Attachment 8 - NIST SP 800-171 System Security Plan Template.docx

Special Publication DOCX document 20 KB Posted

Attached to
Pharmaceutical Prime Vendor Global GEN V Solicitation
Solicitation number
SPE2DX-24-R-0001_SOLICITATION
Issued by

About this file

This document contains a system security plan template for a federal contractor to document how it will meet NIST SP 800-171 security requirements for protecting controlled unclassified information. The template requires the contractor to provide key details about covered IT systems such as system names and purposes, hardware and software components, numbers of users and administrators, and plans for how all 110 NIST security requirements will be met. The contractor must also include an assessment summary spreadsheet and a cyber incident response plan.

The related federal contract opportunity is a solicitation from the Defense Logistics Agency Troop Support Medical for pharmaceutical products under the Pharmaceutical Prime Vendor Generation V program. Offerors should review the attachments for details on product and service requirements.

View the file

Other versions and copies of NIST SP 800-171

File Revision Posted Attached to
ATT 25_NIST SP 800-171 Rev 3.pdf Rev. 3 Andromeda Draft RFP
Attachment 7 - SPRS_Access_NISTSP800-171.pdf Revision not stated PKAB Maintain Missile Alert Fields (MAFs) Septic Tanks and Grease Traps (Services) AMENDMENT 03
Attachment 7a - NIST SP 800-171 Assessment.pdf Revision not stated PKAB Maintain Missile Alert Fields (MAFs) Septic Tanks and Grease Traps (Services) AMENDMENT 03
Attachment 7b - NIST SP 800-171 Entry Guide.pdf Revision not stated PKAB Maintain Missile Alert Fields (MAFs) Septic Tanks and Grease Traps (Services) AMENDMENT 03
Atch 2a NIST SP 800-171 Assessment.pdf Revision not stated Combined Synopsis/Solicitation: Test and Replace Fire Suppression Sprinkler Heads at FE Warren AFB, WY (Service) AMENDMENT 02
Atch 2b NIST SP 800-171 Entry Guide.pdf Revision not stated Combined Synopsis/Solicitation: Test and Replace Fire Suppression Sprinkler Heads at FE Warren AFB, WY (Service) AMENDMENT 02
Atch 2 SPRS_Access_NISTSP800-171.pdf Revision not stated Combined Synopsis/Solicitation: Test and Replace Fire Suppression Sprinkler Heads at FE Warren AFB, WY (Service) AMENDMENT 02
Attachment 9 - NIST SP 800-171 Entry Guide.pdf Revision not stated Design and Build Covered Parking Structure for Fighter Aircraft
Attachment 8 - NIST SP 800-171 Assessment.pdf Revision not stated Design and Build Covered Parking Structure for Fighter Aircraft
Atch 3b NIST SP 800-171 Assessment.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Atch 3c NIST SP 800-171 Entry Guide.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Atch 2a NIST SP 800-171 Assessment.pdf Revision not stated Amendment 03: Replace Underground Storage Tank (UST) at Launch Facility (LF) D-02 (Banner County, NE)
Atch 2b NIST SP 800-171 Entry Guide.pdf Revision not stated Amendment 03: Replace Underground Storage Tank (UST) at Launch Facility (LF) D-02 (Banner County, NE)
Atch 3a NIST SP 800-171 Assessment.pdf Revision not stated AMENDMENT 02: Replace Site Lighting Electrical Conduits at 5 LFs
Atch 3b NIST SP 800-171 Entry Guide.pdf Revision not stated AMENDMENT 02: Replace Site Lighting Electrical Conduits at 5 LFs
ATTACH_11_For Contractors - NIST SP 800-171 and SPRS.pdf Revision not stated Integrated Solid Waste Management Bulk Waste at Marine Corps Installations Pacific (MCI-PAC) Camp Smedley D. Butler, Okinawa Japan
Attachment 2b NIST SP 800-171 Assessment.pdf Revision not stated Decommission Missile Alert Field (MAF) R-01 Radio Tower and Generator AMENDMENT 01
Attachment 2c NIST SP 800-171 Entry Guide.pdf Revision not stated Decommission Missile Alert Field (MAF) R-01 Radio Tower and Generator AMENDMENT 01
ATTACH_17_For_Contractors-NIST_SP_800-171_and_SPRS.pdf Revision not stated Integrated Solid Waste Management South at Marine Corps Installations Pacific (MCI-PAC) Camp Smedley D. Butler, Okinawa, Japan
ATTACHMENT 6_252-204-7019-Notice-of-NISTSP-800-171-DoD-Assessment-Requirements-.pdf Revision not stated FOREIGN MILITARY SALES (FMS) TECHNICAL ORDER (TO) & COMPUTER PROGRAM IDENTIFICATION NUMBER (CPIN) WORLDWIDE REVIEW (WWR)
Show all 20

Who attaches NIST SP 800-171

Other files

File Type Posted
SPE2DX24R0001 revised by Amendment 0008.pdf PDF
SPE2DX24R0001 AMENDMENT 0008.pdf PDF
SPE2DX24R0001 AMENDMENT 0007.pdf PDF
SPE2DX24R0001 AMENDMENT 0006.pdf PDF
Attachment 9 - NIST SP 800-171 Assessment Summary updated Amendment 0006.xlsx XLSX spreadsheet
SPE2DX24R0001 AMENDMENT 0005.pdf PDF
SPE2DX24R0001 AMENDMENT 0004.pdf PDF
Attachment 6 - PPV-G PVR-WRM Requirements Spreadsheet Updated Amendment 0004.xlsx XLSX spreadsheet
Amendment 0004 Submitted Questions and Answers.pdf PDF
Amendment 0004 Language -solicitation changes.pdf PDF
SPE2DX24R0001 Revised by Amendment 0004.pdf PDF
Attachment 2 - PPVG GEN V - Price Proposal Submission Spreadsheet updated Amendment 0004.xlsx XLSX spreadsheet
SPE2DX24R0001 AMENDMENT 0003.pdf PDF
Attachment 3 - PPV-G Specialty Drug List 3.27.24.xlsx XLSX spreadsheet
SPE2DX24R0001 AMENDMENT 0002.pdf PDF
SPE2DX24R0001 AMENDMENT 0001.pdf PDF
Attachment 2 - PPVG GEN V - Price Proposal Submission Spreadsheet.xlsx XLSX spreadsheet
Attachment 11 - NIST.SP.800-171(r2) Publication.pdf PDF
Attachment 5 - Preservation Packaging Packing Labeling and Marking PPPLM.pdf PDF
Attachment 6 - PPV-G PVR-WRM Requirements Spreadsheet.xlsx XLSX spreadsheet
Attachment 9 - NIST SP 800-171 Assessment Summary.xlsx XLSX spreadsheet
SPE2DX24R0001 Final 3.13.24.pdf PDF
Attachment 7 - PPV-G Day-to-Day Requirements Spreadsheets.xlsx XLSX spreadsheet
Attachment 1 - PPVG GEN IV 2023 SALES BY NDC.xlsx XLSX spreadsheet
Attachment 10 - NIST SP 800-171 Assessment Methodology.pdf PDF
Attachment 3 - PPV-G Specialty Drug List.xlsx XLSX spreadsheet
Attachment 4 - Discrepancy Report Template.XLSX XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYSTEM SECURITY PLAN - company name

DATE: XX/XX/XX

1. INFORMATION TECHNOLOGY INFRASTRUCTURE

1.1. Covered System(s) Name: [Provide a list of covered systems. Spell out acronyms.]

1.2. Vendor System Owner (assignment of security responsibility):

Name:

Title:

Office Address:

Work Phone:

e-Mail Address:

1.3. General Description/Purpose of System(s):

1.4. List all vendor Information Technology systems required to perform the requirements of the contract and their purpose [Provide a short, high-level description of the function/purpose of the system(s). Add rows or tables as needed if there are multiple systems]

1.4.1. Number of end users and privileged users: [In the table below, provide the approximate number of users and administrators of the system. Include all those with privileged access such as system administrators, database administrators, application administrators, etc. Add rows to define different roles as needed.]

Roles of Users and Number of Each Type:

Number of Users
Number of Administrators/

Privileged Users

1.5. For each system, include a high-level listing of all hardware and software (system software and application software) components, including make/OEM, model, version, service packs, and person or role responsible for the component. This does not require identifying every workstation or device, but including the types/model each kind of hardware, operating system in use, an type/model of portable components (if applicable), all virtual and physical servers (e.g., file, print, web, database, application), as well as any networked workstations (e.g., Unix, Windows, Mac, Linux), firewalls, routers, switches, copiers, printers, lab equipment, handhelds. [If providing as an attachment, insert the reference or note that the hardware component list is attached. A system topology graphic can be used but would require a narrative consistent with the graphic that clearly lists and describes each system component.]

1.6. Hardware and Software Maintenance and Ownership - Is all hardware and software maintained and owned by the organization? [Yes/No - If no, explain:]

2. NIST REQUIREMENTS

Provide a thorough description of how all 110 NIST SP 800-171 requirements are being met or are planned to be met in the future using the NIST SP 800-171 Assessment Summary spreadsheet.

[Ensure that the Assessment Summary is fully completed and attached along with the System Security Plan.]

3. CYBER INCIDENT RESPONSE AND REPORTING

Provide a plan for responding to Cyber incidents and reporting such incidents.

File details come from the government source that posted it. Updated .