Attachment 6 - DEMO BINDER1.pdf

PDF 8 MB Posted

Attached to
Y1DA--626-309 Construct Integrated Health Center (Minor) - Murfreesboro
Solicitation number
36C77623B0037
Issued by

About this file

This solicitation is for a construction project to build an integrated health center at the Alvin C. York VA Medical Center campus in Murfreesboro, Tennessee. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas under number 36C77623B0037.

The project, numbered 626-309, will construct a new facility to consolidate clinical and support services currently spread across multiple buildings on the VA campus. Demolition and renovation work is included as part of the project. The statement of work specifies requirements for site preparation, structural work, interior construction and finishes. Pricing will be fixed-price with a period of performance of 730 calendar days from notice to proceed. Proposals are due by February 2023 and award is expected in Spring 2023.

View the file

Other files

File Type Posted
36C77623B0037 0008 - 8-29-23.pdf PDF
36C77623B0037 0007.pdf PDF
36C77623B0037 0006 - 8-22-23.pdf PDF
36C77623B0037 0005 - 8-18-23.pdf PDF
081710 integrated door assemblies - R2.pdf PDF
36C77623B0037 0004 - 08-15-2023.pdf PDF
Technical Questions Round 2 - 8-14-23.docx DOCX document
232113.13 FL - UNDERGROUND HYDRONIC PIPING.pdf PDF
2023-08-09 - IHC - Addendum 2.pdf PDF
IHC - Add 2 - Narrative.pdf PDF
36C77623B0037 0003 - 08-03-2023.pdf PDF
Technical Questions Tracking Spreadsheet - Murf IHC - 7-24-23.pdf PDF
VAMC - IHC - Addendum 1 - Dwgs.pdf PDF
36C77623B0037 0002.pdf PDF
Integrated Health Laydown Areas.pdf PDF
Attachment 17 - Construction Wage Rates - Rutherford County - 6-30-23.pdf PDF
Site Visit Sign In Sheet.pdf PDF
36C77623B0037 0001.docx DOCX document
Civil Binder.pdf PDF
Attachment 5 - CIVIL BINDER.pdf PDF
Attachment 11 - MECH BINDER-1.pdf PDF
Attachment 19 - Site Visit Instructions.pdf PDF
36C77623B0037_1.docx DOCX document
Attachment 9 - GENERAL BINDER.pdf PDF
Attachment 3 - ARCHITECTURAL BINDER-1.pdf PDF
Attachment 2 - IHC - SPEC - VOLUME 2.pdf PDF
Attachment 8 - FP BINDER.pdf PDF
Attachment 18 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 7 - ELEC BINDER.pdf PDF
Attachment 1 - IHC - SPEC - VOLUME 1.pdf PDF
Attachment 13 - PLUMBING BINDER.pdf PDF
Attachment 15 - TECH BINDER.pdf PDF
Attachment 10 - INTERIORS BINDER.pdf PDF
Attachment 12 - MECH BINDER-2.pdf PDF
Attachment 17 - Construction Wage Rates.pdf PDF
Attachment 4 - ARCHITECTURAL BINDER-2.pdf PDF
Attachment 14 - STRUCTURAL BINDER.pdf PDF
Attachment 16 - Limitations on Subcontracting - Construction Jan 2023 Deviation.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02.83

02.84 02.8402.15

02.17 02.17

02.80 02.80

02.83

02.83

02.83

02.1602.16

02.64

02.12

CHIEF RECSECRETARYSP SERVBARBERSHOP

CORRIDOR

MEN'S

LOUNGE

MEN WOMEN WOMEN'S

LOUNGE

RECREATION

THERAPY

CLOSET

TOILET

REC

THERAPY

CHIEF

ENTRANCE

REC

THERAPY

ENTRANCE

JAN

CORRIDOR

C O R R

ID

O R T O B

LD

G

CORRIDOR TO BLDG 7

02.16

02.42

02.42

02.42

DEMO LEGEND

WALL TO BE DEMOLISHED

DOOR/FRAME TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

PLUMBING FIXTURES TO BE DEMOLISHED

DEMO AERA OUTSIDE OF WARD

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2020

TLC No.:

www.tlc-engineers.com

120483

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

214 Centerview Drive Suite 300 Brentwood, TN 37027

615.370.8500woldhfr.com

WOLD | HFR DESIGN

102 THIRD AVENUE NE

HICKORY, NC 28601

PHONE: 828.315.9962

FAX: 828.315.9966

NC ENGINEERING LICENSE NO: P-0214

NC ARCHITECTURE LICENSE NO: 51254

MURFREESBORO, TN

KEYPLAN

AREA A

AREA B

OUT OF

SCOPE

B

IM

/T

V H

S

A lv in C

Y o rk

V A

I n te g ra te d H e a lt h /2

A R

C H

P

R O

J E

C T

C E

N T

R A

L .r v t

/2

/2

:5

:1

P

M

AD 01.01

PHASE I DEMO PLAN TVHS - ALVIN C. YORK VAMC -

INTEGRATED HEALTH CENTER

AT05-20-2022

626-309

RA

1/16" = 1'-0"

1 GROUND FLOOR DEMO PLAN PHASE I

DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.

ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.

KEYNOTE SCHEDULE

02.12 REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL,

SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT

SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT,

AND DUCTWORK, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION.

PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE. REF RCP AND FINISH PLAN.

02.15 REMOVE WOOD FLOORING AND ANY OTHER FINISH FLOORING TO EXISTING CONCRETE

FLOOR SLAB, INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS

REQUIRED TO RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR

02.16 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING

LEAVES, FRAME AND HARDWARE.

02.17 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING

LEAVES, FRAME AND HARDWARE. PREP OPENING TO RECEIVE BRICK INFILL

02.42 REMOVE EXISTING HIGH WINDOWS AND ALL ASSOCIATED HARDWARE. REF. NEW WORK FOR

INFILL.

02.64 REMOVE PORTION OF EXISTING WALL TO ALLOW FOR NEW CASED OPENING. BRACE

EXISTING CMU WALL UNTIL NEW STRUCTURE IS PUT INTO PLACE.

02.80 DEMO EXISTING RAMP AND RAILING. INFILL AS REQUIRED. REF. CIVIL DRAWINGS FOR MORE

INFORMATION

02.83 DEMO ALL EXISTING FURRING WALLS AND BUILT-UP WALL PANELS AROUND THE GYM.

REMOVE EXISTING BRICK ALL AROUND THE INTERIOR SIDE OF THE EXISTING GYM BACK TO

THE EXISTING CMU WALLS, INCLUDING THE PILASTERS. PREPARE CMU FOR NEW FURRING

WALL.

02.84 REMOVE AND DISCARD OF BASKETBALL GOALS (2).

2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /

ARCHITECT SPECIFICATIONS.

1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.

EQUIPMENT

3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.

2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT

DEMOLITION.

1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO

DEMOLITION.

STRUCTURAL

6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).

EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.

5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE

PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.

4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.

3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).

2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE

RE-INSTALLED AT NO COST.

1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.

ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES

DURING INTERUPTIONSTOF EXISTING UTILITIES.

MPE SYSTEMS

4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL

GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.

3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS

(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.

2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.

1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR

PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.

HAZARDOUS MATERIALS

2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO

DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.

1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.

RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO

DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.

REGULATORY

2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE

IMPERCEPTIBLE TRANSITION, (U.N.O.)

● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED

FOR RE-USE.

● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /

REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.

● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE

SUBSTRATE (LEVEL AND FILL AS NEEDED).

1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:

ARCHITECTURAL / INTERIORS

7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS

THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.

6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS

REQUIRED TO COMPLETE NEW WORK.

5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED

DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.

4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME

OPERATIONS UNTIL DIRECTED.

3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING

SELECTIVE DEMOLITION OPERATIONS.

2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT

BUILDING AREAS.

1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL

FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.

EXISTING CONDITIONS

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.

6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM

DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.

4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF

CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.

3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC

INFORMATION.

2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.

1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION

PLAN.)

GENERAL

GENERAL DEMOLITION NOTES

0 8' 16' 32'4'

NOTE: THIS DRAWING MUST BE

PRINTED IN COLOR FOR AN ACCURATE

DEPICTION OF INFORMATION

Revisions: Date:

02.16

02.11

02.19

02.12 02.13

CHIEF RECSECRETARYSP SERVBARBERSHOP

CORRIDOR

MEN'S

LOUNGE

MEN WOMEN WOMEN'S

LOUNGE

RECREATION

THERAPY

CLOSET

TOILET

REC

THERAPY

CHIEF

ENTRANCE

REC

THERAPY

ENTRANCE

JAN

CORRIDOR

02.1102.11

02.40

02.11

C O R R

ID

O R T O B

LD

G

CORRIDOR TO BLDG 7 02.58 02.5802.16

02.20

02.10

02.10

02.16

02.16

02.16 02.16

02.10

02.10 02.1602.1602.10

07.05

02.1602.16

02.16

02.1602.16

02.16

02.16

02.11

02.10 02.10

02.10

02.10 02.10

02.10

02.2002.2002.2002.20 02.2002.2002.2002.2002.20 02.2002.2002.2002.20

02.12

02.1202.1202.12 02.12

02.12

02.12

02.1202.13

02.1302.13

02.13

02.13 02.13 02.13

02.13 02.13

02.27

02.27 02.27

DEMO LEGEND

WALL TO BE DEMOLISHED

DOOR/FRAME TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

PLUMBING FIXTURES TO BE DEMOLISHED

DEMO AERA OUTSIDE OF WARD

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2020

TLC No.:

www.tlc-engineers.com

120483

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

214 Centerview Drive Suite 300 Brentwood, TN 37027

615.370.8500woldhfr.com

WOLD | HFR DESIGN

102 THIRD AVENUE NE

HICKORY, NC 28601

PHONE: 828.315.9962

FAX: 828.315.9966

NC ENGINEERING LICENSE NO: P-0214

NC ARCHITECTURE LICENSE NO: 51254

MURFREESBORO, TN

KEYPLAN

AREA A

AREA B

OUT OF

SCOPE

B

IM

/T

V H

S

A lv in C

Y o rk

V A

I n te g ra te d H e a lt h /2

A R

C H

P

R O

J E

C T

C E

N T

R A

L .r v t

/2

/2

:5

:1

P

M

AD 01.02

PHASE II DEMO PLAN TVHS - ALVIN C. YORK VAMC -

INTEGRATED HEALTH CENTER

AT05-20-2022

626-309

RA

1/16" = 1'-0"

1 GROUND FLOOR DEMO PLAN PHASE II

DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.

ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.

KEYNOTE SCHEDULE

02.10 REMOVE EXISTING PARTITIONS, AS INDICATED BY DASHED LINES, ENTIRELY FROM FLOOR

TO HIGHEST POINT. REMOVE ALL APPERTUNANCES AND DISCONNECT ALL MOUNTED

SERVICES. TYPICAL AT ALL DASHED WALLS

02.11 REMOVE ALL PLUMBING FIXTURES, FAUCETS, FITTINGS, TOILET PARTITIONS, AND

ACCESSORIES AS INDICATED BY RED DASHED LINES. CAP UTILITIES PER MEP

REQUIREMENTS (SEE PLUMBING DRAWINGS).

02.12 REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL,

SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT

SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT,

AND DUCTWORK, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION.

PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE. REF RCP AND FINISH PLAN.

02.13 REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB,

INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO

RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR

02.16 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING

LEAVES, FRAME AND HARDWARE.

02.19 PHASE I DEMO INCLUDING FLOORING FINISHES AND CEILING DEMOLITION SHOULD STOP AT

THIS LINE OR THE EDGE OF THE EXISITNG CORRIDOR. DO NOT EXTEND PAST EXISTING

CORRIDOR OTHER THAN WHAT IS NOTED.

02.20 REMOVE WINDOW INCLUDING ALL FRAMES AND ASSEMBLIES. COORDINATE WITH NEW

WINDOW INSTALLATION.

02.27 REMOVE EXISTING GYP. BOARD, PLASTER AND FURRING WALLS ALONG THE EXTERIOR

WALL BACK TO EXISTING CMU.

02.40 REMOVE EXISTING EXPANSION JOINT AND COVER. CLEAN/REMOVE DEBRIS AND PREP TO

RECEIVE NEW EXPANSION JOINT AND FINISHES.

02.58 REMOVE CROSS CORRIDOR DOORS BEFORE ALL OTHER WORK BEGINS AS PART OF PHASE

IB. THE TEMPORARY PARTITION WILL THEN NEED TO BE CONSTRUCTED AROUND DEMO

AREA BEFORE DEMO WORK CAN BEGIN.

07.05 REMOVE EXISTING CURTAIN WALL INLCUDING GLAZING, DOOR AND HARDWARE. REPLACE

WITH NEW CURTAIN WALL REFERENCE WINDOW ELEVATION P ON SHEET AE 03.04.

2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /

ARCHITECT SPECIFICATIONS.

1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.

EQUIPMENT

3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.

2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT

DEMOLITION.

1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO

DEMOLITION.

STRUCTURAL

6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).

EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.

5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE

PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.

4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.

3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).

2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE

RE-INSTALLED AT NO COST.

1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.

ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES

DURING INTERUPTIONSTOF EXISTING UTILITIES.

MPE SYSTEMS

4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL

GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.

3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS

(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.

2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.

1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR

PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.

HAZARDOUS MATERIALS

2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO

DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.

1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.

RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO

DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.

REGULATORY

2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE

IMPERCEPTIBLE TRANSITION, (U.N.O.)

● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED

FOR RE-USE.

● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /

REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.

● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE

SUBSTRATE (LEVEL AND FILL AS NEEDED).

1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:

ARCHITECTURAL / INTERIORS

7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS

THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.

6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS

REQUIRED TO COMPLETE NEW WORK.

5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED

DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.

4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME

OPERATIONS UNTIL DIRECTED.

3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING

SELECTIVE DEMOLITION OPERATIONS.

2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT

BUILDING AREAS.

1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL

FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.

EXISTING CONDITIONS

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.

6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM

DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.

4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF

CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.

3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC

INFORMATION.

2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.

1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION

PLAN.)

GENERAL

GENERAL DEMOLITION NOTES

0 8' 16' 32'4'

NOTE: THIS DRAWING MUST BE

PRINTED IN COLOR FOR AN ACCURATE

UP

UP

BASEMENT ACCESS

WORK ROOM

DRESS ROOM DRESS ROOM

JAN

STAGE

AUDITORIUM

WOMENLOBBYMENSTORAGE

TRANSFORMER

ENTRANCE

OFFICE SHOWER

THERAPEUTIC POOL/STORAGE

LOCKER

TOILET

TOILET

CORRIDOR

HACLOCKER

STAIR

OFFICESTORAGEOFFICE

EXERCISE/GYMRECREATION HALL

KITCHEN

TLT

02.1202.12

02.1302.13

C O R R

ID

O R T O B

LD

G

CORRIDOR TO BLDG 7

DEMO LEGEND

WALL TO BE DEMOLISHED

DOOR/FRAME TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

PLUMBING FIXTURES TO BE DEMOLISHED

DEMO AERA OUTSIDE OF WARD

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2020

TLC No.:

www.tlc-engineers.com

120483

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

214 Centerview Drive Suite 300 Brentwood, TN 37027

615.370.8500woldhfr.com

WOLD | HFR DESIGN

102 THIRD AVENUE NE

HICKORY, NC 28601

PHONE: 828.315.9962

FAX: 828.315.9966

NC ENGINEERING LICENSE NO: P-0214

NC ARCHITECTURE LICENSE NO: 51254

MURFREESBORO, TN

KEYPLAN

AREA A

AREA B

OUT OF

SCOPE

B

IM

/T

V H

S

A lv in C

Y o rk

V A

I n te g ra te d H e a lt h /2

A R

C H

P

R O

J E

C T

C E

N T

R A

L .r v t

/2

/2

:5

:2

P

M

AD 01.03

PHASE III DEMOLITION PLAN TVHS - ALVIN C. YORK VAMC -

INTEGRATED HEALTH CENTER

AT05-20-2022

626-309

RA

1/16" = 1'-0"

1 GROUND FLOOR DEMO PLAN PHASE III

DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.

ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.

KEYNOTE SCHEDULE

02.12 REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL,

SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT

SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT,

AND DUCTWORK, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION.

PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE. REF RCP AND FINISH PLAN.

02.13 REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB,

INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO

RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR

2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /

ARCHITECT SPECIFICATIONS.

1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.

EQUIPMENT

3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.

2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT

DEMOLITION.

1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO

DEMOLITION.

STRUCTURAL

6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).

EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.

5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE

PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.

4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.

3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).

2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE

RE-INSTALLED AT NO COST.

1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.

ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES

DURING INTERUPTIONSTOF EXISTING UTILITIES.

MPE SYSTEMS

4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL

GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.

3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS

(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.

2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.

1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR

PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.

HAZARDOUS MATERIALS

2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO

DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.

1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.

RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO

DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.

REGULATORY

2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE

IMPERCEPTIBLE TRANSITION, (U.N.O.)

● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED

FOR RE-USE.

● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /

REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.

● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE

SUBSTRATE (LEVEL AND FILL AS NEEDED).

1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:

ARCHITECTURAL / INTERIORS

7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS

THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.

6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS

REQUIRED TO COMPLETE NEW WORK.

5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED

DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.

4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME

OPERATIONS UNTIL DIRECTED.

3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING

SELECTIVE DEMOLITION OPERATIONS.

2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT

BUILDING AREAS.

1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL

FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.

EXISTING CONDITIONS

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.

6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM

DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.

4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF

CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.

3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC

INFORMATION.

2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.

1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION

PLAN.)

GENERAL

GENERAL DEMOLITION NOTES

0 8' 16' 32'4'

NOTE: THIS DRAWING MUST BE

PRINTED IN COLOR FOR AN ACCURATE

DEMO LEGEND

WALL TO BE DEMOLISHED

DOOR/FRAME TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

PLUMBING FIXTURES TO BE DEMOLISHED

DEMO AERA OUTSIDE OF WARD

02.88

02.87

02.13

02.96

02.94

02.13 02.9702.97

02.9702.97

02.77

02.99

02.18

02.79

02.78 02.18

02.81

02.92

02.73

BASEMENT ACCESS

02.87

02.91

02.89

02.89

ELECTRICAL

STAIRS

WORK ROOM

DRESS ROOM DRESS ROOM

JAN

STAGE

AUDITORIUM

WOMENLOBBYMENSTORAGE

TRANSFORMER

ENTRANCE

OFFICE SHOWER

THERAPEUTIC POOL/STORAGE

LOCKER

TOILET

TOILET

CORRIDOR

HACLOCKER

STAIR

OFFICESTORAGEOFFICE

EXERCISE/GYMRECREATION HALL

KITCHEN

TLT

02.70

AS PART OF BASE BID,

TRANSFORMER IS TO BE

REMOVED AND RELOCATED.

REFERENCE ELECTRICAL

DRAWINGS FOR MORE

INFORMATION.

02.66 02.8902.89

02.63 02.63

02.63

02.63

02.63

02.63

02.64

02.64

02.64

02.11

02.62

02.68

02.60

02.60

02.60

02.60

C O R R

ID

O R T O B

LD

G

CORRIDOR TO BLDG 7

DN

02.57

02.57

02.56

UP

02.16 02.16

02.1602.16

02.1102.11 02.10

02.10

02.10

02.11

02.16 02.16

02.1602.16

02.17

02.17

02.16

02.16 02.11

02.1102.16

02.16

02.10

02.16

02.28

02.11 02.11

02.10

02.10

02.10

02.10

02.64

02.16

02.16

02.10

02.16

02.16

02.16

02.10

02.16

02.1102.1102.1102.11

02.14

02.1602.10

02.10

02.11

02.16

02.10

02.10 02.16

02.16

02.16

02.16

02.16

02.16

02.16

02.16

02.10

02.10

02.10

02.11

02.10 02.1602.16

ROOF BELOW

ROOF BELOW

ROOF BELOW

REC THERAPY BELOW

STAIR

STUDIO

FAN ROOM

GENERATOR

RM

REWIND RM PROJECTION ROOM CONTROL RM AMP RM

C O

R R

ID

O

R

AMATEUR

RADIO ROOM

JANITOR

02.11

02.16

02.16

02.10

02.16

02.16

02.10

02.10

02.1002.10

02.16

02.16

02.1602.16

02.16

02.10

02.10

02.10

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2020

TLC No.:

www.tlc-engineers.com

120483

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

214 Centerview Drive Suite 300 Brentwood, TN 37027

615.370.8500woldhfr.com

WOLD | HFR DESIGN

102 THIRD AVENUE NE

HICKORY, NC 28601

PHONE: 828.315.9962

FAX: 828.315.9966

NC ENGINEERING LICENSE NO: P-0214

NC ARCHITECTURE LICENSE NO: 51254

MURFREESBORO, TN

KEYPLAN

AREA A

AREA B

OUT OF

SCOPE

B

IM

/T

V H

S

A lv in C

Y o rk

V A

I n te g ra te d H e a lt h /2

A R

C H

P

R O

J E

C T

C E

N T

R A

L .r v t

/2

/2

:5

:3

P

M

AD 01.04

PHASE IV DEMOLITION PLAN TVHS - ALVIN C. YORK VAMC -

INTEGRATED HEALTH CENTER

AT05-20-2022

626-309

RA

DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.

ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.

KEYNOTE SCHEDULE

02.64 REMOVE PORTION OF EXISTING WALL TO ALLOW FOR NEW CASED OPENING. BRACE

EXISTING CMU WALL UNTIL NEW STRUCTURE IS PUT INTO PLACE.

02.66 DEMO EXISTING CONCRETE PAD

02.68 EXISTING LADDER TO ROOF TO REMAIN.

02.70 EXISTING WALL TO REMAIN. MINIMIZE DAMAGE AND PREPARE TO RECEIVE NEW FURRING

WALL.

02.73 REMOVE FINISHES ON STAGE TO EXISTING SLAB ON GRADE. REPAIR ANY DAMAGE TO

EXISTING SLAB

02.77 DEMO EXSITING METAL STAIR AND RAILING.

02.78 REMOVE EXISTING DOOR(S) AND RECESSED WALLS. REF. NEW PLAN FOR DOOR ADDITION

02.79 DEMO EXISTING STAIRS AND RAILING TO FINISH GRADE.

02.81 REMOVE EXISTING DOOR. PREP OPENING TO RECEIVE NEW SLIDING DOOR. REF. FLOOR

PLAN FOR MORE INFORMATION. CAREFULLY REMOVE ANY BRICK AND STORE FREE OF

DAMAGE. THE BRICK IS TO BE REUSED FOR WALL INFILL IN VARIOUS LOCATIONS AROUND

THE BUILDING. REF NEW PLAN FOR LOCATIONS

02.87 CAREFULLY REMOVE BRICK FROM AROUND THE DOOR. STORE THE BRICK IN A SAFE

LOCATION TO BE FREE FROM DAMAGE. THE BRICK IS TO BE REUSED FOR WALL INFILL IN

VARIOUS LOCATIONS AROUND THE BUILDING.

02.88 REMOVE EXISTING CONCRETE STOOP.

02.89 S.T.F.U. BLOCKING TO BE REMOVED BACK TO EXISTING CMU. PREP CMU FOR NEW WALL.

02.91 EXISTING POOL LINER TO REMAIN. REF. STRUCTURAL FOR INFILL MATERIAL

02.92 DEMO HANDRAILS AROUND POOL. REPAIR ANY DAMAGE CAUSED TO EXISTING SLAB.

02.94 EXISTING AUDITORIUM WALLS TO REMAIN.

02.96 REMOVE AND DISPOSE OF ALL SEATS.

02.97 REMOVE ENTIRETY OF CMU WALLS AND ALL ITEMS THAT ARE CONNECTED INCLUDING

LOUVERS, EXIT SIGNS, ETC.

02.99 REMOVE EXISTING DOOR AND FRAME AND PREP OPENING FOR WALL INFILL USING

EXISTING BRICKS SALAVAGED FROM VARIOUS DEMO LOCATIONS

DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.

ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.

KEYNOTE SCHEDULE

02.10 REMOVE EXISTING PARTITIONS, AS INDICATED BY DASHED LINES, ENTIRELY FROM FLOOR

TO HIGHEST POINT. REMOVE ALL APPERTUNANCES AND DISCONNECT ALL MOUNTED

SERVICES. TYPICAL AT ALL DASHED WALLS

02.11 REMOVE ALL PLUMBING FIXTURES, FAUCETS, FITTINGS, TOILET PARTITIONS, AND

ACCESSORIES AS INDICATED BY RED DASHED LINES. CAP UTILITIES PER MEP

REQUIREMENTS (SEE PLUMBING DRAWINGS).

02.13 REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB,

INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO

RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR

02.14 REMOVE EXISTING FLOOR TILE AND CHIP OUT GROUT. PATCH AND LEVEL SLAB AS

REQUIRED TO RECEIVE NEW FLOOR FINISHES.

02.16 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING

LEAVES, FRAME AND HARDWARE.

02.17 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING

LEAVES, FRAME AND HARDWARE. PREP OPENING TO RECEIVE BRICK INFILL

02.18 PROTECT EXISTING ELEMENTS TO REMAIN DURING CONSTRUCTION. PATCH/REPAIR

DAMAGED ELEMENTS DUE TO DEMOLITION OR NEW CONSTRUCTION WITH SIMILAR

ADJACENT MATERIALS.

02.28 REMOVE EXISTING CASEWORK ALONG WITH ALL HARDWARE AND ATTACHED

ACCESSORIES.

02.56 REMOVE METAL STAIRS DOWN TO THE BASEMENT.

02.57 REMOVE RAMP DOWN TO EXISTING CONCRETE SLAB.

02.60 CAREFULLY REMOVE A PORTION OF THE BRICK AS INDICATED BY THE DASHED LINES. THE

BRICK IS TO BE REUSED FOR WALL INFILL IN VARIOUS LOCATIONS AROUND THE BUILDING.

REF NEW PLAN FOR LOCATIONS

02.62 ALL EXISTING OVERHEAD STEEL IN PROSCENIUM TO REMAIN AS IS.

02.63 CAREFULLY REMOVE BRICK AS INDICATED BY RED DASHED LINES. STORE THE BRICK IN A

SAFE LOCATION TO BE FREE FROM DAMAGE. THE BRICK IS TO BE REUSED FOR WALL INFILL

IN VARIOUS LOCATIONS AROUND THE BUILDING. REF NEW PLAN FOR LOCATIONS

1/16" = 1'-0"

1 GROUND FLOOR DEMO PLAN PHASE IV

1/16" = 1'-0"

2 MECH EQUIP PLATFORM DEMO PLAN - PHASE IV

2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /

ARCHITECT SPECIFICATIONS.

1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.

EQUIPMENT

3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.

2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT

DEMOLITION.

1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO

DEMOLITION.

STRUCTURAL

6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).

EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.

5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE

PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.

4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.

3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).

2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE

RE-INSTALLED AT NO COST.

1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.

ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES

DURING INTERUPTIONSTOF EXISTING UTILITIES.

MPE SYSTEMS

4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL

GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.

3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS

(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.

2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.

1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR

PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.

HAZARDOUS MATERIALS

2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO

DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.

1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.

RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO

DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.

REGULATORY

2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE

IMPERCEPTIBLE TRANSITION, (U.N.O.)

● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED

FOR RE-USE.

● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /

REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.

● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE

SUBSTRATE (LEVEL AND FILL AS NEEDED).

1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:

ARCHITECTURAL / INTERIORS

7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS

THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.

6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS

REQUIRED TO COMPLETE NEW WORK.

5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED

DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.

4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME

OPERATIONS UNTIL DIRECTED.

3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING

SELECTIVE DEMOLITION OPERATIONS.

2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT

BUILDING AREAS.

1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL

FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.

EXISTING CONDITIONS

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.

6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM

DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.

4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF

CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.

3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC

INFORMATION.

2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.

1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION

PLAN.)

GENERAL

GENERAL DEMOLITION NOTES

0 8' 16' 32'4'

0 8' 16' 32'4'

NOTE: THIS DRAWING MUST BE

PRINTED IN COLOR FOR AN ACCURATE

HOLDOPEN

HOLDOPEN

FEC FEC

FEC

F E

C

FEC

FEC

F E

C

FEC

F E

C

F E

C

UP

UP

UP

FEC FEC

F E

C

F E

C

UP

CR

.8

72.0'

.0

BASEMENT ACCESS

02.16

02.16

02.20

02.1202.12 02.1302.13

02.61

C O R R

ID

O R T O B

LD

G

CORRIDOR TO BLDG 7

02.2002.2002.2002.2002.2002.20

02.2002.2002.20

02.20

DEMO LEGEND

WALL TO BE DEMOLISHED

DOOR/FRAME TO BE DEMOLISHED

EXISTING PARTITION TO REMAIN

PLUMBING FIXTURES TO BE DEMOLISHED

DEMO AERA OUTSIDE OF WARD

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2020

TLC No.:

www.tlc-engineers.com

120483

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

214 Centerview Drive Suite 300 Brentwood, TN 37027

615.370.8500woldhfr.com

WOLD | HFR DESIGN

102 THIRD AVENUE NE

HICKORY, NC 28601

PHONE: 828.315.9962

FAX: 828.315.9966

NC ENGINEERING LICENSE NO: P-0214

NC ARCHITECTURE LICENSE NO: 51254

MURFREESBORO, TN

KEYPLAN

AREA A

AREA B

OUT OF

SCOPE

B

IM

/T

V H

S

A lv in C

Y o rk

V A

I n te g ra te d H e a lt h /2

A R

C H

P

R O

J E

C T

C E

N T

R A

L .r v t

/2

/2

:5

:3

P

M

AD 01.05

PHASE V DEMOLITION PLAN TVHS - ALVIN C. YORK VAMC -

INTEGRATED HEALTH CENTER

AT05-20-2022

626-309

RA

1/16" = 1'-0"

1 GROUND FLOOR DEMO PLAN PHASE V

DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.

ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.

KEYNOTE SCHEDULE

02.12 REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL,

SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT

SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT,

AND DUCTWORK, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION.

PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE. REF RCP AND FINISH PLAN.

02.13 REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB,

INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO

RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR

02.16 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING

LEAVES, FRAME AND HARDWARE.

02.20 REMOVE WINDOW INCLUDING ALL FRAMES AND ASSEMBLIES. COORDINATE WITH NEW

WINDOW INSTALLATION.

02.61 APPROXIMATE LOCATION OF EDGE OF DEMO. COORDINATE WITH COR AND WITH PHASE IIB

ON EXACT LOCATION OF EDGE OF DEMOLITION

2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /

ARCHITECT SPECIFICATIONS.

1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.

EQUIPMENT

3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.

2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT

DEMOLITION.

1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO

DEMOLITION.

STRUCTURAL

6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).

EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.

5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE

PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.

4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.

3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).

2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE

RE-INSTALLED AT NO COST.

1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.

ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES

DURING INTERUPTIONSTOF EXISTING UTILITIES.

MPE SYSTEMS

4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL

GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.

3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS

(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.

2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.

1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR

PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.

HAZARDOUS MATERIALS

2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO

DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.

1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.

RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO

DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.

REGULATORY

2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE

IMPERCEPTIBLE TRANSITION, (U.N.O.)

● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED

FOR RE-USE.

● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /

REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.

● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE

SUBSTRATE (LEVEL AND FILL AS NEEDED).

1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:

ARCHITECTURAL / INTERIORS

7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS

THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.

6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS

REQUIRED TO COMPLETE NEW WORK.

5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED

DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.

4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME

OPERATIONS UNTIL DIRECTED.

3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING

SELECTIVE DEMOLITION OPERATIONS.

2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT

BUILDING AREAS.

1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL

FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.

EXISTING CONDITIONS

7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND

SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.

6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM

DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.

4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF

CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.

3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC

INFORMATION.

2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.

1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION

PLAN.)

GENERAL

GENERAL DEMOLITION NOTES

0 8' 16' 32'4'

NOTE: THIS DRAWING MUST BE

PRINTED IN COLOR FOR AN ACCURATE

DEMO EXSITING METAL STAIR AND

RAILING.

REMOVE EXISTING DOOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .