About this file

This is a solicitation for infrastructure upgrades at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The project involves upgrades to the facilities' electric, IT, HVAC, physical security and fiber optic infrastructure to enable the implementation of a new Electronic Health Record Modernization system. Key work includes electrical upgrades, bonding and UPS installation, integration with the Building Management System, reconfiguration and expansion of existing closet spaces, upgrading communication infrastructure with new data outlets and Cat6A cabling, and campus-wide fiber backbone improvements. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. Responses are due based on the standard solicitation timeline.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain, newest first.
File Type Posted
36C77622B0018 0003.pdf PDF
09 69 00 Access Flooring-Addenda 2.pdf PDF
Addendum 1.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 6-17-22.pdf PDF
Technical Questions - FINAL - Iron Mtn. 6-27-22.pdf PDF
EHRM Asbestos Report.pdf PDF
36C77622B0018 0002.pdf PDF
36C77622B0018 0001.pdf PDF
Site Visit Sign-in Sheet - Iron Mtn. 5-18-22.pdf PDF
ATTACHMENT 3 - Drawings VOL 1 - 1 of 5.pdf PDF
ATTACHMENT 15 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 19 - Site Visit Instructions.pdf PDF
36C77622B0018 - 5-5-22.pdf PDF
ATTACHMENT 4 - Drawings VOL 1 - 2 of 5.pdf PDF
ATTACHMENT 5 - Drawings VOL 1 - 3 of 5.pdf PDF
ATTACHMENT 6 - Drawings VOL 1 - 4 of 5.pdf PDF
ATTACHMENT 7 - Drawings VOL 1 - 5 of 5.pdf PDF
ATTACHMENT 10 - Drawings VOL 2 - 3 of 7.pdf PDF
ATTACHMENT 11 - Drawings VOL 2 - 4 of 7.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 18 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 1 - Specifications VOL 1 of 2.pdf PDF
ATTACHMENT 13 - Drawings VOL 2 - 6 of 7.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 2-25-22.pdf PDF
ATTACHMENT 8 - Drawings VOL 2 - 1 of 7.pdf PDF
ATTACHMENT 9 - Drawings VOL 2 - 2 of 7.pdf PDF
ATTACHMENT 12 - Drawings VOL 2 - 5 of 7.pdf PDF
ATTACHMENT 14 - Drawings VOL 2 - 7 of 7.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Electronic Health Record Modernization (EHRM) Infrastructure Upgrades Design Project Contract No. 36C77621C0029

VA 585-21-700 Iron Mountain

100% Technical Specifications

October 29, 2021

Volume 2-Divisions 21 thru 32

Oscar G. Johnson VA Medical Center

325 E H Street

Iron Mountain, Michigan For

US Department of Veterans Affairs

Program Contracting Activity Central (PCAC)

6150 Oak Tree Blvd., Suite 300

Independence, OH 44131

GDM OF OREGON

1584 McNeil St., Suite 200

Dupont, WA, 98327

360-915-5126

Dave Clem, Project Manager

OGJVAMC 100% CONSTRUCTION DOCUMENTS

IRON MOUNTAIN, MI 10/29/2021

OSCAR G. JOHNSON VA MEDICAL CENTER

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 13 13 - 1 of 8

EXISTING PRE-ACTION SPRINKLER SYSTEM

MODIFICATION

SECTION 21 13 13

EXISTING PRE-ACTION SPRINKLER SYSTEM MODIFICATIONS

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section covers the modifications to the existing pre-action sprinkler system for the main computer room 5281 and the change of all sprinklers in all telecommunication rooms from suspended ceiling mounted heads to upright pendant mounted fusible link ordinary hazard sprinklers with protection cages. The pre-action compound will be removed and the sprinklers in Room 5281 will be changed to a standard water filled system.

B. Contractor to provide deferred approval submittal prepared by a NICET

IV designer for the fire sprinkler system modifications in existing and new telecommunication rooms and telecommunication space (Room 5281).

Relocate or add new heads where required, sprinkler heads to be within

12” of the concrete floor/roof deck above in compliance with NFPA 13.

Coordinate sprinkler system shutdown/schedule with VA COR and local fire authority having jurisdiction.

C. The contractor shall provide a full time 24/7/365 fire watch for all areas of the existing building served by the pre-action system until modifications are complete and commissioned.

1.2 RELATED WORK

A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Section 33 10 00, WATER UTILITIES.

C. Section 07 84 00, FIRESTOPPING.

D. Section 09 91 00, PAINTING.

E. Section 22 05 23, GENERAL-DUTY VALVES FOR PLUMBING PIPING.

F. Section 21 08 00 COMMISSIONING OF FIRE SUPRESSION SYSTEM MODIFICATION

G. Section 28 31 00, FIRE DETECTION AND ALARM.

1.3 DESIGN CRITERIA

A. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system modifications in accordance with the requirements of NFPA 13.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 13 13 - 2 of 8

1. Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method.

Hydraulic Calculations: Calculated demand shall fall no less than 10 percent below the available water supply curve.

2. Provide seismic protection for all new work and exiting piping in accordance with NFPA 13.

3. See drawing 001-FX-005 for additional requirements.

1.4 SUBMITTALS

A. Submit as one package in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are designed and signed by a NICET Level IV Sprinkler Technician.

The Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the

COR. Submittals shall include, but not be limited to, the following:

1. Qualifications:

a. Provide a copy of the installing contractors fire sprinkler and state contractor’s license.

b. Provide a copy of the NICET certification for the NICET Level IV

Sprinkler Technician who prepared and signed the detailed working drawings.

c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.

2. Drawings: Submit detailed 1/8 inch scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA 13.

Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 13 13 - 3 of 8

3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.

4. Calculation Sheets:

a. Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and

Calculations chapter of NFPA 13.

b. Submit calculations of loads for sizing of seismic sway bracing in accordance with NFPA 13.

5. Valve Charts: Provide a valve chart that identifies the location of each new control valve. Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID

No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and Location.

6. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in

Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:

a. A complete set of as-built drawings showing the installed system.

Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.

1) One full size (or size as directed by the COR) printed copy.

2) One complete set in electronic pdf format.

3) One complete set in AutoCAD format or a format as directed by the COR.

b. Material and Testing Certificate: Upon completion of the sprinkler system installation, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA 13. Certificates shall be provided to document all parts of the installation.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 13 13 - 4 of 8

c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment.

d. One paper copy of the Material and Testing Certificates and the

Operations and Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the COR.

e. Provide one additional copy of the Operations and Maintenance

Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.

1.5 QUALITY ASSURANCE

A. Installer Reliability: The installer shall possess a valid State of

Michigan contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.

B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. U.S. Department of Veterans Affairs Fire Protection Design Manual, Eight Edition—June 1, 2021.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 13 13 - 5 of 8

C. National Fire Protection Association (NFPA):

13-2022.................Installation of Sprinkler Systems

25-20...................Inspection, Testing, and Maintenance of Water-

Based Fire Protection Systems

101-2021................Life Safety Code

170-2021................Fire Safety Symbols

D. Underwriters Laboratories, Inc. (UL):

Fire Protection Equipment Directory (2021)

E. Factory Mutual Engineering Corporation (FM):

Approval Guide-2021

PART 2 - PRODUCTS

2.1 PIPING & FITTINGS

A. Piping and fittings for modifications to the sprinkler system shall be in accordance with NFPA 13.

1. Plain-end pipe fittings with locking lugs or shear bolts are not permitted.

2. Piping sizes 50 mm (2 inches) and smaller shall be black steel

Schedule 40 with threaded end connections.

3. Piping sizes 65 mm (2 ½ inches) and larger shall be black steel

Schedule 10 with grooved connections. Grooves in Schedule 10 piping shall be rolled grooved only.

4. CPVC and other plastic piping shall not be permitted.

5. Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside diameter or 1-inch and a maximum length of 6-feet.

2.2 VALVES

A. General:

1. Valves shall be in accordance with NFPA 13.

2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.

B. Control Valve: The control valves shall be a listed indicating type.

Control valves shall be UL Listed or FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 13 13 - 6 of 8

C. Check Valve: Shall be of the swing type with a flanged cast iron body and flanged inspection plate.

D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.

2.3 SPRINKLERS

A. Provide FM approved upright standard response sprinklers with fusible link heads with guard cages in Room 5281. Existing suspended acoustical ceilings in 5281 and all of the TRs are being removed as part of this project.

B. In areas with existing ceilings to be removed, the distances between the sprinkler deflector and the ceiling above shall be maintained in accordance with NFPA 13 or the sprinkler head shall be relocated to the new ceiling.

C. The distances between the sprinkler deflector and the ceiling above shall be selected based on the type of sprinkler and the type of construction in accordance with NFPA 13.

2.4 SPRINKLER CABINET

A. Provide sprinkler cabinet with seven (7) of sprinkler heads, and a sprinkler wrench in accordance with NFPA 13. Install at a location directed by the COR.

B. Provide a complete list of new sprinklers installed as part of this project in the cabinet. The list shall include the following:

1. Manufacturer, model, orifice, deflector type, thermal sensitivity, and pressure for each type of sprinkler in the cabinet.

2. General description of where each sprinkler was used.

3. Quantity of each type present in the cabinet.

4. Issue date of list.

2.5 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING

Any new pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 13.

2.6 VALVE TAGS

Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less than 8 mm (1/4 inch) for service designation on 19 gage, 40 mm (1-1/2 inches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 13 13 - 7 of 8

PART 3 - EXECUTION

3.1 INSTALLATION

A. Installation shall be accomplished by a licensed sprinkler installation contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.

B. Installation of Piping: Accurately cut any new pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Concealed piping in spaces that have finished ceilings. Pipe hangers, supports, and restraint of system piping, and seismic bracing shall be installed accordance with NFPA 13.

C. Welding: Conform to the requirements and recommendations of NFPA 13.

D. Drains: Existing low point and test drains and piping for existing zone are to remain and reused.

E. New upright sprinklers shall be installed within 12” of the bottom of the existing concrete roof deck.

F. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings. Ceiling escutcheons in suspended ceiling shall match existing.

G. Clearances: For systems requiring seismic protection, piping that passes through floors or walls shall have penetrations sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm

(1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches) nominally larger for penetrating pipe sizes 100 mm (4 inches) and larger.

H. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with

Section 07 84 00, FIRESTOPPING.

I. Firestopping shall be provided for all penetrations of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, EXISTING FIRESTOPPING.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 13 13 - 8 of 8

J. Painting of Pipe: Paint with primer and two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting sprinklers. Provide the identification tagging per NFPA 13.

K. Existing values, releasing panel and pre-action system devices shall be removed.

L. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system modifications by the installer at no additional expense to the Government.

3.2 INSPECTION AND TEST

A. Preliminary Testing: Flush the system prior to performing hydrostatic tests in order to remove any debris which may have been left as well as ensuring piping is unobstructed. Hydrostatically test system, as specified in NFPA 13, in the presence of the Contracting Officers

Representative (COR) or his designated representative.

B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test.

Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests. Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test

3.3 INSTRUCTIONS

Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the modified system, on the dates requested by the COR.

- - - E N D - - -

OGJVAMC 95% DOCUMENTS

IRON MOUNTAIN, MI 8/09/2021

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

Project No. 585-21-700

21 13 45 - 1 of 2

SPRINKLER GUARDS

SECTION 21 13 45

A. Supply and installation of sprinkler guards for wet-pipe system sprinklers in all Telecommunication Rooms (TRs).

1.2 RELATED WORK

A. Section 02 41 00, DEMOLITION OF EXISTING CEILING SYSTEMS.

1.3 DESIGN CRITERIA

A. Hard-wire cage designed to incase the sprinkler and protect it from mechanical damage. Guards shall be approved by the manufacture for use with standard and large office, standard and quick response upright and pendent style sprinklers.

1.4 SUBMITTALS

A. Submit as one package in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES.

1. Manufacturers technical data

2. Two samples of each proposed type

1.5 QUALITY ASSURANCE

A. Listings and Approvals

1. UL listed

2. FM approved class 2901

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. National Fire Protection Association (NFPA):

13-19...................Installation of Sprinkler Systems

C. Underwriters Laboratories, Inc. (UL):

Fire Protection Equipment Directory (2011)

D. Factory Mutual Engineering Corporation (FM):

Approval Guide

OGJVAMC 95% DOCUMENTS

IRON MOUNTAIN, MI 8/09/2021

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

Project No. 585-21-700

21 13 45 - 2 of 2

PART 2 - PRODUCTS

2.1 PIPING & FITTINGS

A. Basis of Design

1. Viking model D-1 Sprinkler guard

The Viking Corporation, 2010 N Industrial Park Drive, Hastings, MI

49058. Telephone: 269-945-9501 Technical Services: 877-384-5494

Fax:269-818-1680 Email:techsvcs@vikingcorp.com www.vikinggroupinc.com

2. Or approved equal.

2.2 SPARES

A. Provide four(4) spare guards of each type

A. Installation shall be accomplished by a qualified technician, experienced in the installation of sprinkler guards.

B. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler guards by the installer at no additional expense to the Government.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 1 of 2

CLEAN AGENT FIRE SUPPRESSION SYSTEM

SECTION 21 22 00

A. The requirements in this specification section include the design, installation and testing of a calculated automatic and manual fixed total flooding clean agent fire extinguishing system and releasing system in accordance with VHA Office of Occupational Safety Health

(19HEF) Fire Protection Design Manual Eighth Edition – June 1, 2021, NFPA 2001, NFPA 72, NFPA 70, and NFPA 75 and proposed clean agent manufacturer’s written instructions for Room 5281 in Building 1 on the contract drawings. The installation shall include all mechanical, controls and electrical components necessary for a complete and operating clean agent fire suppression system.

1.2 RELATED WORK

A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

B. Section 07 84 00, FIRESTOPPING

C. Section 09 91 00, PAINTING

D. Section 28 05 13, CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND

SECURITY

E. Section 28 05 28.33, CONDUIT AND BACKBOXES FOR ELECTRONIC SAFETY AND

SECURITY

F. Section 28 31 00, FIRE DETECTION AND ALARM

1.3 DESIGN CRITERIA

A. The clean agent fire extinguishing system shall be a fixed total flooding type utilizing clean agent designed to provide a uniform concentration throughout the protected spaces in accordance with NFPA

2001 for a Class C fire.

1. The system shall provide a minimum design concentration by volume, throughout the protected spaces at the minimum anticipated temperature within the protected space.

2. The design concentration within any protected space shall not exceed by volume the no observable adverse effects level (NOAEL). Special

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 2 of 3 means such as mechanical exhaust, shall not be permitted to be used to achieve this criterion.

3. The clean agent shall have a global warming potential (GWP) of less than 4000 and the clean agent shall be readily available throughout the continental United States.

4. Provide the quantity of clean agent as required by NFPA 2001 and agent’s manufacturer’s calculations and written instructions. Such factors as unenclosed openings (if any), “rundown” time of fans, time required for dampers to close, and any other feature of the facility that could affect concentration shall be addressed in clean agent quality to maintain an agent concentration of 85% for a 10 minute time duration per NFPA 2001.

5. Provide seismic bracing for the clean agent fire extinguishing system components per specification Section 13 05 41.

1.4 SUBMITTALS

A. Submit as one package in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level IV Special Hazards Suppression Systems

Technician. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation.

Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in Paragraphs 1.4 (A) 1 through

1.4 (A) 5 electronically in pdf format on a compact disc or as directed by the Contracting Officers Representative (COR). Submittals shall include, but not be limited to, the following:

1. Qualifications:

a. Provide a copy of the installing contractor’s and State of

Michigan contractors license.

b. Provide a copy of the NICET certification for the NICET Level IV

Special Hazards Suppression System Technician who will prepare and sign the detailed working drawings.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 3 of 4

c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of clean agent fire suppression systems for the past ten years.

2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working plans and drawings of the clean agent fire extinguishing system conforming to NFPA 2001. Submit detailed 1:100 (1/8 inch) scale

(minimum) working plans and drawings of the releasing system conforming to NFPA 72. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size.

a. The following items must be included on the drawings:

1. General

a. Name and owner and occupant

b. Address of building

c. Designers qualifications

d. Point of compass and symbol list

e. Description of occupancies and hazards being protected, designate whether or not the enclosure is normally occupied

f. Description of exposures surrounding the enclosure

g. Location and construction of protected enclosure walls, indicating fire rated walls; FSD; HVAC

h. Enclosure cross section, full height or schematic diagram, including location and construction of building floor/ceiling assemblies above and below raised access floor and suspended ceiling

i. Plan view of protected area showing enclosure partitions (full and partial height), agent distribution system, pipe hangers, fire alarm system, controlled devices (e.g., SF dampers), and instructional signs

2. Suppression

a. Type of clean agent being used, including manufactures specifications, and design standards used (NFPA 2001), etc.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 4 of 5

b. Description and specifications of the agent storage containers used including internal volume, storage pressure and nominal capacity expressed in units of agent mass, or volume at standard conditions of temperature and pressure; include calculations which determine enclosure volume, size of tank and quantity of agent.

c. Description and specifications of nozzles used including size, orifice port configuration and equivalent orifice area.

d. Description of pipe and fittings used including material specifications, grade and pressure rating

e. Show pipe length calculations; indicate actual, maximum and minimum lengths of pipe and equivalent lengths; show the actual and maximum vertical rise; show branch line limitations; include isometric view of agent distribution with node reference numbers

f. Detail the bracing for both the storage cylinders and the rigid piping, showing how each is secured to the building

g. Provide a detail of the pipe supports/hangers and their locations.

3. Fire Alarm

a. Equipment list showing quantity, make, model, and CSFM listing sheet of each fire alarm device

b. Detector mounting methods

c. Type and size of wire, cable and conduit (include conduit fill ratio); show class and/or style designation of circuits; Detail the required method of wire termination

d. Scale drawings showing the layout of the annunciator panel

e. Point-to-point wiring diagram showing connections from all circuits to the control panel, annunciator and external or add-on relays

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 5 of 6

f. Voltage drop and backup battery calculations

g. Sequence-of-operation description or matrix including functioning of abort and maintenance switches, delay timers and emergency power shutdown

h. The clean agent “Releasing Panel” shall be OUTSIDE of the hazardous area being protected

i. Install a smoke detector above the releasing panel

j. The audible alarm generated when the clean agent system discharges shall not interfere with the building’s existing fire alarm detection and notification system.

3. Manufacturers Data Sheets:

a. Provide for all materials and equipment proposed for use on the clean agent fire extinguishing system, including the releasing system. Include listing information and installation instructions in data sheets. Where data sheet describes items in addition to that item being submitted, clearly identify proposed item on the sheet.

4. Calculation Sheets:

a. Submit flow calculation sheets in tabular form conforming to the requirements of NFPA 2001. Calculations shall include total storage capacity, flooding concentrations, enclosure leakage rates, discharge times, flow through distribution network, pipe sizes, and nozzle orifice sizes.

b. Submit battery calculations sheets in tabular form conforming to the requirements of NFPA 72.

c. Submit voltage drop calculations in tabular form. Calculations shall indicate circuit amperage draw, wire resistance, circuit length, and voltage drop. The voltage drop shall demonstrate that voltage provided at the each appliance is within its operating voltage range. Voltage drop calculations shall assume an initial voltage of 20.4 volts.

d. Submit calculations of loads for sizing of sway bracing.

5. Clean Agent Recharging Certification: Provide a letter to the COR certifying that the installer maintains or has access to a clean agent recharging station. The installer shall also provide proof of

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 6 of 7 the ability to recharge the largest clean agent fire extinguishing system capacity within 48 hours.

6. Test Plan: Provide a test plan to the COR. The testing plan shall describe the procedures to be used to test the system. The testing plan shall include a step-by-step procedure of all tests to be performed, including indication of which tests will present a disruption to building occupants. No tests shall be conducted until the testing plan is approved by the COR or his designated representative.

7. Final Record Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in

Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

Submittals shall include, but not be limited to, the following:

a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.

1) One full size (or size as directed by the COR) printed copy.

2) One complete set in electronic pdf format.

3) One complete set in AutoCAD format or a format as directed by the COR.

b. System Certification: Upon completion of the clean agent fire extinguishing system installation, including testing, the authorized representative of the installing contractor and the

NICET IV designer shall certify that the installation complies with all requirements and that satisfactory total system operation has been achieved. Provide a copy of the Record of

Completion for the releasing system in accordance with NFPA 72.

c. Operating and Maintenance Manuals that include step-by-step procedures required for operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer’s name, model number, parts list, the name of the local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 7 of 8 including address and telephone number, for each item of equipment.

d. One paper copy of the System Certification and Record of

Completion and the Operating and Maintenance Manuals listed above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the COR.

e. Provide one additional copy of the Operations and Maintenance

Manual for the system in a binder and mount in an accessible location adjacent to the storage cylinder(s).

1.5 QUALITY ASSURANCE

A. Installer Reliability: The installer shall possess a valid State of

Michigan contractor's license. The installer shall have been actively and successfully engaged in the installation of five similar sized clean agent special suppression systems for the past ten years. The installer shall maintain or have access to a clean agent recharging station. The installer shall provide proof of the ability to recharge the clean agent fire extinguishing system capacity within 48 hours.

B. Materials and Equipment: All equipment and devices shall be UL listed or approved by FM. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect.

C. Clean Agent Hold Time

Per NFPA 2001 the required clean agent concentration shall be at 85% for ten minutes after discharge. Existing permeability of Room 5281 enclosure delimitations will result in losses of extinguishing agent.

This can prevent an effective extinguishing concentration or the required hold time from being reached or maintained. Subjective visual assessment of a protected enclosure’s leak tightness is not precise enough. Contractor shall be required to perform a blower door air leakage test after the contractor has sealed all room perimeter cracks, completed the required perimeter 1 hour stopping measures, installed new gaskets on exit doors, etc.

Room 5281 must have the following characteristics:

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 8 of 9

• The protected enclosure must have automatic closing devices on all doors into the space.

• Windows should not open or should only be openable with special tools. Existing windows shall be provided with additional gaskets.

D. Blower Door Room Air Leakage Test

For function of the fire suppression system known room permeability is a crucial factor.

A test shall be done by the contractor after he feels all of the required new crack sealing, gasketing and auto-closure work is complete to aide in calculating the amount of clean agent required.

Based on multiple pressure differential and air throughout measurements a leakage surface as well as the theoretical hold time of the concentration capable of extinguishing fires can be calculated. In addition any leakage observed can be addressed for additional sealing measures.

Description of the door fan test is provided in

• NFPA 2001 Annex C

1.6 APPLICABLE PUIBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. National Fire Protection Association (NFPA):

70-2021.................National Electric Code

72-2019.................National Fire Alarm Code

75-2020.................Fire Protection of Information Technology

Equipment

170-2021................Fire Safety Symbols

2001-2018...............Installation of Clean Agent Fire Extinguishing

Systems

C. Underwriters Laboratories, Inc. (UL): Fire Protection Equipment

As of Contract Award Date Directory

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 9 of 10

D. Factory Mutual Engineering Corporation (FM): Approval Guide

As of Contract Award Date

1.7 WARRANTY

All work performed and all material and equipment furnished under this contract shall be free from defects and shall remain so for a period of one year from the date of acceptance of the entire installation by the

COR.

PART 2 PRODUCTS

2.1 GENERAL

A. All equipment and components shall be new and the manufacturer’s current model. All equipment and components shall be UL listed or FM approved for its intended use. The authorized representative of the manufacturer of the major equipment shall certify that the installation complies with all manufacturer’s requirements and that satisfactory total system operation has been achieved.

B. Fire extinguishing agents approved by VA are limited to:

1. FK-5-1-12 (NOVEC 1230 Sapphire)

2. HFC-227ea (FM-200, MH 227, NAF 5227)

3. IG-541 (Inergen)

2.2 CLEAN AGENT FIRE EXTINGUISHING SYSTEM

A. General:

1. The clean agent fire extinguishing system shall be UL listed and shall be in accordance with NFPA 2001.

B. Piping and fittings:

1. All piping and fittings shall be in compliance with NFPA 2001.

2. Multi-outlet fittings, other than tees, shall not be permitted.

3. All piping shall be reamed, blown clear, and swabbed with appropriate solvent to remove mill varnish and cutting oils before assembly.

4. Ordinary cast iron steel and non-metallic piping and fittings and flexible hoses shall not be used unless specifically required by the manufacturer.

C. Piping Support:

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 10 of 11

1. All piping shall be supported in accordance with the manufacturer’s written instructions.

2. Piping shall be supported within 12 inches (304 mm) of discharge nozzles. The supports shall prevent the upward movement of the nozzle.

3. Seismic bracing shall be installed.

D. Storage Cylinders:

1. Provide storage cylinders as required by the manufacturer’s written instructions and in accordance with NFPA 2001.

2. Cylinder assemblies shall be of steel construction designed to meet the requirements of the U.S. Department of Transportation.

3. Filling of the storage cylinders shall be by an authorized systems distributor in conjunction with a factory authorized agent filling station. Initial filling and recharge shall be performed in accordance with manufacturer’s written instructions and shall not require replacement components for normal service.

4. Cylinders shall be securely attached to the wall. Provide factory-or field-fabricated retaining brackets consisting of steel straps and channels; suitable for container support, maintenance, and tank refilling or replacement.

5. For halocarbon clean agents, storage cylinders shall be provided with a low agent pressure switch.

E. Valve Actuators:

1. Electric valve actuators shall be of brass construction and stackable design with swivel connections to allow removal of actuators for maintenance or testing.

2. Operation of actuators shall not require replacement of components.

No electro-explosive devices may be used to actuate the valve assembly. Actuators shall include an indication if they are set or actuated.

3. Electric valve actuators shall be magnetic latch, continuous duty type for 24 VDC operation.

4. Actuation devices shall be UL listed or FM approved for use with the system.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 11 of 12

5. Removal of the electric valve actuator shall cause a trouble on the clean agent control panel.

F. Discharge Nozzles:

1. Nozzles shall be permanently marked with the manufacturer’s part number. The nozzles shall be threaded directly to the discharge piping without the use of special adaptors.

2.3 RELEASING SYSTEM

A. General

1. The releasing system shall be an analog addressable intelligent reporting, microprocessor controlled system, capable of remote sensitivity testing of the smoke detectors, and be installed in accordance with NFPA 70, NFPA 72, and NFPA 2001.

B. Clean Agent Control Panel:

1. General:

a. The clean agent control panel shall be UL listed or FM approved and include a UL listed or FM approved releasing module.

b. Each protected space shall be provided with its own clean agent control unit.

c. All circuits shall be monitored for integrity.

d. Visually and audibly annunciate all alarm, supervisory, and trouble signals including, but not limited to main power failure, open circuit, short circuit, ground faults, and system bypass activation.

e. The panel or releasing module shall include a 0-60 second programmable timer.

f. The clean agent control panel shall be provided with separate contacts to provide common supervisory, alarm, and trouble signals to the main building fire alarm system.

2. Enclosure:

a. The clean agent control unit shall be housed in a cabinet suitable for both recessed and surface mounting. The cabinet and front panel shall be corrosion protected, given a rust-resistant prime coat, and manufacturer's standard finish.

b. The cabinet shall contain all necessary relays, terminals, lamps, and legend plates to provide control for the system.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 12 of 13

3. Power Supply:

a. The clean agent control unit shall derive its normal power from a

120 volt, 60 Hz dedicated supply connected to the emergency power system. Standby power shall be provided by a 24 volt DC battery as hereinafter specified. The normal power shall be transformed, rectified, coordinated, and interfaced with the standby battery and charger.

b. The power supply for smoke detection systems shall be taken from the clean agent control unit.

4. Circuit Supervision: Each alarm initiating device circuit, signaling line circuit, and notification appliance circuit, shall be supervised against the occurrence of an open, short circuit, or ground fault condition in the field wiring. These conditions shall cause a trouble signal to sound in the control unit until manually silenced by an off switch.

a. Initiating device circuits (IDC) shall be wired Class B in accordance with NFPA 72.

b. Signaling line circuits (SLC) shall be wired Class B in accordance with NFPA 72.

c. Notification appliance circuits (NAC) shall be wired Class B in accordance with NFPA 72.

5. Supervisory Alarm Devices: The low agent pressure switch and maintenance lock-out switch shall initiate a supervisory signal.

6. Trouble signals:

a. Arrange the trouble signals for automatic reset (non-latching).

b. System trouble switch off and on lamps shall be visible through the control unit door.

7. Function Switches: Provide the following switches in addition to any other switches required for the system:

a. Remote Alarm Transmission By-pass Switch: Shall prevent transmission of all signals to the building fire alarm control unit when in the "off" position. A clean agent control unit system trouble signal shall be energized when switch is in the off position.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 13 of 14

b. Alarm Off Switch: Shall disconnect power to notification appliance circuits on the clean agent control panel. A system trouble signal shall be activated when the switch is in the off position.

c. Trouble Silence Switch: Shall silence the trouble signal whenever the trouble silence switch is operated. This switch shall not reset the trouble signal.

d. Reset Switch: Shall reset the system after an alarm, provided the initiating device has been reset. The system shall lock in alarm until reset.

e. Lamp Test Switch: A test switch or other approved convenient means shall be provided to test the indicator lamps.

f. AHU By-Pass: Provide a means to disable air handling units shutdown and dampers from closing upon operation of an initiating device designed to interconnect with these devices. A system trouble signal shall be activated when switch is in the off position.

8. Reset2 Capability: Each clean agent control unit shall be installed and programmed so that each must be reset locally after an alarm, before the main fire alarm control unit can be reset.

C. Conduit, Boxes, and Wire

1. Conduit shall be in accordance with Section 28 05 28.33 CONDUIT AND

BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY and as follows:

a. All new conduits shall be installed in accordance with NFPA 70.

b. Conduit fill shall not exceed 40 percent of interior cross sectional area.

c. All new conduits shall be 3/4 inch (19 mm) minimum.

2. Wire:

a. Wiring shall be installed in conduit.

b. Wiring shall be in accordance with NEC article 760, Section 28 05

13, CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY, and as recommended by the manufacturer of the fire alarm system. All wires shall be color coded. Number and size of conductors shall be as recommended by the fire alarm system manufacturer, but not

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 14 of 15 less than 18 AWG for initiating device circuits and 14 AWG for notification appliance circuits.

c. Signaling line circuits shall be twisted and shielded unless other wiring methods are specifically required by the fire alarm equipment manufacturer in writing.

3. Terminal Boxes, Junction Boxes, and Cabinets:

a. These shall be galvanized steel in accordance with UL requirements.

b. All boxes shall be sized and installed in accordance with NFPA

70.

c. Covers shall be repainted red in accordance with Section 09 91

00, PAINTING and shall be identified with white markings as "CA

FA" or as directed by the COR for junction boxes and as "CLEAN

AGENT FIRE ALARM SYSTEM" for cabinets and terminal boxes.

Lettering shall be a minimum of 3/4 inch (19 mm) high.

d. Terminal boxes and cabinets shall have a volume 50 percent greater than required by NFPA 70. Minimum sized wire shall be considered as 14 AWG for calculation purposes.

e. Terminal boxes and cabinets shall have identified screw type terminal strips and shall be located in an accessible location.

Terminal strips shall be labeled as to what circuit it is or as approved by the COR.

D. Standby Power Supply

1. Batteries:

a. The batteries shall be of the sealed, maintenance free type, 24-volt nominal.

b. The batteries shall have sufficient capacity to power the clean agent control panel and its peripherals for not less than 24 hours plus 5 minutes of alarm to an end voltage of 1.14 volts per cell, upon a normal AC power failure.

c. Battery racks shall be steel with an alkali-resistant finish.

2. Battery Charger:

a. The battery charger shall be completely automatic, with constant potential charger maintaining the battery fully charged under all

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 15 of 16 service conditions. Charger shall operate from a 120-volt, 60 hertz emergency power source.

b. The battery charger shall be rated for fully charging a completely discharged battery within 48 hours while simultaneously supplying any loads connected to the battery.

c. The battery charger shall have protection to prevent discharge through the charger.

d. The battery charger shall have protection for overloads and short circuits on both AC and DC sides.

e. A trouble condition shall actuate the fire alarm trouble signal.

f. The battery charger shall have automatic AC line voltage regulation, automatic current-limiting features, and adjustable voltage controls.

E. Spot-type Smoke Detectors

1. Smoke detectors shall be photoelectric plug-in type and UL listed for use with the clean agent control panel being furnished. Each detector shall be monitored individually, via an integral, analog addressable element.

2. Photoelectric detectors shall be factory calibrated and readily field adjustable. The sensitivity of any photoelectric detector shall be factory set at 3.0 plus or minus 0.25 percent obscuration per foot.

3. Smoke detectors of the protected spaces shall be spaced in accordance with NFPA 72 for high air movement areas. Air velocities within the protected spaces shall be suitable for the listed detection air velocity range of the smoke detector.

4. Each protected space shall have at least 2 detectors.

5. Provide red stickers with an “A” on the ceiling below the location of the above ceiling smoke detectors when above ceiling detectors are provided. Provide red stickers with a “U” on the ceiling above the location of the under floor smoke detectors. Each sticker shall also include the address of the detector. The address shall be the same as that address that shows on the fire alarm control unit when the detector is activated.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 16 of 17

6. For smoke detectors located under the floor, the smoke detectors shall be mounted with a steel angle or channel support independent of the raised floor structure. The smoke detectors shall be mounted in a vertical orientation.

F. Manual Activation Stations:

1. Shall be non-break glass, address reporting type.

2. Station front shall be constructed of durable material such as cast or extruded metal or high impact plastic. Stations shall be semi-flush type.

3. Shall be of dual action pull down type with suitable operating instructions provided on front in raised or depressed letters, and clearly labeled “AGENT RELEASE.”

4. Operating handles shall be constructed of a durable material. On operation, the lever shall lock in alarm position and remain so until physically reset. A key shall be required to gain front access for resetting, or conducting tests and drills.

5. Shall be located at least 3.28 ft (1m) from any fire alarm manual pull station.

G. Notification Appliances:

1. Pre-discharge Bells:

a. Shall be 24 VDC and be capable of producing an alarm signal of not less than 85 dBa at 10 feet.

b. Shall be at least 6 inches (150 mm) in diameter.

2. Pre-discharge Strobes:

a. Be listed in accordance with UL 1971.

b. Shall be a minimum of 75 candela.

c. Shall be provided with an amber lens.

d. Shall be synchronized with other pre-discharge strobes in the protected space.

3. Discharge Strobes:

a. Be listed in accordance with UL 1971.

b. Shall be a minimum of 75 candela.

c. Shall be provided with a red lens.

d. Shall be synchronized with other discharge strobes outside the protected space.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 17 of 18

H. Addressable Interface Module

1. Addressable interface modules shall be installed in individual boxes in accordance with the manufacturer’s product listing. The addressable interface module shall be provided with a protective cover provided by the device manufacturer. The protective cover shall have the provision for viewing the operational LED of the addressable interface module. Addressable interface modules shall not be installed in a back-box with other devices or relays.

2. The installer shall provide, install, and test addressable interface modules as necessary to comply with the sequence of operations, whether shown on the drawings or not.

I. Graphic Floor Plans:

1. Provide readable scaled graphics of the protected area. The graphics shall show the location and address of each the ceiling smoke detectors, above ceiling smoke detectors, and under floor smoke detectors, on separate plans.

2. The graphic shall be framed and shall be located in an area approved by the COR.

3. Where approved by the COR a single graphic floor plan shall be permitted.

J. Abort Switches:

1. The abort switch front shall be constructed of durable material such as cast or extruded metal or high impact plastic. The abort switch shall be semi-flush type.

2. The abort switch shall not be a locking or keyed type.

3. The abort switch shall be of single action dead-man spring loaded type with suitable operating instructions provided on front in raised or depressed letters, and clearly labeled “ABORT.”

2.4 SWITCHES

A. Maintenance Lock-out Switch

1. Shall be key-operated only allowing the removal of the key in the

“Normal” position. A red indicator lamp shall be included on the switch assembly to be illuminated when in the “Lock-out” position.

The clean agent control panel shall indicate a supervisory alarm condition when in the “Lock-out” position.

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

VA Project No. 585-21-700

21 22 00 - 18 of 19

2. The terminals shall be of the screw type.

3. Shall be provided adjacent to the clean agent control panel.

2.5 SIGNAGE

A. Signage shall have white lettering on a red plastic background.

B. The letters shall be 1 inch (25 mm) high with a stroke width of 3/8 inches (9.5 mm).

PART 3 - EXECUTION

3.1 INSTALLATION

A. Installation shall be accomplished by the licensed contractor. Provide a factory trained qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.