ATTACHMENT 11 - Drawings VOL 2 - 4 of 7.pdf

PDF 11 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
Solicitation number
36C77622B0018
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This federal contract opportunity is a solicitation for infrastructure upgrades at the Iron Mountain VA Medical Center in Michigan. The Department of Veterans Affairs Technology Acquisition Center Austin is seeking offers to perform electrical upgrades, HVAC reconfiguration and expansion, communication and fiber infrastructure improvements, as well as physical security and building management system integration work. The scope of the project includes electrical system upgrades, bonding and grounding, uninterruptible power supply installation, building automation integration, HVAC modifications, IT closet expansion and renovation, upgraded data and fiber cabling, and physical security enhancements across campus buildings to support a new electronic health records system. Offerors should respond by the date listed in solicitation number 36C77622B0018.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain, newest first.
File Type Posted
36C77622B0018 0003.pdf PDF
09 69 00 Access Flooring-Addenda 2.pdf PDF
Technical Questions - FINAL - Iron Mtn. 6-27-22.pdf PDF
EHRM Asbestos Report.pdf PDF
Addendum 1.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 6-17-22.pdf PDF
36C77622B0018 0002.pdf PDF
Site Visit Sign-in Sheet - Iron Mtn. 5-18-22.pdf PDF
36C77622B0018 0001.pdf PDF
ATTACHMENT 2 - Specifications VOL 2 of 2.pdf PDF
ATTACHMENT 3 - Drawings VOL 1 - 1 of 5.pdf PDF
ATTACHMENT 15 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 19 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Drawings VOL 2 - 1 of 7.pdf PDF
ATTACHMENT 9 - Drawings VOL 2 - 2 of 7.pdf PDF
ATTACHMENT 12 - Drawings VOL 2 - 5 of 7.pdf PDF
ATTACHMENT 14 - Drawings VOL 2 - 7 of 7.pdf PDF
ATTACHMENT 1 - Specifications VOL 1 of 2.pdf PDF
ATTACHMENT 13 - Drawings VOL 2 - 6 of 7.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 2-25-22.pdf PDF
36C77622B0018 - 5-5-22.pdf PDF
ATTACHMENT 4 - Drawings VOL 1 - 2 of 5.pdf PDF
ATTACHMENT 5 - Drawings VOL 1 - 3 of 5.pdf PDF
ATTACHMENT 6 - Drawings VOL 1 - 4 of 5.pdf PDF
ATTACHMENT 7 - Drawings VOL 1 - 5 of 5.pdf PDF
ATTACHMENT 10 - Drawings VOL 2 - 3 of 7.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 18 - Contractor Safety - Environmental Form.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE/SMOKE DAMPER

ACTUATOR 120V

NL

C

WAP

48" AFF

42" AFF

48" AFF

42" AFF

42" AFF

42" AFF 42" AFF

C

WAP

48" AFF

48" AFF

48" AFF

48" AFF

48" AFF 48" AFF

48" AFF

48" AFF

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C

J

C J

C J

CJ CJ

CJCJCJCJCJCJCJCJ

C J

CJ

CJ

C

J

CJ

C J

CJ CJ CJ

C J

CJ

CJ

CJ CJ

C J

C J

C J

C J

C J

C J

C J

CJCJ

CJCJCJCJ

C J

C J

C J

C J

C J

C J

C J

CJ

CJ

C J

C J

CJCJCJCJ

CJ

CJ

CJCJ

C J

CJ

CJ

C J

C J

CJ

C J

CJ

C

J

F1,F2

RK-2218-1

F3

RK-2218-1

F4,F5

RK-2218-1

F7,F8

RK-2218-1

F9,F10

RK-2218-1

F11,F12

RK-2218-1

F6

RK-2218-1

F13,F14

RK-2218-1

F15,F16

RK-2218-1

F17,F18

RK-2218-1

F19

RK-2218-1

F20,F21

RK-2218-1

F22,F23

RK-2218-1 F24,F25

RK-2218-1

F26,F27

RK-2218-1

F28,F29

RK-2218-1

F30,F31

RK-2218-1

F32,F33

RK-2218-1

F34,F35

RK-2218-1

F36,F37

RK-2218-1

F38,F39

RK-2218-1

F40,F41

RK-2218-1

F42,F43

RK-2218-1

F46,F47

RK-2218-1

F44,F45

RK-2218-1

F48,G1

RK-2218-1

G2,G3

RK-2218-1

G4,G5

RK-2218-1

G6,G7

RK-2218-1

G8,G9

RK-2218-1

G10,G11

RK-2218-1

G12,G13

RK-2218-1

G14,G15

RK-2218-1

G16,G17

RK-2218-1

G18,G19

RK-2218-1

G20,G21

RK-2218-1

G22

RK-2218-1

G23

RK-2218-1

G24,G25

RK-2218-1

G26,G27

RK-2218-1

G28,G29

RK-2218-1

G30,G31

RK-2218-1

G32,G33

RK-2218-1

G38,G39

RK-2218-1

G36,G37

RK-2218-1

G34,G35

RK-2218-1

G40,G41

RK-2218-1

G42,G43

RK-2218-1

G44,G45

RK-2218-1

G46,G47

RK-2218-1

H1,H2

RK-2218-1

G48

RK-2218-1

H3,H4

RK-2218-1

H5,H6

RK-2218-1

H7,H8

RK-2218-1

H9,H10

RK-2218-1

H11,H12

RK-2218-1

H14,H15

RK-2218-1

H13

RK-2218-1

H16,H17

RK-2218-1

H18,H19

RK-2218-1

H20,H21

RK-2218-1

H22,H23

RK-2218-1

H24,H25

RK-2218-1

H26

RK-2218-1

H27,H28

RK-2218-1

H29-H32

RK-2218-1

H33-H36

RK-2218-1

H37,H38

RK-2218-1

H39,H40

RK-2218-1

H41,H42

RK-2218-1

H43,H44

RK-2218-1

H45,H46

RK-2218-1

H47,H48

RK-2218-1

I1,I2

RK-2218-1

I3,I4

RK-2218-1

I5,I6

RK-2218-1

I7,I8

RK-2218-1

I9,I10

RK-2218-1

I11,I12

RK-2218-1

I13,I14

RK-2218-1

I15,I16

RK-2218-1

I17

RK-2218-1

I18,I19

RK-2218-1

FIRE/SMOKE DAMPER

ACTUATOR 120V

NL

(N)BONDING

BUSBAR

(N)COPPER

PATCH PANELS

(N) SLEEVES

(N) FA HORN

STROBE

RK-2306-1

(N) SECURITY

CAMERA

(N) SMOKE

DETECTOR

(E) 2-POST

RACKS

(E) CABLE LADDER

(N)BONDING

BUSBAR

(N) FA HORN

STROBE

(N)COPPER

PATCH PANELS

RK-2118-1

(N) SECURITY

CAMERA

(N) SMOKE

DETECTOR

(E) 2-POST

RACKS

(E) CABLE LADDER

(N)BONDING

BUSBAR

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FLOOR PLAN - COPPER -

BLDG 1 PARTIAL SECOND FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL SECOND FLOOR

NORTH

T

N

M A

T C

H

L I N

E

T

N

M A

T C

H

L

I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2306

NORTH

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2218

NORTH

001-TN-022

001-TN-022

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2215A

NORTH

001-TN-022

GENERAL NOTES

1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT

SLEEVES TO BE SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS

CABLING THROUGH WALLS AND NON ACCESSIBLE CEILING AREAS. CONDUIT

SLEEVES SHALL BE HILTI SPEED SLEEVES. CONDUIT SIZE IS TO BE AS NOTED.

2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING

CONCRETE WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE

-DRILLING, SEALING, AND FIRE STOPPING AS REQUIRED.

3. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF

FIBER OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL

APPURTENANCES FOR INSTALLATION OF J-HOOKS.

4. PROVIDE NEW TELECOMMUNICATION OUTLETS FOR TERMINATION OF CAT 6A

CABLING IN ALL ROOMS WHERE OUTLET DROPS ARE INDICATED. ROUTE CABLING

BACK TO PATCH PNL IN TELECOMM RACK/CABINET NUMBER AS INDICATED IN EACH

ROOM.

5. NEW WORK STATION OUTLETS TO BE RECESS MOUNTED WITH SINGLE GANG MPLS

STRAP, FREE RUN CAT6A CABLING WITHIN WALLS, JACKS, AND STAINLESS STEEL

FACE PLATE.

6. DEMOLITION OF ALL EXISTING FIBER/COPPER CABLES AND EQUIPMENT TO BE

PERFORMED ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND VA HAS

CUT SYSTEMS OVER TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND

A/E TEAM.

7. SEE SHEET TJ-011 FOR PATCH PANEL SCHEDULE SCHEDULES.

RSDC

001-TN-022

PLAN NOTES

NO CATEGORY CABLE WORK THIS AREA

NO CATEGORY CABLE WORK THIS AREA

PROVIDE HILTI SPEED SLEEVES FROM CABLE TRAY TO CORRIDOR SIZED

APPROPRIATELY FOR THE NUMBER OF CABLES TO MAXIMUM FILL OF 40 PERCENT AT

TIME OF INSTALLATION. APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO

BOTH SIDES OF ALL PENETRATIONS.

PROVIDE EMT SLEEVE(S) APPROPRIATE TO SUPPORT CABLES TO A MAXIMUM FILL OF

40 PERCENT AT TIME OF INSTALLATION. APPLY FIRESTOP AS PER CODE AND AHJ.

APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO BOTH SIDES OF ALL

PENETRATIONS. SEE SHEET TJ-003 FOR WATERFALL AND BUSHING DETAILS.

PROVIDE ALL VERTICAL CABLE SUPPORTS FROM CONDUIT/SLEEVE DOWN TO

UNIVERSAL CABLE RUNWAY. PROVIDE TAL-TY CONDUIT WATERFALL #CWF400 OR

APPROVED EQUAL FOR ALL 4" EMT SLEEVES.

PROVIDE CHANNEL RACKS OR APPROVED EQUAL. PROVIDE VERTICAL CABLE

MANAGEMENT OR APPROVED EQUAL ON BOTH ENDS AND BETWEEN ALL RACKS.

PROVIDE HORIZONTAL CABLE MANAGER OR APPROVED EQUAL ABOVE, BELOW, AND

BETWEEN ALL PATCH PANELS AND ACTIVE EQUIPMENT AS SHOWN ON RACK

ELEVATIONS. SEE SCHEDULE THIS SHEET FOR DETAILS. PROVIDE ALL NECESSARY

MOUNTING HARDWARE, BRACKETS, AND ASSOCIATED FASTENERS.

PROVIDE ORTRONICS HDJ SERIES 48 PORT UNLOADED ANGLED PANELS OR

APPROVED EQUAL AS PER DETAIL ON SHEET TJ-003 FOR TERMINATION OF NEW

TELECOMM OUTLETS. PROVIDE ORTRONICS HIGH DENSITY JACK OR APPROVED EQUAL

FOR WALL PLATES AND UNLOADED, HIGH DENSITY PATCH PANELS. PROVIDE HDJ HAND

CRIMPING / TERMINATION TOOL OR APPROVED EQUAL.

PROVIDE PDUs AND MOUNTING BRACKETS FOR ALL TR RACKS. PROVIDE ALL NECESSARY MOUNTING HARDWARE. SEE SCHEDULE ON SHEET TJ-002 FOR PDUs AND

BRACKETS OR APPROVED EQUAL.

PROVIDE 18” UNIVERSAL CABLE RUNWAY #10250-718 OR APPROVED EQUAL IN

QUANTITIES TO COMPLETE DESIGN ON PLANS. PROVIDE CABLE RUNWAY RADIUS DROP

# 12100-718 OR APPROVED EQUAL ON EACH SIDE OF ALL RACKS TO SUPPORT CABLE

TRANSITION FROM RUNWAY. RUNWAY SHALL BE MOUNTED 6” ABOVE HEIGHT OF

RACKS. PROVIDE ALL NECESSARY SUPPORTS, MOUNTING HARDWARE, BRACKETS, AND

ASSOCIATED FASTENERS.

PROVIDE HILTI SPEED SLEEVES THROUGH ALL FIRE RATED WALLS SIZED

APPROPRIATELY FOR THE NUMBER OF CABLES TO MAXIMUM FILL OF 40 PERCENT AT

TIME OF INSTALLATION. APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO

BOTH SIDES OF ALL PENETRATIONS.

PROVIDE SBB OR APPROVED EQUAL AND BONDING. SEE SHEETS TJ-001 AND TJ-008

THROUGH TJ-010 FOR DETAILS.

ALL WALLS MUST BE LINED WITH 3/4” AC GRADE (OR BETTER) PLYWOOD. THE PLYWOOD

WILL BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT.

AT LEAST ONE FIRE RATING STAMP PER SHEET MUST BE READILY VISIBLE AFTER

PAINTING AND EQUIPMENT INSTALLATION. THE PAINT COLOR WILL BE SEMI-GLOSS

BRIGHT WHITE TO AID WITH LIGHTING IN THE ROOMS. THE BOTTOM OF THE PLYWOOD

SHOULD BE MOUNTED 6” ABOVE FINISHED FLOOR (AFF) IN NEW TR SPACES. NO

ELECTRICAL CONDUITS, JUNCTION BOXES OR ANY OTHER NON-TELECOMMUNICATION

SYSTEMS EQUIPMENT WILL BE MOUNTED ON OR ACROSS ANY BACKBOARD AREA.

PROVIDE KEYPAD/CARD READER #HID RPK40. CONNECT TO ACCESS CONTROL SYSTEM.

PROVIDE COMPATIBLE HORN/STROBE DEVICE PER NFPA 101, TO MATCH EXISTING

DEVICES, CONNECT TO NEAREST NAC WITH AVAILABLE CAPACITY.

PROVIDE ZONE PDU OR APPROVED EQUAL. PROVIDE ALL NECESSARY MOUNTING

HARDWARE. SEE SCHEDULE ON SHEET TJ-002.

PROVIDE AXIS P3245-V FIXED DOME NETWORK CAMERA OR APPROVED EQUAL. HOME

RUN CABLE BACK TO NEAREST AXIS CAMERA NETWORK SWITCH, TERMINATE CAMERA

END USING FIELD TERM MODULAR PLUGS. SEE DETAILS SHEET TJ-002. COORDINATE

WITH VA COR FOR SWITCH LOCATIONS.

PROVIDE COMPATIBLE SMOKE DETECTOR PER NFPA 101, TO MATCH EXISTING DEVICES,

CONNECT TO NEAREST SLC LOOP WITH AVAILABLE CAPACITY.

RACK EQUIPMENT SCHEDULE - BLDG 1 RM 2118

EQUIPMENT QTY TYPE PART #

PATCH PANELS NOTE 1 HIGH DENSITY ANGLED

48-PORT

ORTHRONICS #OR-PHAHJU48 OR

APPROVED EQUAL

TEMP / HUMIDITY

SENSOR NOTE 6 NOTE 6 NOTE 6

PDU NOTE 2 NOTE 2 NOTE 2

ZONE PDU NOTE 3 NOTE 3 NOTE 3

NOTES: SEE RACK ELEVATIONS FOR EXACT LOCATION OF EACH PIECE OF EQUIPMENT.

1. SEE RACK ELEVATIONS ON SHEET TJ-012 FOR ADDITIONAL INFORMATION.

4. TWO CPI PDUs PER RACK, OR APPROVEDS EQUAL, ONE PER SIDE, MOUNTED WITH LISTED BRACKETS.

SEE SHEET TJ-002 FOR QUANTITIES.

5. ZONIT ZONE PDU, OR APPROVED EQUAL, TO BE MOUNTED AS SHOWN ON RACK ELEVATIONS, SHEET

TJ-012. SEE SHEET TJ-002 FOR QUANTITIES.

6. USB TEMP / HUMIDITY SENSOR SHALL BE INSTALLED IN EACH CABINET, PLUGGED INTO PDU. SEE

SHEET TJ-002 FOR QUANTITIES.

RACK EQUIPMENT SCHEDULE - BLDG 1 RM 2306

EQUIPMENT QTY TYPE PART #

PATCH PANELS NOTE 1 HIGH DENSITY ANGLED

48-PORT

ORTHRONICS #OR-PHAHJU48 OR

APPROVED EQUAL

TEMP / HUMIDITY

SENSOR NOTE 6 NOTE 6 NOTE 6

PDU NOTE 2 NOTE 2 NOTE 2

ZONE PDU NOTE 3 NOTE 3 NOTE 3

NOTES: SEE RACK ELEVATIONS FOR EXACT LOCATION OF EACH PIECE OF EQUIPMENT.

1. SEE RACK ELEVATIONS ON SHEET TJ-012 FOR ADDITIONAL INFORMATION.

4. TWO CPI PDUs PER RACK, OR APPROVEDS EQUAL, ONE PER SIDE, MOUNTED WITH LISTED BRACKETS.

SEE SHEET TJ-002 FOR QUANTITIES.

5. ZONIT ZONE PDU, OR APPROVED EQUAL, TO BE MOUNTED AS SHOWN ON RACK ELEVATIONS, SHEET

TJ-012. SEE SHEET TJ-002 FOR QUANTITIES.

6. USB TEMP / HUMIDITY SENSOR SHALL BE INSTALLED IN EACH CABINET, PLUGGED INTO PDU. SEE

SHEET TJ-002 FOR QUANTITIES.

SEE PACU

HEADWALL

DETAIL

P P P

S S S S S S S S S

PPPP

SSSS

P

S

PPP

SSS

P

P P P P P

P P

S S

SEE PACU

HEADWALL

DETAIL

FIRE/SMOKE DAMPER

ACTUATOR 120V

COMM.

RACK

COMM.

RACK

COMM.

RACK

NL

(N)FIBER OPTIC

PANELS

(N) FA HORN

STROBE

(N)BONDING

BUSBAR

(E) 2-POST

RACKS

(E) CABLE LADDER

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FLOOR PLAN - FIBER -

BLDG 1 PARTIAL SECOND FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL SECOND FLOOR

NORTH

T

N

M A

T C

H

L

I N

E

T

N

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2140

NORTH

001-TN-023

NO CATEGORY CABLE

WORK THIS AREA

RSDC

001-TN-023

2 3

GENERAL NOTES

1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT

SLEEVES TO BE SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS

CABLING THROUGH WALLS AND NON ACCESSIBLE CEILING AREAS. CONDUIT

SLEEVES SHALL BE HILTI SPEED SLEEVES. CONDUIT SIZE IS TO BE AS NOTED.

2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING

CONCRETE WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE

-DRILLING, SEALING, AND FIRE STOPPING AS REQUIRED.

3. ALL NEW FIBER SHALL BE ROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE

UTILIZED FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL

UTILIZE NEW AND EXISTING PATHWAYS AS REQUIRED.

4. ALL FIBER OPTIC CABLES RAN IN BLDG 1 FROM MCR 5281 AND ENTRANCE RM B105

TO ALL TR TO BE FACTORY TERMINATED WITH MPO CONNECTORS. ALL BUILDING

TO BUILDING FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED WITH MPO

CONNECTORS. ALL LENGTHS LISTED IN THE MATRIX, SHOWN ON TS-003 AND TJ-004,

ARE APPROXIMATE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY

REQUIRED LENGTHS PRIOR TO PURCHASE OF FACTORY TERMINATED CABLES.

CONTRACTOR SHALL PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16'

WITHIN EACH VAULT FOR SERVICE LOOPS.

4. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF

FIBER OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL

APPURTENANCES FOR INSTALLATION OF J-HOOKS.

5. DEMOLITION OF ALL EXISTING FIBER/COPPER CABLES AND EQUIPMENT TO BE

PERFORMED ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND VA HAS

CUT SYSTEMS OVER TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND

A/E TEAM.

6. PRIMARY AND SECONDARY FIBER RUNS SHOWN ADJACENT FOR CLARITY ON

DRAWING. PRIMARY AND SECONDARY FIBER RUNS SHALL BE SEPARATED AS MUCH

AS PHYSICALLY POSSIBLE WHEN IN A COMMON SPACE.

PLAN NOTES

PROVIDE HIGH DENSITY FIBER OPTIC ENCLOSURE AND CASSETTES AS SHOWN/LISTED ON

SHEET TJ-004 IN EXISTING AND NEW COMMUNICATION RACKS FOR FIBER TERMINATION.

PROVIDE PRIMARY (1)24 STRAND MM FROM RM 5281 TO COMM RACK IN TR.

PROVIDE SECONDARY (1)24 STRAND MM FROM RM B105 TO COMM RACK IN TR.

PROVIDE HILTI SPEEDSLEEVE SLEEVE FOR ROUTING FIBER OPTIC CABLES SIZED

APPROPRIATELY FOR THE NUMBER OF CABLES TO MAXIMUM FILL OF 40 PERCENT AT

TIME OF INSTALLATION. INNERDUCT TO TERMINATE AT SLEEVE ENTRANCE LOCATION

PASSING ONLY FIBER OPTIC CABLE THROUGH SLEEVE AND RESUME INNERDUCT AT EXIT

LOCATION. APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO BOTH SIDES OF

ALL PENETRATIONS. "PRIMARY" CABLES CAN SHARE SLEEVES THROUGH BARRIERS.

"SECONDARY" CABLES CAN SHARE SLEEVES THROUGH BARRIERS. ADDITIONAL SLEEVES

SHOWN ON PLANS FOR CLARITY.

ROUTE FIBER OPTICAL INNERDUCT TO MCR RM 5281 VIA VERTICAL PIPE SHAFT. SEE

SHEET 001-TN-053 FOR CONTINUATION.

RACK EQUIPMENT SCHEDULE - FIBER EQUIPMENT

EQUIPMENT QTY TYPE PART #

FIBER ENCLOSURE NOTE 1 NOTE 1 NOTE 1

NOTES: SEE RACK ELEVATIONS FOR EXACT LOCATION OF EACH PIECE OF EQUIPMENT.

1. SEE FIBER ONE LINE DIAGRAM ON SHEETS TJ-004 FOR ADDITIONAL INFORMATION.

FIRE/SMOKE DAMPER

ACTUATOR 120V

COMM.

RACK

COMM.

RACK

COMM.

RACK

NL

S

P P P P P P P

S S SS S

P

P

S

P

S

P P

P P

S S

S S

PP

SS

S

SEE PACU

HEADWALL

DETAIL

FIRE/SMOKE DAMPER

ACTUATOR 120V

COMM.

RACK

COMM.

RACK

COMM.

RACK

NL

COMM.

RACK

COMM.

RACK

COMM.

RACK

(N)FIBER OPTIC

PANEL

(N) SLEEVES

(N) FA HORN

STROBE

(N)BONDING

BUSBAR

RK-2306-1

(E) CABLE LADDER

(E) 2-POST

RACKS

(N)FIBER OPTIC

PANEL

(N) FA HORN

STROBE

(N)BONDING

BUSBAR

RK-2118-1

(E) 2-POST

RACKS

(E) CABLE LADDER

(N)FIBER OPTIC

PANEL

(N)BONDING

BUSBAR

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FLOOR PLAN - FIBER -

BLDG 1 PARTIAL SECOND FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL SECOND FLOOR

NORTH

T

N

M A

T C

H

L I N

E

T

N

M A

T C

H

L

I N

E

SCALE: N.T.S.

KEYPLAN

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2306

NORTH

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2218

NORTH

001-TN-024

001-TN-024

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 2215A

NORTH

001-TN-024

NO CATEGORY CABLE

WORK THIS AREA

RSDC

001-TN-024

GENERAL NOTES

1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT

SLEEVES TO BE SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS

CABLING THROUGH WALLS AND NON ACCESSIBLE CEILING AREAS. CONDUIT

SLEEVES SHALL BE HILTI SPEED SLEEVES. CONDUIT SIZE IS TO BE AS NOTED.

2. TERMINATE CABLING ON NEW FIBER PATCH PANEL IN COMMUNICATION RACK.

3. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING

CONCRETE WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE

-DRILLING, SEALING, AND FIRE STOPPING AS REQUIRED.

4. ALL NEW FIBER SHALL BE ROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE

UTILIZED FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL

UTILIZE NEW AND EXISTING PATHWAYS AS REQUIRED.

5. ALL FIBER OPTIC CABLES RAN IN BUILDING FROM MDF TO TR TO BE FACTORY

TERMINATED WITH MPO CONNECTORS. ALL BUILDING TO BUILDING FIBER OPTIC

CABLES ARE TO BE FIELD TERMINATED WITH MPO CONNECTORS. ALL LENGTHS

LISTED IN THE MATRIX, SHOWN ON TG0001, ARE APPROXIMATE. IT IS THE

CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY REQUIRED LENGTHS PRIOR TO

PURCHASE OF FACTORY TERMINATED CABLES. CONTRACTOR SHALL PROVIDE 10'

OF ADDITIONAL LENGTH AT EACH END AND 16' WITHIN EACH VAULT FOR SERVICE

LOOPS.

6. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF

FIBER OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL

APPURTENANCES FOR INSTALLATION OF J-HOOKS.

7. DEMOLITION OF ALL EXISTING FIBER/COPPER CABLES AND EQUIPMENT TO BE

PERFORMED ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND VA HAS

CUT SYSTEMS OVER TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND

A/E TEAM.

8. PRIMARY AND SECONDARY FIBER RUNS SHOWN ADJACENT FOR CLARITY ON

DRAWING. PRIMARY AND SECONDARY FIBER RUNS SHALL BE SEPARATED AS MUCH

AS PHYSICALLY POSSIBLE WHEN IN A COMMON SPACE.

2 3

1 2 3

1 2 3

PLAN NOTES

PROVIDE HIGH DENSITY FIBER OPTIC ENCLOSURE AND CASSETTES AS SHOWN/LISTED ON

SHEET TJ-004 IN EXISTING AND NEW COMMUNICATION RACKS FOR FIBER TERMINATION.

PROVIDE PRIMARY (1)24 STRAND MM FROM RM 5281 TO COMM RACK IN TR.

PROVIDE SECONDARY (1)24 STRAND MM FROM RM B105 TO COMM RACK IN TR.

PROVIDE HILTI SPEEDSLEEVE SLEEVE FOR ROUTING FIBER OPTIC CABLES SIZED

APPROPRIATELY FOR THE NUMBER OF CABLES TO MAXIMUM FILL OF 40 PERCENT AT

TIME OF INSTALLATION. INNERDUCT TO TERMINATE AT SLEEVE ENTRANCE LOCATION

PASSING ONLY FIBER OPTIC CABLE THROUGH SLEEVE AND RESUME INNERDUCT AT EXIT

LOCATION. APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO BOTH SIDES OF

ALL PENETRATIONS. "PRIMARY" CABLES CAN SHARE SLEEVES THROUGH BARRIERS.

"SECONDARY" CABLES CAN SHARE SLEEVES THROUGH BARRIERS. ADDITIONAL SLEEVES

SHOWN ON PLANS FOR CLARITY.

ROUTE FIBER OPTICAL INNERDUCT TO ENTRANCE RM B105 VIA "DUMBWAITER" SHAFT.

SEE SHEET 001-TN-0B6 FOR CONTINUATION.

RACK EQUIPMENT SCHEDULE - FIBER EQUIPMENT

EQUIPMENT QTY TYPE PART #

FIBER ENCLOSURE NOTE 1 NOTE 1 NOTE 1

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

43" AFF

C J

C J

C J

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

CJ CJ CJ

CJCJCJCJCJCJCJCJ

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C

J

CJ

CJ

C J

C J

C J

C J

C J

C J

C J

CJ

C J

C

J

C

J

C

J

C J

C

J

CJCJ

C

JC

J

CJ

C J

CJ

C

J

C

J

CJCJ

C

J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

CJ CJ CJ CJ CJ CJ CJ CJ CJ

CJ CJ CJ CJ CJ

C J

CJCJCJCJ

C J

C J

CJCJ

CJ CJ

CJ

CJ

C

J

CJ

C J

C J

C J

C J

C J

C J

C

J

CJ CJ

CJ

C

J

C J

C J

C J

C

J

C J

C J

C J

CJ

C

J

CJ CJ

C J

C J

CJ

CJ

CJ

CJ

C J

C

J

CJ

CJ

CJ

C J

CJ CJ

CJCJCJCJCJ

43" AFF

C4

RK-3163-2

C5,C6

RK-3163-2

C9

RK-3163-2

C7,C8

RK-3163-2

C10-C12

RK-3163-2

C2,C3

RK-3163-2

B48

C1

RK-3163-2

B44,B45

RK-3163-2

B43

RK-3163-2

B41,B42

RK-3163-2

B40

RK-3163-2

B36-B39

RK-3163-2

C13-C15

RK-3163-2

C16

RK-3163-2

C17,C18

RK-3163-2

C19

RK-3163-2

C20

RK-3163-2

C25,C26

RK-3163-2

C21,C22

RK-3163-2

C27-C29

RK-3163-2

C40-C44

RK-3163-2

C45,C46

RK-3163-2

C47,C48

D1,D2

RK-3163-2

C23,C24

RK-3163-2

B27-B30

RK-3163-2

B35

RK-3163-2

B31-B34

RK-3163-2

B23-B26

RK-3163-2

B22

RK-3163-2

B18-B21

RK-3163-2

B14-B17

RK-3163-2

B10-B13

RK-3163-2

B5-B8

RK-3163-2

B9

RK-3163-2

B1-B3

RK-3163-2

B4

RK-3163-2

A45-A48

RK-3163-2

A41-A44

RK-3163-2

A37-A40

RK-3163-2

A36

RK-3163-2

A32-A35

RK-3163-2

A31

RK-3163-2

A28-A30

RK-3163-2

A27

RK-3163-2

A23-A26

RK-3163-2

A19-A22

RK-3163-2

A15-A18

RK-3163-2

A11-A14

RK-3163-2

A10

RK-3163-2

A6-A9

RK-3163-2

A2-A5

RK-3163-2

A1

RK-3163-2

E17,E18

RK-3163-2

E15,E16

RK-3163-2

E14

RK-3163-2

E9,E10

RK-3163-2

E11-E13

RK-3163-2

E8

RK-3163-2

E6,E7

RK-3163-2

E3,E4

RK-3163-2

E5

RK-3163-2

D3-D6

RK-3163-2

D10

RK-3163-2

D7-D9

RK-3163-2

C38,C39

RK-3163-2

C35-C37

RK-3163-2

C33,C34

RK-3163-2

C30-C32

RK-3163-2

D20-D22

RK-3163-2

D23-D25

RK-3163-2

D17-D19

RK-3163-2

D14-D16

RK-3163-2

D11-D13

RK-3163-2

D29-D31

RK-3163-2

D26-D28

RK-3163-2

D38-D40

RK-3163-2

D41-D43

RK-3163-2

D44-D46

RK-3163-2

D47,D48,E1

RK-3163-2

D32-D34

RK-3163-2

D35-D37

RK-3163-2

D4-D7

RK-3216-1

A5-A7

RK-3216-1

A10-A12

RK-3216-1

A8,A9

RK-3216-1

A13

RK-3216-1

A14-A16

RK-3216-1

A2-A4

RK-3216-1

A1

RK-3216-1

E10-E12

RK-3216-2

E40-E42

RK-3216-2

E43-E45

RK-3216-2

F1-F3

RK-3216-2

E46-E48

RK-3216-2

F7,F8

RK-3216-2

F6

RK-3216-2

F4,F5

RK-3216-2

F13,F14

RK-3216-2

F11,F12

RK-3216-2

F9,F10

RK-3216-2

F15

RK-3216-2

F16

RK-3216-2

F18

RK-3216-2

F17

RK-3216-2

F20

RK-3216-2

F19

RK-3216-2

F23,F24

RK-3216-2

F21,F22

RK-3216-2

B46,B47

RK-3163-2

E2

RK-3163-2

F25

RK-3216-2

(N) CABLE TRAY

(N) 6" VERTICAL

CABLE MANAGER

(N) SLEEVES

(N)BONDING

BUSBAR

(N) KEYPAD/

READER

(N) FA HORN

STROBE

(N) FLOOR MOUNTED

CHANNEL RACKRK-3163

(N) SECURITY

CAMERA

(N) SMOKE

DETECTOR

(N) CABLE TRAY

(N) 6" VERTICAL

CABLE MANAGER

(N)BONDING

BUSBAR

(N) SLEEVES

(N) SLEEVES

(N) KEYPAD/READER

(N) FLOOR MOUNTED

CHANNEL RACK

(N) FA HORN

STROBE

RK-3163-1RK-3163-2

(N) SECURITY

CAMERA

(N) SMOKE

DETECTOR

A17-A19

RK-3216-1

A20-A22

RK-3216-1

WALL BEING

DEMOLISHED

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FLOOR PLAN - COPPER -

BLDG 1 PARTIAL THIRD FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL THIRD FLOOR

NORTH

T

N

M A

T C

H

L I N

E

T

N

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

SCALE: NTS

ENLARGED ROOM - 3163

001-TN-031

SCALE: NTS

ENLARGED ROOM - 3216

001-TN-031

GENERAL NOTES

1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT SLEEVES

TO BE SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS CABLING

THROUGH WALLS AND NON ACCESSIBLE CEILING AREAS. CONDUIT SLEEVES SHALL

BE HILTI SPEED SLEEVES. CONDUIT SIZE IS TO BE AS NOTED.

2. TERMINATE CABLING ON NEW FIBER PATCH PNL IN EXISTING COMMUNICATION RACK.

3. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING

CONCRETE WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE -DRILLING,

SEALING, AND FIRE STOPPING AS REQUIRED.

4. PROVIDE NEW TELECOMMUNICATION OUTLETS FOR TERMINATION OF CAT 6A

CABLING IN ALL ROOMS WHERE OUTLET DROPS ARE INDICATED. ROUTE CABLING

BACK TO PATCH PNL IN TELECOMM RACK/CABINET NUMBER AS INDICATED IN EACH

ROOM.

5. NEW WORK STATION OUTLETS TO BE RECESS MOUNTED WITH SINGLE GANG MPLS

STRAP, FREE RUN CAT6A CABLING WITHIN WALLS, JACKS, AND STAINLESS STEEL

FACE PLATE.

6. DEMOLITION OF ALL EXISTING FIBER/COPPER CABLES AND EQUIPMENT TO BE

PERFORMED ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND VA HAS

CUT SYSTEMS OVER TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND A/E

TEAM.

7. SEE SHEET TJ-011 FOR PATCH PANEL SCHEDULE SCHEDULES.

8. THE GENERAL CONTRACTOR IS TO ENSURE ALL FLOORS WITH ACCESS CONTROLS

PROPERLY FUNCTION AND ARE COMMISSIONED. COORDINATE THE WORK AMONG

THE TRADES TO ACHIEVE SECURITY REQUIREMENTS.

9. EXPAND ALL SEQUENCE OF OPERATIONS, GRAPHICS, AND TOPOLOGY AS IS

REQUIRED TO PROVIDE A COMPLETE DISPLAY AT THE GRAPHICAL USER INTERFACE.

10. THE CABLE AND CONDUIT ROUTES MAY BE FIELD ADJUSTED AS REQUIRED TO

PREVENT DISTURBANCE OF HAZARDOUS MATERIALS OR OTHER TRADES.

11. SUBMIT SHOP DRAWINGS WHICH FULLY DETAIL ALL COMPONENTS OF THE ACCESS

CONTROL SYSTEM. PROVIDE MFL'S CUT SHEETS FOR ALL COMPONENTS.

12. PROVIDE ALL NEW WIRE. REUSE CONDUIT AS APPLICABLE.

13. JOHNSON CONTROLS, INC. IS THE HISTORICAL VENDOR FOR THIS SCOPE OF WORK.

THEIR CONTACT INFORMATION IS AS FOLLOWS:

JOHNSON CONTROLS

GREEN BAY OFFICE

ATTN: SCOTT NIELSON

ACCOUNT MANAGER

PHONE: 920.883.9309

EMAIL: SCOTT.NIELSON@JCI.COM

14. EXISTING ACCESS CONTROL SYSTEM IS A SOFTWARE HOUSE CCURE 9000.

15. EXISTING CONTROL PANELS ARE A MIXTURE OF ISTAR PRO AND I STAR ULTRA

CONTROLLERS.

16. SEE SPECIFICATION SYSTEM 06 20 00 ACCESS CONTROL FOR FULL CONTRACT

REQUIREMENTS.

RSDC

001-TN-031

4 5 6

4 5 6

PLAN NOTES

PROVIDE HILTI SPEED SLEEVES FROM CABLE TRAY TO CORRIDOR SIZED

APPROPRIATELY FOR THE NUMBER OF CABLES TO MAXIMUM FILL OF 40 PERCENT AT

TIME OF INSTALLATION. APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO

BOTH SIDES OF ALL PENETRATIONS.

PROVIDE EMT SLEEVE(S) APPROPRIATE TO SUPPORT CABLES TO A MAXIMUM FILL OF

40 PERCENT AT TIME OF INSTALLATION. APPLY FIRESTOP AS PER CODE AND AHJ.

APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO BOTH SIDES OF ALL

PENETRATIONS. SEE SHEET TJ-003 FOR WATERFALL AND BUSHING DETAILS.

PROVIDE ALL VERTICAL CABLE SUPPORTS FROM CONDUIT/SLEEVE DOWN TO

UNIVERSAL CABLE RUNWAY. PROVIDE TAL-TY CONDUIT WATERFALL #CWF400 OR

APPROVED EQUAL FOR ALL 4" EMT SLEEVES. SEE SHEET TJ-003 FOR WATERFALL AND

BUSHING DETAILS.

PROVIDE CHANNEL RACKS # MM2073038-W OR APPROVED EQUAL IN QUANTITY AS

INDICATED ON PLANS. PROVIDE VERTICAL CABLE MANAGEMENT # MM20VMD706-W OR

APPROVED EQUAL ON BOTH ENDS AND BETWEEN ALL RACKS. PROVIDE HORIZONTAL

CABLE MANAGER #13930-701 OR APPROVED EQUAL ABOVE, BELOW, AND BETWEEN ALL

PATCH PANELS AND ACTIVE EQUIPMENT AS SHOWN ON RACK ELEVATIONS. PROVIDE

ALL NECESSARY MOUNTING HARDWARE, BRACKETS, AND ASSOCIATED FASTENERS.

PROVIDE ORTRONICS HDJ SERIES 48 PORT UNLOADED ANGLED PANEL #OR-PHAHJU48

OR APPROVED EQUAL AS PER DETAIL FOR TERMINATION OF NEW TELECOMM OUTLETS.

PROVIDE ORTRONICS HIGH DENSITY JACK #OR-HDJ6A-13 OR APPROVED EQUAL. FOR

WALL PLATES AND UNLOADED, HIGH DENSITY PATCH PANELS. PROVIDE HDJ HAND

CRIMPING / TERMINATION TOOL #HDJHCT OR APPROVED EQUAL.

PROVIDE PDUs AND MOUNTING BRACKETS FOR ALL TR RACKS. PROVIDE ALL NECESSARY MOUNTING HARDWARE. SEE SCHEDULE ON SHEET TJ-002 FOR PDUs AND

BRACKETS OR APPROVED EQUAL.

PROVIDE 18” UNIVERSAL CABLE RUNWAY #10250-718 OR APPROVED EQUAL IN

QUANTITIES TO COMPLETE DESIGN ON PLANS. PROVIDE CABLE RUNWAY RADIUS DROP

# 12100-718 OR APPROVED EQUAL ON EACH SIDE OF ALL RACKS TO SUPPORT CABLE

TRANSITION FROM RUNWAY. RUNWAY SHALL BE MOUNTED 6” ABOVE HEIGHT OF

RACKS. PROVIDE ALL NECESSARY SUPPORTS, MOUNTING HARDWARE, BRACKETS, AND

ASSOCIATED FASTENERS.

PROVIDE TGB #13622-012 OR APPROVED EQUAL AND BONDING. SEE SHEET TJ-008

THROUGH TJ-010 FOR DETAILS.

ALL WALLS MUST BE LINED WITH 3/4” AC GRADE (OR BETTER) PLYWOOD. THE PLYWOOD

WILL BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT.

AT LEAST ONE FIRE RATING STAMP PER SHEET MUST BE READILY VISIBLE AFTER

PAINTING AND EQUIPMENT INSTALLATION. THE PAINT COLOR WILL BE SEMI-GLOSS

BRIGHT WHITE TO AID WITH LIGHTING IN THE ROOMS. THE BOTTOM OF THE PLYWOOD

SHOULD BE MOUNTED 6” ABOVE FINISHED FLOOR (AFF) IN NEW TR SPACES. NO

ELECTRICAL CONDUITS, JUNCTION BOXES OR ANY OTHER NON-TELECOMMUNICATION

SYSTEMS EQUIPMENT WILL BE MOUNTED ON OR ACROSS ANY BACKBOARD AREA.

PROVIDE KEYPAD/CARD READER #HID multiCLASS SE RPK40 CONNECT TO ACCESS

CONTROL SYSTEM PANEL IN RM 3216. SEE SHEET TY-001 FOR DOOR DETAILS AND

ADDITIONAL PART NUMBERS.

PROVIDE COMPATIBLE HORN/STROBE DEVICE PER NFPA 101, TO MATCH EXISTING

DEVICES, CONNECT TO NEAREST NAC WITH AVAILABLE CAPACITY.

PROVIDE ZONE PDU OR APPROVED EQUAL. PROVIDE ALL NECESSARY MOUNTING

HARDWARE. SEE SCHEDULE ON SHEET TJ-002.

RELOCATE BAC SYSTEM PANEL, 2 SIMPLEX FA PANELS, AND SECURITY CAMERA

SYSTEM FROM LOCATIONS ON WALL BEING DEMOLISH TO NORTH WALL. DOOR

OPENING TO BE REPLACE WITH GWB. ACTUAL PANEL PLACEMENT LOCATIONS TO BE

COORDINATED WITH VA COR AND OR AE. PROVIDE ALL NECESSARY ELECTRICAL

CIRCUITS. PROVIDE ALL NECESSARY CONDUIT AND CABLING REQUIRED TO MAKE

SYSTEM INTEGRAL FOR PANEL MIGRATION WITHOUT SPLICES. CONTRACTOR

RESPONSIBLE FOR PROVIDING FIRE SAFETY WATCH DURING ANY FA PANEL DOWNTIME.

PROVIDE AXIS P3245-V FIXED DOME NETWORK CAMERA OR APPROVED EQUAL. HOME

RUN CABLE BACK TO NEAREST AXIS CAMERA NETWORK SWITCH, TERMINATE CAMERA

END USING FIELD TERM MODULAR PLUGS. SEE DETAILS SHEET TJ-002. COORDINATE

WITH VA COR FOR SWITCH LOCATIONS.

PROVIDE COMPATIBLE SMOKE DETECTOR PER NFPA 101, TO MATCH EXISTING DEVICES,

CONNECT TO NEAREST SLC LOOP WITH AVAILABLE CAPACITY.

SCALE: NTS

ENLARGED ROOM - 3216

OTHER SYSTEMS MIGRATIONS

RACK EQUIPMENT SCHEDULE - BLDG 1 RM 3163

EQUIPMENT QTY TYPE PART #

RACK 1 CHANNEL RACK CPI #MM2073038-W OR APPROVED EQUAL

PATCH PANELS NOTE 1 HIGH DENSITY

ANGLED 48-PORT

ORTHRONICS #OR-PHAHJU48 OR

APPROVED EQUAL

CABLE MANAGER NOTE 2 HORIZONTAL CABLE

MANAGER CPI #13930-701 OR APPROVED EQUAL

CABLE MANAGER NOTE 3 10" VERTICAL CABLE

MANGER CPI #MM20VMD706-W OR APPROVED EQUAL

TEMP / HUMIDITY

SENSOR NOTE 6 NOTE 6 NOTE 6

PDU NOTE 4 VERTICAL PDU CPI #EA-3013-E, WITH MOUNTING BRACKETS

#39221-E03 OR APPROVED EQUAL

NOTES: SEE RACK ELEVATIONS FOR EXACT LOCATION OF EACH PIECE OF EQUIPMENT.

1. SEE RACK ELEVATIONS ON SHEET TJ-012 FOR ADDITIONAL INFORMATION.

2. HORIZONTAL CABLE MANAGERS TO BE INSTALLED JUST ABOVE TOP PATCH PANEL, JUST BELOW BOTTOM PATCH PANE, AND BETWEEN ALL PATCH PANELS. SEE TELECOMM RACK ELEVATIONS ON SHEET

TJ-012 FOR QUANTITY INFORMATION FOR THIS EQUIPMENT.

3. VERTICAL CABLE MANAGERS TO BE INSTALLED AT EACH END AND BETWEEN ALL RACKS. SEE FLOOR

PLAN FOR QUANTITIES.

4. TWO CPI PDUs PER RACK, OR APPROVEDS EQUAL, ONE PER SIDE, MOUNTED WITH LISTED BRACKETS.

SEE SHEET TJ-002 FOR QUANTITIES.

6. USB TEMP / HUMIDITY SENSOR SHALL BE INSTALLED IN EACH CABINET, PLUGGED INTO PDU. SEE

SHEET TJ-002 FOR QUANTITIES.

RACK EQUIPMENT SCHEDULE - BLDG 1 RM 3216

EQUIPMENT QTY TYPE PART #

RACK 2 CHANNEL RACK CPI #MM2073038-W OR APPROVED EQUAL

PATCH PANELS NOTE 1 HIGH DENSITY ANGLED

48-PORT

ORTHRONICS #OR-PHAHJU48 OR

APPROVED EQUAL

CABLE MANAGER NOTE 2 HORIZONTAL CABLE

MANAGER CPI #13930-701 OR APPROVED EQUAL

CABLE MANAGER NOTE 3 10" VERTICAL CABLE

MANGER

CPI #MM20VMD706-W OR APPROVED

EQUAL

TEMP / HUMIDITY

SENSOR NOTE 6 NOTE 6 NOTE 6

PDU NOTE 4 NOTE 4 NOTE 4

ZONE PDU NOTE 5 NOTE 5 NOTE 5

NOTES: SEE RACK ELEVATIONS FOR EXACT LOCATION OF EACH PIECE OF EQUIPMENT.

1. SEE RACK ELEVATIONS ON SHEET TJ-012 FOR ADDITIONAL INFORMATION.

2. HORIZONTAL CABLE MANAGERS TO BE INSTALLED JUST ABOVE TOP PATCH PANEL, JUST BELOW BOTTOM PATCH PANE, AND BETWEEN ALL PATCH PANELS. SEE TELECOMM RACK ELEVATIONS ON SHEET

TJ-012 FOR QUANTITY INFORMATION FOR THIS EQUIPMENT.

3. VERTICAL CABLE MANAGERS TO BE INSTALLED AT EACH END AND BETWEEN ALL RACKS. SEE FLOOR

PLAN FOR QUANTITIES.

4. TWO CPI PDUs PER RACK, OR APPROVEDS EQUAL, ONE PER SIDE, MOUNTED WITH LISTED BRACKETS.

SEE SHEET TJ-002 FOR QUANTITIES.

5. ZONIT ZONE PDU, OR APPROVED EQUAL, TO BE MOUNTED AS SHOWN ON RACK ELEVATIONS, SHEET

TJ-012. SEE SHEET TJ-002 FOR QUANTITIES.

6. USB TEMP / HUMIDITY SENSOR SHALL BE INSTALLED IN EACH CABINET, PLUGGED INTO PDU. SEE

SHEET TJ-002 FOR QUANTITIES.

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

CJ

CJ

CJ

C J

CJ

CJ

C J

CJCJ

CJ CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ CJ CJ CJ CJ CJ

C J

C J

C J

C J

CJ

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C

J

C

J

CJ

CJ

CJ

C J

C J

CJ CJ CJ

C J

C J

CJ

CJ

CJ

C J

C J

CJ CJ CJ

C J

C J

CJ CJ

CJ CJ CJ CJ

C J

C J

CJ CJ CJ CJ

C J

CJ

CJ CJ

CJ

C J

C J

C J

CJCJCJCJCJCJCJCJCJCJ

C J

CJ

C J

C J

CJCJCJ

C J

C J

C J

C J

C J

A17-A19

RK-3216-1

A23-A25

RK-3216-1

A26-A28

RK-3216-1

C8-C10

RK-3216-1

C7

RK-3216-1

C3-C5

RK-3216-1

B48

C1,C2

RK-3216-1

B42-B44

RK-3216-1

B39-B41

RK-3216-1

B33-B35

RK-3216-1

B30-B32

RK-3216-1

B25-B27

RK-3216-1

B22-B24

RK-3216-1

B19-B21

RK-3216-1

C6

RK-3216-1

B47

RK-3216-1

B37

RK-3216-1

B36

RK-3216-1

B29

RK-3216-1

B12

RK-3216-1

B46

RK-3216-1

B38

RK-3216-1

B28

RK-3216-1

B13-B15

RK-3216-1

B11

RK-3216-1

B2

RK-3216-1

A41

RK-3216-1

A42

RK-3216-1

D9-D11

RK-3216-1

D12-D14

RK-3216-1

D24

RK-3216-1

D25-D27

RK-3216-1

D4-D6

RK-3216-1

D7

RK-3216-1

D1-D3

RK-3216-1

C11-C13

RK-3216-1

C26

RK-3216-1

C14-C16

RK-3216-1

C20-C22

RK-3216-1

C23-C25

RK-3216-1

C17-C19

RK-3216-1

C35-C37

RK-3216-1

C33,C34

RK-3216-1

C30-C32

RK-3216-1

C41

RK-3216-1

C29

RK-3216-1

C27,C28

RK-3216-1

C48

RK-3216-1

C42-C44

RK-3216-1

C45-C47

RK-3216-1

D28

RK-3216-1

D29-D31

RK-3216-1

D18-D20

RK-3216-1

D15-D17

RK-3216-1

D21-D23

RK-3216-1

D35

RK-3216-1

D32-D34

RK-3216-1

D36-D38

RK-3216-1

D39-D41

RK-3216-1

D42-D44

RK-3216-1

D45-D47

RK-3216-1

E3-E5

RK-3216-2

D48

RK-3216-1

E1,E2

RK-3216-2

E6

RK-3216-2

E7-E9

RK-3216-2

E10-E12

RK-3216-2

E13-E15

RK-3216-2

E16-E18

RK-3216-2

E19-E21

RK-3216-2

E22-E24

RK-3216-2

E25-E27

RK-3216-2

E28-E30

RK-3216-2

E31-E33

RK-3216-2

E37-E39

RK-3216-2

E34-E36

RK-3216-2

A20-A22

RK-3216-1

B45

RK-3216-1

C38-C40

RK-3216-1

D8

RK-3216-1

B8-B10

RK-3216-1

B16-B18

RK-3216-1

B4

RK-3216-1

A47,A48,B1

RK-3216-1

A44-A46

RK-3216-1

A38-A40

RK-3216-1

A34

RK-3216-1

A35-A37

RK-3216-1

A33

RK-3216-1

A43

RK-3216-1

A30-A32

RK-3216-1

B3

RK-3216-1

B5-B7

RK-3216-1

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FLOOR PLAN - COPPER -

BLDG 1 PARTIAL THIRD FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL THIRD FLOOR

NORTH0

T

N

M A

T C

H

L I N

E

T

N

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

GENERAL NOTES

1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT

SLEEVES TO BE SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS

CABLING THROUGH WALLS AND NON ACCESSIBLE CEILING AREAS. CONDUIT

SLEEVES SHALL BE HILTI SPEED SLEEVES. CONDUIT SIZE IS TO BE AS NOTED.

2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING

CONCRETE WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE

-DRILLING, SEALING, AND FIRE STOPPING AS REQUIRED.

3. PROVIDE NEW TELECOMMUNICATION OUTLETS FOR TERMINATION OF CAT 6A

CABLING IN ALL ROOMS WHERE OUTLET DROPS ARE INDICATED. ROUTE CABLING

BACK TO PATCH PNL IN TELECOMM RACK/CABINET NUMBER AS INDICATED IN EACH

ROOM.

4. NEW WORK STATION OUTLETS TO BE RECESS MOUNTED WITH TWO GANG MPLS2

STRAP, FREE RUN CAT6A CABLING WITHIN WALLS, JACKS, AND STAINLESS STEEL

FACE PLATE.

5. DEMOLITION OF ALL EXISTING FIBER/COPPER CABLES AND EQUIPMENT TO BE

PERFORMED ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND VA HAS

CUT SYSTEMS OVER TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND

A/E TEAM.

6. SEE SHEET TJ-011 FOR PATCH PANEL SCHEDULE SCHEDULES.

RSDC

001-TN-032

PLAN NOTES

PROVIDE EMT SLEEVE(S) APPROPRIATE TO SUPPORT CABLES TO A MAXIMUM FILL OF

40 PERCENT AT TIME OF INSTALLATION. APPLY FIRESTOP AS PER CODE AND AHJ.

APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO BOTH SIDES OF ALL

PENETRATIONS. SEE SHEET TJ-003 FOR WATERFALL AND BUSHING DETAILS.

P

P P

S S

PPPPP

SSSSS

P P

S S

P P P P

S S S S S S S S S S S

P P P P P P P

(N) CABLE TRAY

(N) 6" VERTICAL

CABLE MANAGER

(N) SLEEVES

(N)BONDING

BUSBAR

(N) FA HORN

STROBE

(N) KEYPAD/

READER

(N) CABLE TRAY

(N) 6" VERTICAL

CABLE MANAGER

(N)BONDING

BUSBAR

(N) SLEEVES

(N) SLEEVES

(N) KEYPAD/READER

(N) FLOOR MOUNTED

CHANNEL RACK

(N) FA HORN

STROBE

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FLOOR PLAN - FIBER -

BLDG 1 PARTIAL THIRD FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL THIRD FLOOR

NORTH

T

N

M A

T C

H

L I N

E

T

N

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

SCALE: NTS

ENLARGED ROOM - 3163

001-TN-033

SCALE: NTS

ENLARGED ROOM - 3216

001-TN-033

RSDC

001-TN-033

GENERAL NOTES

1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT

SLEEVES TO BE SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS

CABLING THROUGH WALLS AND NON ACCESSIBLE CEILING AREAS. CONDUIT

SLEEVES SHALL BE HILTI SPEED SLEEVES. CONDUIT SIZE IS TO BE AS NOTED.

2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING

CONCRETE WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE

-DRILLING, SEALING, AND FIRE STOPPING AS REQUIRED.

3. ALL NEW FIBER SHALL BE ROUTED IN NEW INNERDUCT. INNERDUCT SHALL BE

UTILIZED FOR ROUTING FROM POINT OF ENTRY TO TERMINATION RACK AND SHALL

UTILIZE NEW AND EXISTING PATHWAYS AS REQUIRED.

4. ALL FIBER OPTIC CABLES RAN IN BLDG 1 FROM MCR 5281 AND ENTRANCE RM B105

TO ALL TR TO BE FACTORY TERMINATED WITH MPO CONNECTORS. ALL BUILDING

TO BUILDING FIBER OPTIC CABLES ARE TO BE FIELD TERMINATED WITH MPO

CONNECTORS. ALL LENGTHS LISTED IN THE MATRIX, SHOWN ON TS-003 AND TJ-004,

ARE APPROXIMATE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY

REQUIRED LENGTHS PRIOR TO PURCHASE OF FACTORY TERMINATED CABLES.

CONTRACTOR SHALL PROVIDE 10' OF ADDITIONAL LENGTH AT EACH END AND 16'

WITHIN EACH VAULT FOR SERVICE LOOPS.

5. CONTRACTOR TO PROVIDE NEW J-HOOKS SIZED AS REQUIRED FOR ROUTING OF

FIBER OPTIC CABLE IN ACCESSIBLE SPACES AS SHOWN. PROVIDE ALL

APPURTENANCES FOR INSTALLATION OF J-HOOKS.

6. DEMOLITION OF ALL EXISTING FIBER/COPPER CABLES AND EQUIPMENT TO BE

PERFORMED ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND VA HAS

CUT SYSTEMS OVER TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND

A/E TEAM.

7. PRIMARY AND SECONDARY FIBER RUNS SHOWN ADJACENT FOR CLARITY ON

DRAWING. PRIMARY AND SECONDARY FIBER RUNS SHALL BE SEPARATED AS MUCH

AS PHYSICALLY POSSIBLE WHEN IN A COMMON SPACE.

1 2 3

PLAN NOTES

PROVIDE HIGH DENSITY FIBER OPTIC ENCLOSURE AND CASSETTES AS SHOWN/LISTED ON

SHEET TJ-004 IN EXISTING AND NEW COMMUNICATION RACKS FOR FIBER TERMINATION.

PROVIDE PRIMARY (1)24 STRAND MM FROM RM 5281 TO COMM RACK IN TR.

PROVIDE SECONDARY (1)24 STRAND MM FROM RM B105 TO COMM RACK IN TR.

PROVIDE HILTI SPEEDSLEEVE SLEEVE FOR ROUTING FIBER OPTIC CABLES SIZED

APPROPRIATELY FOR THE NUMBER OF CABLES TO MAXIMUM FILL OF 40 PERCENT AT

TIME OF INSTALLATION. INNERDUCT TO TERMINATE AT SLEEVE ENTRANCE LOCATION

PASSING ONLY FIBER OPTIC CABLE THROUGH SLEEVE AND RESUME INNERDUCT AT EXIT

LOCATION. APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO BOTH SIDES OF

ALL PENETRATIONS. "PRIMARY" CABLES CAN SHARE SLEEVES THROUGH BARRIERS.

"SECONDARY" CABLES CAN SHARE SLEEVES THROUGH BARRIERS. ADDITIONAL SLEEVES

SHOWN ON PLANS FOR CLARITY.

ROUTE FIBER OPTICAL INNERDUCT TO MCR RM 5281 VIA VERTICAL PIPE SHAFT. SEE

SHEET 001-TN-053 FOR CONTINUATION.

ROUTE FIBER OPTICAL INNERDUCT TO ENTRANCE RM B105 VIA "DUMBWAITER" SHAFT.

SEE SHEET 001-TN-0B6 FOR CONTINUATION.

1 2 3

RACK EQUIPMENT SCHEDULE - FIBER EQUIPMENT

EQUIPMENT QTY TYPE PART #

FIBER ENCLOSURE NOTE 1 NOTE 1 NOTE 1

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FLOOR PLAN - FIBER -

BLDG 1 PARTIAL THIRD FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FLOOR PLAN - FIBER - BLDG 1 PARTIAL THIRD FLOOR

NORTH0

T

N

M A

T C

H

L I N

E

T

N

M A

T C

H

L I N

E

SCALE: N.T.S.

KEYPLAN

RSDC

001-TN-034

NO FIBER

WORK THIS AREA

REFERENCE ONLY

NO FIBER OPTIC CABLE WORK THIS AREA

43" AFF

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

CJCJCJCJCJCJCJCJCJCJCJCJCJ

C J

C J

C J

C J

C J

C J

C J

CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ CJ

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

CJ

CJCJ

CJCJCJ

CJCJCJ

C J

CJ

CJ CJ CJ

C J

C J

C J

C J

C J

C J

CJ CJ

C J

C J

C J

C J

C J

C J

C J

CJ CJ CJ

C J

C J

CJ

C J

C J

C J

C J

C J

C J

C J

C J

CJ CJ CJ

C J

CJ

C J

CJ

C J

C J

CJ

CJ CJ

C J

C J

C J

C J

C J

C J

C J

CJ

CJCJ

CJ

CJCJ

D24-D27

RK-4122-1

D20-D23

RK-4122-1

D12-D15

RK-4122-1

D16-D19

RK-4122-1

D8-D11

RK-4122-1

D28-D31

RK-4122-1

D36-D39

RK-4122-1

D40-D43

RK-4122-1

D48

E1-E3

RK-4122-1

E4-E7

RK-4122-1

D32-D35

RK-4122-1

D44-D47

RK-4122-1

E8-E11

RK-4122-1

E12-E15

RK-4122-1

E16-E19

RK-4122-1

E24

RK-4122-1

C44-C47

RK-4122-1

C48

D1-D3

RK-4122-1

D4-D7

RK-4122-1

C36-C39

RK-4122-1

E20-E23

RK-4122-1

E26-E29

RK-4122-1

E30-E33

RK-4122-1

E25

RK-4122-1

C40-C43

RK-4122-1

C31-C34

RK-4122-1

C27-C30

RK-4122-1

C23-C26

RK-4122-1

C19-C22

RK-4122-1

C35

RK-4122-1

C18

RK-4122-1

C2-C5

RK-4122-1

C6-C9

RK-4122-1

C10-C13

RK-4122-1

C14-C17

RK-4122-1

B46-B48

C1

RK-4122-1

B42-B45

RK-4122-1

B41

RK-4122-1

B37-B40

RK-4122-1

B33-B36

RK-4122-1

B29-B32

RK-4122-1

B25-B28

RK-4122-1

B21-B24

RK-4122-1

B20

RK-4122-1

A39-A42

RK-4122-1

A35-A38

RK-4122-1

B12-B15

RK-4122-1

B11

RK-4122-1

B7-B10

RK-4122-1

B16-B19

RK-4122-1

A6-A9

RK-4122-1

A11-A14

RK-4122-1

A19-A22

RK-4122-1

A31-A34

RK-4122-1

A43-A46

RK-4122-1

A47,A48

B1,B2

RK-4122-1

B3-B6

RK-4122-1

A7-A10

RK-4122-1

A15-A18

RK-4122-1

A23-A26

RK-4122-1

A27-A30

RK-4122-1

A1

RK-4122-1

A2-A5

RK-4122-1

F18,F19

RK-4122-1

F20

RK-4122-1

E34-E37

RK-4122-1

E38-E41

RK-4122-1

E42

RK-4122-1

F17

RK-4122-1

F16

RK-4122-1

F15

RK-4122-1

F13,F14

RK-4122-1

F10-F12

RK-4122-1

F9

RK-4122-1

E43

RK-4122-1

E44-E47

RK-4122-1

CJCJ

(N) CABLE TRAY

(N) 6" VERTICAL

CABLE MANAGER

(N) SLEEVES

(N)BONDING

BUSBAR

(N) KEYPAD/READER

(N) FLOOR MOUNTED

CHANNEL RACK

(N) FA HORN

STROBE

RK-4122

(N) SECURITY

CAMERA

(N) SMOKE

DETECTOR

WALL BEING

DEMOLISHED

BAC CABINET

TO REMAIN

RELOCATE ACCESS CONTROL

AND NURSE CALL CABINETS

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TELECOMM FLOOR PLAN - COPPER -

BLDG 1 PARTIAL FOURTH FLOOR

1/8"=1'-0"

4' 8' 16'

SCALE:

TELECOMM FLOOR PLAN - COPPER - BLDG 1 PARTIAL FOURTH FLOOR

NORTH

T

N

M A

T C

H

L I N

E

T

N

M A

T C

H

L I N

E

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 4122

NORTH

001-TN-041

SCALE: NTS

KEY PLAN

GENERAL NOTES

1. CONTRACTOR TO PROVIDE ALL CONDUIT SLEEVES AND CONDUIT. CONDUIT

SLEEVES TO BE SIZED AS REQUIRED FOR ROUTING OF TELECOMMUNICATIONS

CABLING THROUGH WALLS AND NON ACCESSIBLE CEILING AREAS. CONDUIT

SLEEVES SHALL BE HILTI SPEED SLEEVES. CONDUIT SIZE IS TO BE AS NOTED.

2. FOR NEW CONDUIT INSTALLATIONS THAT PENETRATE THROUGH EXISTING

CONCRETE WALLS AND FLOORS, CONTRACTOR SHALL PROVIDE ALL CORE

-DRILLING, SEALING, AND FIRE STOPPING AS REQUIRED.

3. PROVIDE NEW TELECOMMUNICATION OUTLETS FOR TERMINATION OF CAT 6A

CABLING IN ALL ROOMS WHERE OUTLET DROPS ARE INDICATED. ROUTE CABLING

BACK TO PATCH PNL IN TELECOMM RACK/CABINET NUMBER AS INDICATED IN EACH

ROOM.

4. NEW WORK STATION OUTLETS TO BE RECESS MOUNTED WITH TWO GANG MPLS2

STRAP, FREE RUN CAT6A CABLING WITHIN WALLS, JACKS, AND STAINLESS STEEL

FACE PLATE.

5. DEMOLITION OF ALL EXISTING FIBER/COPPER CABLES AND EQUIPMENT TO BE

PERFORMED ONLY AFTER NEW CABLING IS INSTALLED, TERMINATED AND VA HAS

CUT SYSTEMS OVER TO NEW INFRASTRUCTURE. COORDINATE WITH VA COR AND

A/E TEAM.

6. SEE SHEET TJ-011 FOR PATCH PANEL SCHEDULE SCHEDULES.

10. THE GENERAL CONTRACTOR IS TO ENSURE ALL FLOORS WITH ACCESS CONTROLS

PROPERLY FUNCTION AND ARE COMMISSIONED. COORDINATE THE WORK AMONG

THE TRADES TO ACHIEVE SECURITY REQUIREMENTS.

11. EXPAND ALL SEQUENCE OF OPERATIONS, GRAPHICS, AND TOPOLOGY AS IS

REQUIRED TO PROVIDE A COMPLETE DISPLAY AT THE GRAPHICAL USER

INTERFACE.

12. THE CABLE AND CONDUIT ROUTES MAY BE FIELD ADJUSTED AS REQUIRED TO

PREVENT DISTURBANCE OF HAZARDOUS MATERIALS OR OTHER TRADES.

13. SUBMIT SHOP DRAWINGS WHICH FULLY DETAIL ALL COMPONENTS OF THE ACCESS

CONTROL SYSTEM. PROVIDE MFL'S CUT SHEETS FOR ALL COMPONENTS.

14. PROVIDE ALL NEW WIRE. REUSE CONDUIT AS APPLICABLE.

15. JOHNSON CONTROLS, INC. IS THE HISTORICAL VENDOR FOR THIS SCOPE OF WORK.

THEIR CONTACT INFORMATION IS AS FOLLOWS:

JOHNSON CONTROLS

GREEN BAY OFFICE

ATTN: SCOTT NIELSON

ACCOUNT MANAGER

PHONE: 920.883.9309

EMAIL: SCOTT.NIELSON@JCI.COM

16. EXISTING ACCESS CONTROL SYSTEM IS A SOFTWARE HOUSE CCURE 9000.

17. EXISTING CONTROL PANELS ARE A MIXTURE OF ISTAR PRO AND I STAR ULTRA

CONTROLLERS.

18. SEE SPECIFICATION SYSTEM 06 20 00 ACCESS CONTROL FOR FULL CONTRACT

REQUIREMENTS.

RSDC

2 2 2

001-TN-041

PLAN NOTES

PROVIDE HILTI SPEED SLEEVES FROM CABLE TRAY TO CORRIDOR SIZED

APPROPRIATELY FOR THE NUMBER OF CABLES TO MAXIMUM FILL OF 40 PERCENT AT

TIME OF INSTALLATION. APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO

BOTH SIDES OF ALL PENETRATIONS.

PROVIDE EMT SLEEVE(S) APPROPRIATE TO SUPPORT CABLES TO A MAXIMUM FILL OF

40 PERCENT AT TIME OF INSTALLATION. APPLY FIRESTOP AS PER CODE AND AHJ.

APPLY MANUFACTURER FIRE RATED ASSEMBLY STICKER TO BOTH SIDES OF ALL

PENETRATIONS. SEE SHEET TJ-003 FOR WATERFALL AND BUSHING DETAILS.

PROVIDE ALL VERTICAL CABLE SUPPORTS FROM CONDUIT/SLEEVE DOWN TO

UNIVERSAL CABLE RUNWAY. PROVIDE TAL-TY CONDUIT WATERFALL #CWF400 OR

APPROVED EQUAL FOR ALL 4" EMT SLEEVES. SEE SHEET TJ-003 FOR WATERFALL AND

BUSHING DETAILS.

PROVIDE CHANNEL RACKS OR APPROVED EQUAL. PROVIDE VERTICAL CABLE

MANAGEMENT OR APPROVED EQUAL ON BOTH ENDS AND BETWEEN ALL RACKS.

PROVIDE HORIZONTAL CABLE MANAGER OR APPROVED EQUAL ABOVE, BELOW, AND

BETWEEN ALL PATCH PANELS AND ACTIVE EQUIPMENT AS SHOWN ON RACK

ELEVATIONS. SEE SCHEDULE THIS SHEET FOR DETAILS. PROVIDE ALL NECESSARY

MOUNTING HARDWARE, BRACKETS, AND ASSOCIATED FASTENERS.

PROVIDE ORTRONICS HDJ SERIES 48 PORT UNLOADED ANGLED PANELS OR

APPROVED EQUAL AS PER DETAIL ON SHEET TJ-003 FOR TERMINATION OF NEW

TELECOMM OUTLETS. PROVIDE ORTRONICS HIGH DENSITY JACK OR APPROVED EQUAL

FOR WALL PLATES AND UNLOADED, HIGH DENSITY PATCH PANELS. PROVIDE HDJ HAND

CRIMPING / TERMINATION TOOL OR APPROVED EQUAL.

PROVIDE PDUs AND MOUNTING BRACKETS FOR ALL TR RACKS. PROVIDE ALL NECESSARY MOUNTING HARDWARE. SEE SCHEDULE ON SHEET TJ-002 FOR PDUs AND

BRACKETS OR APPROVED EQUAL.

PROVIDE 18” UNIVERSAL CABLE RUNWAY #10250-718 OR APPROVED EQUAL IN

QUANTITIES TO COMPLETE DESIGN ON PLANS. PROVIDE CABLE RUNWAY RADIUS DROP

# 12100-718 OR APPROVED EQUAL ON EACH SIDE OF ALL RACKS TO SUPPORT CABLE

TRANSITION FROM RUNWAY. RUNWAY SHALL BE MOUNTED 6” ABOVE HEIGHT OF

RACKS. PROVIDE ALL NECESSARY SUPPORTS, MOUNTING HARDWARE, BRACKETS, AND

ASSOCIATED FASTENERS.

PROVIDE SBB OR APPROVED EQUAL AND BONDING. SEE SHEETS TJ-001 AND TJ-008

THROUGH TJ-010 FOR DETAILS.

ALL WALLS MUST BE LINED WITH 3/4” AC GRADE (OR BETTER) PLYWOOD. THE PLYWOOD

WILL BE FIRE RETARDANT AND COATED WITH TWO COATS OF FIRE RETARDANT PAINT.

AT LEAST ONE FIRE RATING STAMP PER SHEET MUST BE READILY VISIBLE AFTER

PAINTING AND EQUIPMENT INSTALLATION. THE PAINT COLOR WILL BE SEMI-GLOSS

BRIGHT WHITE TO AID WITH LIGHTING IN THE ROOMS. THE BOTTOM OF THE PLYWOOD

SHOULD BE MOUNTED 6” ABOVE FINISHED FLOOR (AFF) IN NEW TR SPACES. NO

ELECTRICAL CONDUITS, JUNCTION BOXES OR ANY OTHER NON-TELECOMMUNICATION

SYSTEMS EQUIPMENT WILL BE MOUNTED ON OR ACROSS ANY BACKBOARD AREA.

PROVIDE KEYPAD/CARD READER #HID multiCLASS SE RPK40. CONNECT TO ACCESS

CONTROL SYSTEM PANEL IN RM 4118. SEE SHEET TY-001 FOR DOOR DETAILS AND

ADDITIONAL PART NUMBERS.

PROVIDE COMPATIBLE HORN/STROBE DEVICE PER NFPA 101, TO MATCH EXISTING

DEVICES, CONNECT TO NEAREST NAC WITH AVAILABLE CAPACITY.

RELOCATE ACCESS CONTROL AND NURSE CALL CABINET ON WALL BEING DEMOLISH

TO NORTH WALL. DOOR OPENING TO BE REPLACE WITH GWB. ACTUAL LOCATION AND

POSSIBLE DOWNTIME TO BE COORDINATED WITH VA COR AND OR AE. REMOVE FROM

WALL, PROTECT SYSTEM AND CABLING DURING DEMOLITION. PROVIDE ALL

NECESSARY ELECTRICAL CIRCUITS. PROVIDE ALL NECESSARY CONDUIT AND CABLING

REQUIRED AS NEEDED TO MAKE SYSTEM INTEGRAL FOR PANEL MIGRATION WITHOUT

SPLICES.

PROVIDE AXIS P3245-V FIXED DOME NETWORK CAMERA OR APPROVED EQUAL. HOME

RUN CABLE BACK TO NEAREST AXIS CAMERA NETWORK SWITCH, TERMINATE CAMERA

END USING FIELD TERM MODULAR PLUGS. SEE DETAILS SHEET TJ-002. COORDINATE

WITH VA COR FOR SWITCH LOCATIONS.

PROVIDE COMPATIBLE SMOKE DETECTOR PER NFPA 101, TO MATCH EXISTING DEVICES,

CONNECT TO NEAREST SLC LOOP WITH AVAILABLE CAPACITY.

4 5 6

1/4"=1'-0"

2' 4' 8'

SCALE:

ENLARGED ROOM - 4122

OTHER SYSTEMS MIGRATION

NORTH

RACK EQUIPMENT SCHEDULE - BLDG 1 RM 4122

EQUIPMENT QTY TYPE PART #

RACK 1 CHANNEL RACK CPI #MM2073038-W OR APPROVED EQUAL

PATCH PANELS NOTE 1 HIGH DENSITY

ANGLED 48-PORT

ORTHRONICS #OR-PHAHJU48 OR

APPROVED EQUAL

CABLE MANAGER NOTE 2 HORIZONTAL CABLE

MANAGER CPI #13930-701 OR APPROVED EQUAL

CABLE MANAGER NOTE 3 10" VERTICAL CABLE

MANGER CPI #MM20VMD706-W OR APPROVED EQUAL

TEMP / HUMIDITY

SENSOR NOTE 6 NOTE 6 NOTE 6

PDU NOTE 4 VERTICAL PDU CPI #EA-3013-E, WITH MOUNTING BRACKETS

#39221-E03 OR APPROVED EQUAL

NOTES: SEE RACK ELEVATIONS FOR EXACT LOCATION OF EACH PIECE OF EQUIPMENT.

1. SEE RACK ELEVATIONS ON SHEET TJ-012 FOR ADDITIONAL INFORMATION.

2. HORIZONTAL CABLE MANAGERS TO BE INSTALLED JUST ABOVE TOP PATCH PANEL, JUST BELOW BOTTOM PATCH PANE, AND BETWEEN ALL PATCH PANELS. SEE TELECOMM RACK ELEVATIONS ON SHEET

TJ-012 FOR QUANTITY INFORMATION FOR THIS EQUIPMENT.

3. VERTICAL CABLE MANAGERS TO BE INSTALLED AT EACH END AND BETWEEN ALL RACKS. SEE FLOOR

PLAN FOR QUANTITIES.

4. TWO CPI PDUs PER RACK, OR APPROVEDS EQUAL, ONE PER SIDE, MOUNTED WITH LISTED BRACKETS.

SEE SHEET TJ-002 FOR QUANTITIES.

6. USB TEMP / HUMIDITY SENSOR SHALL BE INSTALLED IN EACH CABINET, PLUGGED INTO PDU. SEE

SHEET TJ-002 FOR QUANTITIES.

43" AFF

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

C

WAP

CJ

C J

C J

C J

CJ CJ CJ

C J

C J

CJ

CJCJCJCJ

C J

C J

C J

C J

CJCJCJCJCJCJCJCJCJ

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

CJ

C J

C J

CJ

C J

CJ

C J

CJ

CJ CJ

C J

CJ

CJ

C J

CJ CJ

C J

CJ

C J

C J

CJ

C J

C J

CJ

C J

CJ

C J

C J

C J

C J

C J

CJ

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

C J

CJ

C J

C J

C J

C J

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .