This solicitation is for the construction of an integrated health center at the Alvin C. York VA Medical Center campus in Murfreesboro, Tennessee. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas under solicitation number 36C77623B0037.
The project involves the full construction of an integrated health center building to replace and expand upon existing facilities. Scope of work includes demolition of existing structures, construction of a new approximately 80,000 square foot building, and installation of new mechanical, electrical and fire protection systems. The construction drawings provide layouts and details for demolition, new construction, and fire protection work. Notes specify requirements for phasing, maintaining existing operations, and temporary fire protection during construction.
The solicitation is for a firm-fixed-price design-bid-build contract. The contractor will be responsible for designing and constructing the project in accordance with the provided drawings and specifications, and all applicable local and federal codes and standards.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT TO SCALE
METAL PIPE THROUGH GYPSUM WALL ASSEMBLY (1-HR.)
INSTALL PER UL SYSTEM W-L-1054
USE HILTI FS-ONE MAX FIRESTOP SEALANT
METAL PIPE
TYPE MAX. DIA.
STEEL PIPE (SCH. 10
OR HEAVIER)
30"
CAST IRON PIPE 30"
COPPER PIPE 6"
STEEL CONDUIT 6"
EMT 4"
2 1/2"
2 1/2"
3-0
NOT TO SCALE
METAL PIPE THROUGH GYPSUM WALL ASSEMBLY (2-HR.)
INSTALL PER UL SYSTEM W-L-1054
USE HILTI FS-ONE MAX FIRESTOP SEALANT
METAL PIPE
TYPE MAX. DIA.
STEEL PIPE (SCH. 10
OR HEAVIER)
30"
CAST IRON PIPE 30"
COPPER PIPE 6"
STEEL CONDUIT 6"
EMT 4"
Notes:
1. Refer to the following specifications for firestopping.
a. 07 84 00 Firestopping
b. 07 84 13 Penetration Firestopping
c. 22 00 00 Plumbing
d. 23 00 00 HVAC
e. 26 00 00 Electrical
f. 27 06 37 Communication
For Quality Control requirements, refer to the Quality Control portion of the specification.
2. Details shown are typical details, containing general information only. Always refer to the full UL system detail for complete system requirements. If field conditions do not match requirements of details, approved alternate details shall be utilized. Design requirements, field conditions and dimensions need to be verified for compliance with the details, including but not limited to the following:
* Fire Rating (F-Rating)
* Temperature Rating (T-Rating)
* Leakage Rating (L-Rating)
* Water Rating (W-Rating)
* Annular Space
* Percent Fill
* Movement
* Type and thickness of fire-rated construction.
3. If alternate details matching the field conditions are not available, manufacturer's engineering judgment drawings are acceptable.
Contact Hilti Inc. for alternative systems or Engineering Judgment (800-879-8000) Drawings shall follow the International Firestop Council (IFC) Guidelines for Evaluating Firestop
Systems Engineering Judgments.
4. References:
* 2013 Underwriter's Laboratories Fire Resistance Directory, Volumes 1 & 2
* NFPA 101 Life Safety Code
* NFPA 70 - National Electric Code
* All governing local and regional building codes
5. Firestop System installation must meet requirements of ASTM
E-814 (UL 1479) tested assemblies that provide a fire rating equal to that of construction being penetrated.
6. All rated through-penetration assemblies shall be prominently labeled with a Hilti Firestop Label equipped with a QR code with the following information:
*Warning! - Do Not Disturb
*Through Penetration Firestop System
* UL System # * Product(s) used
* Hourly Rating (F-Rating)
* Installation Date
*Contractor's Name
7. For outlet boxes requiring protection, use only Wall Opening
Protective Materials, category CLIV as classified by Underwriter's
Laboratories, Fire Resistance Directory (Volume 1.)
FIRE PROTECTION DRAWING INDEX
FIRE PROTECTION LEGEND
FIRE PROTECTION DESIGN CRITERIA
FIRE PROTECTION FLOW TEST DATA
THERE IS NO FIRE PUMP AT THIS FACILITY.
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
SYMBOL DESCRIPTION
- CONTROL VALVE w/TAMPER SWITCH
- HYDRAULIC REFERENCE NODE
- EXISTING SPRINKLER PIPING
- FIRE VALVE CABINET
- REVISION REFERENCE
OR
- CONNECT TO
- DEMO TO
- DEMOLISHED SPRINKLER PIPING
- NEW SPRINKLER PIPING
- U/G GATE VALVE
# - KEYNOTE
- HYDRAULIC REMOTE AREA
- CONTROL VALVE W/ TAMPER SWITCH
- PIPE SIZE
- 2-1/2" FIRE DEPARTMENT VALVE W/ CAP AND CHAIN
- PIPE SIZE AND LENGTH
1. FIRE PROTECTION DESIGN SHALL COMPLY THE VA FIRE PROTECTION DESIGN MANUAL; SEVENTH
EDITION 2015.
2. V.A. IS THE ONLY AHJ. SEE V.A. FIRE PROTECTION DESIGN MANUAL AND NFPA 13, 2019 EDITION.
3. THE FIRE PROTECTION SYSTEMS SHOWN REPRESENT THE DESIGN INTENT OF THE ENGINEER, IN
ACCORDANCE WITH ALL APPLICABLE LOCAL CODES. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO COORDINATE INSTALLATION WITH ALL OTHER TRADES. SUBMIT COMPLETE
SPRINKLER SYSTEM LAYOUT DRAWINGS WITH ANY ADDITIONAL OFFSETS, SPRINKLERS OR SYSTEM
COMPONENTS AS REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM AND TO AVOID CONFLICTS
WITH OTHER TRADES.
4. SPRINKLER SHOP DRAWINGS AND MATERIAL CUT SHEETS SHALL BE SUBMITTED TO THE
ARCHITECT AND LOCAL FIRE MARSHAL FOR APPROVAL PRIOR TO ANY INSTALLATION.
5. PIPE ROUTING SHOWN IS SCHEMATIC ONLY. PROVIDE ALL ADDITIONAL OFFSETS REQUIRED FOR
PROPER INSTALLATION AND COORDINATION WITH OTHER TRADES.
6. INSTALL PIPING IN AREAS WITH EXPOSED STRUCTURE AS HIGH AS POSSIBLE TO ALLOW THE
OWNER MAXIMUM USE OF THE SPACE.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING DESCRIPTIONS AND HEIGHTS.
8. COORDINATE SPRINKLERS WITH ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES AND LISTING OF
THE SPRINKLER.
9. CENTER SPRINKLERS IN THE CENTER OF CEILING TILE. PROVIDE ARMOVER OR SWING JOINT AS
REQUIRED.
10. SPRINKLERS IN AREAS WITH EXPOSED STRUCTURE (OBSTRUCTED CONSTRUCTION) SHALL BE
INSTALLED WITH DEFLECTOR 1" BELOW THE BOTTOM OF THE BEAM (MAXIMUM 22" BELOW ROOF
DECK). EXPOSED BAR JOISTS THAT HAVE SPRAY-ON FIRE PROOFING THAT MAKES THE JOIST SOLID
SHALL BE TREATED LIKE A BEAM WITH THE SPRINKLERS 1" BELOW THE BOTTOM OF THE FIRE
PROOFING.
11. SLEEVE AND/OR FIRESTOP ALL PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND FLOORS WITH U/L LISTED ASSEMBLIES. PROVIDE FIRESTOP ASSEMBLIES EQUAL TO OR EXCEEDING THE
RATING OF THE WALL, CEILING OR FLOOR. SEE ARCHITECTURAL DRAWINGS FOR RATINGS.
12. FURNISH ACCESS PANELS TO ALL VALVES ABOVE NON-ACCESSIBLE CEILINGS AND CHASES, FOR
INSTALLATION BY GENERAL CONTRACTOR.
13. PROVIDE A PERMANENTLY ATTACHED NAME TAG TO THE RISER STATING THE REQUIRED DESIGN
CRITERIA FOR EACH HYDRAULICALLY-DESIGNED SYSTEM.
14. PROVIDE SPRINKLERS UNDERNEATH ALL EXPOSED DUCTWORK WHICH IS OVER 48" WIDE AND
SPACE HEADS AROUND ALL OBSTRUCTIONS IN ACCORDANCE WITH VA FIRE PROTECTION DESIGN
MANUAL 2015 EDITION AND NFPA 13, 2019 EDITION. HEADS UNDER DUCTS ARE NOT INDICATED ON THE DRAWINGS BUT ARE REQUIRED. PROVIDE IN ACCORDANCE WITH VA FIRE PROTECTION DESIGN
MANUAL 2015 EDITION. COORDINATE SPRINKLER LOCATIONS UNDER DUCTWORK AND AROUND
OBSTRUCTIONS WITH FINAL INSTALLED LOCATIONS.
15. PROVIDE SPRINKLER GUARDS ON ALL HEADS IN ELECTRIC ROOMS, TELEPHONE ROOMS, ELEVATOR
ROOMS, ELEVATOR SHAFTS, STORAGE ROOMS, UTILITY ROOMS AND ON ANY HEADS LESS THAN
7'-0" ABOVE THE FLOOR.
16. PROVIDE HANGERS ON END HEADS IN PENDANT POSITION WITHIN 12" OF END OF LINE, IN
ACCORDANCE WITH VA FIRE PROTECTION DESIGN MANUAL 2015 EDITION, WHEN SYSTEM
PRESSURE EXCEEDS 100 PSI.
17. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT (PANELS, TRANSFORMERS, ETC.) PRIOR TO
ANY INSTALLATION. DO NOT ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS UNDER ANY
CIRCUMSTANCES. REROUTE ANY PIPING RUN OVER ELECTRICAL EQUIPMENT.
18. ALL DRAIN SYSTEM PIPING AND FITTINGS SHALL BE GALVANIZED BOTH INSIDE AND OUTSIDE.
19. PROVIDE TAMPER SWITCHES ON ALL CONTROL VALVES.
20. SLOPE ALL PIPING TO THE SYSTEM MAIN DRAIN AS REQUIRED TO INSURE PROPER DRAINAGE.
INSTALL ADDITIONAL DRAINS AND PLUGS WHERE REQUIRED TO COMPLY WITH THE ABOVE
REFERENCED CODES.
21. SPRINKLER CONTRACTOR TO INDICATE SPRINKLER DESIGN DENSITIES FOR ALL AREAS/ROOMS ON
THEIR RESPECTIVE DRAWINGS.
22. THIS BUILDINGS STRUCTURAL SYSTEM HAS BEEN DESIGNED TO SUPPORT THE ADDITIONAL
WEIGHT ASSOCIATED WITH THE SPRINKLER SYSTEM.
23. PAINT ALL SPRINKLER PIPING INSTALLED BELOW THE CEILINGS AND IN EXPOSED LOCATIONS.
CLEAN, PRIME AND PAINT ALL EXPOSED PIPING RED, UNLESS OTHERWISE NOTED. COORDINATE
ALL COLORS WITH THE ARCHITECT.
24. COORDINATE HANGER LOCATIONS WITH THE BUILDING STRUCTURE. SUPPORT PIPING IN
ACCORDANCE WITH VA FIRE PROTECTION DESIGN MANUAL 2015 EDITION. PROVIDE ALL
MISCELLANEOUS STEEL FRAMING AS REQUIRED TO SUPPORT PIPING. PROVIDE GALVANIZED OR
COATED HANGERS AND RODS.
25. THE OWNER AND ARCHITECT/ENGINEER SHALL BE NOTIFIED IN WRITING AT LEAST 10 DAYS PRIOR
TO ANY FIRE PROTECTION SYSTEM SHUTDOWNS. FIRE PROTECTION CONTRACTOR SHALL BE
RESPONSIBLE FOR A FIRE WATCH ON THE BUILDING WHILE THE SYSTEM IS DOWN.
26. TENNESSEE SPRINKLER CONTRACTOR TO PROVIDE SPRINKLER CALCS ON THE DRAWINGS.
27. SPRINKLER CONTRACTOR TO MOUNT INFORMATION PLATES ON SPRINKLER SYSTEMS WITH CALCS
ON THE PLATES.
28. SPRINKLER CONTRACTOR SHOW LOCATION OF SPRINKLER RISER AND ALL CONTROL AND TEST
VALVES FOR THIS AREA.
29. PROVIDE DETAILED DRAWING OF THE MAIN SPRINKLER RISER AND ALARM VALVE
INCLUDINGTAMPER AND FLOW SWITCH LOCATIONS. SHOW BACKFLOW PREVENTER AND METHOD
FOR FRONT FLOW TESTING IT. SHOW ALL DRAINS DISCHARGING TO THE EXTERIOR OF THE
BUILDING.
GENERAL NOTES
HANGER - STEEL
No Scale
PIPE HANGER RING
(UL LISTED OR FM APPROVED)
ALL THREAD ROD
TOP BEAM CLAMP
(UL LISTED OR FM APPROVED)
RETURN BEND
No Scale
SPRINKLER HEAD
1" DROP
1" 90° ELL
1" 90° ELL
BRANCH LINE
1x1/2 REDUCER
CEILING
LIGHT HAZARD
WET PIPE
.10 GPM/SQ. FT.
1,500 SQ. FT.
1/2"
30 MIN.
225 SQ. FT.
100 GPM
OCCUPANCY CLASSIFICATION:
SYSTEM TYPE:
DESIGN DENSITY:
HYDRAULIC REMOTE AREA:
SPRINKLER ORIFICE SIZE:
DURATION OF SUPPLY:
MAXIMUM COVERAGE/SPRINKLER HEAD:
HOSE STREAM ALLOWANCE:
ENTIRE BUILDING (EXCEPT AS NOTED):
FIRE SPRINKLER:
WATER SUPPLY DATA:
THE CONTRACTOR SHALL PREPARE SYSTEM LAYOUT DRAWINGS PER VA FIRE PROTECTION
DESIGN MANUAL 2015 EDITION AND NFPA 13, 2019 EDITION. THE CONTRACTOR SHALL PERFORM
HYDRAULIC CALCULATIONS. CONTRACTOR'S SPRINKLER SYSTEM LAYOUT (SHOP DRAWINGS),
HYDRAULIC CALCULATIONS AND MATERIAL DATA SHALL BE SUBMITTED TO THE
ARCHITECT/ENGINEER AND AUTHORITY HAVING JURISDICTION FOR APPROVAL PRIOR TO
SYSTEM INSTALLATION.
THE CONTRACTOR SHALL PERFORM HYDRANT-FLOW TEST TO VERIFY WATER PRESSURE
REQUIRED FOR HYDRAULIC CALCULATIONS.
UNLESS OTHERWISE NOTED ALL STORAGE ROOMS:
DESIGN CRITERIA:
DESIGN OF THE FIRE SUPPRESSION SYSTEM ON THIS PROJECT. THE
FOLLOWING PUBLICATIONS SHALL BE USED AS A REFERENCE.
1. VA FIRE PROTECTION MANUAL, 2015 EDITION AND NFPA 13, 2019 EDITION.
ORDINARY HAZARD GROUP II
WET PIPE
0.2 GPM/SQ. FT.
1,500 SQ. FT.
1/2"
60-90 MIN.
130 SQ. FT.
250 GPM
OCCUPANCY CLASSIFICATION:
SYSTEM TYPE:
DESIGN DENSITY:
HYDRAULIC REMOTE AREA:
SPRINKLER ORIFICE SIZE:
DURATION OF SUPPLY:
MAXIMUM COVERAGE/SPRINKLER HEAD:
HOSE STREAM ALLOWANCE:
STANDPIPE DESIGN CRITERIA:
HYDRAULIC DESIGN CRITERIA: EXISTING
SPRINKLER LEGEND
SWING JOINT
No Scale
1" DROP
1" 90° ELL
1" NIPPLE
BRANCH LINE
1" 90° ELL
REDUCER
CEILING
SPRINKLER HEAD
UNLESS OTHERWISE NOTED ALL MECHANICAL AND ELECTRICAL ROOMS:
ORDINARY HAZARD GROUP I
WET PIPE
.15 GPM/SQ. FT.
1,500 SQ. FT.
1/2"
60-90 MIN.
130 SQ. FT.
250 GPM
OCCUPANCY CLASSIFICATION:
SYSTEM TYPE:
DESIGN DENSITY:
HYDRAULIC REMOTE AREA:
SPRINKLER ORIFICE SIZE:
DURATION OF SUPPLY:
MAXIMUM COVERAGE/SPRINKLER HEAD:
HOSE STREAM ALLOWANCE:
• SCOPE OF WORK INDICATED HEREIN FOR THIS DISCIPLINE DOES NOT INDICATE
SPECIFIC REQUIREMENTS RELATED TO PHASING OF WORK, ALTHOUGH EVERY
EFFORT HAS BEEN MADE TO INCORPORATE SEQUENTIAL PHASES OF WORK AS
REQUESTED BY THE GOVERNMENT.
• PUBLIC AND STAFF ACCESS TO BUILDINGS 7, 107 AND 116 SHALL NOT BE
INTERRUPTED AT ANY TIME DURING CONSTRUCTION.
• CANTEEN, KITCHEN, AND GIFT SHOP NORMAL OPERATION SHALL NOT BE
INTERRUPTED AT ANY TIME DURING CONSTRUCTION.
• REFER TO SHEET GI 01.30 FOR FURTHER INFORMATION ON PROJECT PHASING
REQUIREMENTS
CONSTRUCTION PHASING/ PUBLIC AND STAFF
ACCESS/BUILDING OPERATIONS
FIRE SPRINKLER LEGEND
SYMBOL ORF.
1/2"
1/2"
TEMP.
155 DEG.
155 DEG.
RESPONSE
QUICK
QUICK
K-FACTOR
5.6
5.6
FINISH
BRASS
BRASS
MODEL STYLE PLATE
WHITE
WHITE
MFG
RELIABLE
RELIABLERECESSED
UPRIGHTF1-FR
DESIGN NOTES:
1. PROVIDE F1FR SPRINKLERS WITH 175 DEG. F. TEMPERATURE RATING IN ALL MECHANICAL
AND ELECTRICAL ROOMS
2. RELIABLE IS BASIS OF DESIGN, APPROVED EQUALS ARE ALLOWED.
1/2" 155 DEG. QUICK 5.6 BRASS RELIABLESIDEWALL
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
121388
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
B
IM
/T V
H S
A lv in
C Y o rk
V A
I n te g ra te d H e a lt h
/1
-P
L U
M B
-T V
H S
A C
Y V
A M
C I n te g ra te d
H e a lt h
C e n te r- R
.r v t
/1
/2
:0
:0
P
M
F-FI-01
FIRE PROTECTION LEGENDS,
DETAILS & NOTES
TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
SHK5/20/22 DRT
Sheet Number Sheet Name
F-FI-01 FIRE PROTECTION LEGENDS, DETAILS & NOTES
F-FD-01 BASEMENT - DEMOLITION PLAN - FIRE PROTECTION OVERALL
F-FD-02 GROUND FLOOR - DEMOLITION PLAN - FIRE PROTECTION OVERALL
F-FD-03 SECOND FLOOR - DEMOLITION - FIRE PROTECTION
F-FX-01A GROUND FLOOR - NEW WORK - FIRE PROTECTION - AREA A
F-FX-01B GROUND FLOOR - NEW WORK - FIRE PROTECTION - AREA B
F-FX-02A SECOND FLOOR - NEW WORK PLAN - FIRE PROTECTION - AREA A
F-FX-02B SECOND FLOOR - NEW WORK PLAN - FIRE PROTECTION - AREA B
MIN.RADIUS = 7"
MAX NUMBER OF BENDS = 2
SHEET METAL SCREW
DROP CEILING TILE
CEILING COVER PLATE
SPRINKLER HEAD
END BRACKET ASSEMBLY
SQUARE BAR
CENTER BRACKET ASSEMBLYREDUCING OUTLET
NUT
COLLAR
STAINLESS STEEL FLEXIBLE
BRAIDED HOSE
COLLAR
ISOLATION RING
NUT
INLET NIPPLE
MAX LENGTH OF PIPE = 48"
FLEX PIPE TO SPRINKLER
No Scale
FLEXIBLE HOSE SHALL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF THE LISTING INCLUDING INSTALLATION INSTRUCTIONS SEE 9.2.1.3.3.1 OF THE 2018 NFPA-13. FLEXIBLE SPRINKLER HOSE SHALL BE FM APPROVED AND LIMITED TO HOSE WITH THREADED END FITTINGS WITH A MINIMUM INSIDE
DIAMETER OR 1-INCH AND A MAXIMUM LENGTH OF 6-FEET.
SUSPENDED CEILINGS SHALL BE CERTIFIED AS
MEETING ASTM C 635 SPECIFICATION AND ASTM
C 636 STANDARD PRACTICE FOR INSTALLATION.
SEE NFPA-13, 2019 EIDTION. ADD A NOTE THAT
THE CEILING INSTALLING CONTRACTOR SHALL
PROVIDE A SIGNED STATEMENT CONFIRMING
THE LAY-IN CEILING SYSTEMS COMPLY WITH
ASTM C 635 AND ASTM C 636 AT THE AHCA
SURVEY.
FLEXIBLE HOSE EXCEEDING 6 FEET IN
LENGTH SERVING SPRINKLERS IN
SUSPENDED CEILINGS SHALL HAVE
HANGER ATTACHED TO THE STRUCTURE
TO LIMIT THE MAXIMUM UNSUPPORTED
LENGTH TO 6 FEET. SEE NFPA-13, 2019
EDITION.
Revisions: Date:
ADDENDUM 01 06/20/2019
THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING THE CONSTRUCTION
AND INSTALLATION OF THE NEW FIRE SPRINKLER SYSTEM. ONCE THE NEW SYSTEM IS
INSTALLED, CONNECTED TO THE WATER SOURCE, IS TESTED AND ACCEPTED BY THE AHJ THE
EXISTING SYSTEM CAN BE DEMOLISHED. THE BUILDING SHALL NOT BE WITH OUT FIRE
SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION EXCEPT FOR THE TIME OF
CONNECTING THE NEW SYSTEM AND DISCONNECTING THE EXISTING SYSTEM. PROVIDE 72
HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT DOWNS. COORDINATION WITH THE
OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE SPRINKLER SYSTEM IS REQUIRED TO
IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE BUILDING.
TEMPORARY FIRE PROTECTION:
PROVIDE TEMPORARY HEAT DETECTORS, CONNECTED TO EXISTING FIRE ALARM SYSTEM TO
NOTIFY SYSTEM IN THE EVENT OF A FIRE IN SPACES UNDER CONSTRUCTION. HEAT
DETECTORS SHALL PROVIDE COMPLETE COVERAGE OF THE AREA UNDER CONSTRUCTION.
QUANTITIES AND SPACING SHALL NOT EXCEED MANUFACTURER’S RECOMMENDATIONS FOR
THE DETECTORS USED. PROVIDE A MINIMUM OF ONE (1) HEAT DETECTOR IN EVERY SPACE IN
THE AREA OF CONSTRUCTION FOR EVERY 900 SQUARE FEET (MAXIMUM). HEAT DETECTORS
SHALL REMAIN ACTIVE AND IN PLACE UNTIL REPLACEMENT FIRE ALARM SYSTEM IS FULLY-
FUNCTIONAL AND COVERAGE IS PROVIDED.
FIRE SPRINKLER CONSTRUCTION CONSIDERATIONS
FIRE PROTECTION GENERAL NOTES
1. FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR
GENERAL INFORMATION ONLY AND NOT AN EXACT
INDICATOR OF PIPE AND SPRINKLER HEAD LOCATIONS.
2. REMOVE EXISTING FIRE EXTINGUISHERS AND RETURN
TO VA FOR STORAGE.
3. REMOVE EXISTING FIRE VALVE CABINETS AND PIPING.
EXISTING MECHANICAL
ROOM TO REMAIN.
EXISTING UTILITY TUNNEL
PROVIDE NEW SPRINKLER
PIPING AND VA APPROVED
SPRINKLER HEADS.
EXISTING POOL
TO BE REMOVED.
EXISTING CRAWLSPACE
EXISTING CRAWLSPACE
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
121388
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
AREA B
OUT OF
SCOPE
B
IM
/T V
H S
A lv in
C Y o rk
V A
I n te g ra te d H e a lt h
/1
-P
L U
M B
-T V
H S
A C
Y V
A M
C I n te g ra te d
H e a lt h
C e n te r- R
.r v t
/1
/2
:0
:5
P
M
F-FD-01
BASEMENT - DEMOLITION PLAN -
FIRE PROTECTION OVERALL
TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
SHK5/20/22 DRT
1/16" = 1'-0"
1 BASEMENT OVERALL - FIRE PROTECTION DEMO
0 8' 16' 32'4'
UP
UP
J
I I
H
G
F
E
D
C
B
A
10987
11 12
135.1 10.25.2
H1
F3
F2
E1
I2
H3
G1
12.511.5
9.57.5
15 16 17 18 19 22
F4
F1
E2
D1
C1
B1
H2
I1
I3
K
L
15.1 15.2 17.1 17.2
00 01 02 03
7.1 9.1
4.5
5.5
ELECTRICAL
STAIRS
20 21
SIDEWALL
SIDEWALL
SIDEWALL
EXISTING FIRE MAIN.
TO REMAIN.
EXISTING FIRE DEPT.
CHECK VALVE.
REMOVE
EXISTING F.H.R
F.D.C.
REMOVE EXISTING FIRE
SPRINKLER PIPING IN
RENOVATED AREAS.
REMOVE EXISTING FIRE
SPRINKLER PIPING IN
RENOVATED AREAS.
REMOVE FIRE
MAIN UP TO
2ND FLOOR.
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
NOT IN
SCOPE
REMOVE EXISTING FIRE
SPRINKLER PIPING IN
RENOVATED AREAS.
EXISTING GYM AREA
EXISTING POOL AREA
EXISTING AUDITORIUM AREA
REMOVE
EXISTING
FDC 2ND FLR
MAIN
EXISTING FIRE MAIN
WEST DOWN BELOW
GRADE TO REMAIN.
FIRE MAIN
WEST
FIRE MAIN
EAST DOWN
TO REMAIN.
FIRE MAIN
UP FROM
BELOW TO
REMAIN. EXISTING SPRINKLER RISER
FIRE MAIN EAST AND 2ND FLR (STAGE AREA)
FIRE MAIN WEST
2ND FLR
MAIN TO
REMAIN
REMOVE EXISTING FIRE
SPRINKLER PIPING IN
RENOVATED AREAS.
REMOVE EXISTING FIRE
SPRINKLER PIPING IN
RENOVATED AREAS.
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
121388
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
AREA B
OUT OF
SCOPE
B
IM
/T V
H S
A lv in
C Y o rk
V A
I n te g ra te d H e a lt h
/1
-P
L U
M B
-T V
H S
A C
Y V
A M
C I n te g ra te d
H e a lt h
C e n te r- R
.r v t
/1
/2
:0
:0
P
M
F-FD-02
GROUND FLOOR - DEMOLITION
PLAN - FIRE PROTECTION
OVERALL
TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
SHK5/20/22 DRT
1/16" = 1'-0"
1 GROUND FLOOR OVERALL - FIRE PROTECTION DEMO
0 4' 8' 12'
THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING THE CONSTRUCTION
AND INSTALLATION OF THE NEW FIRE SPRINKLER SYSTEM. ONCE THE NEW SYSTEM IS
INSTALLED, CONNECTED TO THE WATER SOURCE, IS TESTED AND ACCEPTED BY THE AHJ THE
EXISTING SYSTEM CAN BE DEMOLISHED. THE BUILDING SHALL NOT BE WITH OUT FIRE
SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION EXCEPT FOR THE TIME OF
CONNECTING THE NEW SYSTEM AND DISCONNECTING THE EXISTING SYSTEM. PROVIDE 72
HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT DOWNS. COORDINATION WITH THE
OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE SPRINKLER SYSTEM IS REQUIRED TO
IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE BUILDING.
TEMPORARY FIRE PROTECTION:
PROVIDE TEMPORARY HEAT DETECTORS, CONNECTED TO EXISTING FIRE ALARM SYSTEM TO
NOTIFY SYSTEM IN THE EVENT OF A FIRE IN SPACES UNDER CONSTRUCTION. HEAT
DETECTORS SHALL PROVIDE COMPLETE COVERAGE OF THE AREA UNDER CONSTRUCTION.
QUANTITIES AND SPACING SHALL NOT EXCEED MANUFACTURER’S RECOMMENDATIONS FOR
THE DETECTORS USED. PROVIDE A MINIMUM OF ONE (1) HEAT DETECTOR IN EVERY SPACE IN
THE AREA OF CONSTRUCTION FOR EVERY 900 SQUARE FEET (MAXIMUM). HEAT DETECTORS
FIRE PROTECTION GENERAL NOTES
1. FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR
GENERAL INFORMATION ONLY AND NOT AN EXACT
INDICATOR OF PIPE AND SPRINKLER HEAD LOCATIONS.
2. REMOVE EXISTING FIRE EXTINGUISHERS AND RETURN
TO VA FOR STORAGE.
3. REMOVE EXISTING FIRE VALVE CABINETS AND PIPING.
ROOF BELOW
ROOF BELOW
ROOF BELOW
REC THERAPY BELOW
STAIR
STUDIO
FAN ROOM
GENERATOR
RM
REWIND RM PROJECTION ROOM CONTROL RM AMP RM
C O
R R
ID
O
R
AMATEUR
RADIO ROOM
JANITOR
02.11
02.16
02.16
02.10
02.16
02.16
02.10
02.10
02.1002.10
02.16
02.16
02.1602.16
02.16
02.10
02.10
02.10
J
I
G
F
10987
I2
H3
G1
REMOVE F.H.C.
REMOVE EXISTING FIRE
SPRINKLER PIPING IN
RENOVATED AREAS.
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
121388
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
OUT OF
SCOPE
B
IM
/T V
H S
A lv in
C Y o rk
V A
I n te g ra te d H e a lt h
/1
-P
L U
M B
-T V
H S
A C
Y V
A M
C I n te g ra te d
H e a lt h
C e n te r- R
.r v t
/1
/2
:0
:0
P
M
F-FD-03
SECOND FLOOR - DEMOLITION -
FIRE PROTECTION
TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
SHK5/20/22 DRT
1/4" = 1'-0"
1 SECOND FLOOR OVERALL - FIRE PROTECTION DEMO
0 4' 8' 12'
FIRE PROTECTION GENERAL NOTES
1. FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR
GENERAL INFORMATION ONLY AND NOT AN EXACT
INDICATOR OF PIPE AND SPRINKLER HEAD LOCATIONS.
2. REMOVE EXISTING FIRE EXTINGUISHERS AND RETURN
TO VA FOR STORAGE.
3. REMOVE EXISTING FIRE VALVE CABINETS AND PIPING.
THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING THE CONSTRUCTION
AND INSTALLATION OF THE NEW FIRE SPRINKLER SYSTEM. ONCE THE NEW SYSTEM IS
INSTALLED, CONNECTED TO THE WATER SOURCE, IS TESTED AND ACCEPTED BY THE AHJ THE
EXISTING SYSTEM CAN BE DEMOLISHED. THE BUILDING SHALL NOT BE WITH OUT FIRE
SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION EXCEPT FOR THE TIME OF
CONNECTING THE NEW SYSTEM AND DISCONNECTING THE EXISTING SYSTEM. PROVIDE 72
HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT DOWNS. COORDINATION WITH THE
OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE SPRINKLER SYSTEM IS REQUIRED TO
IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE BUILDING.
TEMPORARY FIRE PROTECTION:
PROVIDE TEMPORARY HEAT DETECTORS, CONNECTED TO EXISTING FIRE ALARM SYSTEM TO
NOTIFY SYSTEM IN THE EVENT OF A FIRE IN SPACES UNDER CONSTRUCTION. HEAT
DETECTORS SHALL PROVIDE COMPLETE COVERAGE OF THE AREA UNDER CONSTRUCTION.
QUANTITIES AND SPACING SHALL NOT EXCEED MANUFACTURER’S RECOMMENDATIONS FOR
THE DETECTORS USED. PROVIDE A MINIMUM OF ONE (1) HEAT DETECTOR IN EVERY SPACE IN
THE AREA OF CONSTRUCTION FOR EVERY 900 SQUARE FEET (MAXIMUM). HEAT DETECTORS
EXISTING
A/S ZONE
#2
EXISTING
A/S ZONE
#3
Z
J
I
H
G
F
E
D
C
B
A
10987
11 12
5.1
10.2
5.2
H1
F3
F2
E1
I2
H3
G1
12.511.5
9.57.5
F4
F1
E2
D1
C1
B1
7.1
9.1
E.9
10.1 12.911.9
E.4
STAIRS
EDUC CHIEF
G17A
MUSIC THERAPY CLINIC
G13
WC STORAGE
G12B
REC. THERAPY CLINIC
G08
BARBER CART
G02
FOOD SERVICE CHIEF
G03
FOOD SERVICE VEND SUPPLY
G04
CORRIDOR
G45
WORK AREA
G15ENTRY
G01
CORRIDOR
G46
COURTYARD
G10
PRACTICE ROOM
G13BMUSIC STORAGE
G13A
PMRS CONSULT
G14
HAC
G07
RECREATION
STORAGE
G08B
MALE
G09A
FEMALE
G09C
KINESIO GROUP THERAPY
G12
WORK
G12A
KITCHENETTE
G08A
615 SF
CONNECTOR
G47
B.2
C.5
C.6
E.3
E.5
F.3
COORDINATE WITH
CELING CLOUD FOR
SPRINKLER HEAD
LAYOUT.
COORDINATE WITH
CELING CLOUD FOR
SPRINKLER HEAD
LAYOUT.
COORDINATE WITH
CELING CLOUD FOR
SPRINKLER HEAD
LAYOUT. CONNECTOR
ATLERNATE #3
NOT IN SCOPE
NOT IN SCOPE
PROVIDE NEW VA APPROVED
SPRINKER HEADS IF REQUIRED
IN EXISTING MECH. ROOM.
NEW EQUIPMENT BEING
INSTALLED IN SPACE.
COORDINATE WITH STRUCTURAL.
EXISTING ROOF STRUCTURE IS LOW.
VERIFY SPACE BETWEEN NEW
CEILING AND STRUTURAL.
OPEN SPACE TO OUTISDE
COORDINATE WITH
CELING CLOUD FOR
SPRINKLER HEAD
LAYOUT.
OCCUPANCY:
SEE LIFE SAFETY PLAN.
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
NOT IN SCOPE
COORDINATE WITH
CELING CLOUD FOR
SPRINKLER HEAD
LAYOUT.
COORDINATE WITH
CELING CLOUD FOR
SPRINKLER HEAD
LAYOUT.
PROVIDE SPRINKLER COVERAGE
ABOVE AND BELOW DECORATIVE
CEILING.
NEW SPRINKLER
RISER SPACE.
EXTERIOR DOOR.
ACCESS TO NEW
SPRINKLER RISER
ROOM.
EXISTING FIRE MAIN
AND SPRINKLER RISER
COURTYARD
ATLERNATE #3
STORAGE
STORAGE
JANITOR CLOSET
STORAGE
STORAGE
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
121388
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
OUT OF
SCOPE
B
IM
/T V
H S
A lv in
C Y o rk
V A
I n te g ra te d H e a lt h
/1
-P
L U
M B
-T V
H S
A C
Y V
A M
C I n te g ra te d
H e a lt h
C e n te r- R
.r v t
/1
/2
:0
:1
P
M
F-FX-01A
GROUND FLOOR - NEW WORK -
FIRE PROTECTION - AREA A
TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
SHK5/20/22 DRT
0 4' 8' 12'
1/8" = 1'-0"
1 GROUND FLOOR - RCP NEW WORK AREA A
THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING THE CONSTRUCTION
AND INSTALLATION OF THE NEW FIRE SPRINKLER SYSTEM. ONCE THE NEW SYSTEM IS
INSTALLED, CONNECTED TO THE WATER SOURCE, IS TESTED AND ACCEPTED BY THE AHJ THE
EXISTING SYSTEM CAN BE DEMOLISHED. THE BUILDING SHALL NOT BE WITH OUT FIRE
SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION EXCEPT FOR THE TIME OF
CONNECTING THE NEW SYSTEM AND DISCONNECTING THE EXISTING SYSTEM. PROVIDE 72
HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT DOWNS. COORDINATION WITH THE
OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE SPRINKLER SYSTEM IS REQUIRED TO
IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE BUILDING.
TEMPORARY FIRE PROTECTION:
PROVIDE TEMPORARY HEAT DETECTORS, CONNECTED TO EXISTING FIRE ALARM SYSTEM TO
NOTIFY SYSTEM IN THE EVENT OF A FIRE IN SPACES UNDER CONSTRUCTION. HEAT
DETECTORS SHALL PROVIDE COMPLETE COVERAGE OF THE AREA UNDER CONSTRUCTION.
QUANTITIES AND SPACING SHALL NOT EXCEED MANUFACTURER’S RECOMMENDATIONS FOR
THE DETECTORS USED. PROVIDE A MINIMUM OF ONE (1) HEAT DETECTOR IN EVERY SPACE IN
THE AREA OF CONSTRUCTION FOR EVERY 900 SQUARE FEET (MAXIMUM). HEAT DETECTORS
1. SPRINKLER CONTRACTOR TO INDICATE SPRINKLER DESIGN DENSITIES FOR ALL
AREAS/ROOMS ON THEIR RESPECTIVE DRAWINGS.
2. SPRINKLER CONTRACTOR TO SHOW LOCATION OF SPRINKLER RISER AND ALL
CONTROL AND TEST VALVES FOR THIS AREA.
3. PROVIDE DETAILED DRAWING OF THE MAIN SPRINKLER RISER AND ALARM
VALVE INCLUDING TAMPER AND FLOW SWITCH LOCATIONS. SHOW BACKFLOW
PREVENTER AND METHOD FOR FRONT FLOW TESTING IT. SHOW ALL DRAINS
DISCHARGING TO THE EXTERIOR OF THE BUILDING.
FIRE PROTECTION GENERAL NOTES:
S
S
S
SSSS
S
S
S
S
S
J J
J
J
J J
J
J
J
J
I
H
12.5
17 18 19 22
F4
F1
E2
D1
C1
B1
H2
I1
I3
K
L
15.1 15.2
17.1 17.2
E.9
12.9
12.9
E.4
K.8
24 26
J.5
15' - 0"
10' - 0"
10' - 0"
10' - 0"
ELECTRICAL
MEDIA COORD.
G17B
LOBBY
G36
MALE
G37
FEMALE
G38
VESTIBULE
G35
SECURITY
G35A
HAC
G30I
PAT. RESOURCE
G40
STORAGE
G34A
SIM MAINTENANCE
G30G
PROCEDURE SIM LAB
G30F
CONTROL ROOM
G30E
TRNG EQUIP STOR
G30C
ALS CLASSROOM
G30J
MALE
G25
WAITING
G39
LACTATION
G27
MULTI-PURPOSE
G20J
MULTI-PURPOSE
G20F
MULTI-PURPOSE
G20D
MULTI-PURPOSE
G20B
MULTI-PURPOSE
G20
MULTI-PURPOSE
G20H
STOR.
G20A
STOR.
G20E
STOR
G20G
STOR.
G20I
STOR.
G20C
MED/SURG SIM LAB
G30D
VENDING
G32
STAFF LOUNGE
G33
KITCHEN/SERVING
G21
EDUC CHIEF
G17A
WORK
G17
RT SPVR.
G15A
COMPUTER LAB
G16
CREATIVE ARTS GROUP
G34
CORRIDOR
G48
CORRIDOR
G48A
CORRIDOR
G49
CORRIDOR
G50
CORRIDOR
G51
STORAGE
G20K
FEMALE
G24
MUSIC THER. 1
G43
MUSIC THER. 2
G42 CORRIDOR
G54
CORRIDOR
G52
ACCESS STAIR
G26
PMRS STORAGE
G31
327 SF
DE-BRIEF
G30A
361 SF
CORRIDOR
G30
177 SF
STORAGE
G30H
8' - 5" 10' - 0"
10' - 0"
10' - 0" 10' - 0"
16' - 0"
8' - 9"8' - 9"
16' - 0"
16' - 0"
16' - 0"
15' - 0"
16' - 0"
8' - 9" 8' - 9" 16' - 0" 8' - 9"
8' - 6"
10' - 0"
10' - 0"
8' - 5"
8' - 5"
8' - 5"
8' - 5"
8' - 5"
9' - 0"
11' - 5"
8' - 5"
8' - 1"
7' - 10"
8' - 0"
7' - 10"
9' - 0"
9' - 0"
9' - 0"
23 25
15' - 0"
10' - 0"
14' - 6"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
8' - 5" 10' - 0"
10' - 0"
10' - 0"
10' - 0"
8' - 5"
10' - 0"
10' - 0" 10' - 0"
16' - 0"
16' - 0"8' - 9"8' - 9"
16' - 0"
16' - 0" 16' - 0"
9' - 0"
8' - 9"
16' - 0"
16' - 0"
15' - 0"
16' - 0"
16' - 0"
8' - 9"
8' - 9"
16' - 0"
16' - 0"
8' - 9" 8' - 9" 16' - 0" 8' - 9"
8' - 6"
10' - 0"
10' - 0"
8' - 5" 8' - 8"
8' - 5"
8' - 5"
8' - 5"
8' - 5"
8' - 5"
8' - 5"
9' - 0"
11' - 5"
8' - 5"
8' - 1"
8' - 0"
8' - 0"
7' - 10"
9' - 0"
8' - 8"
9' - 0"
8' - 8"
9' - 0"
9' - 0"
9' - 0"
8' - 4"
15' - 9"
15' - 0"
14' - 10"
9' - 0"
9' - 0"
CHARGING CART STOR.
G19
WHOLE HEALTH
STORAGE
G18
IT
G23
20 21
K.1
K.9
B.2
C.5
C.6
E.3
E.5
F.3
16.5 17.4 17.5 18.8 18.9 20.1 20.2 21.321.5
+ 8'-5"
13' - 7"
STORAGE
G30K
15' - 0"15' - 0" 15' - 0"
7' - 10"
8' - 0"
COORDINATE WITH
CLOUD CEILING FOR
SPRINKLER HEAD LAYOUT.
COORDINATE WITH
CLOUD CEILING FOR
SPRINKLER HEAD LAYOUT.
COORDINATE WITH
CLOUD CEILING FOR
SPRINKLER HEAD LAYOUT.
CHASE TO
MECH. ROOM
BELOW.
OCCUPANCY:
REFER TO THE LIFE SAFETY
PLANS.
ELECTRICAL ROOM
STORAGE
STORAGE
STORAGE
STORAGE STORAGE STORAGE STORAGE
STORAGE
STORAGE
JANITOR CLOSET
STORAGE
I.T. ROOM
COMM. ROOM
STORAGE
CLOSET
RETRACTABLE WALL
RETRACTABLE WALL
RETRACTABLE WALL
RETRACTABLE WALL
RETRACTABLE WALL
STORAGE
MULTI-PURPOSE
G20J
MULTI-PURPOSE
G20F
MULTI-PURPOSE
G20D
MULTI-PURPOSE
G20B
MULTI-PURPOSE
G20
MULTI-PURPOSE
G20H
STOR.
G20A
STOR.
G20E STOR
G20G
STOR.
G20I
STOR.
G20C
CORRIDOR
G49
CORRIDOR
G50
CORRIDOR
G51
STORAGE
G20K
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
121388
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA B
OUT OF
SCOPE
B
IM
/T V
H S
A lv in
C Y o rk
V A
I n te g ra te d H e a lt h
/1
-P
L U
M B
-T V
H S
A C
Y V
A M
C I n te g ra te d
H e a lt h
C e n te r- R
.r v t
/1
/2
:0
:2
P
M
F-FX-01B
GROUND FLOOR - NEW WORK -
FIRE PROTECTION - AREA B
TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
SHK5/20/22 DRT
0 4' 8' 12'
1/8" = 1'-0"
1 GROUND FLOOR - RCP NEW WORK AREA B
THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING THE CONSTRUCTION
AND INSTALLATION OF THE NEW FIRE SPRINKLER SYSTEM. ONCE THE NEW SYSTEM IS
INSTALLED, CONNECTED TO THE WATER SOURCE, IS TESTED AND ACCEPTED BY THE AHJ THE
EXISTING SYSTEM CAN BE DEMOLISHED. THE BUILDING SHALL NOT BE WITH OUT FIRE
SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION EXCEPT FOR THE TIME OF
CONNECTING THE NEW SYSTEM AND DISCONNECTING THE EXISTING SYSTEM. PROVIDE 72
HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT DOWNS. COORDINATION WITH THE
OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE SPRINKLER SYSTEM IS REQUIRED TO
IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE BUILDING.
TEMPORARY FIRE PROTECTION:
PROVIDE TEMPORARY HEAT DETECTORS, CONNECTED TO EXISTING FIRE ALARM SYSTEM TO
NOTIFY SYSTEM IN THE EVENT OF A FIRE IN SPACES UNDER CONSTRUCTION. HEAT
DETECTORS SHALL PROVIDE COMPLETE COVERAGE OF THE AREA UNDER CONSTRUCTION.
QUANTITIES AND SPACING SHALL NOT EXCEED MANUFACTURER’S RECOMMENDATIONS FOR
THE DETECTORS USED. PROVIDE A MINIMUM OF ONE (1) HEAT DETECTOR IN EVERY SPACE IN
THE AREA OF CONSTRUCTION FOR EVERY 900 SQUARE FEET (MAXIMUM). HEAT DETECTORS
AREAS/ROOMS ON THEIR RESPECTIVE DRAWINGS.
2. SPRINKLER CONTRACTOR TO SHOW LOCATION OF SPRINKLER RISER AND ALL
CONTROL AND TEST VALVES FOR THIS AREA.
3. PROVIDE DETAILED DRAWING OF THE MAIN SPRINKLER RISER AND ALARM
VALVE INCLUDING TAMPER AND FLOW SWITCH LOCATIONS. SHOW BACKFLOW
PREVENTER AND METHOD FOR FRONT FLOW TESTING IT. SHOW ALL DRAINS
DISCHARGING TO THE EXTERIOR OF THE BUILDING.
REC THERAPY BELOW
STAIR
NEW MECHANICAL
ROOM NEW STEAM WATER HEATER
ROOM.
STORAGE
STORAGE
STAIR
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
121388
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
OUT OF
SCOPE
B
IM
/T V
H S
A lv in
C Y o rk
V A
I n te g ra te d H e a lt h
/1
-P
L U
M B
-T V
H S
A C
Y V
A M
C I n te g ra te d
H e a lt h
C e n te r- R
.r v t
/1
/2
:0
:2
P
M
F-FX-02A
SECOND FLOOR - NEW WORK
PLAN - FIRE PROTECTION - AREA
A
TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
SHK5/20/22 DRT
1/8" = 1'-0"
1 SECOND FLOOR - RCP NEW WORK AREA A
0 4' 8' 12'
THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING THE CONSTRUCTION
AND INSTALLATION OF THE NEW FIRE SPRINKLER SYSTEM. ONCE THE NEW SYSTEM IS
INSTALLED, CONNECTED TO THE WATER SOURCE, IS TESTED AND ACCEPTED BY THE AHJ THE
EXISTING SYSTEM CAN BE DEMOLISHED. THE BUILDING SHALL NOT BE WITH OUT FIRE
SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION EXCEPT FOR THE TIME OF
CONNECTING THE NEW SYSTEM AND DISCONNECTING THE EXISTING SYSTEM. PROVIDE 72
HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT DOWNS. COORDINATION WITH THE
OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE SPRINKLER SYSTEM IS REQUIRED TO
IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE BUILDING.
TEMPORARY FIRE PROTECTION:
PROVIDE TEMPORARY HEAT DETECTORS, CONNECTED TO EXISTING FIRE ALARM SYSTEM TO
NOTIFY SYSTEM IN THE EVENT OF A FIRE IN SPACES UNDER CONSTRUCTION. HEAT
DETECTORS SHALL PROVIDE COMPLETE COVERAGE OF THE AREA UNDER CONSTRUCTION.
QUANTITIES AND SPACING SHALL NOT EXCEED MANUFACTURER’S RECOMMENDATIONS FOR
THE DETECTORS USED. PROVIDE A MINIMUM OF ONE (1) HEAT DETECTOR IN EVERY SPACE IN
THE AREA OF CONSTRUCTION FOR EVERY 900 SQUARE FEET (MAXIMUM). HEAT DETECTORS
AREAS/ROOMS ON THEIR RESPECTIVE DRAWINGS.
2. SPRINKLER CONTRACTOR TO SHOW LOCATION OF SPRINKLER RISER AND ALL
CONTROL AND TEST VALVES FOR THIS AREA.
3. PROVIDE DETAILED DRAWING OF THE MAIN SPRINKLER RISER AND ALARM
VALVE INCLUDING TAMPER AND FLOW SWITCH LOCATIONS. SHOW BACKFLOW
PREVENTER AND METHOD FOR FRONT FLOW TESTING IT. SHOW ALL DRAINS
DISCHARGING TO THE EXTERIOR OF THE BUILDING.
NEW MECHANICAL ROOM
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
121388
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA B
OUT OF
SCOPE
B
IM
/T V
H S
A lv in
C Y o rk
V A
I n te g ra te d H e a lt h
/1
-P
L U
M B
-T V
H S
A C
Y V
A M
C I n te g ra te d
H e a lt h
C e n te r- R
.r v t
/1
/2
:0
:2
P
M
F-FX-02B
SECOND FLOOR - NEW WORK
PLAN - FIRE PROTECTION - AREA
B
TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
SHK5/20/22 DRT
1/8" = 1'-0"
1 SECOND FLOOR RCP NEW WORK AREA B
0 4' 8' 12'
THE EXISTING FIRE PROTECTION SYSTEM SHALL REMAIN ACTIVE DURING THE CONSTRUCTION
AND INSTALLATION OF THE NEW FIRE SPRINKLER SYSTEM. ONCE THE NEW SYSTEM IS
INSTALLED, CONNECTED TO THE WATER SOURCE, IS TESTED AND ACCEPTED BY THE AHJ THE
EXISTING SYSTEM CAN BE DEMOLISHED. THE BUILDING SHALL NOT BE WITH OUT FIRE
SPRINKLER PROTECTION AT ANY TIME DURING CONSTRUCTION EXCEPT FOR THE TIME OF
CONNECTING THE NEW SYSTEM AND DISCONNECTING THE EXISTING SYSTEM. PROVIDE 72
HOUR NOTICE TO THE OWNER PRIOR TO SYSTEM SHUT DOWNS. COORDINATION WITH THE
OWNER PRIOR TO SHUT DOWN OF THE EXISTING FIRE SPRINKLER SYSTEM IS REQUIRED TO
IMPLEMENT OTHER MEANS OF FIRE SAFETY FOR THE BUILDING.
TEMPORARY FIRE PROTECTION:
PROVIDE TEMPORARY HEAT DETECTORS, CONNECTED TO EXISTING FIRE ALARM SYSTEM TO
NOTIFY SYSTEM IN THE EVENT OF A FIRE IN SPACES UNDER CONSTRUCTION. HEAT
DETECTORS SHALL PROVIDE COMPLETE COVERAGE OF THE AREA UNDER CONSTRUCTION.
QUANTITIES AND SPACING SHALL NOT EXCEED MANUFACTURER’S RECOMMENDATIONS FOR
THE DETECTORS USED. PROVIDE A MINIMUM OF ONE (1) HEAT DETECTOR IN EVERY SPACE IN
THE AREA OF CONSTRUCTION FOR EVERY 900 SQUARE FEET (MAXIMUM). HEAT DETECTORS
PROVIDE NEW SPRINKLER PIPING AND SPRINKLER HEADS IN NEW
MECHANICAL SPACE. COORDINATE WITH MECHANICAL EQUIPMENT
AND DUCTWORK. THIS SPACE IS REQUIRED TO SUPPLY THE NEW
I.T. ROOM BELOW.
1. SPRINKLER CONTRACTOR TO INDICATE SPRINKLER DESIGN DENSITIES FOR ALL
AREAS/ROOMS ON THEIR RESPECTIVE DRAWINGS.
2. SPRINKLER CONTRACTOR TO SHOW LOCATION OF SPRINKLER RISER AND ALL
CONTROL AND TEST VALVES FOR THIS AREA.
3. PROVIDE DETAILED DRAWING OF THE MAIN SPRINKLER RISER AND ALARM
VALVE INCLUDING TAMPER AND FLOW SWITCH LOCATIONS. SHOW BACKFLOW
PREVENTER AND METHOD FOR FRONT FLOW TESTING IT. SHOW ALL DRAINS
DISCHARGING TO THE EXTERIOR OF THE BUILDING.
| F-FI-01 - FIRE PROTECTION LEGENDS, DETAILS & NOTES |
| F-FD-01 - BASEMENT - DEMOLITION PLAN - FIRE PROTECTION OVERALL |
| F-FD-02 - GROUND FLOOR - DEMOLITION PLAN - FIRE PROTECTION OVERALL |
| F-FD-03 - SECOND FLOOR - DEMOLITION - FIRE PROTECTION |
| F-FX-01A - GROUND FLOOR - NEW WORK - FIRE PROTECTION - AREA A |
| F-FX-01B - GROUND FLOOR - NEW WORK - FIRE PROTECTION - AREA B |
| F-FX-02A - SECOND FLOOR - NEW WORK PLAN - FIRE PROTECTION - AREA A |
| F-FX-02B - SECOND FLOOR - NEW WORK PLAN - FIRE PROTECTION - AREA B |
File details come from the government source that posted it. Updated .