6973GH-25-R-00132 Amend0006.pdf
PDF 186 KB Posted
- Attached to
- Solicitation - Hanger 9 Renovation at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK
- Solicitation number
- 6973GH-25-R-00132
About this file
This document is an Amendment (Amendment 0006) to Solicitation 6973GH-25-R-00132 for the Hangar 9 Renovation project at the Mike Monroney Aeronautical Center in Oklahoma City. The amendment incorporates multiple revised drawings and specifications, including updated demolition plans, floor plans, enlarged area plans, and technical drawings across architectural, fire alarm, electrical, and other disciplines. Key changes include updating drawing revisions from January and March 2025 to a new revision dated June 26, 2025.
The amendment also adds critical flightline and vehicle access requirements to Section H of the solicitation. Contractors must have flightline and escort-badged personnel maintain line-of-site supervision over unbadged personnel, and all vehicles entering the aircraft ramp/hangar area must display a ramp permit. Additional insurance requirements are specified, including $200,000 bodily injury per person, $1,000,000 per occurrence, and $1,000,000 property damage per accident. The amendment further includes compliance instructions for recent executive orders related to various governmental policies.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 7
0006 07/07/2025
AAQ-730 FAC. & AVIATION SAFETY ACQ
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
OKLAHOMA CITY OK 73125
AAQ730-AFN
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
6973GH-25-R-00132
1 copies to the issuing office.
05/09/2025
(x)
WO#21-019348
Hangar 9 Renovation
The purpose of this amendment is to incorporate revised Specifications/Drawings and incorporate Flightline Badging/Escort/Ramp Permit requirements to Section H of the SIR
See list of changes below
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
LIST OF CHANGES:
I. FIRST: The following drawings are hereby incorporated and are located in Attachment 1e Revised.Additional Drawings Hangar 9 Renovation_6.26.2025
1. G-004 - INDEX OF DRAWINGS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes G-004 - INDEX OF DRAWINGS Rev 1 Dated 6.17.25
2. AD102 - LEVEL 2 COMPOSITE DEMOLITION PLAN – FLOORING Rev 2 Dated 6.26.25 is hereby incorporated and supersedes AD102 - LEVEL 2 COMPOSITE DEMOLITION PLAN – FLOORING Dated 1.24.25
3. AD103 - LEVEL 3 COMPOSITE DEMOLITION PLAN – FLOORING Rev 2 Dated 6.26.25 is hereby incorporated and supersedes AD103 - LEVEL 3 COMPOSITE DEMOLITION PLAN – FLOORING Dated 1.24.25
4. AD105 - LEVEL 2 COMPOSITE DEMOLITION PLAN – CEILINGS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes AD105 - LEVEL 2 COMPOSITE DEMOLITION PLAN – CEILINGS Dated 1.24.2
5. A-110 - LEVEL 1 - COMPOSITE FLOOR PLAN Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A- 110 - LEVEL 1 - COMPOSITE FLOOR PLAN Dated 1.24.25
6. A-222 - LEVEL 2 - SECTORS 3 & 4 RCP Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-222 - LEVEL 2 - SECTORS 3 & 4 RCP Dated 1.24.25
7. A-401 - ENLARGED PLANS - 104E, 224E Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-401 - ENLARGED PLANS - 104E, 224E Dated 1.24.25
8. A-402 - ENLARGED PLANS - 143E Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-402 - ENLARGED PLANS - 143E Dated 1.24.25
9. A-403 - ENLARGED PLANS - 107W, 106W, 115W Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-403 - ENLARGED PLANS - 107W, 106W, 115W Dated 1.24.25
10. A-404 - ENLARGED PLANS - 215E, 218E Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-404 - ENLARGED PLANS - 215E, 218E Dated 1.24.25
11. A-405 - ENLARGED PLANS - 215E, 218E Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-405 - ENLARGED PLANS - 215E, 218E Dated 1.24.25
12. A-406 - ENLARGED PLANS - 214W, 215W Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-406
- ENLARGED PLANS - 214W, 215W Dated 1.24.25
13. A-407 - ENLARGED PLANS - 305E, 311E, 313E Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-407 - ENLARGED PLANS - 305E, 311E, 313E Dated 1.24.25
14. A-408 - ENLARGED PLANS - 305E, 311E, 313E Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-408 - ENLARGED PLANS - 305E, 311E, 313E Dated 1.24.25
15. A-409 - ENLARGED PLANS - 328E Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-409 - ENLARGED PLANS - 328E Dated 1.24.25
16. A-410 - ENLARGED PLANS - 303W, 304W Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-410
- ENLARGED PLANS - 303W, 304W Dated 1.24.25
17. A-411 - ENLARGED PLANS - 313W, 315W Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-411
- ENLARGED PLANS - 313W, 315W Dated 1.24.25
18. A-420 - INTERIOR ELEVATIONS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-420 - INTERIOR ELEVATIONS Dated 1.24.25
19. A-421 - INTERIOR ELEVATIONS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-421 - INTERIOR ELEVATIONS Dated 1.24.25
20. A-422 - INTERIOR ELEVATIONS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-422 - INTERIOR ELEVATIONS Dated 1.24.25
21. A-423 - INTERIOR ELEVATIONS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-423 - INTERIOR ELEVATIONS Dated 1.24.25
22. A-424 - INTERIOR ELEVATIONS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-424 - INTERIOR ELEVATIONS Dated 1.24.25
23. A-425 - INTERIOR ELEVATIONS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-425 - INTERIOR ELEVATIONS Dated 1.24.25
24. A-502 – DETAILS Rev 2 Dated 6.26.25 is hereby incorporated and supersedes A-502 – DETAILS Rev 1 Dated 6.17.25
25. I-121 - LEVEL 2 FINISH PLAN - SECTORS 1 & 2 Rev 2 Dated 6.26.25 is hereby incorporated and supersedes I-121 - LEVEL 2 FINISH PLAN - SECTORS 1 & 2 Rev 1 Dated 6.17.25
26. I-122 - LEVEL 2 FINISH PLAN - SECTORS 3 & 4 Rev 2 Dated 6.26.25 is hereby incorporated and supersedes I-122 - LEVEL 2 FINISH PLAN - SECTORS 3 & 4 Rev 1 Dated 6.17.25
27. I-131 - LEVEL 3 FINISH PLAN - SECTORS 1 & 2 Rev 2 Dated 6.26.25 is hereby incorporated and supersedes I-131 - LEVEL 3 FINISH PLAN - SECTORS 1 & 2 Rev 1 Dated 6.17.25
28. IN601 - ROOM FINISH SCHEDULE - LEVELS 1 & 2 Rev 2 Dated 6.26.25 is hereby incorporated and supersedes IN601 - ROOM FINISH SCHEDULE - LEVELS 1 & 2 Dated 1.24.25
29. IN602 - ROOM FINISH SCHEDULE - LEVEL 3 Rev 2 Dated 6.26.25 is hereby incorporated and supersedes IN602 - ROOM FINISH SCHEDULE - LEVEL 3 Dated 1.24.25
30. FA001 - FIRE ALARM LEGEND AND GENERAL NOTES Rev 2 Dated 6.20.25 is hereby incorporated and supersedes FA001 - FIRE ALARM LEGEND AND GENERAL NOTES Rev 1 Dated 6.17.25
31. FA122 - FIRE ALARM PLAN LEVEL 2 - SECTORS 3 & 4 Rev 2 Dated 6.20.25 is hereby incorporated and supersedes FA122 - FIRE ALARM PLAN LEVEL 2 - SECTORS 3 & 4 Dated 1.24.25
32. FX001 - FIRE SUPPRESSION GENERAL NOTES AND LEGEND Rev 2 Dated 6.20.25 is hereby incorporated and supersedes FX001 - FIRE SUPPRESSION GENERAL NOTES AND LEGEND Dated 1.24.25
33. FX110 - FIRE SUPPRESSION PLAN LEVEL 1 – COMPOSITE Rev 2 Dated 6.20.25 is hereby incorporated and supersedes FX110 - FIRE SUPPRESSION PLAN LEVEL 1 – COMPOSITE Dated 1.24.25
34. FX120 - FIRE SUPPRESSION PLAN LEVEL 2 – COMPOSITE Rev 2 Dated 6.20.25 is hereby incorporated and supersedes FX120 - FIRE SUPPRESSION PLAN LEVEL 2 – COMPOSITE Dated 1.24.25
35. FX130 - FIRE SUPPRESSION PLAN LEVEL 3 – COMPOSITE Rev 2 Dated 6.20.25 is hereby incorporated and supersedes FX130 - FIRE SUPPRESSION PLAN LEVEL 3 – COMPOSITE Dated 1.24.25
36. P-001 - LEGEND AND ABBREVATIONS Rev 1 Dated 6.20.25 is hereby incorporated and supersedes P-001 - LEGEND AND ABBREVATIONS Dated 1.24.25
37. P-601 - PLUMBING SCHEDULES Rev 1 Dated 6.20.25 is hereby incorporated and supersedes P-601 - PLUMBING SCHEDULES Dated 1.24.25
38. M-001 - LEGEND AND ABBREVIATIONS Rev 1 Dated 6.20.25 is hereby incorporated and supersedes M-001
- LEGEND AND ABBREVIATIONS Dated 1.24.25
39. E-001 - LEGEND AND ABBREVIATIONS Rev 1 Dated 6.26.25 is hereby incorporated and supersedes E-001 - LEGEND AND ABBREVIATIONS Dated 3.14.25
40. E-002 - LEGEND AND ABBREVIATIONS Rev 1 Dated 6.26.25 is hereby incorporated and supersedes E-002 - LEGEND AND ABBREVIATIONS Dated 3.14.25
41. ED111 - LEVEL 1 - LIGHTING DEMOLITION PLANS Rev 1 Dated 6.26.25 is hereby incorporated and supersedes ED111 - LEVEL 1 - LIGHTING DEMOLITION PLANS Dated 3.14.25
42. ED212 - LEVEL 2 - LIGHTING DEMOLITION PLANS Rev 1 Dated 6.26.25 is hereby incorporated and supersedes ED212 - LEVEL 2 - LIGHTING DEMOLITION PLANS Dated 3.14.25
43. EL111 - LEVEL 1 - LIGHTING PLAN Rev 1 Dated 6.26.25 is hereby incorporated and supersedes EL111 - LEVEL 1 - LIGHTING PLAN Dated 3.14.25
44. EL212 - LEVEL 2 - LIGHTING PLAN Rev 1 Dated 6.26.25 is hereby incorporated and supersedes EL212 - LEVEL 2 - LIGHTING PLAN Dated 3.14.25
II. SECOND: The following Specifications are hereby incorporated and are located in Attachment 1f Amended Specifications_Am02_6.26.25
1. 010100 - SUMMARY OF WORK_100_H9_AM02 is hereby incorporated and supersedes the previous 010100 -
SUMMARY OF WORK
2. 015000 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS_100_H9_AM02 is hereby incorporated and supersedes the previous 015000 - CONSTRUCTION FACILITIES AND TEMPORARY
CONTROLS
3. 015723 - STORM WATER POLLUTION PREVENTION_H9_AM02 is hereby incorporated
4. 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL_H9_AM02 is hereby incorporated and supersedes the previous 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
5. 061000 - ROUGH CARPENTRY_H9_AM02 is hereby incorporated and supersedes the previous 061000 -
ROUGH CARPENTRY
6. 078413 - PENETRATION FIRESTOPPING_H9_AM02 is hereby incorporated and supersedes the previous
078413 - PENETRATION FIRESTOPPING
7. 078443 - JOINT FIRESTOPPING_100_AM02 is hereby incorporated and supersedes the previous 078443 -
JOINT FIRESTOPPING
8. 079200 - JOINT SEALANTS_100_H9_AM02 is hereby incorporated and supersedes the previous 079200 -
JOINT SEALANTS
9. 088000 - GLAZING_100_H9_AM02 is hereby incorporated and supersedes the previous 088000 - GLAZING
10. 095113 - ACOUSTICAL PANEL CEILINGS_100_H9_AM02 is hereby incorporated and supersedes the previous 095113 - ACOUSTICAL PANEL CEILINGS
11. 099124 - INTERIOR PAINTING_100_H9_AM02 is hereby incorporated and supersedes the previous 099124 -
INTERIOR PAINTING
12. 102800 - TOILET ACCESSORIES_H9_AM02 is hereby incorporated and supersedes the previous 102800 -
TOILET ACCESSORIES
13. 233113 - METAL DUCTS_100_H9_AM02 is hereby incorporated and supersedes the previous 233113 -
METAL DUCTS
14. 233300 - AIR DUCT ACCESSORIES_100_H9_AM02 is hereby incorporated and supersedes the previous
233300 - AIR DUCT ACCESSORIES
III. THIRD: The following language is added to Section H of the SIR
H.2. Flightline Work Requirements The general contractor must have a flightline and escort-badged personnel maintain a line-of-site supervision over all unbadged personnel at all times during the construction on the flightline. Any vehicles driven onto the flightline must have a ramp permit and the driver must be flightline and driver badged.
H.3. Vehicle Access To Aircraft Ramp/Hangar Area
(a) Contractor vehicles, including vehicles of suppliers and subcontractors, entering the Aeronautical Center aircraft ramp/hangar area (defined as that area east of Duke Avenue where access is limited by security guard or locked doors/gates), must display a ramp permit. Ramp Permits are issued through the Will Rogers International Airport Operations Division. The contractor’s ramp permit application will be coordinated through AMP-400, Architecture & Engineering Division and AJO-R26, MMAC Space Management and Facility Security Team. The Contracting Officer will assist the contractor with the application process.
(b) Ramp permits are issued subsequent to the Contracting Officer's receipt of a current certificate of insurance for vehicle liability, furnished by the contractor, as follows (Contractor shall verify amounts after award):
Coverage Minimum Limits of Liability
Bodily injury $200,000 for each person
$1,000,000 for each occurrence
Property damage $1,000,000 for each accident
(c) The policy of insurance shall contain the following statements:
(1) ‘The United States of America, acting by and through the Federal Aviation Administration, The City of Oklahoma City, and Oklahoma City Airport Trust, are additional insureds with respect to operations performed under this contract.’
(2) ‘It is a condition of this policy that the insurer shall furnish written notice to the Federal Aviation Administration, in care of the issuing office, 30 days in advance of any reduction in or cancellation of this policy.’
(d) The address of the certificate holder shall be:
Andre Casiano, AAQ-730
P.O. Box 25082
Oklahoma City, OK 73125
(e) In addition to (b) and (c) above, the contractor shall furnish to the Contracting Officer, at any time during the contract period, upon request by the Contracting Officer, a certified true copy of the liability policy and manually countersigned endorsements of any changes thereto.
Section H - Special Contract Requirements was revised as follows.
Clause List was revised as follows.
H.1 FAA Compliance with Executive Orders
FAA shall comply with all Presidential directives. If any clause, provision, term, or condition in this SIR or contract is inconsistent with any Executive Order or Presidential Memoranda issued on or after January 20, 2025, or implementing guidance thereof, FAA will take action it deems appropriate and as permitted by law to correct any such inconsistency to include finding a provision or clause invalid. Applicable Executive Orders include, but are not limited to:
- Executive Order 14148 of January 20, 2025, Initial Recissions of Harmful Executive Orders and Actions.
- Executive Order 14151 of January 20, 2025, Ending Radical and Wasteful Government DEI Programs and Preferencing.
- Executive Order 14154 of January 20, 2025, Unleashing American Energy.
- Executive Order 14168 of January 20, 2025, Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government
- Executive Order 14173 of January 21, 2025, Ending Illegal Discrimination and Restoring Merit-Based Opportunity.
H.2. Flightline Work Requirements The general contractor must have a flightline and escort-badged personnel maintain a line-of-site supervision over all unbadged personnel at all times during the construction on the flightline. Any vehicles driven onto the flightline must have a ramp permit and the driver must be flightline and driver badged.
H.3. Vehicle Access To Aircraft Ramp/Hangar Area
(a) Contractor vehicles, including vehicles of suppliers and subcontractors, entering the Aeronautical Center aircraft ramp/hangar area (defined as that area east of Duke Avenue where access is limited by security guard or locked doors/gates), must display a ramp permit. Ramp Permits are issued through the Will Rogers International Airport Operations Division. The contractor’s ramp permit application will be coordinated through AMP-400, Architecture & Engineering Division and AJO-R26, MMAC Space Management and Facility Security Team. The Contracting Officer will assist the contractor with the application process.
The remainder of this page has been intentionally left blank.
Section J - List of Documents, Exhibits and Other Attachments was revised as follows.
Attachment List was revised as follows.
Table has been revised and now reads as follows:
ATTACHMENT TITLE DATE NO. OF
PAGES
1 Attachment 1 Hangar 09_Combined Specs_3.14.2025 03/14/2025 498 1a Attachment 1(a) Hangar_9_Renovation_100%_Drawings_3.14.2025 03/14/2025 150 1b Attachment 1(b) Hangar_9_High_Bay_Lights_100%_Drawings.3.14.2025 03/14/2025 6 1c Attachment 1c Revised.Additional Drawings Hangar 9 Renovation_6.17.2025 06/17/2025 19 1d Attachment 1d Amended Specifications_Am01_6.17.25 06/17/2025 34 1e Attachment 1e Revised.Additional Drawings Hangar 9 Renovation_6.26.2025 06/26/2025 44 1f Attachment 1f Amended Specifications_Am02_6.26.25 06/26/2025 93 2 Attachment 2 Wage Determination OK20250049 03.14.2025 03/14/2025 10 3 Attachment 3 SF25 Performance Bond 08/01/2016 3 4 Attachment 4 SF25A Payment Bond 08/01/2016 2 5 Attachment 5 SF24 Bid Bond 08/01/2016 2 6 Attachment 6 Past Performance Survey 4.23.25 04/23/2025 4 7 Attachment 7 Past Performance Experience Form 04/23/2025 2 8 Attachment 8 Client Authorization Letter 04/23/2025 1 9 Attachment 9 Contractor Release 05/01/2005 1 10 Attachment 10 AMP400-ENV-OC-2.4.3-CC 03/02/2022 14 11 Attachment 11 Chapter 33 Construction Safety 05/16/2014 9 12 Attachment 12 Furniture Equipment Moving Diagram Hangar 9 6.17.25 06/17/2025 3
File details come from the government source that posted it. Updated .