Attachment 12 Furniture Equipment Moving Diagram Hangar 9 6.17.25.pdf

PDF 1 MB Posted

Attached to
Solicitation - Hanger 9 Renovation at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK
Solicitation number
6973GH-25-R-00132
Issued by

About this file

The document is a set of composite floor plan drawings for Hangar 9 at the Mike Monroney Aeronautical Center in Oklahoma City, depicting three levels (1, 2, and 3) with detailed furniture and equipment moving diagrams. The drawings are part of a 100% design submittal for construction, showing the layout of various spaces including restrooms, stairwells, elevators, and high bay areas, with specific color-coded indicators for furniture and equipment movement: blue for items to be removed prior to construction, green for items to be relocated or remain during construction, yellow for items remaining in place during construction, and gray for minor/no work areas.

Key technical specifications include requirements for penetration firestop systems in high bay demising walls, with all penetrations to be protected by an approved system tested in accordance with ASTM E814 or UL 1479, maintaining a fire resistance rating consistent with the wall. General notes emphasize contractor responsibilities such as coordinating utility connections, verifying equipment requirements, providing proper material separation, and adhering to Oklahoma Department of Labor regulations and FAA orders. The drawings are part of a federal renovation project with an estimated budget between $5-10 million, focusing on comprehensive updates to the facility's interior spaces and infrastructure.

View the file

Other files

File Type Posted
6973GH-25-R-00132 Amend0009.pdf PDF
6973GH-25-R-00132 Amend0008.pdf PDF
6973GH-25-R-00132 Amend0007.pdf PDF
Attachment 1f Amended Specifications_Am02_6.26.25.pdf PDF
QA Log - Answers - 25-R-00132 H9 Reno 7.7.25 Final.pdf PDF
6973GH-25-R-00132 Amend0006.pdf PDF
Attachment 1e Revised.Additional Drawings Hangar 9 Renovation_6.26.2025.pdf PDF
6973GH-25-R-00132 Amend0005.pdf PDF
QA Log.2 25-R-00132 H9 Reno 6.30.25.pdf PDF
6973GH-25-R-00132 Amend0004.pdf PDF
Attachment 1c Revised.Additional Drawings Hangar 9 Renovation_6.17.2025.pdf PDF
Attachment 1d Amended Specifications_Am01_6.17.25.pdf PDF
6973GH-25-R-00132 Amend0003.pdf PDF
6973GH-25-R-00132 Amend0002.pdf PDF
6973GH-25-R-00132 Amend0001.pdf PDF
Attendance List Hanger 9 May 20 Site Visit.pdf PDF
QA Log.1 25-R-00132 H9 Reno 5.16.25.pdf PDF
6973GH-25-R-00132.pdf PDF
Attachment 9 Contractor Release.pdf PDF
Attachment 1b Hangar_9_High_Bay_Lights_100_Drawings.3.14.2025.pdf PDF
Attachment 4 SF25A Payment Bond.pdf PDF
Attachment 10 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 5 SF24 Bid Bond.pdf PDF
Attachment 2 Wage Determination OK20250049 03.14.2025.pdf PDF
Attachment 1 Hangar 09_Combined Specs_3.14.2025.pdf PDF
Attachment 11 Chapter 33 Construction Safety.pdf PDF
Attachment 6 Past Performance Survey 4.23.25.docx DOCX document
Attachment 1a Hangar 9_Renovation_100_Drawings_3.14.2025.pdf PDF
Attachment 8 Client Authorization Letter.docx DOCX document
Attachment 7 Past Performance Experience Form.docx DOCX document
Attachment 3 SF25 Performance Bond.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L

J

J

G

G

F

F

E

E

D

D

C

C

B

B

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

ALL PENETRATIONS IN HIGH BAY

DEMISING WALLS, INCLUDING HANGAR

DOOR POCKETS, TO BE PROTECTED BY

AN APPROVED PENETRATION FIRESTOP

SYSTEM INSTALLED AS TESTED IN

ACCORDANCE WITH ASTM E814 OR UL

1479 AND SHALL HAVE AN 'F' RATING OF

NOT LESS THAN THE REQUIRED FIRE

RESISTANCE RATING OF THE WALL.

ALL PENETRATIONS IN HIGH BAY

DEMISING WALLS, INCLUDING HANGAR

DOOR POCKETS, TO BE PROTECTED BY

AN APPROVED PENETRATION FIRESTOP

SYSTEM INSTALLED AS TESTED IN

ACCORDANCE WITH ASTM E814 OR UL

1479 AND SHALL HAVE AN 'F' RATING OF

NOT LESS THAN THE REQUIRED FIRE

RESISTANCE RATING OF THE WALL.

MEN

143E

UNISEX

104E

UNISEX

107W

WOMEN

106W

MEN

115W

STAIR

100JW

A-111

A-111

A-112

A-112

HIGH BAY

O .T

.O . O

F B

U

IL

D

IN

G , V

.I.

F

7'

O.T.O. OF BUILDING, V.I.F.

278' - 8"

STAIR

100HW

ELEV.

100GW

STAIR

109BW

ELEV.

100DW

P A

R K

IN

G

S

ID

E

T A

R M

A C

S

ID

E

STAIR

100KE

STAIR

100PE

ELEV.

100QE

ELEV.

100JE

REFER TO INTERIOR DESIGN SHEETS FOR

STAIRWELL FLOORING INFORMATION, AT

ALL INTERIOR STAIRWELL LOCATIONS.

FLOORS TO BE PREPARED TO REDUCE

TRIP HAZARDS AT STAIR TREADS AND

FLOORING MATERIAL TRANSITIONS.

Drawing No. AMP - 400 -lead or pm designed

WORK REQUEST NO.

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

MIKE MONRONEY AERONAUTICAL CENTER − OKLAHOMA CITY, OKLAHOMA

drawn approved by

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

ISSUED BY

OFFICE OF

facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e

100% DESIGN SUBMITTAL - FOR CONSTRUCTION

SEAL:

1/ 1/ :1 :0

A M

A u t o d e s k D o c s /1 F A A H a n g a r

R e n o v a t io n s R /1 1_

A R C H H C F .r v t

1/ 1/ :1 :0

A M

A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_

A R C H H C F .r v t

B. BRADDICK

T. AUFRANC

HANGAR 9

LEVEL 1 - COMPOSITE FLOOR PLAN

1550021

MATTCV

11.10.2023

A-110

N

SECTOR 2

SECTOR 1 SECTOR 3

SECTOR 4

HIGH BAY

1" = 20'-0"1

LEVEL 1 - COMPOSITE FLOOR PLAN

8 ALL HANGAR BAY WALLS TO RECEIVE NEW PAINT FINISH FULL HEIGHT TO BOTTOM OF ROOF

DECK.

7 DIMENSIONS IN PLANS ARE TYPICALLY SHOWN TO:

A. COLUMN CENTERLINES.

B. FACE OF UNIT MASONRY OR CONCRETE.

C. FACE OF FRAMING WALLS.

D. FACE OF INTERIOR PARTITIONS (FACE OF CMU, IMP, MTL PANEL)

NOTE: WALL WITH APPLIED FINISHES ARE DIMENSIONED TO FACE OF FINISH U.O.N.

6 COORDINATE PLACEMENT OF FIRE ALARM HORN STROBES WITH FIRE PROTECTION...

5 EQUIPMENT SHOWN IN DRAWINGS IS NOT IN CONTRACT AND FURNISHED BY THE OWNER

U.O.N. REFER TO OWNER FURNISHED EQUIPMENT BOOK FOR SOME EQUIPMENT THAT

REQUIRES UTILITY CONNECTIONS IN CONTRACT

4 PROVIDE PROPER SEPARATION BETWEEN ALL DISSIMILAR MATERIALS

3 VERIFY EQUIPMENT REQUIREMENTS FOR ROUGH-IN AND UTILITY CONNECTIONS PRIOR TO

CONSTRUCTION TO ASSURE THAT PROPER BLOCKING, OPENINGS, AND UTILITY

CONNECTIONS ARE PROVIDED

2 THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED ON

DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD DIMENSIONS. WHERE NO

DIMENSIONS OR METHOD OF DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT

PRIOR TO PROCEEDING.

1 CONTRACTOR SHALL REFER TO THE OKLAHOMA DEPARTMENT OF LABOR (ODOL)

REGULATIONS AND ALL APPLICABLE FAA ORDERS, NOTICES, PROTOCOLS AND OTHER

REQUIREMENTS.

GENERAL NOTES

0 10' 20' 40'

No. Date Description Issued by

Issued to

0 03/14/25 100% DESIGN SUBMITTAL TV FAA

Mary A Tsien Rectangle

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Text Box

FURNITURE / EQUIPMENT WILL BE REMOVED PRIOR TO CONSTRUCTION

Mary A Tsien Text Box FURNITURE / EQUIPMENT WILL BE REMAIN AND BE RELOCATED WITHIN THE SPACE PRIOR TO CONSTRUCTION. FAA MOVING SERVICES WILL BE AVAILABLE TO SHIFT FURNITURE / EQUIPMENT DURING CONSTRUCTION

Mary A Tsien Text Box

FURNITURE / EQUIPMENT WILL REMAIN WITHIN THE SPACE DURING CONSTRUCTION

Mary A Tsien Text Box

MINOR / NO WORK

Mary A Tsien Text Box

FURNITURE / EQUIPMENT MOVING DIAGRAM

J

J

G

G

F

F

E

E

D

D

C

C

B

B

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

ALL PENETRATIONS IN HIGH BAY

DEMISING WALLS, INCLUDING HANGAR

DOOR POCKETS, TO BE PROTECTED BY

AN APPROVED PENETRATION FIRESTOP

SYSTEM INSTALLED AS TESTED IN

ACCORDANCE WITH ASTM E814 OR UL

1479 AND SHALL HAVE AN 'F' RATING OF

NOT LESS THAN THE REQUIRED FIRE

RESISTANCE RATING OF THE WALL.

ALL PENETRATIONS IN HIGH BAY

DEMISING WALLS, INCLUDING HANGAR

DOOR POCKETS, TO BE PROTECTED BY

AN APPROVED PENETRATION FIRESTOP

SYSTEM INSTALLED AS TESTED IN

ACCORDANCE WITH ASTM E814 OR UL

1479 AND SHALL HAVE AN 'F' RATING OF

NOT LESS THAN THE REQUIRED FIRE

RESISTANCE RATING OF THE WALL.

UNISEX

224E

MEN

218E

WOMEN

215E

JANITOR

215BE

MEN

214W

WOMEN

215W

A-121

A-121

A-122

A-122

P A

R K

IN

G

S

ID

E

T A

R M

A C

S

ID

E

STAIR

200CWELEV.

200DW

STAIR

225W

STAIR

200HW

ELEV.

200GW

ELEV.

200JE

STAIR

207E

STAIR

201E

ELEV.

200QE

Drawing No. AMP - 400 -lead or pm designed drawn approved by

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

ISSUED BY

OFFICE OF

facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e

100% DESIGN SUBMITTAL - FOR CONSTRUCTION

SEAL:

1/ 1/ :1 :0

A

M A u t o d e s k D o c s /1 F A A H a n g a r

R e n o v a t io n s R /1 1_

A R C H H C F .r v t

1/ 1/ :1 :0

A

M A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_

A R C H H C F .r v t

B. BRADDICK

T. AUFRANC

HANGAR 9

LEVEL 2 - COMPOSITE FLOOR PLAN

1550021

MATTCV

11.10.2023

A-120

N

SECTOR 2

SECTOR 1 SECTOR 3

SECTOR 4

HIGH BAY

1" = 20'-0"1

LEVEL 2 - COMPOSITE FLOOR PLAN

8 ALL HANGAR BAY WALLS TO RECEIVE NEW PAINT FINISH FULL HEIGHT TO BOTTOM OF ROOF

DECK.

7 DIMENSIONS IN PLANS ARE TYPICALLY SHOWN TO:

A. COLUMN CENTERLINES.

B. FACE OF UNIT MASONRY OR CONCRETE.

C. FACE OF FRAMING WALLS.

D. FACE OF INTERIOR PARTITIONS (FACE OF CMU, IMP, MTL PANEL)

NOTE: WALL WITH APPLIED FINISHES ARE DIMENSIONED TO FACE OF FINISH U.O.N.

6 COORDINATE PLACEMENT OF FIRE ALARM HORN STROBES WITH FIRE PROTECTION...

5 EQUIPMENT SHOWN IN DRAWINGS IS NOT IN CONTRACT AND FURNISHED BY THE OWNER

U.O.N. REFER TO OWNER FURNISHED EQUIPMENT BOOK FOR SOME EQUIPMENT THAT

REQUIRES UTILITY CONNECTIONS IN CONTRACT

4 PROVIDE PROPER SEPARATION BETWEEN ALL DISSIMILAR MATERIALS

3 VERIFY EQUIPMENT REQUIREMENTS FOR ROUGH-IN AND UTILITY CONNECTIONS PRIOR TO

CONSTRUCTION TO ASSURE THAT PROPER BLOCKING, OPENINGS, AND UTILITY

CONNECTIONS ARE PROVIDED

2 THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED ON

DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD DIMENSIONS. WHERE NO

DIMENSIONS OR METHOD OF DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT

PRIOR TO PROCEEDING.

1 CONTRACTOR SHALL REFER TO THE OKLAHOMA DEPARTMENT OF LABOR (ODOL)

REGULATIONS AND ALL APPLICABLE FAA ORDERS, NOTICES, PROTOCOLS AND OTHER

REQUIREMENTS.

GENERAL NOTES

0 10' 20' 40'

No. Date Description Issued by

Issued to

0 03/14/25 100% DESIGN SUBMITTAL TV FAA

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Text Box

FURNITURE / EQUIPMENT WILL BE REMOVED PRIOR TO CONSTRUCTION

Mary A Tsien Text Box FURNITURE / EQUIPMENT WILL BE REMAIN AND BE RELOCATED WITHIN THE SPACE PRIOR TO CONSTRUCTION. FAA MOVING SERVICES WILL BE AVAILABLE TO SHIFT FURNITURE / EQUIPMENT DURING CONSTRUCTION

Mary A Tsien Text Box

FURNITURE / EQUIPMENT WILL REMAIN WITHIN THE SPACE DURING CONSTRUCTION

Mary A Tsien Text Box

MINOR / NO WORK

Mary A Tsien

J

J

G

G

F

F

E

E

D

D

C

C

B

B

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

ALL PENETRATIONS IN HIGH BAY

DEMISING WALL, INCLUDING HANGAR

DOOR POCKETS, TO BE PROTECTED BY

AN APPROVED PENETRATION FIRESTOP

SYSTEM INSTALLED AS TESTED IN

ACCORDANCE WITH ASTM E814 OR UL

1479 AND SHALL HAVE AN 'F' RATING OF

NOT LESS THAN THE REQUIRED FIRE

RESISTANCE RATING OF THE WALL.

ALL PENETRATIONS IN HIGH BAY

DEMISING WALL, INCLUDING HANGAR

DOOR POCKETS, TO BE PROTECTED BY

AN APPROVED PENETRATION FIRESTOP

SYSTEM INSTALLED AS TESTED IN

ACCORDANCE WITH ASTM E814 OR UL

1479 AND SHALL HAVE AN 'F' RATING OF

NOT LESS THAN THE REQUIRED FIRE

RESISTANCE RATING OF THE WALL.

A-412

MEN

303W

WOMEN

304W

MEN

313W

WOMEN

315W

WOMEN

313E

MEN

305E

UNISEX

311E

MEN

328E

A-131

A-131

A-132

A-132

P A

R K

IN

G

S

ID

E

T A

R M

A C

S

ID

E

STAIR

320E

STAIR

333E

ELEV.

300JE

STAIR

307E

STAIR

301W

STAIR

327W

STAIR

316W

ELEV.

300DW

ELEV.

300GW

ELEV.

300QE

Drawing No. AMP - 400 -lead or pm designed drawn approved by

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

ISSUED BY

OFFICE OF

facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e

100% DESIGN SUBMITTAL - FOR CONSTRUCTION

SEAL:

1/ 1/ :1 :1 A

M A u t o d e s k D o c s /1 F A A H a n g a r

R e n o v a t io n s R /1 1_

A R C H H C F .r v t

1/ 1/ :1 :1 A

M A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_

A R C H H C F .r v t

B. BRADDICK

T. AUFRANC

HANGAR 9

LEVEL 3 - COMPOSITE FLOOR PLAN

1550021

MATTCV

11.10.2023

A-130

N

SECTOR 2

SECTOR 1 SECTOR 3

SECTOR 4

HIGH BAY

1" = 20'-0"1

LEVEL 3 - COMPOSITE FLOOR PLAN

8 ALL HANGAR BAY WALLS TO RECEIVE NEW PAINT FINISH FULL HEIGHT TO BOTTOM OF ROOF

DECK.

7 DIMENSIONS IN PLANS ARE TYPICALLY SHOWN TO:

A. COLUMN CENTERLINES.

B. FACE OF UNIT MASONRY OR CONCRETE.

C. FACE OF FRAMING WALLS.

D. FACE OF INTERIOR PARTITIONS (FACE OF CMU, IMP, MTL PANEL)

NOTE: WALL WITH APPLIED FINISHES ARE DIMENSIONED TO FACE OF FINISH U.O.N.

6 COORDINATE PLACEMENT OF FIRE ALARM HORN STROBES WITH FIRE PROTECTION...

5 EQUIPMENT SHOWN IN DRAWINGS IS NOT IN CONTRACT AND FURNISHED BY THE OWNER

U.O.N. REFER TO OWNER FURNISHED EQUIPMENT BOOK FOR SOME EQUIPMENT THAT

REQUIRES UTILITY CONNECTIONS IN CONTRACT

4 PROVIDE PROPER SEPARATION BETWEEN ALL DISSIMILAR MATERIALS

3 VERIFY EQUIPMENT REQUIREMENTS FOR ROUGH-IN AND UTILITY CONNECTIONS PRIOR TO

CONSTRUCTION TO ASSURE THAT PROPER BLOCKING, OPENINGS, AND UTILITY

CONNECTIONS ARE PROVIDED

2 THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED ON

DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD DIMENSIONS. WHERE NO

DIMENSIONS OR METHOD OF DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT

PRIOR TO PROCEEDING.

1 CONTRACTOR SHALL REFER TO THE OKLAHOMA DEPARTMENT OF LABOR (ODOL)

REGULATIONS AND ALL APPLICABLE FAA ORDERS, NOTICES, PROTOCOLS AND OTHER

REQUIREMENTS.

GENERAL NOTES

0 10' 20' 40'

No. Date Description Issued by

Issued to

0 03/14/25 100% DESIGN SUBMITTAL TV FAA

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Polygon

Mary A Tsien Text Box

FURNITURE / EQUIPMENT WILL BE REMOVED PRIOR TO CONSTRUCTION

Mary A Tsien Text Box FURNITURE / EQUIPMENT WILL BE REMAIN AND BE RELOCATED WITHIN THE SPACE PRIOR TO CONSTRUCTION. FAA MOVING SERVICES WILL BE AVAILABLE TO SHIFT FURNITURE / EQUIPMENT DURING CONSTRUCTION

Mary A Tsien Text Box

FURNITURE / EQUIPMENT WILL REMAIN WITHIN THE SPACE DURING CONSTRUCTION

Mary A Tsien Text Box

MINOR / NO WORK

Mary A Tsien

File details come from the government source that posted it. Updated .