLAN - BLDG 1 SECOND FLOOR
HVAC PLAN - BLDG 1 SECOND FLOOR
HVAC PLAN - BLDG 1 THIRD FLOOR
HVAC PLAN - BLDG 1 THIRD FLOOR
HVAC PLAN - BLDG 1 FOURTH FLOOR
HVAC PLAN - BLDG 1 FOURTH FLOOR
HVAC PLAN - BLDG 1 FIFTH FLOOR
HVAC PLAN - BLDG 1 FIFTH FLOOR
HVAC PLAN - BLDG 1 SIXTH FLOOR
HVAC PLAN - BLDG 2 BASEMENT
HVAC PLAN - BLDG 2 FIRST FLOOR
HVAC PLAN - BLDG 4 BASEMENT
HVAC PLAN - BLDG 4 FIRST FLOOR
HVAC PLAN - BLDG 6 FIRST FLOOR
HVAC PLAN - BLDG 11 GROUND FLOOR
HVAC DEMOLITION PLAN - BLDG 2 BASEMENT
HVAC PLAN - BLDG 1 SEVENTH FLOOR
000-GI-003 ABBREVIATIONS
000-EG-001 - ELECTRICAL LEGEND AND SCHEDULES
000-ES-001 - ELECTRICAL SITE PLAN
000-EJ-001 - ELECTRICAL DETAILS
001-TD-SB1 ELECTRICAL DEMOLITION PLAN - BLDG 1 PARTIAL SUB BASEMENT
001-ED-0B1 - ELECTRICAL DEMOLITION - BLDG 1 BASEMENT
001-ED-011 - ELECTRICAL DEMOLITION - BLDG 1 FIRST FLOOR
001-ED-021 - ELECTRICAL DEMOLITION - BLDG 1 SECOND FLOOR
001-ED-031 - ELECTRICAL DEMOLITION - BLDG 1 THIRD FLOOR
001-ED-041 - ELECTRICAL DEMOLITION - BLDG 1 FOURTH FLOOR
001-ED-051 - ELECTRICAL DEMOLITION - BLDG 1 FIFTH FLOOR
001-ED-061 - ELECTRICAL DEMOLITION - BLDG 1 SIXTH FLOOR
001-ED-071 - ELECTRICAL DEMOLITION - BLDG 1 SEVENTH FLOOR
001-ED-081 - ELECTRICAL DEMOLITION - BLDG 1 EIGHTH FLOOR
002-ED-0B1 - ELECTRICAL DEMOLITION - BLDG 2
004-ED-0B1 - ELECTRICAL DEMOLITION - BLDG 4
006-ED-0B1 - ELECTRICAL DEMOLITION - BLDG 6
001-EP-SB1 - ELECTRICAL REMODEL - BLDG 1 SUB BASEMENT
001-EP-0B1 - ELECTRICAL REMODEL - BLDG 1 BASEMENT
001-EP-011 - ELECTRICAL REMODEL - BLDG 1 FIRST FLOOR
001-EP-021 - ELECTRICAL REMODEL - BLDG 1 SECOND FLOOR
001-EP-031 - ELECTRICAL REMODEL - BLDG 1 THIRD FLOOR
001-EP-041 - ELECTRICAL REMODEL - BLDG 1 FOURTH FLOOR
001-EP-051 - ELECTRICAL REMODEL - BLDG 1 FIFTH FLOOR
001-EP-061 - ELECTRICAL REMODEL - BLDG 1 SIXTH FLOOR
001-EP-071 - ELECTRICAL REMODEL - BLDG 1 SEVENTH FLOOR
001-EP-081 - ELECTRICAL REMODEL - BLDG 1 EIGHTH FLOOR
002-EP-0B1 - ELECTRICAL REMODEL - BLDG 2
004-EP-0B1 - ELECTRICAL REMODEL - BLDG 4
006-EP-0B1 - ELECTRICAL REMODEL - BLDG 6
011-EP-0B1 - ELECTRICAL REMODEL - BLDG 11
INDEX OF DRAWINGS VOL.2
001-AJ-002 ARCH ENLARGED FLOOR PLANS
001-AJ-003 ARCH ENLARGED FLOOR PLANS
001-AJ-004 ARCH ENLARGED FLOOR PLANS
001-AJ-005 ARCH ENLARGED FLOOR PLANS
001-AJ-007 WALL PARTITION TYPES
000-AI-010 DOOR SCHEDULE
001-AJ-006 ARCH ENLARGED FLOOR PLANS
000-AK-001 FIRE STOPPING DETAILS
CI0001 CIVIL - GENERAL NOTES
RC0001 CIVIL - EXISTING CONDITIONS PLAN
CS0001 CIVIL - FIBER OPTICS SITE PLAN
CU0100 CIVIL - PRIMARY FIBER OPTICS SITE PLAN
CU0101 CIVIL - PRIMARY FIBER OPTICS PLAN AND PROFILE
CU0102 CIVIL - PRIMARY FIBER OPTICS PLAN AND PROFILE
CU0103 CIVIL - PRIMARY FIBER OPTICS PLAN AND PROFILE
CU0200 CIVIL - SECONDARY FIBER OPTICS SITE PLAN
CU0201 CIVIL - SECONDARY FIBER OPTICS PLAN AND PROFILE
CU0202 CIVIL - RESERVED FOR POWER PLAN AND PROFILE
CU0300 CIVIL - DETAILS
CU0301 CIVIL - DETAILS
GENERAL
ARCHITECTURAL
CIVIL
MECHANICAL
ELECTRICAL & TELECOMMUNICATIONS
TJ-004 TELECOMM FIBER OPTIC ONE-LINE
TJ-005 TELECOMM EXISTING RACK ELEVATIONS
TJ-006 TELECOMM DETAILS
TJ-007 TELECOMM DETAILS
TJ-008 TELECOMM DETAILS
TJ-009 TELECOMM DETAILS
TJ-010 TELECOMM DETAILS
TJ-011 TELECOMM DETAILS
011-ED-0B1 - ELECTRICAL DEMOLITION - BLDG 11 BASEMENT
STRUCTURE
MG0002 DETAILS
MG0003 SCHEDULES
TJ-012 TELECOMM RACK DETAILS
TJ-013 TELECOMM RACK DETAILS
001-TN-0B4 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL BASEMENT
001-TN-0B5 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL BASEMENT
001-TN-0B6 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL BASEMENT
001-TN-014 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL FIRST FLOOR
001-TN-015 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL FIRST FLOOR
001-TN-016 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL FIRST FLOOR
001-TN-023 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL SECOND FLOOR
001-TN-024 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL SECOND FLOOR
001-TN-033 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL THIRD FLOOR
001-TN-034 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL THIRD FLOOR
001-TN-043 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL FOURTH FLOOR
001-TN-044 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL FOURTH FLOOR
001-TN-053 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL FIFTH FLOOR
001-TN-054 TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL FIFTH FLOOR
001-TN-063 TELECOMM FLOOR PLAN - FIBER - BLDG 1 SIXTH FLOOR
001-TN-064 TELECOMM FLOOR PLAN - FIBER - BLDG 1 SIXTH FLOOR
001-AE-071 ARCH FLOOR PLAN - BLDG 1 SEVENTH FLOOR ROOF PLAN
001-AE-SB1 ARCH FLOOR PLAN - BLDG 1 SUB-BASEMENT
000-AI-011 DOOR DETAILS
000-GI-001 COVER SHEET, VICINITY MAP, AND GENERAL REQUIREMENTS - VOLUME 2
000-GI-002 INDEX OF DRAWINGS - VOLUME 2
000-GI-003 ABBREVIATIONS AND GENERAL NOTES
GENERAL
001-AJ-008 ARCH ENLARGED FLOOR PLANS
001-GI-006 LIFE SAFETY - BLDG. 1 - SUB-BASEMENT
001-GI-007 LIFE SAFETY - BLDG. 1 - BASEMENT - NORTHWEST
001-GI-008 LIFE SAFETY - BLDG. 1 - BASEMENT - WEST
001-GI-009 LIFE SAFETY - BLDG. 1 - BASEMENT - EAST
001-GI-010 LIFE SAFETY - BLDG. 1 - 1ST FLOOR - NORTHWEST
001-GI-011 LIFE SAFETY - BLDG. 1 - 1ST FLOOR - WEST
001-GI-012 LIFE SAFETY - BLDG. 1 - 1ST FLOOR - EAST
001-GI-013 LIFE SAFETY - BLDG. 1 - 2ND FLOOR
001-GI-014 LIFE SAFETY - BLDG. 1 - 3RD FLOOR
001-GI-015 LIFE SAFETY - BLDG. 1 - 4TH FLOOR
001-GI-016 LIFE SAFETY - BLDG. 1 - 5TH FLOOR
001-GI-017 LIFE SAFETY - BLDG. 1 - 6TH FLOOR
001-GI-018 LIFE SAFETY - BLDG. 1 - 7TH FLOOR
001-GI-019 LIFE SAFETY - BLDG. 1 - 8TH FLOOR
001-TD-0B1 TELECOMM DEMOLITION PLAN - BLDG 1 PARTIAL BASEMENT
001-ED-SB1 - ELECTRICAL DEMOLITION - BLDG 1 SUB-BASEMENT
TJ-014 TELECOMM PAGING DEMOLITION
TJ-015 TELECOMM PAGING DETAILS
000-GI-004 LEGEND AND SYMBOLS
000-AI-012 DOOR HARDWARE SCHEDULE
002-GI-020 LIFE SAFETY - BLDG. 2
000-GI-005 INFECTION CONTROL PLAN - TYPICAL
004-GI-021 LIFE SAFETY - BLDG. 4
006-GI-022 LIFE SAFETY - BLDG. 6
011-GI-023 LIFE SAFETY - BLDG. 11
001-AJ-009 ARCH 3RD FLOOR ROOF ACCESS AND DETAILS
00-SN-001 STRUCTURAL NOTES
00-SN-002 STRUCTURAL NOTES
01-SD-100 BUILDING 1 DETAILS
02-SF-100 BUILDING 2 PLANS
02-SD-100 BUILDING 2 DETAILS
11-SF-100 BUILDING 11 PLANS
11-SD-100 BUILDING 11 DETAILS
FIRE SPRINKLER PLAN
001-FX-005 NEW AND MODIFIED FIRE SUPPRESSION SYSTEMS - RM 5281
FIRE PROTECTION
002-FP-00B BUILDING 2 TELECOMM ROOM FIRE SUPPRESSION SYSTEM
004-FP-00B BUILDING 4 TELECOMM ROOM FIRE SUPPRESSION SYSTEM
006-FP-001 BUILDING 6 TELECOMM ROOM FIRE SUPPRESSION SYSTEM
011-FP-002 BUILDING 11 TELECOMM ROOM FIRE SUPPRESSION SYSTEM
000-FP-005 EXTINGUISHANT PANEL CONNECTIONS
000-FP-006 DESIGN GUIDELINES
000-FP-007 FIRE SUPPRESSION DESIGN CALCULATIONS, FACU BATTERY CALCULATIONS
000-FP-008 DETAILS
001-ED-SB1 ELECTRICAL DEMOLITION PLAN - BLDG 1 SUB BASEMENT
001-TN-SB1 TELECOMM FLOOR PLAN - BLDG 1 SUB BASEMENT
TY-001 ACCESS CONTROL DOOR DETAILS
000-GI-003
ABBREVIATIONS
TAWCS
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
LEGEND
A
LIGHT FIXTURE SCHEDULE
N/A
000-EG-001
ELECTRICAL LEGEND AND SCHEDULES
DB LKA
EQUIPMENT SCHEDULE - BUILDING 1
LOAD CALCULATIONS
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS N/A
000-EJ-001
ELECTRICAL DETAILS
DB LKA
GENERAL NOTES
SHEET NOTES
2 PARTIAL POWER ONE-LINE DIAGRAMS - REMODEL
NO SCALE
1 PARTIAL POWER ONE-LINE DIAGRAM - DEMOLITION
NO SCALE
3 TRENCH DETAIL
NO SCALE
5 TYPICAL POWER ELEVATION AND SCHEMATIC FOR A TWO RACK TR
NO SCALE
6 TYPICAL POWER ELEVATION AND SCHEMATIC FOR A THREE RACK TR
NO SCALE
4 TYPICAL POWER ELEVATION AND SCHEMATIC FOR A ONE RACK TR
NO SCALE
CONDUIT & CONDUCTOR SCHEDULE
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS N/A
000-EJ-002
PANEL SCHEDULES
DB LKA
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS N/A
000-EJ-003
PANEL SCHEDULES
NO P
ARKIN
G
NO PARKING
ES-001
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES:
GENERAL NOTES:GENERAL NOTES:
1 ELECTRICAL SITE PLAN
1"=40'-0"
N/A
000-ES-001
ELECTRICAL SITE PLAN
DB LKA
2 ENLARGED SITE PLAN
1"=10'-0"
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 SUB BASEMENT
1/8"=1'-0"
GENERAL NOTES
SHEET NOTES
001-ED-SB1
ELECTRICAL DEMOLITION PLAN -
BLDG 1 SUB BASEMENT
ED-0B1
ED-0B1
ED-0B1
ED-0B1
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
5 ENLARGED ROOM - B296
1/4"=1'-0"
GENERAL NOTES
SHEET NOTES
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 BASEMENT
1/16"=1'-0"
2 ENLARGED ROOM - B091
1/4"=1'-0" 3 ENLARGED ROOM - B085
1/4"=1'-0" 4 ENLARGED ROOM - B117
1/4"=1'-0"
001-ED-0B1
ELECTRICAL DEMOLITION PLAN -
BLDG 1 BASEMENT
(SHOWN FOR REFERENCE ONLY)
OPC NURSE CALL PNL
FIRE ALARM TRANSPONDER PNL
SECURITY SYSTEM
"L1D"
"L1C"
"CR1A"
ED NURSE CALL PNLFIRE ALARM AUX PNL
LIGHTING CONTROL "LCP1B"
LIGHTING CONTROL "LCP1A"
STACKED PNLS
SECURITY SYSTEM
CONTROL PANEL
CONTROL PANEL
M M1 L1A(R) L1A(L)
CR1EQ1LS1
W1N
W1S
W1SA
LN1-1
LN1-2
CR2(L)CR2(R)
LS2
E1S
E1C
E1C-A
C1
SECURITY SYSTEM
CONTROL PANEL
EQ1A CR1C
ED-011
ED-011
ED-011
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 FIRST FLOOR
1/16"=1'-0"
2 ENLARGED ROOM - 1161/1120
1/4"=1'-0" 3 ENLARGED ROOM - 1218A/1216/1220
1/4"=1'-0"
001-ED-011
ELECTRICAL DEMOLITION PLAN -
BLDG 1 FIRST FLOOR
DB LKA
GENERAL NOTES
4 ENLARGED ROOM - 1243
1/4"=1'-0"
FIRE/SMOKE DAMPER
ACTUATOR 120V
NL
ED-012
ED-012
ED-012
ED-012
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
2 ENLARGED ROOM - 2140
1/4"=1'-0"
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 SECOND FLOOR
1/16"=1'-0"
001-ED-021
ELECTRICAL DEMOLITION PLAN -
BLDG 1 SECOND FLOOR
DB LKA
GENERAL NOTES
SHEET NOTES
4 ENLARGED ROOM - 2218
1/4"=1'-0"3 ENLARGED ROOM - 2215A
1/4"=1'-0" 5 ENLARGED ROOM - 2306
ED-031
ED-031
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 3122/3163
1/4"=1'-0" 3 ENLARGED ROOM - 3214/3216
1/4"=1'-0"
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 THIRD FLOOR
1/16"=1'-0"
001-ED-031
ELECTRICAL DEMOLITION PLAN -
BLDG 1 THIRD FLOOR
GENERAL NOTES
ED-041
ED-041
ED-041
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 4122/4118
1/4"=1'-0" 3 ENLARGED ROOM - 4218
1/4"=1'-0"
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 FOURTH FLOOR
1/16"=1'-0"
4 ENLARGED ROOM - 4246
1/4"=1'-0"
001-ED-041
ELECTRICAL DEMOLITION PLAN -
BLDG 1 FOURTH FLOOR
DB LKA
ED-051
ED-051
ED-051
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 5122
1/4"=1'-0" 3 ENLARGED ROOM - 5220/5222
1/4"=1'-0"
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 FIFTH FLOOR
1/16"=1'-0"
001-ED-051
ELECTRICAL DEMOLITION PLAN -
BLDG 1 FIFTH FLOOR
DB LKA
GENERAL NOTES
4 ENLARGED ROOM - 5281
ED-061
ED-061
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
2 ENLARGED ROOM - 6122
1/4"=1'-0"
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 SIXTH FLOOR
1/16"=1'-0"
3 ENLARGED ROOM - 6222A
1/4"=1'-0"
001-ED-061
ELECTRICAL DEMOLITION PLAN -
BLDG 1 SIXTH FLOOR
3RD FLOOR ROOF
2ND FLOOR ROOF
2ND FLOOR ROOF
2ND FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
FIRST FLOOR ROOF
4TH FLOOR ROOF
5TH FLOOR ROOF5TH FLOOR ROOF
BASEMENT ROOF
BASEMENT ROOF
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 SEVENTH FLOOR (SHOWN FOR REFERENCE ONLY)
1/8"=1'-0"
001-ED-071
ELECTRICAL DEMOLITION PLAN -
BLDG 1 SEVENTH FLOOR
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
1 ELECTRICAL DEMOLITION PLAN - BLDG 1 EIGHTH FLOOR (SHOWN FOR REFERENCE ONLY)
1/4"=1'-0"
001-ED-081
ELECTRICAL DEMOLITION PLAN -
BLDG 1 EIGHTH FLOOR
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
1 BLDG 2 BASEMENT
1/8"=1'-0" 2 ELECTRICAL DEMOLITION PLAN - BLDG 2 FIRST FLOOR (SHOWN FOR REFERENCE ONLY)
1/8"=1'-0"
ELECTRICAL DEMOLITION PLAN -
002-ED-0B1
ELECTRICAL DEMOLITION PLAN -
BLDG 2
DB LKA
SHEET NOTES
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
1 ELECTRICAL DEMOLITION PLAN - BLDG 4 BASEMENT
1/8"=1'-0" 2 ELECTRICAL DEMOLITION PLAN - BLDG 4 FIRST FLOOR
1/8"=1'-0" 3 ELECTRICAL DEMOLITION PLAN - BLDG 4 SECOND FLOOR
1/8"=1'-0"
004-ED-0B1
ELECTRICAL DEMOLITION PLAN -
BLDG 4
DB LKA
SHEET NOTES
(SHOWN FOR REFERENCE ONLY) (SHOWN FOR REFERENCE ONLY)
ED-0B1
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
1 ELECTRICAL DEMOLITION PLAN - BLDG 6 BASEMENT
1/8"=1'-0" 2 ELECTRICAL DEMOLITION PLAN - BLDG 6 FIRST FLOOR
1/8"=1'-0"
3 ELECTRICAL DEMOLITION PLAN - BLDG 6 SECOND FLOOR
1/8"=1'-0"
006-ED-0B1
ELECTRICAL DEMOLITION PLAN -
BLDG 6
DB LKA
GENERAL NOTES
4 ENLARGED ROOM - 107
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
SHEET NOTES
1 ELECTRICAL DEMOLITION PLAN - BLDG 11 GROUND FLOOR
1/4"=1'-0"
011-ED-0B1
ELECTRICAL DEMOLITION PLAN -
BLDG 11
Fire Pump System
ERV-4
W or k S in k
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
CHWP-1
CHWP-2
Steam Piping
HP Chiller
Pump
Pump
Pump
Pump
HX'S 3&4
C H
W P
-2 A
H X
's
P U
M P
LIFT
STATION
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
Anchorage, AK 99503 Phone (907) 276-0521 Corporate No.: AECC542
670 West Fireweed Lane, Suite 200
S
MECHANICAL AND ELECTRICAL CONSULTING ENGINEERS
Engineering, Inc.
R A
10-29-2021
100% DESIGN DOCUMENTS 10.29.2021
10/29/21
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION
DOCUMENTS
1 ELECTRICAL REMODEL PLAN - BLDG 1 SUB BASEMENT
1/8"=1'-0"
GENERAL NOTES
SHEET NOTES
001-EP-SB1
ELECTRICAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .