6973GH-25-R-00132 Amend0004.pdf
PDF 247 KB Posted
- Attached to
- Solicitation - Hanger 9 Renovation at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK
- Solicitation number
- 6973GH-25-R-00132
About this file
This document is an amendment (Amendment 0004) to Solicitation 6973GH-25-R-00132 for the Hangar 9 Renovation project at the Mike Monroney Aeronautical Center in Oklahoma City. The amendment extends the proposal due date to July 8, 2025 at 4:30 p.m. Central Time and significantly modifies the project timeline, changing the construction completion period from 365 to 548 calendar days after receiving notice to proceed. Key changes include incorporating revised drawings for multiple disciplines (architectural, mechanical, fire alarm, and finish plans), updating specifications for items like cabinet installations and electrical systems, and adding a furniture equipment moving diagram.
The amendment affects multiple technical documents, superseding previous versions dated March 14, 2025 and earlier, with new revisions dated June 17, 2025. The modifications update the Section J attachment list, adding new documents such as Attachment 1c (Revised Additional Drawings) and Attachment 1d (Amended Specifications). The project remains a full and open competition with an estimated price range between $5,000,000 and $10,000,000, managed by the Federal Aviation Administration's Franchise Acquisition Services.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 5
0004 06/30/2025
AAQ-730 FAC. & AVIATION SAFETY ACQ
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
OKLAHOMA CITY OK 73125
AAQ730-AFN
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
6973GH-25-R-00132
1 copies to the issuing office.
05/09/2025
(x)
WO#21-019348
Hangar 9 Renovation
The purpose of this amendment is to incorporate revised & additional
Specifications/Drawings, change the construction completion date, and extend the proposal due date to July 8, 2025 at 4:30 p.m. Central Time.
I. FIRST: The proposal due date is hereby extended to July 8, 2025 at 4:30 p.m. Central
Time.
II. SECOND: The following drawings are hereby incorporated and are located in Attachment 1c
Revised.Additional Drawings Hangar 9 Renovation_6.17.2025
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-25-R-00132/0004
1. Drawing G-004 - INDEX OF DRAWINGS Rev 1 dated
6.17.25 is hereby incorporated and supersedes
G-004 - INDEX OF DRAWINGS dated 3.14.25 in its entirety
2. Drawing A-110a - LEVEL 1 - SLAB THICKNESS PLAN
Rev 1 dated 6.17.25 is hereby incorporated
3. Drawing A-301 - BUILDING SECTIONS Rev 1 dated
6.17.25 is hereby incorporated and supersedes
A-301 - BUILDING SECTIONS dated 3.14.25 in its entirety
4. Drawing A-502 – DETAILS Rev 1 dated 6.17.25 is hereby incorporated
5. Drawing I-111 - LEVEL 1 FINISH PLAN - SECTORS
1 & 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-111 - LEVEL 1 FINISH PLAN -
SECTORS 1 & 2 dated 3.14.25 in its entirety
6. Drawing I-112 - LEVEL 1 FINISH PLAN - SECTORS
3 & 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-112 - LEVEL 1 FINISH PLAN -
SECTORS 3 & 4 dated 3.14.25 in its entirety
7. Drawing I-121 - LEVEL 2 FINISH PLAN - SECTORS
1 & 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-121 - LEVEL 2 FINISH PLAN -
SECTORS 1 & 2 dated 3.14.25 in its entirety
8. Drawing I-122 - LEVEL 2 FINISH PLAN -SECTORS
3 & 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-122 - LEVEL 2 FINISH PLAN
-SECTORS 3 & 4 dated 3.14.25 in its entirety
9. Drawing I-131 - LEVEL 3 FINISH PLAN - SECTORS
1 & 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-131 - LEVEL 3 FINISH PLAN -
SECTORS 1 & 2 dated 3.14.25 in its entirety
10. Drawing I-132 - LEVEL 3 FINISH PLAN - SECTORS
3 & 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-132 - LEVEL 3 FINISH PLAN -
SECTORS 3 & 4 dated 3.14.25 in its entirety
11. Drawing IN603 - MATERIALS & FINISH LEGEND Rev
1 dated 6.17.25 is hereby incorporated and supersedes IN603 - MATERIALS & FINISH LEGEND
Continued ...
3 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-25-R-00132/0004
dated 3.14.25 in its entirety
12. Drawing FA001 - FIRE ALARM LEGEND AND GENERAL
NOTES Rev 1 dated 6.17.25 is hereby incorporated and supersedes FA001 - FIRE ALARM LEGEND AND
GENERAL NOTES dated 11.10.23 in its entirety
13. Drawing FA111 - FIRE ALARM PLAN LEVEL 1 -
SECTORS 1 & 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes FA111 - FIRE ALARM
PLAN LEVEL 1 - SECTORS 1 & 2 dated 11.10.23 in its entirety
14. Drawing M-111 - LEVEL 1 - MECHANICAL PLAN -
SECTORS 1 AND 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-111 - LEVEL 1 -
MECHANICAL PLAN - SECTORS 1 AND 2 dated 1.24.24 in its entirety
15. Drawing M-112 - LEVEL 1 - MECHANICAL PLAN -
SECTORS 3 AND 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-112 - LEVEL 1 -
MECHANICAL PLAN - SECTORS 3 AND 4 dated 1.24.24 in its entirety
16. Drawing M-121 - LEVEL 2 - MECHANICAL PLAN -
SECTORS 1 AND 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-121 - LEVEL 2 -
MECHANICAL PLAN - SECTORS 1 AND 2 dated 1.24.24 in its entirety
17. Drawing M-122 - LEVEL 2 - MECHANICAL PLAN -
SECTORS 3 AND 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-122 - LEVEL 2 -
MECHANICAL PLAN - SECTORS 3 AND 4 dated 1.24.24 in its entirety
18. Drawing M-131 - LEVEL 3 - MECHANICAL PLAN -
SECTORS 1 AND 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-131 - LEVEL 3 -
MECHANICAL PLAN - SECTORS 1 AND 2 dated 1.24.24 in its entirety
19. Drawing M-132 - LEVEL 3 - MECHANICAL PLAN -
SECTORS 3 AND 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-132 - LEVEL 3 -
MECHANICAL PLAN - SECTORS 3 AND 4 dated 1.24.24 in its entirety
III. THIRD: The following drawings are hereby
Continued ...
4 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-25-R-00132/0004
incorporated and are located in Attachment 1d
Amended Specifications_Am01_6.17.25
1. Specification 064116 - PLASTIC-LAMINATE-CLAD
ARCHITECTURAL CABINETS_Am01 is hereby incorporated and supersedes the previous 064116 -
PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
2. Specification 102113.17 - PHENOLIC-CORE TOILET
COMPARTMENTS_Am01 is hereby incorporated and supersedes the previous 102113.17 - PHENOLIC-CORE
TOILET COMPARTMENT
3. Specification 102600 - WALL AND DOOR
PROTECTION_Am01 is hereby incorporated and supersedes the previous 102600 - WALL AND DOOR
PROTECTION
4. Specification 260010 - SUPPLEMENTAL
REQUIREMENTS FOR ELECTRICAL_100_Am01 is hereby incorporated and supersedes the previous
SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL
5. Specification 260800 FL - COMMISSIONING OF
ELECTRICAL SYSTEMS_Am01 is hereby incorporated
IV. FOURTH: Attachment 12 Furniture Equipment
Moving Diagram Hangar 9 6.17.25 is hereby incorporated
V. FIFTH: QA Log.2 25-R-00132 H9 Reno 6.30.25 is hereby posted
VI. The construction completion period is changed as follows:
From: "365 calendars after receiving notice to proceed"
To: "548 calendars after receiving notice to proceed"
LIST OF CHANGES:
Section J - List of Documents, Exhibits and Other Attachments was revised as follows.
Attachment List was revised as follows.
Table has been revised and now reads as follows:
ATTACHMENT TITLE DATE NO. OF
PAGES
1 Attachment 1 Hangar 09_Combined Specs_3.14.2025 03/14/2025 498 1a Attachment 1(a) Hangar_9_Renovation_100%_Drawings_3.14.2025 03/14/2025 150 1b Attachment 1(b) Hangar_9_High_Bay_Lights_100%_Drawings.3.14.2025 03/14/2025 6 1c Attachment 1c Revised.Additional Drawings Hangar 9 Renovation_6.17.2025 06/17/2025 19 1d Attachment 1d Amended Specifications_Am01_6.17.25 06/17/2025 34 2 Attachment 2 Wage Determination OK20250049 03.14.2025 03/14/2025 10 3 Attachment 3 SF25 Performance Bond 08/01/2016 3 4 Attachment 4 SF25A Payment Bond 08/01/2016 2 5 Attachment 5 SF24 Bid Bond 08/01/2016 2 6 Attachment 6 Past Performance Survey 4.23.25 04/23/2025 4 7 Attachment 7 Past Performance Experience Form 04/23/2025 2 8 Attachment 8 Client Authorization Letter 04/23/2025 1 9 Attachment 9 Contractor Release 05/01/2005 1 10 Attachment 10 AMP400-ENV-OC-2.4.3-CC 03/02/2022 14 11 Attachment 11 Chapter 33 Construction Safety 05/16/2014 9 12 Attachment 12 Furniture Equipment Moving Diagram Hangar 9 6.17.25 06/17/2025 3