Attachment 9 Contractor Release.pdf

PDF 963 KB Posted

Attached to
Solicitation - Hanger 9 Renovation at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK
Solicitation number
6973GH-25-R-00132
Issued by

About this file

The document appears to be a loading page for a PDF file, containing standard Adobe Reader troubleshooting instructions and trademark information. The page displays a "Please wait..." message with guidance on upgrading Adobe Reader and links for download assistance. It also includes trademark disclaimers for Windows, Mac, and Linux operating systems. No substantive contract or solicitation content is present in this file.

View the file

Other files

File Type Posted
6973GH-25-R-00132 Amend0009.pdf PDF
6973GH-25-R-00132 Amend0008.pdf PDF
6973GH-25-R-00132 Amend0007.pdf PDF
Attachment 1f Amended Specifications_Am02_6.26.25.pdf PDF
QA Log - Answers - 25-R-00132 H9 Reno 7.7.25 Final.pdf PDF
6973GH-25-R-00132 Amend0006.pdf PDF
Attachment 1e Revised.Additional Drawings Hangar 9 Renovation_6.26.2025.pdf PDF
6973GH-25-R-00132 Amend0005.pdf PDF
QA Log.2 25-R-00132 H9 Reno 6.30.25.pdf PDF
Attachment 12 Furniture Equipment Moving Diagram Hangar 9 6.17.25.pdf PDF
6973GH-25-R-00132 Amend0004.pdf PDF
Attachment 1c Revised.Additional Drawings Hangar 9 Renovation_6.17.2025.pdf PDF
Attachment 1d Amended Specifications_Am01_6.17.25.pdf PDF
6973GH-25-R-00132 Amend0003.pdf PDF
6973GH-25-R-00132 Amend0002.pdf PDF
6973GH-25-R-00132 Amend0001.pdf PDF
Attendance List Hanger 9 May 20 Site Visit.pdf PDF
QA Log.1 25-R-00132 H9 Reno 5.16.25.pdf PDF
6973GH-25-R-00132.pdf PDF
Attachment 1b Hangar_9_High_Bay_Lights_100_Drawings.3.14.2025.pdf PDF
Attachment 4 SF25A Payment Bond.pdf PDF
Attachment 10 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 5 SF24 Bid Bond.pdf PDF
Attachment 2 Wage Determination OK20250049 03.14.2025.pdf PDF
Attachment 1 Hangar 09_Combined Specs_3.14.2025.pdf PDF
Attachment 11 Chapter 33 Construction Safety.pdf PDF
Attachment 6 Past Performance Survey 4.23.25.docx DOCX document
Attachment 1a Hangar 9_Renovation_100_Drawings_3.14.2025.pdf PDF
Attachment 8 Client Authorization Letter.docx DOCX document
Attachment 7 Past Performance Experience Form.docx DOCX document
Attachment 3 SF25 Performance Bond.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Microsoft Word - frm4220_4.doc laverne.taylor 11.0.0.20130303.1.892433 Form DOT F 4220.4 (Rev. 5/05)

PREVIOUS EDITION OBSOLETE

AUTHORIZED FOR LOCAL REPRODUCTION

DEPARTMENT OF TRANSPORTATION

CONTRACTOR'S RELEASE

CONTRACTOR (Name and Address)

CONTRACT NO.

ENTER SUM OF TOTAL OF AMOUNTS PAID AND PAYABLE

Pursuant to the terms of the above numbered contract and in consideration of the sum stated above, which has been paid or is to be paid to the Contractor, or its assignees, the Contractor, upon payment of the said sum by the UNITED STATES OF AMERICA (hereinafter called the Government), does remise, release, and discharge the Government, its officers, agents, and employees, of and from all liabilities, obligations, claims, and demands whatsoever under or arising from the said contract, except:

1. Specified claims in stated amounts or in estimated amounts where the amounts are not susceptible of exact statement by the Contractor, as follows: (or state "None")

2. Claims, together with reasonable expenses incidental thereto, based upon the liabilities of the Contractor to third parties arising out of the performance of this contract, which are not known to the Contractor on the date of the execution of this release and of which the Contractor gives notice in writing to the Contracting Officer within the period specified in the said contract; and

3. Claims for reimbursement of costs (other than expenses of the Contractor by reason of his indemnification of the Government against patent liability) including reasonable expenses incidental thereto, incurred by the Contractor under any provisions of the said contract relating to patents.

The Contractor agrees, in connection with patent matters and with claims which are not released as set forth above, that it will comply with all provisions of the said contract, provisions of the said contract, including without limitation those provisions relating to notification to the Contracting Officer and relating to the defense or prosecution of litigation.

IN WITNESSES WHEREOF, this release has been executed this

WITNESSES

(Contractor)

BY

TITLE

NOTE: In the case of a corporation, witnesses are not required but the below statement must be completed.

secretary of the corporation who signed said release on behalf of said corporation; release was duly signed for and in behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.

Signature day of , 20 I, , am the named as Contractor in the foregoing release; that of the Contractor was then

Corporation - Signee Title:
Sum of Total of Amounts Paid and Payable:
Witnesses - Today's Year:
Corporation - Signature:

File details come from the government source that posted it. Updated .