This document is an amendment (Amendment 0004) to Solicitation 6973GH-25-R-00132 for the Hangar 9 Renovation project at the Mike Monroney Aeronautical Center in Oklahoma City. The amendment extends the proposal due date to July 8, 2025 at 4:30 p.m. Central Time and significantly modifies the project timeline, changing the construction completion period from 365 to 548 calendar days after receiving notice to proceed. Key changes include incorporating revised drawings for multiple disciplines (architectural, mechanical, fire alarm, and finish plans), updating specifications for items like cabinet installations and electrical systems, and adding a furniture equipment moving diagram.

The amendment affects multiple technical documents, superseding previous versions dated March 14, 2025 and earlier, with new revisions dated June 17, 2025. The modifications update the Section J attachment list, adding new documents such as Attachment 1c (Revised Additional Drawings) and Attachment 1d (Amended Specifications). The project remains a full and open competition with an estimated price range between $5,000,000 and $10,000,000, managed by the Federal Aviation Administration's Franchise Acquisition Services.

View the file

Other files

File Type Posted
6973GH-25-R-00132 Amend0009.pdf PDF
6973GH-25-R-00132 Amend0008.pdf PDF
6973GH-25-R-00132 Amend0007.pdf PDF
Attachment 1f Amended Specifications_Am02_6.26.25.pdf PDF
QA Log - Answers - 25-R-00132 H9 Reno 7.7.25 Final.pdf PDF
6973GH-25-R-00132 Amend0006.pdf PDF
Attachment 1e Revised.Additional Drawings Hangar 9 Renovation_6.26.2025.pdf PDF
6973GH-25-R-00132 Amend0005.pdf PDF
QA Log.2 25-R-00132 H9 Reno 6.30.25.pdf PDF
Attachment 12 Furniture Equipment Moving Diagram Hangar 9 6.17.25.pdf PDF
Attachment 1c Revised.Additional Drawings Hangar 9 Renovation_6.17.2025.pdf PDF
Attachment 1d Amended Specifications_Am01_6.17.25.pdf PDF
6973GH-25-R-00132 Amend0003.pdf PDF
6973GH-25-R-00132 Amend0002.pdf PDF
6973GH-25-R-00132 Amend0001.pdf PDF
Attendance List Hanger 9 May 20 Site Visit.pdf PDF
QA Log.1 25-R-00132 H9 Reno 5.16.25.pdf PDF
6973GH-25-R-00132.pdf PDF
Attachment 9 Contractor Release.pdf PDF
Attachment 1b Hangar_9_High_Bay_Lights_100_Drawings.3.14.2025.pdf PDF
Attachment 4 SF25A Payment Bond.pdf PDF
Attachment 10 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 5 SF24 Bid Bond.pdf PDF
Attachment 2 Wage Determination OK20250049 03.14.2025.pdf PDF
Attachment 1 Hangar 09_Combined Specs_3.14.2025.pdf PDF
Attachment 11 Chapter 33 Construction Safety.pdf PDF
Attachment 6 Past Performance Survey 4.23.25.docx DOCX document
Attachment 1a Hangar 9_Renovation_100_Drawings_3.14.2025.pdf PDF
Attachment 8 Client Authorization Letter.docx DOCX document
Attachment 7 Past Performance Experience Form.docx DOCX document
Attachment 3 SF25 Performance Bond.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 5

0004 06/30/2025

AAQ-730 FAC. & AVIATION SAFETY ACQ

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

OKLAHOMA CITY OK 73125

AAQ730-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

6973GH-25-R-00132

1 copies to the issuing office.

05/09/2025

(x)

WO#21-019348

Hangar 9 Renovation

The purpose of this amendment is to incorporate revised & additional

Specifications/Drawings, change the construction completion date, and extend the proposal due date to July 8, 2025 at 4:30 p.m. Central Time.

I. FIRST: The proposal due date is hereby extended to July 8, 2025 at 4:30 p.m. Central

Time.

II. SECOND: The following drawings are hereby incorporated and are located in Attachment 1c

Revised.Additional Drawings Hangar 9 Renovation_6.17.2025

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-25-R-00132/0004

1. Drawing G-004 - INDEX OF DRAWINGS Rev 1 dated

6.17.25 is hereby incorporated and supersedes

G-004 - INDEX OF DRAWINGS dated 3.14.25 in its entirety

2. Drawing A-110a - LEVEL 1 - SLAB THICKNESS PLAN

Rev 1 dated 6.17.25 is hereby incorporated

3. Drawing A-301 - BUILDING SECTIONS Rev 1 dated

6.17.25 is hereby incorporated and supersedes

A-301 - BUILDING SECTIONS dated 3.14.25 in its entirety

4. Drawing A-502 – DETAILS Rev 1 dated 6.17.25 is hereby incorporated

5. Drawing I-111 - LEVEL 1 FINISH PLAN - SECTORS

1 & 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-111 - LEVEL 1 FINISH PLAN -

SECTORS 1 & 2 dated 3.14.25 in its entirety

6. Drawing I-112 - LEVEL 1 FINISH PLAN - SECTORS

3 & 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-112 - LEVEL 1 FINISH PLAN -

SECTORS 3 & 4 dated 3.14.25 in its entirety

7. Drawing I-121 - LEVEL 2 FINISH PLAN - SECTORS

1 & 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-121 - LEVEL 2 FINISH PLAN -

SECTORS 1 & 2 dated 3.14.25 in its entirety

8. Drawing I-122 - LEVEL 2 FINISH PLAN -SECTORS

3 & 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-122 - LEVEL 2 FINISH PLAN

-SECTORS 3 & 4 dated 3.14.25 in its entirety

9. Drawing I-131 - LEVEL 3 FINISH PLAN - SECTORS

1 & 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-131 - LEVEL 3 FINISH PLAN -

SECTORS 1 & 2 dated 3.14.25 in its entirety

10. Drawing I-132 - LEVEL 3 FINISH PLAN - SECTORS

3 & 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes I-132 - LEVEL 3 FINISH PLAN -

SECTORS 3 & 4 dated 3.14.25 in its entirety

11. Drawing IN603 - MATERIALS & FINISH LEGEND Rev

1 dated 6.17.25 is hereby incorporated and supersedes IN603 - MATERIALS & FINISH LEGEND

Continued ...

3 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-25-R-00132/0004

dated 3.14.25 in its entirety

12. Drawing FA001 - FIRE ALARM LEGEND AND GENERAL

NOTES Rev 1 dated 6.17.25 is hereby incorporated and supersedes FA001 - FIRE ALARM LEGEND AND

GENERAL NOTES dated 11.10.23 in its entirety

13. Drawing FA111 - FIRE ALARM PLAN LEVEL 1 -

SECTORS 1 & 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes FA111 - FIRE ALARM

PLAN LEVEL 1 - SECTORS 1 & 2 dated 11.10.23 in its entirety

14. Drawing M-111 - LEVEL 1 - MECHANICAL PLAN -

SECTORS 1 AND 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-111 - LEVEL 1 -

MECHANICAL PLAN - SECTORS 1 AND 2 dated 1.24.24 in its entirety

15. Drawing M-112 - LEVEL 1 - MECHANICAL PLAN -

SECTORS 3 AND 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-112 - LEVEL 1 -

MECHANICAL PLAN - SECTORS 3 AND 4 dated 1.24.24 in its entirety

16. Drawing M-121 - LEVEL 2 - MECHANICAL PLAN -

SECTORS 1 AND 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-121 - LEVEL 2 -

MECHANICAL PLAN - SECTORS 1 AND 2 dated 1.24.24 in its entirety

17. Drawing M-122 - LEVEL 2 - MECHANICAL PLAN -

SECTORS 3 AND 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-122 - LEVEL 2 -

MECHANICAL PLAN - SECTORS 3 AND 4 dated 1.24.24 in its entirety

18. Drawing M-131 - LEVEL 3 - MECHANICAL PLAN -

SECTORS 1 AND 2 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-131 - LEVEL 3 -

MECHANICAL PLAN - SECTORS 1 AND 2 dated 1.24.24 in its entirety

19. Drawing M-132 - LEVEL 3 - MECHANICAL PLAN -

SECTORS 3 AND 4 Rev 1 dated 6.17.25 is hereby incorporated and supersedes M-132 - LEVEL 3 -

MECHANICAL PLAN - SECTORS 3 AND 4 dated 1.24.24 in its entirety

III. THIRD: The following drawings are hereby

Continued ...

4 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-25-R-00132/0004

incorporated and are located in Attachment 1d

Amended Specifications_Am01_6.17.25

1. Specification 064116 - PLASTIC-LAMINATE-CLAD

ARCHITECTURAL CABINETS_Am01 is hereby incorporated and supersedes the previous 064116 -

PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

2. Specification 102113.17 - PHENOLIC-CORE TOILET

COMPARTMENTS_Am01 is hereby incorporated and supersedes the previous 102113.17 - PHENOLIC-CORE

TOILET COMPARTMENT

3. Specification 102600 - WALL AND DOOR

PROTECTION_Am01 is hereby incorporated and supersedes the previous 102600 - WALL AND DOOR

PROTECTION

4. Specification 260010 - SUPPLEMENTAL

REQUIREMENTS FOR ELECTRICAL_100_Am01 is hereby incorporated and supersedes the previous

SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL

5. Specification 260800 FL - COMMISSIONING OF

ELECTRICAL SYSTEMS_Am01 is hereby incorporated

IV. FOURTH: Attachment 12 Furniture Equipment

Moving Diagram Hangar 9 6.17.25 is hereby incorporated

V. FIFTH: QA Log.2 25-R-00132 H9 Reno 6.30.25 is hereby posted

VI. The construction completion period is changed as follows:

From: "365 calendars after receiving notice to proceed"

To: "548 calendars after receiving notice to proceed"

LIST OF CHANGES:

Section J - List of Documents, Exhibits and Other Attachments was revised as follows.

Attachment List was revised as follows.

Table has been revised and now reads as follows:

ATTACHMENT TITLE DATE NO. OF

PAGES

1 Attachment 1 Hangar 09_Combined Specs_3.14.2025 03/14/2025 498 1a Attachment 1(a) Hangar_9_Renovation_100%_Drawings_3.14.2025 03/14/2025 150 1b Attachment 1(b) Hangar_9_High_Bay_Lights_100%_Drawings.3.14.2025 03/14/2025 6 1c Attachment 1c Revised.Additional Drawings Hangar 9 Renovation_6.17.2025 06/17/2025 19 1d Attachment 1d Amended Specifications_Am01_6.17.25 06/17/2025 34 2 Attachment 2 Wage Determination OK20250049 03.14.2025 03/14/2025 10 3 Attachment 3 SF25 Performance Bond 08/01/2016 3 4 Attachment 4 SF25A Payment Bond 08/01/2016 2 5 Attachment 5 SF24 Bid Bond 08/01/2016 2 6 Attachment 6 Past Performance Survey 4.23.25 04/23/2025 4 7 Attachment 7 Past Performance Experience Form 04/23/2025 2 8 Attachment 8 Client Authorization Letter 04/23/2025 1 9 Attachment 9 Contractor Release 05/01/2005 1 10 Attachment 10 AMP400-ENV-OC-2.4.3-CC 03/02/2022 14 11 Attachment 11 Chapter 33 Construction Safety 05/16/2014 9 12 Attachment 12 Furniture Equipment Moving Diagram Hangar 9 6.17.25 06/17/2025 3