This addendum provides revisions to construction documents for the Integrated Health Center project number 626-309 being constructed for the Department of Veterans Affairs Technology Acquisition Center Austin. The addendum includes updated drawings and specifications for general project information, demolition, architectural elements including door assemblies, underground piping, interior finishes, and electrical systems such as panels, ground floor plans, and technology details. Revisions include adding notes, circuitry, and connections for projectors and projector screens in multi-purpose rooms. Modified CCTV camera installation details are also included.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM
Distribution:
☒ Owner Contact
☐ User Contact
☐ Client Manager
☐ Project Manager
☐ Civil Consultant
☐ Structural Consultant
☐ Mech. Consultant
☐ Electrical Consultant
☐ Other Consultant
☐ Other Consultant
☐ Other Consultant
☐ Other Consultant
☐ Other Consultant
☒ Job Supt. @ job site
☐ Via fax number
VA Integrated Health
VAMC
Michael.snell@va.gov
SI: Addendum #2
Comm: #217040
Const. Pkg: #
Item Description
PROJECT MANUAL:
081710 – Integrated door assemblies
• Added for hardware set #8
232113.13 – Underground hydronic piping.
• Added section
GENERAL:
1.
G 00.01 – COVER SHEET
• Added note to show Addendum 2
2.
G01.01 – GENERAL DATA
• Updated drawing index to show sheets included in Addendum 2.
DEMOLITION
1.
AD 01.04 – PHASE IV DEMOLITION PLAN
• Added notes to salvage wall murals and signage
ARCHITECTURAL:
1.
AE 02.03 – ENLARGED PLANS – SIM LAB
• Updated Note on elevations about SV base
2.
AE 02.04 – ENLARGED PLANS – KINESO THERAPY
• Updated Note on elevation 3
3.
AE 03.06 – WINDOW DETAILS - EXTERIOR
• Updated Detail 6 to remove the fiber cement board at base
4.
AE 08.01 – EXTERIOR DETAILS
• Updated detail 10
5.
AE 08.07 – RAMP DETAILS
• Updated note on detail 9
Anthony Traylor Snapshot
Anthony Traylor Snapshot
Anthony Traylor Image
SUPPLEMENTAL INSTRUCTIONS
SI: Addendum #2
Comm: #217040
Const. Pkg: #
Item Description
6.
AE 09.04 – INTERIOR ELEVATIONS
• Updated window tag on elevation 12
7.
AE 09.06 – INTERIOR ELEVATIONS
• Updated title for elevation 4
INTERIOR
8.
IN 01.00 – FINISH LEGEND & SCHEDULE
• Removed reference to window shades
ELECTRICAL
9.
E-EI-04 – ELECTRICAL PANEL SCHEDULES
• Panel “2N107R” – Added circuits for projectors and projector screens at spare circuit breakers
10.
E-EP-00 – GROUND FLOOR – NEW WORK PLAN – POWER -
OVERALL
• In Multi-Purpose Rooms, added connections and circuitry for projectors and projector screens, along with associated coded notes.
11.
E-EP-02 – GROUND FLOOR – NEW WORK PLAN – POWER –
PART B
• In Multi-Purpose Rooms, added connections and circuitry for projectors and projector screens, along with associated coded notes.
TECHNOLOGY
12.
T-TJ-07 – TECHNOLOGY - DETAILS
• Modified detail #1 CCTV Camera Installation to be full conduit as requested.
Attachments: Drawings and specifications listed above.
Issued By: Anthony Traylor Date: 08/09/2023
File details come from the government source that posted it. Updated .