Attachment 1a Hangar 9_Renovation_100_Drawings_3.14.2025.pdf
PDF 32 MB Posted
- Attached to
- Solicitation - Hanger 9 Renovation at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK
- Solicitation number
- 6973GH-25-R-00132
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing No. AMP - 400 -lead or pm designed
WORK REQUEST NO.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
MIKE MONRONEY AERONAUTICAL CENTER − OKLAHOMA CITY, OKLAHOMA
drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
100% DESIGN SUBMITTAL - FOR CONSTRUCTION
SEAL:
1/ 1/ :2
:1 A M
A u t o d e s k D o c s /1 F A A H a n g a r
R e n o v a t io n s R /1 1_
A R C H H C F .r v t
1/ 1/ :2
:1 A M
A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_
A R C H H C F .r v t
B. BRADDICK
T. AUFRANC
HANGAR 9
COVER SHEET
1550021
MATTCV
11.10.2023
G-001
PROJECT LOCATION
PROJECT LOCATION
VICINITY MAP LOCATION MAP
14000 Quail Springs Pkwy Suite 500
Oklahoma City, Oklahoma 73134
BENHAM DESIGN, LLC
OKLAHOMA - Architecture # CA02833 Engineering # CA7569
Phone # (405) 478-5353
BENHAM PROJECT NO.:
WORK ORDER NO.:
WWW.BENHAM.COM
2018-021538
FEDERAL AVIATION ADMINISTRATION
HANGAR 9
1550021
100% DESIGN SUBMITTAL
03.14.2025
No. Date Description Issued by Issued to
0 03/14/25 100% DESIGN SUBMITTAL TV FAA
DETAIL NUMBER
EXTERIOR ELEVATION
1 View Name 1/8" = 1'-0"
VIEW SCALE
INDICATES PLAN NORTH
VIEW NUMBER
VIEW NAME
INDICATES TRUE NORTH
A101
SIM
VIEW NUMBER
SHEET NUMBER
TYPICAL VIEW TITLE
DETAIL SECTION
A101
SIM
VIEW NUMBER
SHEET NUMBER
WALL SECTION
REFERENCE LABEL
(WHERE INDICATED)
INDICATES ELEVATION TYPICAL
CONDITION
INDICATES THE CONDITION
IS SIMILAR TO THE
REFERING DETAIL
NAME
ELEVATION
xx.x
SHEET NUMBER
LEVEL MARKER
KEYED NOTE TAG
EXISTING STRUCTURAL GRID
LEVEL ELEVATION
LEVEL NAME
KEYED NOTE VALUE
PLAN NORTH
A101
SIM
NORTH ARROW
ACCESSIBLE WATER
CLOSET FRONT
ELEVATION
STANDARD WATER
CLOSET FRONT
ELEVATION
ACCESSIBLE
WALL MOUNTED
SOAP
DISPENSER
ACCESSIBLE WATER CLOSET
SIDE ELEVATION
ACCESSIBLE
LAVATORY
FRONT
ELEVATION
C E
N T
E R
L
IN
E O
F C
O N
T R
O
LS
NOTE:
INSULATE ALL EXPOSED PIPES UNDER
LAVATORIES IN ACCORDANCE WITH
ANSI, ADA, AND ABA STANDARDS.
TYPICAL FIXTURE AND ACCESSORY MOUNTING HEIGHT LEGEND
SURFACE MOUNTED
PAPER SEAT COVER
DISPENSER
B O
T T
O M
O F
R E
F
LE
C T
IV
E
S U
R F
A C
E
MIRROR
1' - 6"
F A
C E
O F
W A
LL
2'
M A
X
IM
U M
3'
8"
F A
C E
O F
W A
LL
F A
C E
O F
W A
LL
3' - 0" 6"
2'
1' - 6"
1'
7"
1' - 0" 3' - 6"
9" MAXIMUM
7" MINIMUM
3' - 3"
2'
M
IN
IM
U
M 1'
3"
F A
C E
O F
W A
LL
F A
C E
O F
W A
LL
EQ EQ
1'
3"
M A
X
M A
X
IM
U M
3'
4"
GRAB
BAR
GRAB
BAR
TOILET TISSUE
DISPENSOR
3'
3" 1'
6"
ACCESSIBLE
URINAL SIDE
ELEVATION
STANDARD
URINAL SIDE
ELEVATION
ACCESSIBLE WALL
MOUNTED PAPER TOWEL
DISPENSER/ WASTE
RECEPTACLE COMBO
ACCESSIBLE WALL
MOUNTED AUTOMATIC
TOUCHLESS TOWEL
DISPENSER
C E
N T
E R
L
IN
E O
F C
O N
T R
O
LS
C E
N T
E R
L
IN
E O
F D
IS
P
E N
S E
R
T O
P O
F R
E C
E P
T A
C
LE
ACCESSIBLE WALL
MOUNTED WASTE
RECEPTACLE
ACCESSIBLE
SANITARY
NAPKIN/TAMPON
VENDOR
M A
X
1'
5"
2'
0"
M A
X
IM
U M
4'
0"
M A
X
IM
U M
4'
0"
M A
X
IM
U M
3'
4"
4'
0"
C O
IN
S
LO
T
S
F A
C E
O F
W A
LL
F A
C E
O F
W A
LL
FIRE EXTINGUISHER
CABINET AND/OR
BRACKET
ACCESSIBLE/STANDARD
ELECTRIC WATER
COOLER (EWC) FRONT
ELEVATION
T O
P O
F S
P O
U T
O U
T
LE
T
FULL HEIGHT
MIRROR
ACCESSIBLE
SHELF
(WOMEN'S TOILET
ROOM ONLY)
6'
0" 4' -0
M
A X
IM
U
M 3'
4"
M
IN
IM
U
M
4'
0"
3' -2
M
IN
IM
U M
3'
7" M
A X
IM
U
M
3'
0" M
A X
IM
U
M (A
D A
SHOWER CURTAIN
ROD
F A
C E
O F
W A
LL
7'
0"
3'
6"
7'
6"
SOAP
DISH
S H
O W
E R
H E
A D
UTILITY SHELF
WITH
MOP/BROOM
HOLDER
5'
4"
T O
P O
F
A C
C E
S S
O R
Y
ACCESSIBLE
SANITARY
NAPKIN
DISPOSAL
T O
P
C E
S S
O R
Y
2'
6"
STANDARD
HAT/COAT/ROBE
HOOK
5'
0"
T O
P
C E
S S
O R
Y
STANDARD
WATER CLOSET
SIDE ELEVATION
F A
C E
O F
W A
LL
9" MAXIMUM
7" MINIMUM
M A
X
IM
U M
1'
3"
TOILET TISSUE
DISPENSOR
M A
X
IM
U M
3'
8"
ACCESSIBLE
WALL MOUNTED
HAND SANITIZER
F A
C E
O F
S T
A
LL
D O
O R
COAT HOOK
COAT HOOK
4'
/1 6"
Drawing No. AMP - 400 -lead or pm designed drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
100% DESIGN SUBMITTAL - FOR CONSTRUCTION
SEAL:
1/ 1/ :2
:1 A M
A u t o d e s k D o c s /1 F A A H a n g a r
R e n o v a t io n s R /1 1_
A R C H H C F .r v t
1/ 1/ :2
:1 A M
A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_
A R C H H C F .r v t
B. BRADDICK
T. AUFRANC
HANGAR 9
GENERAL PROJECT INFORMATION
1550021
MATTCV
11.10.2023
G-002
GENERAL NOTESARCHITECTURAL SYMBOLS LEGEND
1. CONTRACTOR SHALL VERIFY AND COORDINATE ALL NEW AND EXISTING CONDITIONS AND DIMENSIONS AT JOB SITE FOR COMPARISON WITH THE DRAWINGS PRIOR TO THE START OF AND DURING CONSTRUCTION. IF ANY DISCREPANCIES OR OMISSIONS ARE FOUND, THE CONTRACTING OFFICER'S REPRESENTATIVE SHALL BE NOTIFIED, IN WRITING FOR CLARIFICATION PRIOR TO
PROCEEDING WITH WORK.
2. DO NOT SCALE DRAWINGS. CONTRACTOR SHALL RELY ON WRITTEN DIMENSIONS AS GIVEN. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE FOR CLARIFICATIONS. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY CONTRACTOR AND COORDINATED WITH ALL OF THE WORK OF ALL TRADES. IF DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE IN WRITING FOR CLARIFICATION BEFORE THE COMMENCEMENT OR RESUMPTION OF WORK.
3. COORDINATE INSTALLATION WITH THE WORK OF OTHER TRADES TO ENSURE EXACT FIT AND PERFECT ALIGNMENT. VERIFY DIMENSIONS BEFORE PROCEEDING AND OBTAIN MEASUREMENTS
AT JOB SITE FOR WORK REQUIRED TO BE ACCURATELY FITTED TO OTHER CONSTRUCTION.
4. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE FOR ANY ACTIVITIES THAT MAY CAUSE EXCESSIVE NOISE AND DISRUPTION TO ACTIVITES THAT ARE TAKING PLACE WITHIN THE BUILDING. ALL WORK FOR THIS PROJECT SHALL BE REQUIRED TO TAKE PLACE AFTER HOURS OR ON WEEKENDS. NOISE WILL NOT BE ALLOWED BETWEEN
THE HOURS OF 6:00 AM TO 6:00 PM CST.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING DUST PROOF BARRIERS BETWEEN ANY PORTION OF THE DEMOLITION AND/OR CONSTRUCTION AND OTHER INTERIOR SPACES.
6. THE CONTRACTOR SHALL DO ALL CLEANING NECESSARY TO KEEP THE TRAFFIC ROUTES AND ADJACENT AREAS WITHIN THE PREMISES FREE FROM DUST AND DEBRIS AT ALL TIMES.
7. PROTECT FROM DEMOLITION AND PRE-CONSTRUCTION DEBRIS, ALL "EXISTING TO REMAIN" AND/ OR "SALVAGED FOR REUSE" FIXTURES, FINISHES, EQUIPMENT, ETC. REQUIRED TO REMAIN IN
PLACE DURING CONSTRUCTION.
8. ALL PENETRATIONS IN RATED ASSEMBLIES, WHETHER NEW OR EXISTING, SHALL BE SEALED WITH UL/FM APPROVED MATERIALS AND PROCEDURES. NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE OF QUESTIONABLE CONDITIONS ENCOUNTERED.
9. BASIS-OF-DESIGN PRODUCT DEFINITION: A PRODUCT IN WHICH A SPECIFIC MANUFACTURER'S PRODUCT IS NAMED AND ACCOMPANIED BY THE WORDS "BASIS-OF-DESIGN," INCLUDING MAKE
OR MODEL NUMBER OR OTHER DESIGNATION, TO ESTABLISH THE SIGNIFICANT QUALITIES RELATED TO TYPE, FUNCTION, DIMENSION, IN-SERVICE PERFORMANCE, PHYSICAL PROPERTIES, APPEARANCE, AND OTHER CHARACTERISTICS FOR PURPOSES OF EVALUATING COMPARABLE PRODUCTS OF ADDITIONAL MANUFACTURERS WHICH MEET SPECIFICATION REQUIREMENTS.
ALL WOOD BLOCKING SHALL BE FIRE TREATED.
10. ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS UNTIL AFTER ACCEPTANCE OF INSTALLATION IS MADE BY THE CONTRACTING OFFICER'S REPRESENTATIVE, AND AS IN
ACCORDANCE WITH THE SPECIFICATIONS.
11. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF ANY OF CONSULTANTS WORK AND TO INFORM THE CONTRACTING OFFICER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. IMPROPERLY INSTALLED WORK SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE CLIENT.
12. CONTRACTOR SHALL STOP WORK AND NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE IMMEDIATELY IF ANY SERVICE OR UTILITY IS ACCIDENTALLY TAKEN OFFLINE OR DAMAGED DUE TO CONSTRUCTION ACTIVITIES. CONSTRUCTION SHALL REMAIN STOPPED UNTIL THE CONTRACTOR IS EXPRESSLY NOTIFIED TO CONTINUE WORK FROM THE CONTRACTING OFFICER'S
REPRESENTATIVE.
13. EXCEPT AS MODIFIED BY GOVERNING CODES, COMPLY WITH THE APPLICABLE PROVISIONS AND RECOMMENDATIONS OF ANSI A10 "SAFETY CODE FOR BUILDING CONSTRUCTION".
14. THE CONTRACTOR SHALL NOT LOAD ANY PART OF THE BUILDING AND ITS FACILITIES WITH MATERIALS, EQUIPMENT AND DEBRIS THAT COULD COMPROMISE THE BUILDINGS STRUCTURAL
INTEGRITY.
15. UPON COMPLETION OF THE WORK, TAKE ALL EQUIPMENT, DEBRIS AND SALVAGED ITEMS FROM THE BUILDING. LEAVE ALL WORK AREAS CLEAN. TAKE SPECIAL CARE TO CLEAN ALL TRACES
OF DUST, SLAG AND GRIT ADJACENT TO WORK AREAS AND/OR AS FAR AS DUST, SLAG OR GRIT TRAVELS.
16. PROVIDE ON-SITE DUMP CONTAINERS FOR COLLECTION OF WASTE AND DAILY CLEAN UP REFUSE AND RUBBISH. MAINTAIN SITE IN AN ORDERLY, CLEAN AND SAFE CONDITION AT ALL TIMES.
DUMPSTERS SHOULD REMAIN COVERED WHILE ON MMAC.
17. THERE IS KNOWN ASBESTOS IN EXISTING FLOOR TILE AND FLOOR TILE MASTICS IN A NUMBER OF LOCATIONS THROUGHOUT THE BUILDING. ALL ASBESTOS CONTAINING FLOOR TILE IN AREAS
INDICATED IN THESE DRAWINGS WILL BE REMOVED BY THE GOVERNMENT. IF ANY OTHER FLOOR FINISHES, NOT INDICATED AS ASBESTOS CONTAINING NEED TO BE TEMPORARILY REMOVED
OR ALTERED, COORDINATE WITH OWNER PRIOR TO DISTURBING THE FLOOR FINISHES.
18. FOR THE RESTROOM PORTION OF THE RENOVATION: DRAWINGS FROM A 1988 RENOVATION OF DOMESTIC WATER PIPING INSULATION INDICATES THAT THE EXISTING PIPING INSULATION IS FIBER GLASS. THIS WAS INSPECTED BY THE FAA, IN ADDITION TO OTHER MATERIALS IN THE PROJECT AREA THAT MAY BE DISTURBED DURING DEMOLITION & CONSTRUCTION, AND NO ASBESTOS-CONTAINING MATERIAL (ACM) WAS IDENTIFIED. HOWEVER, IF AT ANY POINT DURING DEMOLITION AND/OR CONSTRUCTION, THE CONTRACTOR DISCOVERS ACM OR SUSPECTED ACM THEY MUST STOP WORK IN THE IMMEDIATE WORK AREA AND CONTACT THE FAA PROJECT MANAGER FOR FURTHER INSTRUCTION. IF NECESSARY, THE FAA WILL COLLECT AND ANALYZE SAMPLES FOR ACM AND SEPARATELY PROCURE AN ABATEMENT CONTRACTOR TO REMOVE ANY ACM IN THE PROJECT WORK AREA(S).
19. THERE SHALL BE NO NOISY CONSTRUCTION ACTIVITIES OR ODOR PRODUCING ACTIVITIES SCHEDULED BETWEEN THE HOURS OF 6:00AM CST TO 6:00PM CST ON MONDAY THROUGH FRIDAY
DUE TO TESTING AND OTHER CRITICAL ACTIVITIES THAT TAKE PLACE IN THE BUILDING.
20. THE FAA WILL REQUIRE TESTING OF WATER AFTER THE CONTRACTOR FLUSHES THE SYSTEM. THE FAA WILL TEST FOR PH, LEAD, COPPER, AND TOTAL COLIFORM (INCLUDES E-COLI). IF THE TEST FAILS, THE CONTRACTOR WILL BE REQUIRED TO MAKE NECESSARY STEPS TO CORRECT THE ISSUE AND THEN THE PROCESS OF FLUSHING AND TESTING HAS TO OCCUR AGAIN. THE WATER TESTING PROCESS CAN TAKE UP TO TWO WEEKS. THE RESTROOMS CANNOT BE IN OPERATION / USED UNTIL THE WATER TEST IS PASSED.
21. PHASING IS TO BE COORDINATED CLOSELY WITH THE AMP-400 AT FAA. CONTRACTOR SHALL ONLY WORK ON 1 FLOOR/LEVEL OF RESTROOMS AT A TIME AS TO NOT LIMIT ACCESS TO RESTROOMS BY THE TENANTS OF THE BUILDING. PORTABLE MENS AND WOMENS TOILETS ARE TO BE BROUGHT IN THE ACCOUNT FOR THE NUMBER OF TOILETS THAT ARE DOWN AT ANY
GIVEN TIME.
22. PAINT/FUME WORK AND ODOR PRODUCING WORK SHALL OCCUR ON WEEKENDS ONLY.
23. COORDINATE SCHEDULE WITH FAA INSPECTOR.
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. DEMOLITION AND REMOVAL WORK SHALL BE DONE WITH DUE CARE, INCLUDING BRACING, ETC. PERFORM PATCHING AND RESTORATION AS REQUIRED TO REMEDY AND RESTORE SUCH
DAMAGED PARTS EQUAL TO ADJACENT AREA.
2. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE FOR ALL ITEMS SALVAGED BUT NOT REUSED.
3. THE CONTRACTOR SHALL REMOVE ALL WORK AS INDICATED ON THE CONSTRUCTION DRAWING.
4. ANY KIND OF DEMOLITION WORK INVOLVING CONCRETE, GYPSUM BOARD, SHEETROCK, PLASTER, ETC. CAN CREATE SILICA DUST. USE TOOLS THAT INCORPORATE THE WET METHOD OR
SHOP VACS WITH HEPA FILTERS TO CAPTURE DUST. CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING UP DUST OR SLAG (FROM WET METHOD) AS FAR AS IT TRAVELS. AMP-100 SAFETY OFFICE REQUIRES A COPY OF THE CONTRACTOR'S SILICA CONTROL PLAN 30 DAYS PRIOR TO ANY WORK BEING PERFORMED THAT WILL CREATE SILICA DUST.
5. EXISTING ELECTRIC AND TELECOMMUNICATIONS OUTLETS INTERFERING WITH NEW WORK SHALL BE REMOVED OR RELOCATED AS DIRECTED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE.
6. PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT AREAS BY DEMOLITION OPERATION AT NO COST TO THE GOVERNMENT.
7. ANY DISCREPANCY FOUND ON DRAWINGS AND FIELD CONDITION SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO PROCEEDING
WITH THE WORK IN QUESTION.
8. COORDINATE WITH THE CONTRACTING OFFICER'S REPRESENTATIVE ALL WORK WHICH WILL AFFECT THE TENANTS ON ADJACENT FLOORS OR SPACES.
9. COORDINATE ANY CEILING REMOVAL WITH ALL TRADES AS REQUIRED WITH CONSTRUCTION PLAN.
10. UNLESS NOTED OTHERWISE, ALL DEMOLITION MATERIAL IS TO BE LEGALLY DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS. THE CONTRACTING OFFICER'S REPRESENTATIVE
RESERVES THE RIGHT AND SHALL BE GIVEN THE OPPORTUNITY TO CLAIM ITEMS WHETHER OR NOT THOSE ITEMS WERE SPECIFICALLY NOTED FOR REMOVAL, RELOCATION, OR AS
RETURNED TO CONTRACTING OFFICER'S REPRESENTATIVE.
11. PROTECT FROM DEMOLITION AND RECONSTRUCTION DEBRIS, ALL "EXISTING TO REMAIN" FIXTURES, FINISHES, EQUIPMENT, ETC. REQUIRED TO REMAIN IN PLACE DURING CONSTRUCTION.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION AND AS NECESSARY TO FULFILL THE PURPOSE AND INTENT OF
THE FINISH WORK, WHETHER OR NOT IT IS SPECIFICALLY SHOWN OR NOTED IN THESE DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ITEMS CALLED TO BE REMOVED
THROUGH OUT THE ENTIRE DOCUMENTS.
13. DEMOLISH MEANS TO REMOVE, TRANSPORT AND LEGALLY DISPOSE OF DEMOLISHED MATERIAL IN ACCORDANCE WITH THE SPECIFICATIONS.
14. REMOVE AND SALVAGE OR REMOVED AND REINSTALLED MEANS TO CAREFULLY DETACH FROM EXISTING CONSTRUCTION, CLEAN AND REPAIR TO CONDITION ADEQUATE FOR INTENDED
REUSE.
15. CONTRACTOR SHALL PALLETIZE AND SHRINK WRAP REMOVED CARPET TILES AND MOVE TO BUILDING 50 FOR AMP-100 RECYCLING. CARPET MUST NOT BE LEFT OUTSIDE AT BUILDING 50.
REMOVED CARPET TILES SHALL BE KEPT CLEAN AND DRY. DO NOT STORE OUTSIDE AT ANY TIME DURING CONSTRUCTION ACTIVITIES. NOTIFY AMP-400 POC/COR, AMP-100 AND FAA INSPECTOR PRIOR TO DELIVERY TO ENSURE THAT THE CARPET IS MOVED INSIDE OF THE BUILDING.
16. IF THE VINYL COMPOSITE TILE (VCT) MATERIAL ADHERES TO THE CARPET TILE ADHESIVE DURING REMOVAL, SUSPEND WORK IN THE IMMEDIATE AREA. CONTACT THE AMP-400 PROJECT MANAGER SO THAT AN FAA ASBESTOS INSPECTOR CAN EXAMINE AND IF NECESSARY, SUSPEND WORK UNTIL MITIGATION/ABATEMENT IS COMPLETED. THE FAA WILL NOTIFY
CONTRACTOR WHEN WORK IS OKAY TO CONTINUE.
17. THE RF SHIELDED VAULT ROOMS LOCATED ON THE EAST SIDE OF THE THIRD FLOOR WERE FOUND TO CONTAIN LEAD. THE DOORS AND WALL SKIN/COATING TERNE IS MOSTLY LEAD
BASED. CONTRACTOR SHALL INFORM DISPOSAL FACILITY OF THE PRESENCE OF LEAD.
24. PAINTING - CONTRACTOR MUST USE LOW VOLATILE ORGANIC COMPOUND (VOC) PAINTS WITH LOW ODOR TO PREVENT FAA WORKER EXPOSURES AND COMPLAINTS. USING STRONG EPOXY PAINTS (ESPECIALLY ANYTHING THAT CONTAINS ISOCYANATES - WHICH IS A KNOWN SENSITIZER) SHOULD ONLY BE CONDUCTED DURING THE WEEKENDS OR NIGHT SHIFT HOURS WHEN NO FAA WORKERS ARE PRESENT. ALL SAFETY DATA SHEETS MUST BE SUBMITTED TO THE AMP-100 SAFETY OFFICE FOR REVIEW PRIOR TO ALL PAINTING PROCESSES (EXCEPT IF USING LOW
VOC INTERIOR LATEX PAINTS).
25. GENERAL CHEMICAL USE - CONTRACTOR MUST USE LOW VOLATILE ORGANIC COMPOUND (VOC) CHEMICALS WITH LOW ODOR TO PREVENT FAA WORKER EXPOSURES AND COMPLAINTS.
CHEMICALS WITH A LOW ODOR THRESHOLD (MEANING IT IS EASILY DETECTABLE BY HUMAN SENSES, WITH STRONG ODORS, ETC) SHOULD ONLY BE CONDUCTED DURING THE WEEKENDS OR NIGHT SHIFT HOURS WHEN NO FAA WORKERS ARE PRESENT. ALL SAFETY DATA SHEETS MUST BE SUBMITTED TO THE AMP-100 SAFETY OFFICE FOR REVIEW 30 DAYS PRIOR TO ALL
PROCESSES USING CHEMICALS.
26. MANUFACTURERS SAFETY DATA SHEETS (SDS) FOR ALL CHEMICAL PRODUCTS, INCLUDING BUT NOT LIMITED TO CEMENTS, CURING COMPOUNDS, BONDING COMPOUNDS THAT ARE USED ON
THE JOB SITE MUST BE READILY AVAILABLE UPON REQUEST.
27. POWER TOOLS USED INSIDE THE BUILDING MUST NOT BE POWERED BY PETROLEUM OR NATURAL GAS FUELS. ONLY ELECTRIC AND PNEUMATIC POWERED TOOLS ARE APPROVED TO BE
USED INSIDE THE BUILDING.
28. A HOT WORK PERMIT WILL BE REQUIRED FOR ANY ACTIVITY THAT GENERATES A SPARK OR SUFFICIENT HEAT TO CAUSE A COMBUSTION. PERMITS CAN BE OBTAINED THROUGH AM-100 AND
THE WILL ROGERS AIRPORT FIRE DEPARTMENT.
29. ALL WORK INSIDE PANELBOARDS REQUIRES AN OUTAGE. SCHEDULE ALL POWER OUTAGES WITH AMP-400 IN ADVANCE AND OBTAIN PERMISSION IN WRITING.
30. FALL PROTECTION, ROOFS - CONTRACTOR MUST HAVE A FALL PROTECTION PROGRAM: ALL ROOF WORK REPAIRS AND RENOVATIONS MUST, AT A MINIMUM, COMPLY WITH 29 CFR 1926.502, FALL PROTECTION SYSTEMS CRITERIA AND PRACTICES. ROOF WORK IS PROHIBITED BETWEEN THE ROOF EDGE AND WARNING LINE WITHOUT WORKERS BEING PROTECTED BY GUARDRAILS, FALL ARREST, OR FALL RESTRAINT AT THE MMAC. THIS PROHIBITS THE USE OF THE "MONITOR SYSTEM" AS FALL PROTECTION. IAW AC 3900-211 - ALL ROOF WORK IS PROHIBITED WHEN
WINDS ARE A SUSTAINED 23 MPH OR MORE OR WHEN WIND GUSTS EXCEED 35 MPH.
31. FALL PROTECTION, GENERAL - COMPLY WITH OSHA CONSTRUCTION INDUSTRY REQUIREMENTS FOR FALL PROTECTION INCLUDE: 29 CFR 1926.500 SCOPE, APPLICATION AND DEFINITIONS; 29 CFR 1926.501, DUTY TO HAVE FALL PROTECTION; 29 CFR 1926.502, FALL PROTECTION SYSTEMS CRITERIA AND PRACTICES; 29 CFR 1926.503, TRAINING; AND MMAC ORDER AC 3900.21, CHAPTER
10, FALL PROTECTION.
32. ALL OPENING IN PANELBOARDS, RECEPTACLES, JUNCTION BOXES, ETC. SHALL BE EFFECTIVELY CLOSED WITH NO EXPOSED HAZARD SAFETY.
33. CONSTRUCTION MUST MEET OR EXCEED ALL FEDERAL, STATE AND LOCAL REQUIREMENTS. ALL WORK MUST COMPLY WITH THE NEC, NFPA 70 & 70E, AND 29 CFR 1910 SUB PART S.
No. Date Description Issued by Issued designed drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
100% DESIGN SUBMITTAL - FOR CONSTRUCTION
SEAL:
1/ 1/ :2
:1 A
M A u t o d e s k D o c s /1 F A A H a n g a r
R e n o v a t io n s R /1 1_
A R C H H C F .r v t
1/ 1/ :2
:1 A
M A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_
A R C H H C F .r v t
B. BRADDICK
T. AUFRANC
HANGAR 9
GENERAL PROJECT INFORMATION
1550021
MATTCV
11.10.2023
G-003
ABBREVIATIONS
ABA ARCHITECTURAL BARRIERS ACT
ABO ADDITIVE BID OPTION
ACC ACCESSORY
AD AREA DRAIN
ADD ADDENDUM
ADJ ADJACENT
AFF ABOVE FLOOR FINISH
AGGR AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BD BOARD
BG BUMPER GUARD
BL BUILDING LINE
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
BU ROD BACK UP ROD
BUR BUILT-UP ROOF
C TO C CENTER TO CENTER
CBB CONCRETE BACKER BOARD
CEM CEMENT
CER CERAMIC
CF CUBIC FOOT
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CG CORNER GUARD
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG CEILING
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
CT CERAMIC TILE
CTR CENTER
CW CURTAIN WALL
D DEPTH
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DN DOWN
DS DOWN SPOUT
DTL DETAIL
DWG DRAWING
DWGS DRAWINGS
DWLS DOWELS
EA EACH
EIFS EXTERIOR INSULATION FINISH
SYSTEM
EJ EXPANSION JOINT
ELEC ELECTRICAL
EQUIP EQUIPMENT
ESC ESCALATOR
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXP BOLT EXPANSION BOLT
EXT EXTERIOR
FA FIRE ALARM
FAU FORCED AIR UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FHC FIRE HOSE CABINET
FIN FINISH
FIXT FIXTURE
FLASH FLASHING
FLOUR FLOURESCENT
FLR FLOOR
FO FACE OF
FR FIRE RESISTIVE
FT FEET
FTG FOOTING
FVC FIRE VALVE CABINET
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GFRC GLASS FIBER REINFORCED
CONCRETE
GI GALVANIZED IRON
GL GLASS
GND GROUND
GR GRADE
GRG GLASS REINFORCED GYPSUM
GYP GYPSUM
GYP BD GYPSUM BOARD
H HIGH
HB HOSE BIB
HC HOLLOW CORE
HD HEAD
HDW HARDWARE
HM HOLLOW METAL
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
HTR HEATER
ID INSIDE DIAMETER
IN INCH
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
K KIPS (1,000 LB)
KO KNOCK OUT
KP KICK PLATE
KS KNEE SPACE
KSF KIPS PER SQUARE FOOT
L ANGLE
LAM LAMINATE
LAV LAVITORY
LB POUND (WIEGHT)
LF LINEAL FOOT
LG LONG
LIN LINEAR, LINEAL
LL LIVE LOAD
LOC LOCATION
LP LOW POINT
LT LIGHT
LWC LIGHT WEIGHT CONCRETE
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MDO MEDIUM DENSITY OVERLAY
ME MATCH EXISTING
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFIED
MOD BIT MODIFIED BITUMEN
MSL MEAN SEA LEVEL
MTD MOUNTED
MTL METAL
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
O TO O OUTSIDE TO OUTSIDE
OA OVERALL
OC ON CENTER
OFCI OWNER FURNISHED, CONTRACTOR
INSTALLED
OFOI OWNER FURNISHED, OWNER
INSTALLED
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OTS OPEN TO STRUCTURE
OVHD OVERHEAD
PC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PD PLANTER DRAIN
PERF PERFORATED
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POL POLISHED
POLYISO POLYISOCYANURATE
PORT
CEM
PORTLAND CEMENT
PR PAIR
PREFAB PREFABRICATED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTD PAINTED
R RISER, REFRIGERATOR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING BAR
RECP RECEPTABLE
REF REFER OR REFERENCE
REINF REINFORCING
RELOC RELOCATED
REQD REQUIRED
RFVC RECESSED FIRE VALVE CABINET
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
SAB SOUND ATTENUATION BLANKET
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SED STANDARD EMBASSY DESIGN
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SMS SHEET METAL SCREW
SOG SLAB ON GRADE
SP STAND PIPE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUC STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
TC TOP OF CURB
TEL TELEPHONE
TEMP TEMPERATURE
THK THICK
THOLD THRESHOLD
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOSHP TOP OF STEEL HIGH POINT
TOSLP TOP OF STEEL LOW POINT
TOSMP TOP OF STEEL MIDPOINT
TOSTL TOP OF STEEL
TS TUBE STEEL
TW TOP OF WALL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
V VENDING
VAR VARIES
VCT VINYL COMPOSITE TILE
VET VERTICAL
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W WIDTH
W/ WITH
W/O WITHOUT
WD WOOD
WF WIDE FLANGE
WH WATER HEATER
WL WIND LOAD
WP WATERPROOFING
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
No. Date Description Issued by Issued designed drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
100% DESIGN SUBMITTAL - FOR CONSTRUCTION
SEAL:
1/ 1/ :2
:1 A
M A u t o d e s k D o c s /1 F A A H a n g a r
R e n o v a t io n s R /1 1_
A R C H H C F .r v t
1/ 1/ :2
:1 A
M A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_
A R C H H C F .r v t
B. BRADDICK
T. AUFRANC
HANGAR 9
INDEX OF DRAWINGS
1550021
MATTCV
11.10.2023
G-004
SHT No SHEET NAME REV DATE
0000 - GENERAL
G-001 COVER SHEET 0 03/14/25
G-002 GENERAL PROJECT INFORMATION 0 03/14/25
G-003 GENERAL PROJECT INFORMATION 0 03/14/25
G-004 INDEX OF DRAWINGS 0 03/14/25
G-005 CONTRACTOR HAUL ROUTE AND LAY DOWN AREA 0 03/14/25
G-006 PHASING PLAN 0 03/14/25
0000 - GENERAL: 6
02 - GENERAL
G001 LIFE SAFETY CODE ANALYSIS 0 11-10-23
GI002 LIFE SAFETY OCCUPANT LOAD CALCULATIONS 0 11-10-23
GI110 LIFE SAFETY PLAN LEVEL 1 - COMPOSITE 0 11-10-23
GI120 LIFE SAFETY PLAN LEVEL 2 - COMPOSITE 0 11-10-23
GI130 LIFE SAFETY PLAN LEVEL 3 - COMPOSITE 0 11-10-23
02 - GENERAL: 5
04 - ARCHITECTURAL
AD101 LEVEL 1 COMPOSITE DEMOLITION PLAN - FLOORING 0 03/14/25
AD102 LEVEL 2 COMPOSITE DEMOLITION PLAN - FLOORING 0 03/14/25
AD103 LEVEL 3 COMPOSITE DEMOLITION PLAN - FLOORING 0 03/14/25
AD104 LEVEL 1 COMPOSITE DEMOLITION PLAN - CEILINGS 0 03/14/25
AD105 LEVEL 2 COMPOSITE DEMOLITION PLAN - CEILINGS 0 03/14/25
AD106 LEVEL 3 COMPOSITE DEMOLITION PLAN - CEILINGS 0 03/14/25
A-110 LEVEL 1 - COMPOSITE FLOOR PLAN 0 03/14/25
A-111 LEVEL 1 - SECTORS 1 & 2 0 03/14/25
A-112 LEVEL 1 - SECTORS 3 & 4 0 03/14/25
A-120 LEVEL 2 - COMPOSITE FLOOR PLAN 0 03/14/25
A-121 LEVEL 2 - SECTORS 1 & 2 0 03/14/25
A-122 LEVEL 2 - SECTORS 3 & 4 0 03/14/25
A-130 LEVEL 3 - COMPOSITE FLOOR PLAN 0 03/14/25
A-131 LEVEL 3 - SECTORS 1 & 2 0 03/14/25
A-132 LEVEL 3 - SECTORS 3 & 4 0 03/14/25
A-210 LEVEL 1 - COMPOSITE RCP 0 03/14/25
A-211 LEVEL 1 - SECTORS 1 & 2 RCP 0 03/14/25
A-212 LEVEL 1 - SECTORS 3 & 4 RCP 0 03/14/25
A-220 LEVEL 2 - COMPOSITE RCP 0 03/14/25
A-221 LEVEL 2 - SECTORS 1 & 2 RCP 0 03/14/25
A-222 LEVEL 2 - SECTORS 3 & 4 RCP 0 03/14/25
A-230 LEVEL 3 - COMPOSITE RCP 0 03/14/25
A-231 LEVEL 3 - SECTORS 1 & 2 RCP 0 03/14/25
A-232 LEVEL 3 - SECTORS 3 & 4 RCP 0 03/14/25
SHT No SHEET NAME REV DATE
06 - FIRE PROTECTION
FA001 FIRE ALARM LEGEND AND GENERAL NOTES 0 11-10-23
FA110 FIRE ALARM PLAN LEVEL 1 - HANGAR BAY 0 11-10-23
FA111 FIRE ALARM PLAN LEVEL 1 - SECTORS 1 & 2 0 11-10-23
FA112 FIRE ALARM PLAN LEVEL 1 - SECTORS 3 & 4 0 11-10-23
FA121 FIRE ALARM PLAN LEVEL 2 - SECTORS 1 & 2 0 11-10-23
FA122 FIRE ALARM PLAN LEVEL 2 - SECTORS 3 & 4 0 11-10-23
FA131 FIRE ALARM PLAN LEVEL 3 - SECTORS 1 & 2 0 11-10-23
FA132 FIRE ALARM PLAN LEVEL 3 - SECTORS 3 & 4 0 11-10-23
FA600 TYPICAL FIRE ALARM RISER DIAGRAM 0 11-10-23
FA601 TYPICAL FIRE ALARM INPUT / OUTPUT MATRIX 0 11-10-23
FX001 FIRE SUPPRESSION GENERAL NOTES AND LEGEND 0 11-10-23
FX110 FIRE SUPPRESSION PLAN LEVEL 1 - COMPOSITE 0 11-10-23
FX120 FIRE SUPPRESSION PLAN LEVEL 2 - COMPOSITE 0 11-10-23
FX130 FIRE SUPPRESSION PLAN LEVEL 3 - COMPOSITE 0 11-10-23
06 - FIRE PROTECTION: 14
07 - PLUMBING
P-001 LEGEND AND ABBREVATIONS 0 01-24-24
PD110 PLUMBING DEMO 0 01-24-24
PD120 PLUMBING DEMO 0 01-24-24
PD130 PLUMBING DEMO 0 01-24-24
PD411 ENLARGED PLUMBING DEMOLITION - SECTOR 1 AND 2 0 01-24-24
PD412 ENLARGED PLUMBING DEMOLITION - SECTOR 3 AND 4 0 01-24-24
PD421 ENLARGED PLUMBING DEMOLITION - SECTOR 2 0 01-24-24
PD422 ENLARGED PLUMBING DEMOLITION - SECTOR 3 AND 4 0 01-24-24
PD431 ENLARGED PLUMBING DEMOLITION - SECTOR 1 AND 2 0 01-24-24
PD432 ENLARGED PLUMBING DEMOLITION - SECTOR 3 AND 4 0 01-24-24
P-110 PLUMBING OVERALL 0 01-24-24
P-120 PLUMBING OVERALL 0 01-24-24
P-130 PLUMBING OVERALL 0 01-24-24
P-411 LEVEL 1 - ENLARGED PLUMBING DRAWINGS - SECTOR 1 AND 2 0 01-24-24
P-412 LEVEL 1 - ENLARGED PLUMBING DRAWINGS - SECTOR 3 AND 4 0 01-24-24
P-421 LEVEL 2 - ENLARGED PLUMBING DRAWINGS - SECTOR 1 AND 2 0 01-24-24
P-422 LEVEL 2 - ENLARGED PLUMBING DRAWINGS - SECTOR 3 AND 4 0 01-24-24
P-431 LEVEL 3 - ENLARGED PLUMBING DRAWINGS - SECTOR 1 AND 2 0 01-24-24
P-432 LEVEL 3 - ENLARGED PLUMBING DRAWINGS - SECTOR 3 AND 4 0 01-24-24
P-501 PLUMBING DETAILS 0 01-24-24
P-601 PLUMBING SCHEDULES 0 01-24-24
P-901 DOMESTIC WATER ISOMETRICS - SECTOR 1 AND 2 0 01-24-24
P-902 DOMESTIC WATER ISOMETRICS - SECTOR 3 AND 4 0 01-24-24
P-903 SANITARY AND VENT ISOMETRICS - SECTOR 1 AND 2 0 01-24-24
P-904 SANITARY AND VENT ISOMETRICS - SECTOR 3 AND 4 0 01-24-24
SHT No SHEET NAME REV DATE
07 - PLUMBING: 25
10 - MECHANICAL
M-001 LEGEND AND ABBREVIATIONS 0 01-24-24
M-110 MECHANICAL OVERALL 0 01-24-24
M-111 LEVEL 1 - MECHANICAL PLAN - SECTORS 1 AND 2 0 01-24-24
M-112 LEVEL 1 - MECHANICAL PLAN - SECTORS 3 AND 4 0 01-24-24
M-120 MECHANICAL OVERALL 0 01-24-24
M-121 LEVEL 2 - MECHANICAL PLAN - SECTORS 1 AND 2 0 01-24-24
M-122 LEVEL 2 - MECHANICAL PLAN - SECTORS 3 AND 4 0 01-24-24
M-130 MECHANICAL OVERALL 0 01-24-24
M-131 LEVEL 3 - MECHANICAL PLAN - SECTORS 1 AND 2 0 01-24-24
M-132 LEVEL 3 - MECHANICAL PLAN - SECTORS 3 AND 4 0 01-24-24
M-401 LEVEL 3 - MECHANICAL ENLARGED SECTOR 3 AND 4 0 01-24-24
M-601 MECHANICAL SCHEDULES 0 01-24-24
10 - MECHANICAL: 12
1500 - ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS 0 11/10/23
ED111 LEVEL 1 - LIGHTING DEMOLITION PLANS 0 11/10/23
ED112 LEVEL 1 - LIGHTING DEMOLITION PLANS 0 11/10/23
ED211 LEVEL 2 - LIGHTING DEMOLITION PLANS 0 11/10/23
ED212 LEVEL 2 - LIGHTING DEMOLITION PLANS 0 11/10/23
ED311 LEVEL 3 - LIGHTING DEMOLITION PLANS 0 11/10/23
ED312 LEVEL 3 - LIGHTING DEMOLITION PLANS 0 11/10/23
ED313 LEVEL 3 - DEMOLITION POWER PLAN 0 11/10/23
EL111 LEVEL 1 - LIGHTING PLAN 0 11/10/23
EL112 LEVEL 1 - LIGHTING PLAN 0 11/10/23
EL211 LEVEL 2 - LIGHTING PLAN 0 11/10/23
EL212 LEVEL 2 - LIGHTING PLAN 0 11/10/23
EL311 LEVEL 3 - LIGHTING PLAN 0 11/10/23
EL312 LEVEL 3 - LIGHTING PLAN 0 11/10/23
EP110 ENLARGED POWER PLANS LEVEL 1 0 11/10/23
EP210 ENLARGED POWER PLANS LEVEL 2 0 11/10/23
EP310 ENLARGED POWER PLANS LEVEL 3 0 11/10/23
E-601 ELECTRICAL PARTIAL ONE-LINE & LIGHTING CONTROLS 0 11/10/23
E-602 INVERTER PANEL SCHEDULES 0 11/10/23
1500 - ELECTRICAL: 19
Grand total: 150
SHT No SHEET NAME REV DATE
A-301 BUILDING SECTIONS 0 03/14/25
A-302 BUILDING SECTIONS 0 03/14/25
A-303 BUILDING SECTIONS 0 03/14/25
A-401 ENLARGED PLANS - 104E, 224E 0 03/14/25
A-402 ENLARGED PLANS - 143E 0 03/14/25
A-403 ENLARGED PLANS - 107W, 106W, 115W 0 03/14/25
A-404 ENLARGED PLANS - 215E, 218E 0 03/14/25
A-405 ENLARGED PLANS - 215E, 218E 0 03/14/25
A-406 ENLARGED PLANS - 214W, 215W 0 03/14/25
A-407 ENLARGED PLANS - 305E, 311E, 313E 0 03/14/25
A-408 ENLARGED PLANS - 305E, 311E, 313E 0 03/14/25
A-409 ENLARGED PLANS - 328E 0 03/14/25
A-410 ENLARGED PLANS - 303W, 304W 0 03/14/25
A-411 ENLARGED PLANS - 313W, 315W 0 03/14/25
A-412 ENLARGED PLANS 0 03/14/25
A-413 ENLARGED PLANS 0 03/14/25
A-420 INTERIOR ELEVATIONS 0 03/14/25
A-421 INTERIOR ELEVATIONS 0 03/14/25
A-422 INTERIOR ELEVATIONS 0 03/14/25
A-423 INTERIOR ELEVATIONS 0 03/14/25
A-424 INTERIOR ELEVATIONS 0 03/14/25
A-425 INTERIOR ELEVATIONS 0 03/14/25
A-501 DETAILS 0 03/14/25
A-601 PARTITION TYPES 0 03/14/25
A-602 PARTITION TYPES 0 03/14/25
A-603 DOOR SCHEDULE/DETAILS 0 03/14/25
04 - ARCHITECTURAL: 50
05 - INTERIORS
I-111 LEVEL 1 FINISH PLAN - SECTORS 1 & 2 0 03/14/25
I-112 LEVEL 1 FINISH PLAN - SECTORS 3 & 4 0 03/14/25
I-121 LEVEL 2 FINISH PLAN - SECTORS 1 & 2 0 03/14/25
I-122 LEVEL 2 FINISH PLAN - SECTORS 3 & 4 0 03/14/25
I-131 LEVEL 3 FINISH PLAN - SECTORS 1 & 2 0 03/14/25
I-132 LEVEL 3 FINISH PLAN - SECTORS 3 & 4 0 03/14/25
IG531 SIGNAGE DETAILS 0 03/14/25
I-400 ENLARGED PLANS & ELEVATIONS 0 03/14/25
I-401 ENLARGED PLANS & ELEVATIONS 0 03/14/25
I-402 ENLARGED PLANS & ELEVATIONS 0 03/14/25
I-403 ENLARGED PLANS & ELEVATIONS 0 03/14/25
I-404 ENLARGED PLANS & ELEVATIONS 0 03/14/25
I-405 ENLARGED PLANS & ELEVATIONS 0 03/14/25
I-406 ENLARGED PLANS & ELEVATIONS 0 03/14/25
I-407 ENLARGED PLANS & ELEVATIONS 0 03/14/25
I-408 MILLWORK DETAILS 0 03/14/25
IN601 ROOM FINISH SCHEDULE - LEVELS 1 & 2 0 03/14/25
IN602 ROOM FINISH SCHEDULE - LEVEL 3 0 03/14/25
IN603 MATERIALS & FINISH LEGEND 0 03/14/25
05 - INTERIORS: 19
No. Date Description Issued by Issued
PROJECT LOCATION:
HANGAR 9 (BLDG. #10)
CONTRACTOR LAY DOWN
AREA AND JOB TRAILER
LOCATION
CONTRACTOR LAY DOWN
AREA AND JOB TRAILER
LOCATION
REGINA AVE.
S. MACARTHUR BLVD.
EXIT OUT THIS GATE
ENTER IN THIS GATE
S.W. 74TH STREET
HAUL ROUTE
S.W. 69TH STREET
GATE 16 -
CONSTRUCTION VEHICLE
ENTRANCE -
COORDINATE WITH FAA
GATE 16 -
CONSTRUCTION VEHICLE
ENTRANCE -
COORDINATE WITH FAA
S. DUKE AVE.
S. DUKE AVE.
GATE 3 - PERSONNEL
Drawing No. AMP - 400 -lead or pm designed drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
100% DESIGN SUBMITTAL - FOR CONSTRUCTION
SEAL:
1/ 1/ :2
:1 A
M A u t o d e s k D o c s /1 F A A H a n g a r
R e n o v a t io n s R /1 1_
A R C H H C F .r v t
1/ 1/ :2
:1 A
M A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_
A R C H H C F .r v t
B. BRADDICK
T. AUFRANC
HANGAR 9
CONTRACTOR HAUL ROUTE AND LAY DOWN AREA
1550021
MATTCV
11.10.2023
G-005
12" = 1'-0"1
CONTRACTOR HAUL ROUTE
NOT TO SCALE
N
No. Date Description Issued by Issued
PHASE 1
FAA CAMPUS (CONTROLLED AREA) FLIGHTLINE (SECURED AREA)
PHASE 2
HANGAR 9
CONTRACTOR HAUL
ROUTE - SEE G-005
HANGAR 8
JOB TRAILER LOCATION
WITHIN LAY DOWN AREA
CONTRACTOR
LAY DOWN AREA
GATE 16 - CONSTRUCTION
VEHICLE ENTRANCE -
COORDINATE WITH FAA
GATE 3 - PERSONNEL GATE
DASHED LINES INDICATES
PORTA-JOHN STAGING
AREA.
Drawing No. AMP - 400 -lead or pm designed drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
100% DESIGN SUBMITTAL - FOR CONSTRUCTION
SEAL:
1/ 1/ :2
:1 A
M A u t o d e s k D o c s /1 F A A H a n g a r
R e n o v a t io n s R /1 1_
A R C H H C F .r v t
1/ 1/ :2
:1 A
M A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_
A R C H H C F .r v t
B. BRADDICK
T. AUFRANC
HANGAR 9
PHASING PLAN
1550021
MATTCV
11.10.2023
G-006
1" = 80'-0"1
PHASING PLAN
0 40' 80' 160'
N
NOTES:
1. CONTRACTOR SHALL BE ALLOWED TO
UTILIZE 1/2 OF THEHANGAR BAY FOR
CONSTRUCTION STAGING AND LAY
DOWN PER CORRESPONDING PHASE.
ANY DAMAGE OCCURING DURING LAY
DOWN SHALL BE REPAIRED BY THE
CONTRACTOR.
2. RE-STRIPING OF THE HANGAR BAY
FLOORS, FIRE SEALING OF THE WALL
PENETRATIONS, REPAINTING THE
HANGAR BAY WALLS AND ALL OTHER
WORK CONCERNING THE HANGAR BAY
SHALL OCCUR ON 1/2 OF EACH
SECTION OF HANGAR BAY DURING THE
PHASE INDICATED.
3. PHASES INDICATED ARE FOR
GRAPHICAL PURPOSES ONLY, THE FAA
RESERVES THE RIGHT TO SPECIFY
WHICH HALF OF THE HANGAR SHALL
RECEIVE WORK FIRST AND SECOND.
CONTRACTOR SHALL CONFIRM WITH
THE FAA BEFORE STARTING WORK.
4. INDICATED PHASES INCLUDE 1/2 OF
THE HANGAR BAY AND CLEAN ACCESS
TO ALL ASSOCIATED FLOORS THEREIN.
No. Date Description Issued by Issued
APPLICABLE CODES AND STANDARDS
• IBC 2015 - INTERNATIONAL BUILDING CODE, 2015
• IFC 2015 - INTERNATIONAL FIRE CODE, 2015
• IMC 2015 – INTERNATIONAL MECHANICAL CODE, 2015
• IEBC 2015 – INTERNATIONAL EXISTING BUILDING CODE, 2015
• NFPA 13 – STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS – 2022 EDITION
• NFPA 70 – NATIONAL ELECTRICAL CODE – 2020 EDITION
• NFPA 72 – NATIONAL FIRE ALARM AND SIGNALING CODE – 2022 EDITION
• NFPA 101 – LIFE SAFETY CODE – 2021 EDITION
CLASSIFICATION OF WORK
SCOPE OF WORK TO INCLUDE THE RENOVATION OF RESTROOMS, REPLACEMENT OF LIGHTING FIXTURES, REPLACEMENT OF EXIT SIGNS, AND HVAC UPGRADES THROUGHOUT THE FACILITY. THE WORK SHALL COMPLY WITH THE REQUIREMENTS FOR A LEVEL 2 ALTERATION (IEBC §504.1). ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS AND SPACES SHALL COMPLY WITH THE REQUIREMENTS OF THE IBC (IEBC §801.3).
OCCUPANCY CLASSIFICATION
THE BUILDING IS A NON-SEPARATED MIXED USE OF:
• BUSINESS, GROUP B [IBC §304.1]
• MODERATE-HAZARD STORAGE, GROUP S-1 [IBC §311.2]
• MODERATE-HAZARD FACTORY INDUSTRIAL, GROUP F-1 [IBC §306.2]
CONSTRUCTION TYPE
THE BUILDING IS TYPE IIB (NON-FIRE-RESISTANCE RATED, NON-COMBUSTIBLE CONSTRUCTION) [IBC §602.2].
FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS OF TYPE IIB CONSTRUCTION [IBC TABLES 601 AND 602]:
STRUCTURAL FRAME (INCLUDING COLUMNS, GIRDERS, AND TRUSSES) 0-HR
BEARING WALLS
EXTERIOR WALLS WITH FIRE SEPARATION DISTANCE >30 FT 0-HR
INTERIOR WALLS 0-HR
NONBEARING WALLS
EXTERIOR WALLS WITH FIRE SEPARATION DISTANCE >30 FT 0-HR
INTERIOR WALLS 0-HR
FLOOR CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS) 0-HR
ROOF CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS) 0-HR
BUILDING SEPARATION
THE BUILDING HAS A FIRE SEPARATION DISTANCE OF AT LEAST 30 FT ON ALL SIDES OF THE BUILDING.
FRONTAGE CALCULATION, IF:
PERIMETER: 862 FT; FRONTAGE WITH FSD OF 30 FT OR MORE: 1,117 FT
IF = [(F/P) -0.25](W/30) = [(1,117 FT/1,117 FT) -0.25](30 FT/30 FT) = 0.75 = 75%
MAXIMUM ALLOWABLE AREA AND HEIGHT
BASED ON NONSEPARATED MIXED USE OF S-1, F-1 AND B IBC §508.3
MAX STORIES: 3 ALLOWED / 3 ACTUAL IBC TABLE 504.4
MAX FEET: 75 FT ALLOWED / 71 FT ACTUAL IBC TABLE 504.3
OCCUPANCY BASE AREA (SQ. FT.) FRONTAGE INCREASE ( SQ. FT.) ALLOWABLE AREA PER FLOOR
(SQ. FT.)
S-1 52,500 17,500 X 75% = 13,125 65,625 F-1 46,500 15,500 X 75% = 11,625 58,125 B 69,000 23,000 X 75% = 17,250 86,250
ACTUAL FIRST FLOOR AREA: 79,099 SQ. FT.
ACTUAL SECOND FLOOR AREA: 27,574 SQ. FT.
ACTUAL THIRD FLOOR AREA: 27,557 SQ. FT.
TOTAL BUILDING AREA IS 134,230 SQ. FT.
CURRENT AREA ALLOWANCES ARE EXCEEDED PER OCCUPANCY, THIS INFORMATION IS PROVIDED FOR
REFERENCE ONLY, LEVEL 2 ALTERATION DOES NOT REQUIRE THIS TO BE UPGRADED TO BE COMPLIANT WITH
NEW CODES.
FIRE-RESISTANCE RATED SEPARATIONS
ITEM SEPARATION REQUIRED REFERENCE
INTERIOR EXIT STAIR 1-HR FIRE BARRIER IBC §1023.2
EXTERIOR EXIT STAIRS 1-HR FIRE BARRIER* IBC §1027.6, IBC §1023.2
HANGAR BAY TO SUPPORT SPACES 1-HR FIRE BARRIER
*EXTERIOR OR OUTSIDE STAIRS ARE PERMITTED TO BE UNPROTECTED FOR EXISTING OUTSIDE STAIRS SERVING THREE OR FEWER ADJACENT STORIES, INCLUDING THE STORY WHERE THE EXIT DISCHARGES, WHERE THERE IS
A REMOTELY LOCATED SECOND EXIT PER NFPA 101 §7.2.2.6.3.1(3).
THE SUPPORTING CONSTRUCTION FOR A FIRE BARRIER SHALL BE PROTECTED TO AFFORD THE REQUIRED FIRE-
RESISTANCE RATING OF THE FIRE BARRIER SUPPORTED [IBC §707.5.1].
OPENING PROTECTION
TYPE OF ASSEMBLY FIRE DOOR FIRE DAMPER SMOKE DAMPER
AND RATING ASSEMBLY RATING RATING RATING REFERENCES
1 HR FIRE BARRIER 1 HR 1.5 HR CLASS I OR CLASS II IBC TABLE 716.5, IBC §
717.5.2
PENETRATIONS
THROUGH PENETRATIONS SHALL BE PROTECTED BY AN APPROVED PENETRATION FIRESTOP SYSTEM, INSTALLED AS TESTED, IN ACCORDANCE WITH ASTM E814 OR UL 1479, WITH A MINIMUM POSITIVE PRESSURE DIFFERENTIAL OF 0.01 INCH OF WATER AND AN F RATING OF NOT LESS THAN THE REQUIRED FIRE-RESISTANCE RATING OF ASSEMBLY
PENETRATED [IBC §714.4.1.2].
EXISTING PENETRATIONS BETWEEN HANGAR BAY AND SUPPORT AREA TO BE FIRESTOPPED AS DESCRIBED ABOVE.
INTERIOR FINISHES
INTERIOR WALL AND CEILING FINISH MATERIALS ARE CLASSIFIED FOR FLAME SPREAD AND SMOKE DEVELOPMENT IN ACCORDANCE WITH ASTM E84 OR ANSI/UL 723 [IBC §803.1.1]. MATERIALS ARE CLASSIFIED AS FOLLOWS IN
ACCORDANCE WITH THEIR FLAME SPREAD AND SMOKE DEVELOPMENT INDEX:
• CLASS A INTERIOR WALL AND CEILING FINISH IS CHARACTERIZED BY THE FOLLOWING: FLAME SPREAD INDEX, 0-25; SMOKE DEVELOPED INDEX, 0-450
• CLASS B INTERIOR WALL AND CEILING FINISH IS CHARACTERIZED BY THE FOLLOWING: FLAME SPREAD INDEX, 26-75; SMOKE DEVELOPED INDEX, 0-450
• CLASS C INTERIOR WALL AND CEILING FINISH IS CHARACTERIZED BY THE FOLLOWING: FLAME SPREAD INDEX, 76-200; SMOKE DEVELOPED INDEX, 0-450
THE REQUIRED INTERIOR WALL AND CEILING FINISH IS AS FOLLOWS [IBC TABLE 803.13]:
INTERIOR WALL AND CEILING FINISH IN EXITS CLASS A
INTERIOR WALL AND CEILING FINISH IN EXIT ACCESS CLASS B
INTERIOR WALL AND CEILING FINISH IN ALL OTHER AREAS CLASS A, B OR C
INTERIOR FLOOR FINISHES SHALL BE CLASSIFIED FOR CRITICAL RADIANT FLUX IN ACCORDANCE WITH NFPA 253 OR
ASTM E648 [IBC §804.2]. MATERIALS ARE CLASSIFIED AS FOLLOWS:
• CLASS I INTERIOR FLOOR FINISH SHALL HAVE A CRITICAL RADIANT FLUX OF NOT LESS THAN 0.45 W/CM2
• CLASS II INTERIOR FLOOR FINISH SHALL HAVE A CRITICAL RADIANT FLUX OF NOT LESS THAN 0.22 W/CM2, BUT
LESS THAN 0.45 W/CM2
GROUP B, S AND F OCCUPANCIES REQUIRE CLASS II INTERIOR FLOOR FINISHES [IBC §804.4.2].
WATER SUPPLY
HANGAR 9 SUPPLIED BY FIRE PUMP.
FIRE SUPPRESSION
THE BUILDING IS EQUIPPED WITH AN EXISTING WET SPRINKLER SYSTEM. EXTENT OF WORK FOR THIS ALTERATION WILL ONLY INVOLVE THE MODIFICATION AND ADDITION OF SPRINKLERS TO ACCOMODATE ANY NEW ROOM OR AREA
CONFIGURATIONS. REFER TO FX SERIES SHEETS.
STANDPIPE SYSTEM
THE BUILDING IS EQUIPPED WITH AN EXISTING STANDPIPE SYSTEM. NO WORK WILL INVOLVE THE EXISTING
STANDPIPE SYSTEM IN THIS ALTERATION.
FIRE ALARM
THE BUILDING IS EQUIPPED WITH AN EXISTING FIRE ALARM SYSTEM. EXTENT OF WORK FOR THIS ALTERATION WILL ONLY INVOLVE THE MODIFICATION AND ADDITION OF NOTIFICATION DEVICES TO ACCOMODATE ANY NEW ROOM OR
AREA CONFIGURATIONS. REFER TO THE FA SERIES SHEETS.
PORTABLE FIRE EXTINGUISHERS
EXISTING FIRE EXTINGUISHERS ARE PROVIDED THROUGHOUT THE FACILITY AND MEET COVERAGE AND DISTANCE
REQUIREMENTS.
MEANS OF EGRESS
GENERAL
THE MEANS OF EGRESS SHALL COMPLY WITH THE REQUIREMENTS OF IEBC, EXCEPT WHERE THE WORK AREA AND
THE MEANS OF EGRESS SERVING IT COMPLIES WITH NFPA 101 (IEBC §805.2).
THE PATH OF EGRESS TRAVEL ALONG A MEANS OF EGRESS SHALL NOT BE INTERRUPTED BY A BUILDING ELEMENT OTHER THAN A MEANS OF EGRESS COMPONENT AS SPECIFIED IN THE FBC. OBSTRUCTIONS SHALL NOT BE PLACED IN THE MINIMUM WIDTH OR REQUIRED CAPACITY OF A MEANS OF EGRESS COMPONENT EXCEPT PROJECTIONS PERMITTED BY THE FBC. THE MINIMUM WIDTH OR REQUIRED CAPACITY OF A MEANS OF EGRESS SYSTEM SHALL NOT
BE DIMINISHED ALONG THE PATH OF EGRESS TRAVEL. [IBC §1003.6]
OCCUPANT LOAD
THE OCCUPANCY LOADS ARE DETERMINED BASED ON THE AREA, FUNCTION OF THE SPACE, AND THE OCCUPANT LOAD FACTOR (SQ. FT. /PERSON). THE OCCUPANT LOAD FACTORS ARE PROVIDED IN FBC TABLE 1004.5. THE OCCUPANT LOAD FACTOR IS BASED ON THE ACTUAL USE OF THE SPACE, NOT ON ITS OCCUPANCY CLASSIFICATION.
OCCUPANT LOAD CALCULATIONS ARE PROVIDED ON THE GI SERIES LIFE SAFETY PLANS FOR CONFIRMATION OF
REQUIRED NUMBER OF EXITS.
TRAVEL DISTANCE, COMMON PATH AND DEAD END LIMITS
EXIT ACCESS TRAVEL DISTANCE SHALL BE MEASURED FROM THE MOST REMOTE POINT WITHIN A STORY ALONG THE NATURAL AND UNOBSTRUCTED PATH OF HORIZONTAL AND VERTICAL EGRESS TRAVEL TO THE ENTRANCE TO AN EXIT [IBC § 1017.3]. TRAVEL DISTANCES SHOWN ON GI SERIES SHEETS FOR CONFIRMATION OF COMPLIANCE WITH
ALTERATIONS TO RESTROOMS.
TRAVEL DISTANCE LIMIT: IBC TABLE 1017.2 & NFPA 101 TABLE A.7.6
B OCCUPANCY: 300 FEET
F-1 OCCUPANCY: 250 FEET
S-1 OCCUPANCY: 250 FEET
COMMON PATH LIMIT: IBC TABLE 1006.2.1 & NFPA 101 TABLE A.7.6
B OCCUPANCY: 100 FEET
F-1 OCCUPANCY: 100 FEET
S-1 OCCUPANCY: 100 FEET
DEAD-END LIMIT: IBC §1020.4 & NFPA 101 TABLE A.7.6
B OCCUPANCY: 50 FEET
F-1 OCCUPANCY: 50 FEET
S-1 OCCUPANCY: 50 FEET
MEANS OF EGRESS REQUIREMENTS CONTINUED
NUMBER AND ARRANGEMENT OF EXITS/EXIT ACCESS
THE NUMBER OF EXIT OR EXIT ACCESS DOORWAYS REQUIRED IS AS FOLLOWS:
• A SINGLE MEANS OF EGRESS IS PERMITTED FROM A F-1 OCCUPANCY IF THE AREA HAS A CALCULATED OCCUPANT
LOAD OF 49 OR LESS AND A MAXIMUM TRAVEL DISTANCE OF 75 FT [IBC TABLE 1006.2.1].
• A SINGLE MEANS OF EGRESS IS PERMITTED FROM A B OCCUPANCY IF THE AREA HAS A CALCULATED OCCUPANT
LOAD OF 49 OR LESS AND A MAXIMUM TRAVEL DISTANCE OF 75 FT IS SERVING AN OCCUPANT LOAD MORE THAN 30 PEOPLE AND 100 FT IF SERVING AN OCCUPANT LOAD OF 30 PEOPLE OR LESS [IBC TABLE 1006.2.1].
• TWO EXITS OR EXIT ACCESS DOORWAYS ARE REQUIRED FROM EACH AREA WITH AN OCCUPANT LOAD OF 500 OR
LESS [IBC §1006.2.1].
THE MINIMUM SEPARATION DISTANCE BETWEEN TWO EXITS, EXIT ACCESSES, OR EXIT DISCHARGES SHALL BE NO LESS THAN ONE-THIRD THE LENGTH OF THE MAXIMUM OVERALL DIAGONAL DIMENSION OF THE BUILDING OR AREA
TO BE SERVED, IN FULLY SPRINKLERED BUILDINGS [IBC §1007.1.1(2)].
EGRESS THROUGH INTERVENING SPACES SHALL COMPLY WITH THE FOLLOWING [IBC §1016.2]:
• EGRESS FROM A ROOM OR SPACE SHALL NOT PASS THROUGH ADJOINING OR INTERVENING ROOMS OR AREAS, EXCEPT WHERE SUCH ADJOINING ROOMS OR AREAS AND THE AREA SERVED ARE ACCESSORY TO ONE OR THE OTHER, ARE NOT A GROUP H OCCUPANCY AND PROVIDE A DISCERNIBLE PATH OF EGRESS TRAVEL TO AN EXIT.
• EXCEPTION: MEANS OF EGRESS ARE NOT PROHIBITED THROUGH ADJOINING OR INTERVENING ROOMS OR
SPACES IN A GROUP F OCCUPANCY WHERE THE ADJOINING OR INTERVENING ROOMS OR SPACES ARE THE
SAME OR A LESSER HAZARD OCCUPANCY GROUP.
• AN EXIT ACCESS SHALL NOT PASS THROUGH A ROOM THAT CAN BE LOCKED TO PREVENT EGRESS.
• EGRESS SHALL NOT PASS THROUGH KITCHENS, STORAGE ROOMS, CLOSETS OR SPACES USED FOR SIMILAR
PURPOSES.
ANY DOOR, PASSAGE, OR STAIRWAY THAT IS NEITHER AN EXIT NOR A WAY OF EXIT ACCESS AND THAT IS LOCATED OR ARRANGED SO THAT IT IS LIKELY TO BE MISTAKEN FOR AN EXIT SHALL BE IDENTIFIED BY A SIGN THAT READS “NO EXIT”. [FFPC:NFPA 101 §7.10.8.3.1] THE NO EXIT SIGN SHALL HAVE THE WORD “NO” IN LETTERS 2 INCH HIGH, WITH A STROKE WIDTH OF 3∕8 INCH, AND THE WORD “EXIT” IN LETTERS 1 INCH HIGH, WITH THE WORD “EXIT” BELOW THE
WORD “NO”. [NFPA 101 §7.10.8.3.2]
MEANS OF EGRESS COMPONENTS AND CLEAR WIDTH
MEANS OF EGRESS DOORS SHALL BE READILY DISTINGUISHABLE FROM THE ADJACENT CONSTRUCTION AND FINISHES SUCH THAT THE DOORS ARE EASILY RECOGNIZABLE AS DOORS. MIRRORS OR SIMILAR REFLECTING MATERIALS SHALL NOT BE USED ON MEANS OF EGRESS DOORS. MEANS OF EGRESS DOORS SHALL NOT BE
CONCEALED BY CURTAINS, DRAPES, DECORATIONS, OR SIMILAR MATERIALS. [IBC §1010.1]
THE REQUIRED CAPACITY OF EACH DOOR OPENING SHALL BE SUFFICIENT FOR THE OCCUPANT LOAD THEREOF AND SHALL PROVIDE A MINIMUM CLEAR WIDTH OF 32 INCHES. CLEAR OPENINGS OF DOORWAYS WITH SWINGING DOORS SHALL BE MEASURED BETWEEN THE FACE OF THE DOOR AND THE STOP, WITH THE DOOR OPEN 90 DEGREES.
WHERE A DOOR OPENING INCLUDES TWO DOOR LEAVES WITHOUT A MULLION, ONE LEAF SHALL PROVIDE A CLEAR OPENING WIDTH OF 32 INCHES. THE MAXIMUM WIDTH OF A SWINGING DOOR LEAF SHALL BE 48 INCHES NOMINAL.
THE HEIGHT OF DOOR OPENINGS SHALL BE NOT LESS THAN 80 INCHES. [IBC §1010.1.1]
THERE SHALL NOT BE PROJECTIONS INTO THE REQUIRED CLEAR WIDTH OF A DOOR OPENING LOWER THAN 34 INCHES ABOVE THE FLOOR OR GROUND. PROJECTIONS INTO THE CLEAR OPENING WIDTH BETWEEN 34 INCHES AND 80 INCHES ABOVE THE FLOOR OR GROUND SHALL NOT EXCEED 4 INCHES. DOOR CLOSERS AND DOORSTOPS SHALL
BE PERMITTED TO BE 78 INCHES MINIMUM ABOVE THE FLOOR. [IBC §1010.1.1.1]
EGRESS DOORS SHALL BE OF THE PIVOTED OR SIDE-HINGED SWINGING TYPE AND SHALL SWING IN THE DIRECTION OF EGRESS TRAVEL WHERE SERVING A ROOM OR AREA CONTAINING AN OCCUPANT LOAD OF 50 OR MORE PERSONS, AN EXIT ENCLOSURES OR A GROUP H OCCUPANCY/ HIGH-HAZARD CONTENTS AREA [IBC §1010.1.2].
EXIT CAPACITY
THE EGRESS/EXIT CAPACITY FOR AN EXIT IS DETERMINED BY DIVIDING THE CLEAR WIDTH OF THE EXIT COMPONENT
BY THE EGRESS CAPACITY FACTOR.
EGRESS CAPACITY FACTORS: IBC §1005.3.1
STAIRWAYS: 0.3 INCHES PER OCCUPANT SERVED
LEVEL COMPONENTS & RAMPS: 0.2 INCHES PER OCCUPANT SERVED
EXIT CAPACITY CALCULATIONS ARE SHOWN ON THE LIFE SAFETY PLANS.
MEANS OF EGRESS ILLUMINATION
ILLUMINATION OF MEANS OF EGRESS PROVIDED IN ACCORDANCE WITH IBC §1008.2 [IBC §1008.1]. ILLUMINATION PROVIDED OUTSIDE THE BUILDING SHOULD BE TO EITHER A PUBLIC WAY OR A DISTANCE AWAY FROM THE BUILDING
THAT IS CONSIDERED SAFE, WHICHEVER IS CLOSEST TO THE BUILDING BEING EVACUATED.
FLOORS AND OTHER WALKING SURFACES WITHIN AN EXIT OR WITHIN PORTIONS OF THE EXIT ACCESS AND EXIT DISCHARGE ARE PROVIDED WITH A MINIMUM ILLUMINATION OF 1 FOOT-CANDLE (FTC; 10.8 LUX) MEASURED AT THE
FLOOR [IBC §1008.2.1].
EMERGENCY LIGHTING
EMERGENCY LIGHTING PROVIDED FOR MEANS OF EGRESS IN ACCORDANCE WITH THE IBC.
EMERGENCY ILLUMINATION IS PROVIDED FOR A MINIMUM OF 1.5 HOURS IN THE EVENT OF FAILURE OF NORMAL LIGHTING [IBC §1008.3.4]. EMERGENCY LIGHTING FACILITIES ARE ARRANGED TO PROVIDE INITIAL ILLUMINATION THAT IS NO LESS THAN AN AVERAGE OF 1 FTC (10.8 LUX) AND, AT ANY POINT, NO LESS THAN 0.1 FTC (1.1 LUX), MEASURED
ALONG THE PATH OF EGRESS AT FLOOR LEVEL [IBC §1008.3.5].
MEANS OF EGRESS REQUIREMENTS CONTINUED
MARKING OF MEANS OF EGRESS
MARKING OF MEANS OF EGRESS SHALL BE IN ACCORDANCE WITH THE IBC. EXIT SIGNS INDICATING THE DIRECTION OF EGRESS WILL BE PROVIDED IN ACCORDANCE WITH NFPA 101 AND FBC §1013. EXIT SIGNS WILL BE PLACED AT ALL EXIT DOORS [IBC §1013.1]. HORIZONTAL COMPONENTS OF THE EGRESS PATH ARE MARKED BY APPROVED EXIT OR DIRECTIONAL EXIT SIGNS WHERE THE CONTINUATION OF THE EGRESS PATH IS NOT OBVIOUS [IBC §1013.1]. EXIT SIGNS ARE PLACED SO THAT NO POINT IN AN EXIT ACCESS CORRIDOR EXCEEDS THE RATED VIEWING DISTANCE OR 100 FT, WHICHEVER IS LESS, FROM THE NEAREST SIGN [IBC §1013.1].
THE FACE OF AN EXIT SIGN ILLUMINATED FROM AN EXTERNAL SOURCE SHALL HAVE AN INTENSITY OF NOT LESS THAN 5 FOOTCANDLES (54 LUX) AND SHALL HAVE A CONTRAST RATIO OF NOT LESS THAN 0.5 [IBC § 1013.6.2].
EXIT SIGNS SHALL BE ILLUMINATED AT ALL TIMES. TO ENSURE CONTINUED ILLUMINATION FOR A DURATION OF NOT LESS THAN 90 MINUTES IN CASE OF PRIMARY POWER LOSS, THE SIGN ILLUMINATION MEANS SHALL
BE CONNECTED TO AN EMERGENCY POWER SYSTEM PROVIDED FROM STORAGE BATTERIES, UNIT
EQUIPMENT OR AN ON-SITE GENERATOR [IBC §1013.6.3].
Drawing No. AMP - 400 -lead or pm designed drawn approved by
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
ISSUED BY
OFFICE OF
facility management amp − 400 drawn d r a w in g N a m e d r a w in g N a m e
100% DESIGN SUBMITTAL - FOR CONSTRUCTION
SEAL:
10/25/23
1/ /2
:3 :2
P
M A u t o d e s k D o c s /1 F A A H a n g a r
R e n o v a t io n s R /1 1_
F
IR
E H R V T .r v t
1/ /2
:3 :2
P
M A u t o d e s k D o c s /1 F A A H a n g a r R e n o v a t io n s R /1 1_
F
IR
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .