ATTACHMENT 14 - Drawings VOL 2 - 7 of 7.pdf
PDF 16 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
- Solicitation number
- 36C77622B0018
About this file
This federal contract opportunity is a solicitation seeking proposals for infrastructure upgrades at the Iron Mountain VA Medical Center in Michigan. The scope of work involves electrical, IT, HVAC, communications, security, and fiber optic infrastructure improvements to enable a new Electronic Health Record Modernization system. Upgrades are required for electrical systems, bonding and grounding, uninterruptible power supplies, building management system interfaces, HVAC configuration and capacity, communications closets, data and network cabling, and the campus fiber backbone. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
Northern Support Services, inc.
3911 Turnagain Blvd East Anchorage, Alaska 99517
(907) 952-4964
JAMES S. BLAIR
No. AELA 7725
10/29/2021
REG IS T ER ED PR O F E S S I O NA L A RCHIT ECT
NICET IV - 104143
FIRE SUPPRESSION DESIGN
CALCULATIONS
000-FP-007
TERPconsulting -fire + life safety James P. Begley, PE, FSFPE, CFM Principal fire protection engineer
REVIEWED BY
3 6 5
1 2
L E D
3 6 5
L E D
IDC CIRCUIT CONNECTION
N.T.S.
Terminal Block A
(6T) Switch A
Terminal Block B (Model 6T)
Switch B
MANUAL PULL STATION CONNECTION
N.T.S.
1 NC 2
43 NO
ABORT SWITCH CONNECTION
N.T.S.
6 HORN/STROBE CONNECTION
N.T.S.
7 KEY SWITCH DISABLE CONNECTION
N.T.S.
EXTINGUISHANT
CIRCUIT FROM FACU
SUPERVISOR TO FACU EXTINGUISHANT
CIRCUIT TO SQA
IDC ZONE 1 OR 2
FROM FACU
15K, 1/2W EOL
RESISTOR
TO NEXT DEVICE
OR EOL RESISTOR
PULL STATION
CIRCUIT FROM FACU
TO NEXT DEVICE
OR EOL RESISTOR
ABORT STATION
CIRCUIT FROM FACU
SEQUENTIAL ACTIVATOR WIRING
N.T.S.
A/E:
GDM OF OREGON
1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128
PROJECT NO.
BUILDING NO.
DRAWING NO.
PROJECT TITLE
FLS
CHECKED BY DRAWN BY
APPROVED: PROJECT DIRECTOR
VA FORM 08 - 6231
A
Program Contracting Activity
Central (PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
REVISIONS: DATE:
LOCATION
04.20.202110% BASIS OF DESIGN STAMP
DRAWING TITLE
ISSUE DATE
100% CONSTRUCTION
DOCUMENTS
ELECTRONIC HEALTH RECORDS
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
585-21-700
35% SCHEMATIC DESIGN 06.01.2021
65% DESIGN DOCUMENTS 07.06.2021
10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER
325 E H ST.
IRON MOUNTAIN, MI 49801
95% DESIGN DOCUMENTS 08.09.2021
FOR OFFICIAL USE ONLY (FOUO)
100% CONSTRUCTION DOCUMENTS 10.29.2021
Northern Support Services, inc.
3911 Turnagain Blvd East Anchorage, Alaska 99517
(907) 952-4964
JAMES S. BLAIR
No. AELA 7725
10/29/2021
REG IS T ER ED P R O F E S S I O NA L A R CHIT ECT
NICET IV - 104143
DETAILS
000-FP-008
6 TYPICAL MOUNTING ELEVATION
N.T.S.
FLOOR LINE
CEILING
Low Pres. Tale
Tell Terminate Release
W/Dog Reset
Processor Reset
Exting.
Mon.
Write EnableExting. ReleaseModeMan.Rel.Abort
Trbl.Trbl.Trbl.Trbl.Trbl.Trbl.Trbl.
NAC3NAC1 NAC2Sys.FuseEarth
Trbl.Trbl.Trbl.Trbl.Trbl.
Comms
Low Batt.
Trbl.
Aux.24V
Trbl.
CPU
Fail Batt.
Fail Mains
EXTRACT
SWITCH
REL PRES.
SWITCH
LOW P.EXTING.ABORT
RELEASE
MAN.
SELECT
MODE2ND STAGE1ST STAGENAC3POWERDATA
STATUS UNITS
REMOTE
CONTROL
AUX
24V
CNONOCNCNOCNC
ZONE 3ZONE 1 ZONE 2NAC2NAC1
RSTR0V SIL AL FLT NOCNCNOCNCNOCNC
FIRE RELAYLOCAL FIRETROUBLE RELAY
(+1)(+10) Enter System Mode Enable AccessSelectModeReset Lamp Test
(+100) Silence/Sound
Alarm
Power On
General System Status Fire In Zone
1 2 3
Zone Trouble/ On Test/ Disabled
Disablements/ Supervisory Releasing Status
Fire
Delay On
Test Mode On
General Disablement
NAC Trouble/ Disabled
Power Trouble
General Trouble
System Trouble
Buzzer Silenced
Manual Release
Extinguishant
1st Stage Output
2nd Stage Output
Extract Fan On
Release Imminent Auto &
Manual Manual
Only
Extinguishant Released
Low Pressue
1st Stage Activated
Abort Activated
Releasing Trouble
Silence Buzzer
Manual Extinguishant Release
Pull Down - Push Button
FACU
AEROSOL
GENERATOR
NOTE:
· THE AEROSOL GENERATORS MUST BE HUNG
FROM AN APPROPRIATE STRUCTURAL SUPPORT
· EACH FNX-1200 WEIGHS 25 POUNDS
· EACH FNX-2000 WEIGHS 35 POUNDS
FAK
HORN
STROBE
TERPconsulting -fire + life safety James P. Begley, PE, FSFPE, CFM Principal fire protection engineer
REVIEWED BY
File details come from the government source that posted it. Updated .