ATTACHMENT 4 - Drawings VOL 1 - 2 of 5.pdf

PDF 16 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain Federal contract opportunity
Solicitation number
36C77622B0018
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal solicitation to upgrade infrastructure at the Iron Mountain VA Medical Center. The solicitation number is 36C77622B0018 and is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The project involves upgrades to the facility's electrical and IT infrastructure to support a new Electronic Health Record Modernization system. Specifically, the scope of work includes electrical upgrades, bonding, uninterruptible power supply systems, building management system interfaces, HVAC upgrades and expansions, communication infrastructure upgrades including new data outlets and Cat6A cabling, physical security improvements, and fiber optic backbone upgrades across the campus. Offerors are required to provide all labor, materials, equipment and supervision to complete the infrastructure upgrades. The response deadline and anticipated award date are not specified in this attachment.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - Iron Mountain, newest first.
File Type Posted
36C77622B0018 0003.pdf PDF
09 69 00 Access Flooring-Addenda 2.pdf PDF
Addendum 1.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 6-17-22.pdf PDF
Technical Questions - FINAL - Iron Mtn. 6-27-22.pdf PDF
EHRM Asbestos Report.pdf PDF
36C77622B0018 0002.pdf PDF
Site Visit Sign-in Sheet - Iron Mtn. 5-18-22.pdf PDF
36C77622B0018 0001.pdf PDF
ATTACHMENT 2 - Specifications VOL 2 of 2.pdf PDF
ATTACHMENT 3 - Drawings VOL 1 - 1 of 5.pdf PDF
ATTACHMENT 15 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 19 - Site Visit Instructions.pdf PDF
ATTACHMENT 8 - Drawings VOL 2 - 1 of 7.pdf PDF
ATTACHMENT 9 - Drawings VOL 2 - 2 of 7.pdf PDF
ATTACHMENT 12 - Drawings VOL 2 - 5 of 7.pdf PDF
ATTACHMENT 14 - Drawings VOL 2 - 7 of 7.pdf PDF
36C77622B0018 - 5-5-22.pdf PDF
ATTACHMENT 5 - Drawings VOL 1 - 3 of 5.pdf PDF
ATTACHMENT 6 - Drawings VOL 1 - 4 of 5.pdf PDF
ATTACHMENT 7 - Drawings VOL 1 - 5 of 5.pdf PDF
ATTACHMENT 10 - Drawings VOL 2 - 3 of 7.pdf PDF
ATTACHMENT 11 - Drawings VOL 2 - 4 of 7.pdf PDF
ATTACHMENT 16 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 18 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 1 - Specifications VOL 1 of 2.pdf PDF
ATTACHMENT 13 - Drawings VOL 2 - 6 of 7.pdf PDF
ATTACHMENT 17 - Construction Wage Rates - Dickinson 2-25-22.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

AE0B1

MATCH LINE

AE0B1

MATCH LINE

AE

0B

M

AT

C H

L

IN

E

AE

0B

M

AT

C H

L

IN

E

TRUE

PLAN

ARCHITECTURAL FLOOR PLAN

PLAN - BLDG 1 PARTIAL BASEMENT

AE0B1 N.T.S

AE0B1 1/8' = 1'-0" NORTH

NORTH

AJ001

AJ001

TDOB2

RELOCATE EXISTING DATA TO

ROOM B091

EXISTING SMOKE

RESISTANCE HAZARDOUS

ROOM ENCLOSURE

001-AE-0B1FULLY SPRINKLERED

NEW

FEC

NEW

FEC

SYMBOLS LIST

TELECOMM ROOM

1 HOUR FIRE BARRIER (HAZARDOUS ROOM ENCLOSURE)

MATCH LINE

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

GENERAL CONTRACTOR SHALL PATCH AND REPAIR EXISTING

SURFACES DAMAGED BY REMOVAL OF EXISTING EQUIPMENT.

REPAIRED SURFACES SHALL MATCH EXISTING CONDITIONS,

ADJACENT FINISHES, AND TEXTURES. COORDINATE FINISHES WITH

THE VA COR FOR THIS PROJECT.

TRUE

PLAN

NORTH

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

001-AE-0B2

AE

-0

B1 M

AT

C

H L

IN

E

AE

-0

B1 M

AT

C

H L

IN

E

ARCHITECTURAL FLOOR PLAN

PLAN - BLDG 1 PARTIAL BASEMENT

EXISTING SMOKE

RESISTANCE HAZARDOUS

ROOM ENCLOSURE

EXISTING ENTRANCE

ROOM TO REMAIN

FULLY SPRINKLERED

NEW

FEC

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED PR O F E S S IO NA L A RCHIT ECT

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

NORTH

NORTH

NEW

FEC

MATCH EXISTING PARTITION

CONSTRUCTION TYPE.

PLYWOOD COVERED WDW.

SEE DETAIL F6/AJ007

NEW FEC

TELECOMM RACKS

006-AE-011

TRUE NORTH

PLAN NORTH

ARCHITECTURAL FLOOR PLAN

BLDG 6 FIRST FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

NOTE: ASBESTOS

FLOORING/MASTIC HAS BEEN

FOUND ON THIS FLOOR.

TO BE RELOCATED TO NEW

TELECOMM ROOM. SEE 006-TD-011

NEW

NOT SPRINKLERED

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S I O NA L A R CHIT ECT

EM

C1

001-AE-012

AE

M

AT

C H

L

IN

E

AE

M

AT

C H

L

IN

E

AE012 N.T.S

AE012 1/8"=1'-0"

ARCHITECTURAL FLOOR PLAN

BLDG 1 PARTIAL FIRST FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

AJ002RELOCATE EXISTING

TELECOMM ROOM TO 1220

DATA ROOM

FULLY SPRINKLERED

EXISTING TELECOMM ROOM

1243 IS BEING RELOCATED TO

NEW TR-RM 1216, SEE

001-TD-013

SYMBOLS LIST

TELECOMM ROOM

MATCH LINE

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED PR O F E S S I O NA L A R CHIT ECT

GENERAL CONTRACTOR SHALL PATCH AND REPAIR EXISTING

SURFACES DAMAGED BY REMOVAL OF EXISTING EQUIPMENT.

REPAIRED SURFACES SHALL MATCH EXISTING CONDITIONS,

ADJACENT FINISHES, AND TEXTURES. COORDINATE FINISHES WITH

THE VA COR FOR THIS PROJECT.

NEW FEC

TRUE

PLAN

001-AE-021

AE

M

AT

C

H L

IN

E

AE

M

AT

C

H L

IN

E

ARCHITECTURAL FLOOR PLAN

BLDG 1 PARTIAL SECOND FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

EXISTING HEATHCARE

OCCUPANCY CORRIDOR

WALL

NEW

FEC

FULLY SPRINKLERED

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REGIS T ER ED P R O FE S S IO NA L A RC HIT ECT

TRUE

PLAN

001-AE-022

M

AT

C

H L

IN

E

AE

M

AT

C

H L

IN

E

ARCHITECTURAL FLOOR PLAN

BLDG 1 PARTIAL SECOND FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

EXISTING HEATH

CARE OCCUPANCY

CORRIDOR WALL

FULLY SPRINKLERED

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED PR O F E S S I O NA L A R CHIT ECT

NEW FEC

TRUE

PLAN

NORTH

NEW FEC

GAS SHUT OFF

001-AE-031

M

AT

C H

L

IN

E

AE

M

AT

C H

L

IN

E

ARCHITECTURAL FLOOR PLAN

BLDG 1 THIRD FLOOR

AE

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

RELOCATE EXISTING

DATA TO ROOM

3163, SEE SHEET

2/TD0014A

NEW

FEC

NEW

FEC

FULLY SPRINKLERED

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED PR O F E S S I O NA L A R CHIT ECT

TRUE

PLAN

EPO

GAS SHUT OFF

001-AE-032

AE

M

AT

C H

L

IN

E M

AT

C

H L

IN

E

ARCHITECTURAL FLOOR PLAN

BLDG 1 THIRD FLOOR

AE

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

FULLY SPRINKLERED

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

NEW FEC

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

001-AE-041

M

AT

C

H L

IN

E

AE

M

AT

C H

L

IN

E

ARCHITECTURAL FLOOR PLAN

BLDG 1 FOURTH FLOOR

AE

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

EXISTING

HEALTH CARE

OCCUPANCY

CORRIDOR

WALL

NEW

FEC

FULLY SPRINKLERED

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A RCHIT ECT

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

C

ISOLATION

VALVE

TEST VALVE

FIRE HOSE

CABINET

001-AE-042

AE

M

AT

C

H L

IN

E

AE

M

AT

C

H L

IN

E

ARCHITECTURAL FLOOR PLAN

BLDG 1 FOURTH FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

EXISTING HEALTH CARE

OCCUPANCY CORRIDOR

WALL

RELOCATE EXISTING

TELECOMM ROOM (RM 4218)

TO ROOM 4246. SEE SHEET

001-TD-042

NEW

FEC

FULLY SPRINKLERED

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED PR O F E S S I O NA L A R CHIT ECT

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

NORTH

NEW

001-AE-051

M

AT

C H

L

IN

E

AE

M

AT

C H

L

IN

E

ARCHITECTURAL FLOOR PLAN

BLDG 1 FIFTH FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

FULLY SPRINKLERED

NEW

FECNEW

FEC

SYMBOLS LIST

NEW

FEC

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S I O NA L A R CHIT ECT

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

001-AE-052

A

M

AT

C H

L

IN

E

AE

A M

AT

C

H L

IN

E

ARCHITECTURAL FLOOR PLAN

BLDG 1 FIFTH FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

NEW

FEC

FULLY SPRINKLERED

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

001-AE-061

ARCHITECTURAL FLOOR PLAN

BLDG 1 SIXTH FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

EXISTING 1 HOUR FIRE

BARRIER WALLS

RELOCATE EXISTING

TELECOMM ROOM TO RM

6222A. SEE 2/TD0017B

FULLY SPRINKLERED

NEW

FEC

NEW

FEC

SYMBOLS LIST

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

TRUE

PLAN

RD

RD

UP TO 6TH FLOOR

ROOF

FLOOR

HATCHUP TO 6TH FLOOR

ROOF

(STACKED)

7/8" 3/8"

R

R

R

MD

5th FLOOR ROOF 5th FLOOR ROOF

3RD FLOOR ROOF

2ND FLOOR ROOF

2ND FLOOR ROOF

2ND FLOOR ROOF

2ND FLOOR ROOF

FIRST FLOOR ROOF

3RD FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOFFIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

4T H

FL

OO

R

RO

OF

5T H

FL

OO

R

RO

OF

BASEMENT ROOF

BASEMENT ROOF

BASEMENT ROOF

BA

SE

ME

NT

R

OO

F

BASEMENT ROOF

MD

MDMD

CHS

CHR

MD

MD

CDW - COOLING

CDW - HEATING

CDW - COOLING

CDW - HEATING

CDW - COOLING

CDW - HEATING

MD MD

MD

MD

MD

MD

MD

5T H

FL

OO

R

RO

OF

7TH FLOOR ROOF

MATCH EXISTING ROOF

ASSEMBLY, FOLLOW EPDM

MEMBRANE MANUFACTURER'S

PATCHING DETAILS

WRAP ROOF MEMBRANE OVER

SUPPORT

EXISTING DECK

CONTINUOUS BEAD OF EPDM

FLASHING EDGE SEALANT. ALL

AROUND LEG OR BASE.

MECHANICAL UNIT SUPPORT

FRAME OR LEG

CARLISLE OR FIRESTONE RUBBER

WALKWAY PADS

EXISTING INSULATION

NEW SPRAY FOAM INSULATION

NEW SPRAY FOAM INSULATION

TREATED 2X BLOCKING (DEPT TO

BE EQUAL TO ROOF INSULATION

THICKNESS, DETERMINED IN

FIELD.)

TREATED 2X BLOCKING (DEPT TO

BE EQUAL TO ROOF INSULATION

THICKNESS, DETERMINED IN

FIELD.)

AE701 1 1/2" = 1'-0"

PIPE BOOT FLANGE ADHERED

TO ROOF MEMBRANE

ROOF INSULATION

ROOF MEMBRANE OVER

EXISTING EPDM

PRE-MOLDED PIPE BOOT

SEALANT

STAINLESS STEEL BAND CLAMP

REMOVE INSULATION JACKET ON

REFRIGERANT PIPING AT BAND CLAMP

EXISTING ROOF ASSEMBLY

PIPE OR CONDUIT

1"

1" CLEAR BETWEEN

BOOT FLANGES

AE071 1/16"=1'-0"

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

001-AE-071

ARCHITECTURAL ROOF PLAN

AND CURB DETAILS - BLDG 1

AE071 1 1/2"=1'-0"

AE071

TYP.

SEE DETAIL B7/AE071 FOR

ROOF CURB DETAIL. TYPICAL

ALL NEW ROOF TOP UNITS.

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

TRUE

PLAN

002-AE-0B1

TRUE NORTH

PLAN NORTH

ARCHITECTURAL PLANS -

BLDG 2 BASEMENTA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TRUE NORTH

PLAN NORTH

NOT SPRINKLERED

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

004-AE-0B1

TRUE NORTH

PLAN NORTH

ARCHITECTURAL FLOOR PLAN

BLDG 4 BASEMENTA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

EXISTING TUNNEL TO BLDG. 6

TO BE ABANDONED.

JAMES S. BLAIR

No. AELA 7725

10/29/2021

006-AE-0B1

TRUE NORTH

PLAN NORTH

ARCHITECTURAL FLOOR PLAN

BLDG 6 BASEMENT

NO ARCHITECTURAL WORK FOR

THIS SHEET.

SEE TELECOMM SHEET TD0061

EXISTING TUNNEL TO BLDG. 1

EXISTING TUNNEL TO BLDG. 4,

TO BE ABANDONED

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

JAMES S. BLAIR

No. AELA 7725

10/29/2021

PLYWOOD COVERED WDW.

SEE DETAIL F6/AJ007

NEW FEC

TELECOMM RACKS

006-AE-011

TRUE NORTH

PLAN NORTH

ARCHITECTURAL FLOOR PLAN

BLDG 6 FIRST FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

NOTE: ASBESTOS

FLOORING/MASTIC HAS BEEN

FOUND ON THIS FLOOR.

TO BE RELOCATED TO NEW

TELECOMM ROOM. SEE 006-TD-011

NEW

NOT SPRINKLERED

JAMES S. BLAIR

No. AELA 7725

10/29/2021

006-AE-021

TRUE NORTH

PLAN NORTH

ARCHITECTURAL FLOOR PLAN

BLDG 6 SECOND FLOORA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

JAMES S. BLAIR

No. AELA 7725

(E)COMM CABINET,

PATCH PANELS, FIBER

OPTIC PANEL

ELECTRICAL

CABINETS

ELECTRICAL

CABINETS

ELECTRICAL

CABINETS

ELECTRICAL

CABINETS

011-AE-021

ARCHITECTURAL FLOOR PLAN

BLDG 11 TELECOMM ROOM ADDITIONA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

TRUE NORTH

PLAN NORTH

NO ARCHITECTURAL WORK FOR

FIRST FLOOR, SEE TELECOMM

SHEET TD00111

FULLY SPRINKLEREDJAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S I O NA L A R CHIT ECT

EM

TRUE

PLAN

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

000-AK-001

FIRE STOPPING DETAILS

JAMES S. BLAIR

No. AELA 7725

REGIS T ER ED P R O F E S S IO NA L A RC HIT ECT

14'-2"

B117

TELECOMMUNICATION

ROOM

8'- 2"

200 200

B091

TELECOMMUNICATION

ROOM

8'-93 4"

'-8

RELOCATED DP SENSOR

EXISTING

LIEBERT

AC UNIT

2'- 2"

5'- 0"

'-6

5 8"

9'-6"

B296A

TELECOMMUNICATION

ROOM

5'- 4"

MA

TC

H

EX

IS

TI

NG

P

AR

TI

TI

ON

C

ON

ST

RU

CT

IO

N

TY

PE

B117

TELECOMMUNICATION

ROOM

200 200

B091

TELECOMMUNICATION

ROOM

8'-93 4"

'-8

CHS CHS CHS CHS CHS

CHR CHR CHR CHR CHR CHR

CH

S

B296A

TELECOMMUNICATION

ROOM

RELOCATED DP SENSOR

B296A

TELECOMMUNICATION

ROOM

B117

TELECOMMUNICATION

ROOM

200 200

B091

TELECOMMUNICATION

ROOM

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

000-AJ-001

ARCHITECTURAL ENLARGED FLOOR

PLANS

AJ001 1/4" = 1'-0"AJ001 1/4" = 1'-0"

AJ001 1/4" = 1'-0"

AJ001 1/4" = 1'-0"AJ001 1/4" = 1'-0"

AJ001 1/4" = 1'-0"

AJ001 1/4" = 1'-0"

AJ001 1/4" = 1'-0"AJ001 1/4" = 1'-0"

1 2

B296A

B298A

B117

10 PARTITION TYPE. SEE SHEET AJ007 FOR DETAILS

RELOCATE DOORS.

SPRINKLER HEAD

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

REMOVE DOOR AND FRAME

REMOVE VINYL FLOOR TILE.

REMOVE CEILING GRID AND TILES. REMOVE THE EXISTING (WHERE

APPLICABLE) LAY-IN CEILING ASSEMBLY AND TILES COMPLETELY.

4' X 8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD

PAINTED HIGH GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT

PAINT AROUND THREE PERIMETER WALLS OF TR'S AND ENTRANCE

ROOMS.

NEW STATIC DISSIPATIVE TILE FLOOR. SEE 000-EJ-001 FOR

GROUNDING DETAILS.

EXISTING WALL MOUNTED DEVICES TO REMAIN IN PLACE. UNLESS

OTHERWISE NOTED IN MECHANICAL AND ELECTRICAL DRAWINGS,

INCLUDING BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES,

ELECTRICAL OUTLETS, DATA PORTS, INTERIOR DEVICES, AND BLANK

PLATES.

SOME EXISTING GRILLES, REGISTERS, AND DIFFUSERS FOR

MECHANICAL SYSTEMS ARE TO REMAIN. SEE MECHANICAL DRAWINGS

FOR DETAILS.

DEMOLISH EXISTING LIGHT FIXTURES. SEE ELECTRICAL DRAWINGS

FOR REQUIREMENTS.

EXISTING CEILING GRID AND TILE TO REMAIN.

PAINT WALLS FULL HEIGHT, WITHIN 1" OF WALL DEVICES. ALL WALLS.

GENERAL CONTRACTOR SHALL PATCH AND REPAIR EXISTING

SURFACES DAMAGED BY REMOVAL OF EXISTING EQUIPMENT.

REPAIRED SURFACES SHALL MATCH EXISTING CONDITIONS, ADJACET

FINISHES, AND TEXTURES. COORDINATE FINISHES WITH THE VA COR

FOR THIS PROJECT.

INSTALL NEW DOORS, PER DOOR SCHEDULE. SHEET 000-AI-010

NEW FEC

NEW KEY PAD

RELOCATE

KEY PAD

NEW FEC

NEW FEC

INDICATES DEMOLISH AND REMOVE

EM

FA HORN AND STROBE

SPRINKLER HEADSD

SD

SD

SD

ABATE ACM

FLOORING ABATE ACM

FLOORING

ABATE ACM

FLOORING

TELECOMMUNICATION

ROOM

'-0

17'-8"

MATCH EXISTING PARTITION

CONSTRUCTION TYPE.

NEW FEC

TELECOMMUNICATION

ROOM 8'-

3'-4"

13'-75 8"

ROOM

NEW FEC

DOOR OPENING TO BE CLOSED

SP

SP

TELECOMMUNICATION

ROOM 1216

TELECOMMUNICATION

ROOM

ROOM

TELECOMMUNICATION

ROOM

'-2

B

C

B

B

A

TELECOMMUNICATION

ROOM

TELECOMMUNICATION

ROOM

TELECOMMUNICATION

ROOM

TELECOMMUNICATION

ROOM

ROOM

000-AJ-002

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

AJ002 1/4" = 1'-0"

ARCHITECTURAL ENLARGED FLOOR

PLANS

AJ002 1/4" = 1'-0"

AJ002 1/4" = 1'-0" AJ002 1/4" = 1'-0"

AJ002 1/4" = 1'-0"

AJ002 1/4" = 1'-0"

AJ002 1/4" = 1'-0" AJ002 1/4" = 1'-0" AJ002 1/4" = 1'-0"

2 3

51161

REMOVE DOOR AND FRAME

REMOVE VINYL FLOOR TILE.

REMOVE CEILING GRID AND TILES. REMOVE THE EXISTING (WHERE

APPLICABLE) LAY-IN CEILING ASSEMBLY AND TILES COMPLETELY.

4' X 8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD

PAINTED HIGH GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT

PAINT FOR SERVICE PROVIDER/SECURITY/VIDEO, ETC. AROUND

THREE PERIMETER WALLS OF TR'S AND ENTRANCE ROOMS.

NEW STATIC DISSIPATIVE TILE FLOOR.

EXISTING WALL MOUNTED DEVICES TO REMAIN IN PLACE. UNLESS

OTHERWISE NOTED IN MECHANICAL AND ELECTRICAL DRAWINGS,

INCLUDING BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES,

ELECTRICAL OUTLETS, DATA PORTS, INTERIOR DEVICES, AND BLANK

PLATES.

EXISTING GRILLES, REGISTERS, AND DIFFUSERS FOR MECHANICAL

SYSTEMS ARE TO REMAIN. SEE MECHANICAL DRAWINGS FOR DETAILS.

DEMOLISH EXISTING LIGHT FIXTURES. SEE ELECTRICAL DRAWINGS

FOR REQUIREMENTS.

EXISTING CEILING GRID AND TILE TO REMAIN.

PAINT WALLS FULL HEIGHT, WITHIN 1" OF WALL DEVICES. ALL WALLS.

GENERAL CONTRACTOR SHALL PATCH AND REPAIR EXISTING

SURFACES DAMAGED BY REMOVAL OF EXISTING EQUIPMENT.

REPAIRED SURFACES SHALL MATCH EXISTING CONDITIONS,

ADJACENT FINISHES, AND TEXTURES. COORDINATE FINISHES WITH

THE VA COR FOR THIS PROJECT.

INSTALL NEW DOORS, PER DOOR SCHEDULE. SHEET AI001

INDICATES WALL TO BE REMOVED

PARTITION TYPE. SEE SHEET AJ007 FOR DETAILS

SPRINKLER HEAD

NEW

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED PR O F E S S I O NA L A R CHIT ECT

NEW

EM

EM

SPRINKLER HEADSD

SD

SD

SD

SD

ABATE ACM

FLOORING

ABATE ACM

FLOORING

000-AJ-003

ARCHITECTURAL ENLARGED

FLOOR PLANSA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED PR O F E S S IO NA L A RCHIT ECT

MATCH EXISTING PARTITION

CONSTRUCTION TYPE.

B B B

JJ

000-AJ-004

ARCHITECTURAL ENLARGED

FLOOR PLANSA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED PR O F E S S IO NA L A RCHIT ECT

EM

NEW FECKEYPAD/

CARDREADER

SEE SPECIFICATIONS

H2M

Z Z

SP

SP

NEW FECKEYPAD/

CARDREADER

SEE SPECIFICATIONS

MATCH EXISTING PARTITION

CONSTRUCTION TYPE.

MATCH EXISTING PARTITION

CONSTRUCTION TYPE.

NEW FEC KEYPAD/

CARDREADER

SEE SPECIFICATIONS

H2 H2 H2

OS

F3

GB

OS

MATCH EXISTING PARTITION

CONSTRUCTION TYPE.

NEW FEC

KEYPAD/

CARDREADER

SEE SPECIFICATIONS

H2

000-AJ-005

ARCHITECTURAL ENLARGED

FLOOR PLANSA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

OS

OS

000-AJ-006

ARCHITECTURAL ENLARGED

FLOOR PLANSA/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IST ER ED PR O F E S S IO NA L A R CHIT ECT

000-AJ-007

WALL PARTITION TYPES

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

JAMES S. BLAIR

No. AELA 7725

CR

ES

CR

CR

CR

C5

IRM5

CR

ESP

CR

SP

IRM-2A

IRM-2

IRM-1

SP

CR

EM

EM EM

EM EM

Rear

Rear Front

CR

SP

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

001-AJ-008

ARCHITECTURAL ENLARGED FLOOR

PLANS

AJ008 1/4" = 1'-0"

AJ008 1/4" = 1'-0"

REMOVE DOOR AND FRAME

REMOVE VINYL FLOOR TILE.

REMOVE CEILING GRID AND TILES. REMOVE THE EXISTING (WHERE

APPLICABLE) LAY-IN CEILING ASSEMBLY AND TILES COMPLETELY.

4' X 8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD

PAINTED HIGH GLOSS WHITE WITH TWO COATS OF FIRE-RESISTANT

PAINT FOR SERVICE PROVIDER/SECURITY/VIDEO, ETC. AROUND

THREE PERIMETER WALLS OF TR'S AND ENTRANCE ROOMS.

NEW STATIC DISSIPATIVE TILE FLOOR.

EXISTING WALL MOUNTED DEVICES TO REMAIN IN PLACE. UNLESS

OTHERWISE NOTED IN MECHANICAL AND ELECTRICAL DRAWINGS,

INCLUDING BUT NOT LIMITED TO THERMOSTATS, LIGHT SWITCHES,

ELECTRICAL OUTLETS, DATA PORTS, INTERIOR DEVICES, AND BLANK

PLATES.

EXISTING GRILLES, REGISTERS, AND DIFFUSERS FOR MECHANICAL

SYSTEMS ARE TO REMAIN. SEE MECHANICAL DRAWINGS FOR DETAILS.

DEMOLISH EXISTING LIGHT FIXTURES. SEE ELECTRICAL DRAWINGS

FOR REQUIREMENTS.

EXISTING CEILING GRID AND TILE TO REMAIN.

PAINT WALLS FULL HEIGHT, WITHIN 1" OF WALL DEVICES. ALL WALLS.

GENERAL CONTRACTOR SHALL PATCH AND REPAIR EXISTING

SURFACES DAMAGED BY REMOVAL OF EXISTING EQUIPMENT.

REPAIRED SURFACES SHALL MATCH EXISTING CONDITIONS, ADJACET

FINISHES, AND TEXTURES. COORDINATE FINISHES WITH THE VA COR

FOR THIS PROJECT.

INSTALL NEW DOORS, PER DOOR SCHEDULE. SHEET AI001

REMOVE EXISTING RAISED COMPUTER FLOORING AND SUPPORT

SYSTEM

PARTITION TYPE. SEE SHEET AJ007 FOR DETAILS

EXISTING SPRINKLER HEAD

AJ005 1/4" = 1'-0"

5281A

AJ005 1/4" = 1'-0"

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

REMOVE FIRE SUPRESSION SYSTEM

FOR REPLACEMENT

AJ008 N.T.S.

INSTALL NEW RAISED COMPUTER FLOORING

SYSTEM CONTROLLER

TO BE REMOVED

LOCATION OF NEW CLEAN AGENT

CONTROL PANEL

SEE 001-FX-005 FOR DETAILS

FOR FURTHER DETAILS, SEE SPECIFICATIONS SECTION 09 69 00

EXISTING PRE-ACTION

CLEAN AGENT STORAGE CYLINDERS

LOCATION OF NEW CLEAN AGENT

CONTROL PANEL

FULLY SPRINKLERED

NEW FEC

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

NORTH

NORTH

TRUE

PLAN

NORTH

NORTH

AJ005 1/4" = 1'-0"

EXISTING COMPUTER FLOORING,

CEILING GRID, AND LIGHT FIXTURES

TO BE REMOVED.

SMOKE DETECTOR

MOTION DETECTOR

SECURITY CAMERA

VA TO RELOCATE EXISTING

CABINETS

NOTE: ASBESTOS

FLOORING/MASTIC HAS BEEN

FOUND ON THIS FLOOR.

MECH

SHAFT

AUDIOLOGY

SOUND BOOTH

AUDIOLOGY

SOUND BOOTH

2ND FLOOR ROOF

TELECOMM RM

NEW

FE

C

& INTERNS

PYSCHOLOGIST

WOMEN'S

PEERS

B.H.

TOILET

MEN'S

PEER

B.H.

SUPPLY

CHECK-IN

AUDIOLOGY

3184C

REHAB

B.H. VOC

3RD FLR.

4TH FLR.

2ND FLR.

2ND FLOOR ROOF

3'- 4"

5'- 1"

(F .V

4'-

8"R.

O.

51 8"

8"

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

000-AJ-009

ARCHITECTURAL 3RD FLOOR ROOF

ACCESS PLANS AND DETAILS

JAMES S. BLAIR

No. AELA 7725

10/29/2021

REG IS T ER ED P R O F E S S IO NA L A R CHIT ECT

AJ009 1/4" = 1'-0"

AJ009 1/4" = 1'-0"

AJ009 1/2" = 1'-0"

AJ009

AJ009 1/4" = 1'-0"

AJ009 1/2" = 1'-0"

AJ009 3" = 1'-0"

AJ009

AJ009 3" = 1'-0"

AJ009 3" = 1'-0"

AJ009 3" = 1'-0"

AJ009

AJ009

AJ009

REMOVE AND REPLACE EXISTING WINDOW

WITH NEW DOUBLE HUNG/OPERABLE

CASEMENT UNIT

AJ009

AJ009

AJ009

120V POWER

DOOR POWER SUPPLY

ON SIDE-B (SECURE SIDE),

EXACT LOCATION VARIES.

(1) 3/4" RSC CONNECTION

TO FIRE ALARM (IF REQUIRED)

DOOR FRAME

CARD READER BACK

BOX (4" x 2" x 2")

ON SIDE-A (NON-

SECURED)

ELECTRIC MORTISE

DOOR FRAME

FF

SIDE-B (SECURED)

SIDE-B (SECURED)

SIDE-A (NON-

SECURED)

4" x 4" x 3" PULL BOX

CONNECT TO DCP ON SIDE-B

(SECURE SIDE)

FF FF

FF

SIDE-A (NON-SECURED)

CR

3"

CARD READER

CONNECT TO

DCP

ON SIDE-A (NON

SECURE SIDE)

3" TO EDGE

CR CARD READER

ON SIDE-A

(NON-SECURE SIDE)

120V POWER

BACK BOX (4" x 2" x

2") FOR CARD

READER WITH PIN

ON SIDE-A (NON-

SECURED)

ELECTRIC MORTISE

FF

SIDE-B (SECURED)

SIDE-B (SECURED)

CR

4" x 4" x 3" PULL BOX

CONNECT TO DCP ON SIDE-B

(SECURE SIDE)

3"

SCRAMBLE PROX PAD

CONNECT TO DCP

ON SIDE-A (NON

SECURE SIDE)

SIDE-A (NON-SECURED)

FF

FF

SIDE-A (NON-SECURED)

ELECTRIC

TRANSFER

HINGE

DOOR CONTROL PANEL

ON SIDE-B (SECURE SIDE),

EXACT LOCATION VARIES.

(1) 3/4" CONNECTION TO FIRE ALARM

(IF REQUIRED)

DOOR FRAME

3" TO EDGE

CR CARD

READER

ON SIDE-A

(NON-

SECURE

SIDE)

D O

O R

H

EI

G H

T

AS

P

ER

D O

O R

S C

H

ED

U

LE

D O

O R

H

EI

G H

T

AS

P

ER

D O

O R

S C

H

ED

U

LE

M

AX

TO TO

P

M

AX

TO TO

P

(1) 1" CONDUIT TO

NEXT DOOR

(1) 1/2" CONDUIT WITH

24 AWG CABLE

(1) 1/2" CONDUIT WITH

24 AWG CABLE

1/2" CONDUIT ROUTED TO DOOR

FRAME, PROVIDE PLASTIC

BUSHING AT END OF CONDUIT

ELECTRIC

TRANSFER

HINGE

(1) 1" CONDUIT TO NEXT

DOOR OR ACCESS PANEL

1/2" CONDUIT ROUTED TO DOOR

FRAME, PROVIDE PLASTIC

BUSHING AT END OF CONDUIT

(1) 1" CONDUIT TO

NEXT DOOR

(1) 1" CONDUIT TO NEXT

DOOR OR ACCESS PANEL

CAUTION

STEP

DOWN

A/E:

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

ARCHITECTURAL DOOR SCHEDULE

000-AI-010JAMES S. BLAIR

No. AELA 7725

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

ARCHITECTURAL DOOR DETAILS

000-AI-011JAMES S. BLAIR

No. AELA 7725

REG IS T ERED PR O FE S S I O NA L A RCHIT ECT

GDM OF OREGON

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

FOR OFFICIAL USE ONLY (FOUO)

100% CONSTRUCTION DOCUMENTS 10.29.2021

ARCHITECTURAL DOOR

000-AI-012

HARDWARE SCHEDULE

JAMES S. BLAIR

No. AELA 7725

1584 McNeil St., Suite 200 Dupont, WA 98327 360-915-5128

PROJECT NO.

BUILDING NO.

DRAWING NO.

PROJECT TITLE

FLS

CHECKED BY DRAWN BY

APPROVED: PROJECT DIRECTOR

VA FORM 08 - 6231

A

Program Contracting Activity

Central (PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

REVISIONS: DATE:

LOCATION

04.20.202110% BASIS OF DESIGN STAMP

DRAWING TITLE

ISSUE DATE

100% CONSTRUCTION

DOCUMENTS

ELECTRONIC HEALTH RECORDS

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

585-21-700

35% SCHEMATIC DESIGN 06.01.2021

65% DESIGN DOCUMENTS 07.06.2021

10-29-2021OSCAR G. JOHNSON VA MEDICAL CENTER

325 E H ST.

IRON MOUNTAIN, MI 49801

95% DESIGN DOCUMENTS 08.09.2021

AJG RDR

100% CONSTRUCTION DOCUMENTS 10.29.2021

FOR OFFICIAL USE ONLY (FOUO)

EXPIRES 8-1-23

CI0001

CIVIL - GENERAL NOTES

GENERAL

1. THE FOLLOWING PROVISIONS ARE TO BE USED IN CONJUNCTION WITH VA SPECIAL PROVISIONS, VA STANDARD SPECIFICATIONS, AND

ALL OTHER APPLICABLE JURISDICTIONS.

2. ANY REVISIONS TO THESE PLANS MUST BE REVIEWED AND APPROVED BY THE APPROPRIATE JURISDICTIONS.

3. CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH THE PROJECT SITE AND BRING ANY DISCREPANCIES TO THE ATTENTION OF THE

ENGINEER PRIOR TO UNDERTAKING OF THE AFFECTED WORK.

4. ANY DISCREPANCIES IN THESE DRAWINGS, SPECIFICATIONS, NOTES, AND THE SITE CONDITIONS SHALL BE REPORTED TO THE ENGINEER, WHO SHALL CORRECT SUCH DISCREPANCIES IN WRITING AFTER THOROUGHLY REVIEWING ANY CHANGES. ANY WORK DONE BY THE CONTRACTOR AFTER THE DISCOVERY OF SUCH DISCREPANCIES SHALL BE DONE AT THE CONTRACTOR'S RISK. THE CONTRACTOR SHALL VERIFY AND COORDINATE THE DIMENSIONS AMONG ALL DRAWINGS PRIOR TO PROCEEDING WITH ANY WORK.

5. A PRE-CONSTRUCTION MEETING SHALL BE HELD AT THE VA FACILITIES WITH THE APPLICANT, CONTRACTOR, ENGINEER, AND ALL

APPLICABLE INSPECTORS PRIOR TO BEGINNING WORK.

ADDITIONAL PERMITS

6. VA SPECIFIC PERMITS MAY BE REQUIRED FOR ON-SITE WORK INCLUDING ALL RETAINING WALLS, GRADING, AND EROSION CONTROL.

ADHERENCE TO ALL CONDITIONS OF THESE PERMITS IS REQUIRED AS A PART OF THIS PLAN. COORDINATE WITH C.O.R.

7. VA SPECIFIC PERMITS MAY BE REQUIRED FOR SIDEWALK INSTALLATION AS WELL AS CURB AND GUTTER REMOVAL AND DRIVEWAY

CONSTRUCTION WHEN CONSTRUCTED AT BUILDING PERMIT STAGE. COORDINATE WITH C.O.R.

UTILITIES

8. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON EXISTING RECORD DRAWINGS AND ARE NOT GUARANTEED

TO BE ACCURATE, NOR ALL INCLUSIVE.

9. ALL UTILITIES MUST BE VERIFIED PRIOR TO CONSTRUCTION. IF THE PROJECT REQUIRES ANY EXCAVATION, THE DEVELOPER/CONTRACTOR IS REQUIRED TO CALL THE UTILITY UNDERGROUND LOCATION CENTER AT (800) 424-5555 AT LEAST TWO DAYS

BEFORE STARTING SUCH EXCAVATION IN ACCORDANCE WITH RCW 19.122.

10. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PROTECT, IN PLACE, ALL UTILITIES AND/OR STRUCTURES WHETHER SHOWN OR NOT SHOWN ON THIS PLAN. PROVIDE FALSEWORK AS IS REQUIRED TO TEMPORARILY SUPPORT ALL MATERIAL. DAMAGE DUE TO THE

CONTRACTORS OPERATIONS SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.

11. DO NOT CUT OR DAMAGE EXISTING UTILITIES, STRUCTURAL MEMBERS, OR BUILDING FOUNDATIONS. HAND EXCAVATE IN LOCATIONS

WHERE EXISTING UTILITIES ARE SUBJECT TO DAMAGE.

EXCAVATION

12. IF WORKERS ENTER ANY TRENCH OR OTHER EXCAVATION FOUR FEET OR MORE IN DEPTH THAT DOES NOT MEET THE OPEN PIT REQUIREMENTS OF SECTION 2-09.3(3)B, IT SHALL BE SHORED AND CRIBBED. ALL TRENCH SAFETY SYSTEMS SHALL MEET THE REQUIREMENTS OF THE WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT, CHAPTER 49.17 RCW. THE CONTRACTOR ALONE SHALL BE RESPONSIBLE FOR ALL WORKER SAFETY, THE ENGINEER, NOR THE VA ASSUMES ANY RESPONSIBILITY.

PAVEMENT PREPARATION/RESTORATION

13. ADDITIONAL REMOVAL AND REPLACEMENT OF PAVEMENT MAY BE REQUIRED TO PROVIDE PROPER TRANSITION/CROWN AS DIRECTED BY

INSPECTOR IN FIELD.

14. THE SUBGRADE COMPACTION SHALL BE TESTED BY A PROFESSIONAL GEOTECHNICAL CONSULTANT PRIOR TO PLACING THE BASE

MATERIAL.

15. PAVEMENT RESTORATION SHALL BE CONSTRUCTED IN ACCORDANCE WITH VA RESTORATION POLICY AND APPLICABLE STANDARD

PLANS.

16. FINAL RESTORATION LIMITS SHALL BE DETERMINED IN THE FIELD BY INSPECTOR.

CONCRETE

17. CONCRETE PAVEMENT MIX DESIGN SHALL BE BASED ON STANDARD PLAN PD-01-PAVEMENT DESIGN STANDARDS.

18. COLD WEATHER CONCRETE WORK. THE FOLLOWING REQUIREMENTS FOR PLACING CONCRETE SHALL BE IN EFFECT FROM NOVEMBER 1

TO APRIL 1:

a. THE ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONCRETE PLACEMENT.

b. WEATHER PERMITTING, ALL CONCRETE PLACEMENT SHALL BE COMPLETED NO LATER THAN 2:00 PM EACH DAY.

c. WHERE FORMS HAVE BEEN PLACED AND THE SUBGRADE HAS BEEN SUBJECTED TO SEVERE FROST, NO CONCRETE SHALL BE PLACED UNTIL THE GROUND IS COMPLETELY THAWED. AT THAT TIME, THE FORMS SHALL BE ADJUSTED AND SUBGRADE REPAIRED AS

DETERMINED BY THE ENGINEER.

19. THE SLUMP FOR STANDARD CONCRETE USED FOR SIDEWALKS SHALL NOT EXCEED FOUR INCHES +/- ONE INCH.

20. ALL SIDEWALKS AND CURB RAMPS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE ADA STANDARDS FOR ACCESSIBLE DESIGN, 28 CFR, PART 35 AND AS SUPPLEMENTED BY THE PUBLIC WORKS RIGHT OF WAY ACCESSIBILITY GUIDELINES (PROWAG).

EROSION CONTROL NOTES

21. WHEN CONSTRUCTION OPERATIONS ARE SUCH THAT DEBRIS FROM THE WORK IS DEPOSITED ON THE STREETS, THE CONTRACTOR SHALL IMMEDIATELY REMOVE ANY DEPOSITS OR DEBRIS WHICH MAY ACCUMULATE ON THE ROADWAY SURFACE. IF THE CONTRACTOR FAILS TO KEEP THE STREETS FREE FROM DEPOSITS AND DEBRIS RESULTING FROM THE WORK, THE CONTRACTOR SHALL, UPON ORDER OF THE INSPECTOR, PROVIDE FACILITIES FOR, AND REMOVE ALL CLAY, DIRT, OR OTHER DEPOSITS FROM THE TIRES OR BETWEEN WHEELS BEFORE TRUCKS OR OTHER EQUIPMENT WILL BE ALLOWED TO TRAVEL OVER PAVED STREETS. SHOULD THE CONTRACTOR FAIL OR REFUSE TO CLEAN THE STREETS IN QUESTION, OR THE TRUCKS OR EQUIPMENT IN QUESTION, JURISDICTION INSPECTOR MAY ORDER THE WORK SUSPENDED AT THE CONTRACTORS RISK UNTIL COMPLIANCE WITH THE CONTRACTORS OBLIGATIONS IS ASSURED, OR THE JURISDICTION INSPECTOR MAY ORDER THE STREETS IN QUESTION CLEANED BY OTHERS AND SUCH COSTS INCURRED BY THE CITY IN ACHIEVING COMPLIANCE WITH THESE REQUIREMENTS, INCLUDING CLEANING OF THE STREETS, SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

22. THE CONTRACTOR SHALL PROTECT EXISTING DRAINAGE STRUCTURES USING ACCEPTABLE METHODS AND MATERIALS AS SHOWN ON THIS PLAN. IF THE METHODS AND MATERIALS AS SHOWN ON THS PLAN ARE NOT ADEQUATE, THE JURISDICTION INSPECTOR MAY REQUIRE ADDITIONAL/ALTERNATIVE METHODS FOR EROSION CONTROL AND/OR PROTECTION OF EXISTING DRAINAGE STRUCTURES.

ADDITIONAL OR ALTERNATIVE METHODS SHALL BE SUBMITTED BY THE DESIGN ENGINEER AND ACCEPTED BY THE JURISDICTION INSPECTOR. ANY DAMAGE CAUSED TO THE JURISDICTION STORMWATER SYSTEM AS A RESULT OF THE WORK OUTLINED ON THIS PLAN SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. RESOLVING SAID DAMAGE MAY INCLUDE, BUT NOT BE LIMITED TO, THE

CLEANING OF THE DRAINAGE SYSTEM IN QUESTION BY THE CONTRACTOR.

23. WATERING PROVISIONS WHEN APPLICABLE MUST BE IN PLACE TO PREVENT DUST FROM BECOMING AIR BORNE. VIOLATION OF THIS

CONDITION WILL RESULT IN A STOP WORK ORDER UNTIL CORRECTED.

24. FILL THAT WILL SUPPORT A STREET SECTION OR OTHER STRUCTURES SHALL BE PLACED UNDER THE INSPECTION OF A WASHINGTON STATE LICENSED GEOTECHNICAL ENGINEER.