This solicitation is for a construction project to build an integrated health center at the Alvin C. York VA Medical Center campus in Murfreesboro, Tennessee. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas under number 36C77623B0037.
The project, numbered 626-309, will construct a new facility to consolidate clinical and support services currently spread across multiple buildings on the VA campus. Demolition and renovation work is included as part of the project. The statement of work specifies requirements for site preparation, structural work, interior construction and finishes. Pricing will be fixed-price with a period of performance of 730 calendar days from notice to proceed. Proposals are due by February 2023 and award is expected in Spring 2023.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02.83
02.84 02.8402.15
02.17 02.17
02.80 02.80
02.83
02.83
02.83
02.1602.16
02.64
02.12
CHIEF RECSECRETARYSP SERVBARBERSHOP
CORRIDOR
MEN'S
LOUNGE
MEN WOMEN WOMEN'S
LOUNGE
RECREATION
THERAPY
CLOSET
TOILET
REC
THERAPY
CHIEF
ENTRANCE
REC
THERAPY
ENTRANCE
JAN
CORRIDOR
C O R R
ID
O R T O B
LD
G
CORRIDOR TO BLDG 7
02.16
02.42
02.42
02.42
DEMO LEGEND
WALL TO BE DEMOLISHED
DOOR/FRAME TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
PLUMBING FIXTURES TO BE DEMOLISHED
DEMO AERA OUTSIDE OF WARD
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
120483
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
AREA B
OUT OF
SCOPE
B
IM
/T
V H
S
A lv in C
Y o rk
V A
I n te g ra te d H e a lt h /2
A R
C H
P
R O
J E
C T
C E
N T
R A
L .r v t
/2
/2
:5
:1
P
M
AD 01.01
PHASE I DEMO PLAN TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
AT05-20-2022
626-309
RA
1/16" = 1'-0"
1 GROUND FLOOR DEMO PLAN PHASE I
DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.
ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.
KEYNOTE SCHEDULE
02.12 REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL,
SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT
SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT,
AND DUCTWORK, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION.
PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE. REF RCP AND FINISH PLAN.
02.15 REMOVE WOOD FLOORING AND ANY OTHER FINISH FLOORING TO EXISTING CONCRETE
FLOOR SLAB, INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS
REQUIRED TO RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR
02.16 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING
LEAVES, FRAME AND HARDWARE.
02.17 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING
LEAVES, FRAME AND HARDWARE. PREP OPENING TO RECEIVE BRICK INFILL
02.42 REMOVE EXISTING HIGH WINDOWS AND ALL ASSOCIATED HARDWARE. REF. NEW WORK FOR
INFILL.
02.64 REMOVE PORTION OF EXISTING WALL TO ALLOW FOR NEW CASED OPENING. BRACE
EXISTING CMU WALL UNTIL NEW STRUCTURE IS PUT INTO PLACE.
02.80 DEMO EXISTING RAMP AND RAILING. INFILL AS REQUIRED. REF. CIVIL DRAWINGS FOR MORE
INFORMATION
02.83 DEMO ALL EXISTING FURRING WALLS AND BUILT-UP WALL PANELS AROUND THE GYM.
REMOVE EXISTING BRICK ALL AROUND THE INTERIOR SIDE OF THE EXISTING GYM BACK TO
THE EXISTING CMU WALLS, INCLUDING THE PILASTERS. PREPARE CMU FOR NEW FURRING
WALL.
02.84 REMOVE AND DISCARD OF BASKETBALL GOALS (2).
2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /
ARCHITECT SPECIFICATIONS.
1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.
EQUIPMENT
3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.
2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT
DEMOLITION.
1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO
DEMOLITION.
STRUCTURAL
6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).
EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.
5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE
PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.
4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.
3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).
2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE
RE-INSTALLED AT NO COST.
1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.
ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES
DURING INTERUPTIONSTOF EXISTING UTILITIES.
MPE SYSTEMS
4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL
GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.
3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS
(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.
2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.
1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR
PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.
HAZARDOUS MATERIALS
2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO
DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.
1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.
RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO
DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.
REGULATORY
2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE
IMPERCEPTIBLE TRANSITION, (U.N.O.)
● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED
FOR RE-USE.
● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /
REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.
● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE
SUBSTRATE (LEVEL AND FILL AS NEEDED).
1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:
ARCHITECTURAL / INTERIORS
7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS
THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.
6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS
REQUIRED TO COMPLETE NEW WORK.
5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED
DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.
4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME
OPERATIONS UNTIL DIRECTED.
3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING
SELECTIVE DEMOLITION OPERATIONS.
2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT
BUILDING AREAS.
1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL
FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.
EXISTING CONDITIONS
7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.
6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.
5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM
DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.
4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF
CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.
3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC
INFORMATION.
2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.
1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION
PLAN.)
GENERAL
GENERAL DEMOLITION NOTES
0 8' 16' 32'4'
NOTE: THIS DRAWING MUST BE
PRINTED IN COLOR FOR AN ACCURATE
DEPICTION OF INFORMATION
Revisions: Date:
02.16
02.11
02.19
02.12 02.13
CHIEF RECSECRETARYSP SERVBARBERSHOP
CORRIDOR
MEN'S
LOUNGE
MEN WOMEN WOMEN'S
LOUNGE
RECREATION
THERAPY
CLOSET
TOILET
REC
THERAPY
CHIEF
ENTRANCE
REC
THERAPY
ENTRANCE
JAN
CORRIDOR
02.1102.11
02.40
02.11
C O R R
ID
O R T O B
LD
G
CORRIDOR TO BLDG 7 02.58 02.5802.16
02.20
02.10
02.10
02.16
02.16
02.16 02.16
02.10
02.10 02.1602.1602.10
07.05
02.1602.16
02.16
02.1602.16
02.16
02.16
02.11
02.10 02.10
02.10
02.10 02.10
02.10
02.2002.2002.2002.20 02.2002.2002.2002.2002.20 02.2002.2002.2002.20
02.12
02.1202.1202.12 02.12
02.12
02.12
02.1202.13
02.1302.13
02.13
02.13 02.13 02.13
02.13 02.13
02.27
02.27 02.27
DEMO LEGEND
WALL TO BE DEMOLISHED
DOOR/FRAME TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
PLUMBING FIXTURES TO BE DEMOLISHED
DEMO AERA OUTSIDE OF WARD
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
120483
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
AREA B
OUT OF
SCOPE
B
IM
/T
V H
S
A lv in C
Y o rk
V A
I n te g ra te d H e a lt h /2
A R
C H
P
R O
J E
C T
C E
N T
R A
L .r v t
/2
/2
:5
:1
P
M
AD 01.02
PHASE II DEMO PLAN TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
AT05-20-2022
626-309
RA
1/16" = 1'-0"
1 GROUND FLOOR DEMO PLAN PHASE II
DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.
ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.
KEYNOTE SCHEDULE
02.10 REMOVE EXISTING PARTITIONS, AS INDICATED BY DASHED LINES, ENTIRELY FROM FLOOR
TO HIGHEST POINT. REMOVE ALL APPERTUNANCES AND DISCONNECT ALL MOUNTED
SERVICES. TYPICAL AT ALL DASHED WALLS
02.11 REMOVE ALL PLUMBING FIXTURES, FAUCETS, FITTINGS, TOILET PARTITIONS, AND
ACCESSORIES AS INDICATED BY RED DASHED LINES. CAP UTILITIES PER MEP
REQUIREMENTS (SEE PLUMBING DRAWINGS).
02.12 REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL,
SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT
SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT,
AND DUCTWORK, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION.
PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE. REF RCP AND FINISH PLAN.
02.13 REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB,
INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO
RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR
02.16 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING
LEAVES, FRAME AND HARDWARE.
02.19 PHASE I DEMO INCLUDING FLOORING FINISHES AND CEILING DEMOLITION SHOULD STOP AT
THIS LINE OR THE EDGE OF THE EXISITNG CORRIDOR. DO NOT EXTEND PAST EXISTING
CORRIDOR OTHER THAN WHAT IS NOTED.
02.20 REMOVE WINDOW INCLUDING ALL FRAMES AND ASSEMBLIES. COORDINATE WITH NEW
WINDOW INSTALLATION.
02.27 REMOVE EXISTING GYP. BOARD, PLASTER AND FURRING WALLS ALONG THE EXTERIOR
WALL BACK TO EXISTING CMU.
02.40 REMOVE EXISTING EXPANSION JOINT AND COVER. CLEAN/REMOVE DEBRIS AND PREP TO
RECEIVE NEW EXPANSION JOINT AND FINISHES.
02.58 REMOVE CROSS CORRIDOR DOORS BEFORE ALL OTHER WORK BEGINS AS PART OF PHASE
IB. THE TEMPORARY PARTITION WILL THEN NEED TO BE CONSTRUCTED AROUND DEMO
AREA BEFORE DEMO WORK CAN BEGIN.
07.05 REMOVE EXISTING CURTAIN WALL INLCUDING GLAZING, DOOR AND HARDWARE. REPLACE
WITH NEW CURTAIN WALL REFERENCE WINDOW ELEVATION P ON SHEET AE 03.04.
2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /
ARCHITECT SPECIFICATIONS.
1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.
EQUIPMENT
3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.
2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT
DEMOLITION.
1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO
DEMOLITION.
STRUCTURAL
6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).
EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.
5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE
PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.
4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.
3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).
2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE
RE-INSTALLED AT NO COST.
1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.
ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES
DURING INTERUPTIONSTOF EXISTING UTILITIES.
MPE SYSTEMS
4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL
GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.
3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS
(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.
2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.
1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR
PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.
HAZARDOUS MATERIALS
2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO
DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.
1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.
RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO
DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.
REGULATORY
2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE
IMPERCEPTIBLE TRANSITION, (U.N.O.)
● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED
FOR RE-USE.
● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /
REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.
● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE
SUBSTRATE (LEVEL AND FILL AS NEEDED).
1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:
ARCHITECTURAL / INTERIORS
7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS
THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.
6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS
REQUIRED TO COMPLETE NEW WORK.
5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED
DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.
4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME
OPERATIONS UNTIL DIRECTED.
3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING
SELECTIVE DEMOLITION OPERATIONS.
2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT
BUILDING AREAS.
1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL
FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.
EXISTING CONDITIONS
7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.
6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.
5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM
DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.
4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF
CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.
3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC
INFORMATION.
2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.
1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION
PLAN.)
GENERAL
GENERAL DEMOLITION NOTES
0 8' 16' 32'4'
NOTE: THIS DRAWING MUST BE
PRINTED IN COLOR FOR AN ACCURATE
UP
UP
BASEMENT ACCESS
WORK ROOM
DRESS ROOM DRESS ROOM
JAN
STAGE
AUDITORIUM
WOMENLOBBYMENSTORAGE
TRANSFORMER
ENTRANCE
OFFICE SHOWER
THERAPEUTIC POOL/STORAGE
LOCKER
TOILET
TOILET
CORRIDOR
HACLOCKER
STAIR
OFFICESTORAGEOFFICE
EXERCISE/GYMRECREATION HALL
KITCHEN
TLT
02.1202.12
02.1302.13
C O R R
ID
O R T O B
LD
G
CORRIDOR TO BLDG 7
DEMO LEGEND
WALL TO BE DEMOLISHED
DOOR/FRAME TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
PLUMBING FIXTURES TO BE DEMOLISHED
DEMO AERA OUTSIDE OF WARD
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
120483
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
AREA B
OUT OF
SCOPE
B
IM
/T
V H
S
A lv in C
Y o rk
V A
I n te g ra te d H e a lt h /2
A R
C H
P
R O
J E
C T
C E
N T
R A
L .r v t
/2
/2
:5
:2
P
M
AD 01.03
PHASE III DEMOLITION PLAN TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
AT05-20-2022
626-309
RA
1/16" = 1'-0"
1 GROUND FLOOR DEMO PLAN PHASE III
DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.
ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.
KEYNOTE SCHEDULE
02.12 REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL,
SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT
SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT,
AND DUCTWORK, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION.
PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE. REF RCP AND FINISH PLAN.
02.13 REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB,
INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO
RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR
2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /
ARCHITECT SPECIFICATIONS.
1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.
EQUIPMENT
3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.
2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT
DEMOLITION.
1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO
DEMOLITION.
STRUCTURAL
6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).
EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.
5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE
PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.
4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.
3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).
2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE
RE-INSTALLED AT NO COST.
1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.
ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES
DURING INTERUPTIONSTOF EXISTING UTILITIES.
MPE SYSTEMS
4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL
GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.
3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS
(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.
2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.
1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR
PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.
HAZARDOUS MATERIALS
2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO
DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.
1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.
RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO
DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.
REGULATORY
2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE
IMPERCEPTIBLE TRANSITION, (U.N.O.)
● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED
FOR RE-USE.
● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /
REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.
● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE
SUBSTRATE (LEVEL AND FILL AS NEEDED).
1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:
ARCHITECTURAL / INTERIORS
7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS
THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.
6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS
REQUIRED TO COMPLETE NEW WORK.
5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED
DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.
4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME
OPERATIONS UNTIL DIRECTED.
3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING
SELECTIVE DEMOLITION OPERATIONS.
2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT
BUILDING AREAS.
1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL
FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.
EXISTING CONDITIONS
7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.
6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.
5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM
DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.
4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF
CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.
3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC
INFORMATION.
2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.
1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION
PLAN.)
GENERAL
GENERAL DEMOLITION NOTES
0 8' 16' 32'4'
NOTE: THIS DRAWING MUST BE
PRINTED IN COLOR FOR AN ACCURATE
DEMO LEGEND
WALL TO BE DEMOLISHED
DOOR/FRAME TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
PLUMBING FIXTURES TO BE DEMOLISHED
DEMO AERA OUTSIDE OF WARD
02.88
02.87
02.13
02.96
02.94
02.13 02.9702.97
02.9702.97
02.77
02.99
02.18
02.79
02.78 02.18
02.81
02.92
02.73
BASEMENT ACCESS
02.87
02.91
02.89
02.89
ELECTRICAL
STAIRS
WORK ROOM
DRESS ROOM DRESS ROOM
JAN
STAGE
AUDITORIUM
WOMENLOBBYMENSTORAGE
TRANSFORMER
ENTRANCE
OFFICE SHOWER
THERAPEUTIC POOL/STORAGE
LOCKER
TOILET
TOILET
CORRIDOR
HACLOCKER
STAIR
OFFICESTORAGEOFFICE
EXERCISE/GYMRECREATION HALL
KITCHEN
TLT
02.70
AS PART OF BASE BID,
TRANSFORMER IS TO BE
REMOVED AND RELOCATED.
REFERENCE ELECTRICAL
DRAWINGS FOR MORE
INFORMATION.
02.66 02.8902.89
02.63 02.63
02.63
02.63
02.63
02.63
02.64
02.64
02.64
02.11
02.62
02.68
02.60
02.60
02.60
02.60
C O R R
ID
O R T O B
LD
G
CORRIDOR TO BLDG 7
DN
02.57
02.57
02.56
UP
02.16 02.16
02.1602.16
02.1102.11 02.10
02.10
02.10
02.11
02.16 02.16
02.1602.16
02.17
02.17
02.16
02.16 02.11
02.1102.16
02.16
02.10
02.16
02.28
02.11 02.11
02.10
02.10
02.10
02.10
02.64
02.16
02.16
02.10
02.16
02.16
02.16
02.10
02.16
02.1102.1102.1102.11
02.14
02.1602.10
02.10
02.11
02.16
02.10
02.10 02.16
02.16
02.16
02.16
02.16
02.16
02.16
02.16
02.10
02.10
02.10
02.11
02.10 02.1602.16
ROOF BELOW
ROOF BELOW
ROOF BELOW
REC THERAPY BELOW
STAIR
STUDIO
FAN ROOM
GENERATOR
RM
REWIND RM PROJECTION ROOM CONTROL RM AMP RM
C O
R R
ID
O
R
AMATEUR
RADIO ROOM
JANITOR
02.11
02.16
02.16
02.10
02.16
02.16
02.10
02.10
02.1002.10
02.16
02.16
02.1602.16
02.16
02.10
02.10
02.10
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
120483
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
AREA B
OUT OF
SCOPE
B
IM
/T
V H
S
A lv in C
Y o rk
V A
I n te g ra te d H e a lt h /2
A R
C H
P
R O
J E
C T
C E
N T
R A
L .r v t
/2
/2
:5
:3
P
M
AD 01.04
PHASE IV DEMOLITION PLAN TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
AT05-20-2022
626-309
RA
DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.
ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.
KEYNOTE SCHEDULE
02.64 REMOVE PORTION OF EXISTING WALL TO ALLOW FOR NEW CASED OPENING. BRACE
EXISTING CMU WALL UNTIL NEW STRUCTURE IS PUT INTO PLACE.
02.66 DEMO EXISTING CONCRETE PAD
02.68 EXISTING LADDER TO ROOF TO REMAIN.
02.70 EXISTING WALL TO REMAIN. MINIMIZE DAMAGE AND PREPARE TO RECEIVE NEW FURRING
WALL.
02.73 REMOVE FINISHES ON STAGE TO EXISTING SLAB ON GRADE. REPAIR ANY DAMAGE TO
EXISTING SLAB
02.77 DEMO EXSITING METAL STAIR AND RAILING.
02.78 REMOVE EXISTING DOOR(S) AND RECESSED WALLS. REF. NEW PLAN FOR DOOR ADDITION
02.79 DEMO EXISTING STAIRS AND RAILING TO FINISH GRADE.
02.81 REMOVE EXISTING DOOR. PREP OPENING TO RECEIVE NEW SLIDING DOOR. REF. FLOOR
PLAN FOR MORE INFORMATION. CAREFULLY REMOVE ANY BRICK AND STORE FREE OF
DAMAGE. THE BRICK IS TO BE REUSED FOR WALL INFILL IN VARIOUS LOCATIONS AROUND
THE BUILDING. REF NEW PLAN FOR LOCATIONS
02.87 CAREFULLY REMOVE BRICK FROM AROUND THE DOOR. STORE THE BRICK IN A SAFE
LOCATION TO BE FREE FROM DAMAGE. THE BRICK IS TO BE REUSED FOR WALL INFILL IN
VARIOUS LOCATIONS AROUND THE BUILDING.
02.88 REMOVE EXISTING CONCRETE STOOP.
02.89 S.T.F.U. BLOCKING TO BE REMOVED BACK TO EXISTING CMU. PREP CMU FOR NEW WALL.
02.91 EXISTING POOL LINER TO REMAIN. REF. STRUCTURAL FOR INFILL MATERIAL
02.92 DEMO HANDRAILS AROUND POOL. REPAIR ANY DAMAGE CAUSED TO EXISTING SLAB.
02.94 EXISTING AUDITORIUM WALLS TO REMAIN.
02.96 REMOVE AND DISPOSE OF ALL SEATS.
02.97 REMOVE ENTIRETY OF CMU WALLS AND ALL ITEMS THAT ARE CONNECTED INCLUDING
LOUVERS, EXIT SIGNS, ETC.
02.99 REMOVE EXISTING DOOR AND FRAME AND PREP OPENING FOR WALL INFILL USING
EXISTING BRICKS SALAVAGED FROM VARIOUS DEMO LOCATIONS
DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.
ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.
KEYNOTE SCHEDULE
02.10 REMOVE EXISTING PARTITIONS, AS INDICATED BY DASHED LINES, ENTIRELY FROM FLOOR
TO HIGHEST POINT. REMOVE ALL APPERTUNANCES AND DISCONNECT ALL MOUNTED
SERVICES. TYPICAL AT ALL DASHED WALLS
02.11 REMOVE ALL PLUMBING FIXTURES, FAUCETS, FITTINGS, TOILET PARTITIONS, AND
ACCESSORIES AS INDICATED BY RED DASHED LINES. CAP UTILITIES PER MEP
REQUIREMENTS (SEE PLUMBING DRAWINGS).
02.13 REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB,
INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO
RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR
02.14 REMOVE EXISTING FLOOR TILE AND CHIP OUT GROUT. PATCH AND LEVEL SLAB AS
REQUIRED TO RECEIVE NEW FLOOR FINISHES.
02.16 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING
LEAVES, FRAME AND HARDWARE.
02.17 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING
LEAVES, FRAME AND HARDWARE. PREP OPENING TO RECEIVE BRICK INFILL
02.18 PROTECT EXISTING ELEMENTS TO REMAIN DURING CONSTRUCTION. PATCH/REPAIR
DAMAGED ELEMENTS DUE TO DEMOLITION OR NEW CONSTRUCTION WITH SIMILAR
ADJACENT MATERIALS.
02.28 REMOVE EXISTING CASEWORK ALONG WITH ALL HARDWARE AND ATTACHED
ACCESSORIES.
02.56 REMOVE METAL STAIRS DOWN TO THE BASEMENT.
02.57 REMOVE RAMP DOWN TO EXISTING CONCRETE SLAB.
02.60 CAREFULLY REMOVE A PORTION OF THE BRICK AS INDICATED BY THE DASHED LINES. THE
BRICK IS TO BE REUSED FOR WALL INFILL IN VARIOUS LOCATIONS AROUND THE BUILDING.
REF NEW PLAN FOR LOCATIONS
02.62 ALL EXISTING OVERHEAD STEEL IN PROSCENIUM TO REMAIN AS IS.
02.63 CAREFULLY REMOVE BRICK AS INDICATED BY RED DASHED LINES. STORE THE BRICK IN A
SAFE LOCATION TO BE FREE FROM DAMAGE. THE BRICK IS TO BE REUSED FOR WALL INFILL
IN VARIOUS LOCATIONS AROUND THE BUILDING. REF NEW PLAN FOR LOCATIONS
1/16" = 1'-0"
1 GROUND FLOOR DEMO PLAN PHASE IV
1/16" = 1'-0"
2 MECH EQUIP PLATFORM DEMO PLAN - PHASE IV
2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /
ARCHITECT SPECIFICATIONS.
1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.
EQUIPMENT
3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.
2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT
DEMOLITION.
1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO
DEMOLITION.
STRUCTURAL
6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).
EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.
5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE
PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.
4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.
3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).
2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE
RE-INSTALLED AT NO COST.
1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.
ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES
DURING INTERUPTIONSTOF EXISTING UTILITIES.
MPE SYSTEMS
4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL
GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.
3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS
(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.
2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.
1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR
PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.
HAZARDOUS MATERIALS
2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO
DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.
1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.
RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO
DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.
REGULATORY
2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE
IMPERCEPTIBLE TRANSITION, (U.N.O.)
● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED
FOR RE-USE.
● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /
REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.
● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE
SUBSTRATE (LEVEL AND FILL AS NEEDED).
1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:
ARCHITECTURAL / INTERIORS
7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS
THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.
6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS
REQUIRED TO COMPLETE NEW WORK.
5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED
DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.
4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME
OPERATIONS UNTIL DIRECTED.
3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING
SELECTIVE DEMOLITION OPERATIONS.
2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT
BUILDING AREAS.
1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL
FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.
EXISTING CONDITIONS
7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.
6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.
5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM
DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.
4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF
CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.
3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC
INFORMATION.
2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.
1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION
PLAN.)
GENERAL
GENERAL DEMOLITION NOTES
0 8' 16' 32'4'
0 8' 16' 32'4'
NOTE: THIS DRAWING MUST BE
PRINTED IN COLOR FOR AN ACCURATE
HOLDOPEN
HOLDOPEN
FEC FEC
FEC
F E
C
FEC
FEC
F E
C
FEC
F E
C
F E
C
UP
UP
UP
FEC FEC
F E
C
F E
C
UP
CR
.8
72.0'
.0
BASEMENT ACCESS
02.16
02.16
02.20
02.1202.12 02.1302.13
02.61
C O R R
ID
O R T O B
LD
G
CORRIDOR TO BLDG 7
02.2002.2002.2002.2002.2002.20
02.2002.2002.20
02.20
DEMO LEGEND
WALL TO BE DEMOLISHED
DOOR/FRAME TO BE DEMOLISHED
EXISTING PARTITION TO REMAIN
PLUMBING FIXTURES TO BE DEMOLISHED
DEMO AERA OUTSIDE OF WARD
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2020
TLC No.:
www.tlc-engineers.com
120483
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
214 Centerview Drive Suite 300 Brentwood, TN 37027
615.370.8500woldhfr.com
WOLD | HFR DESIGN
102 THIRD AVENUE NE
HICKORY, NC 28601
PHONE: 828.315.9962
FAX: 828.315.9966
NC ENGINEERING LICENSE NO: P-0214
NC ARCHITECTURE LICENSE NO: 51254
MURFREESBORO, TN
KEYPLAN
AREA A
AREA B
OUT OF
SCOPE
B
IM
/T
V H
S
A lv in C
Y o rk
V A
I n te g ra te d H e a lt h /2
A R
C H
P
R O
J E
C T
C E
N T
R A
L .r v t
/2
/2
:5
:3
P
M
AD 01.05
PHASE V DEMOLITION PLAN TVHS - ALVIN C. YORK VAMC -
INTEGRATED HEALTH CENTER
AT05-20-2022
626-309
RA
1/16" = 1'-0"
1 GROUND FLOOR DEMO PLAN PHASE V
DENOTED BY A NUMBER ENCLOSED INSIDE A HEXAGON.
ONLY NOTES APPLICABLE TO THIS SHEET ARE SHOWN.
KEYNOTE SCHEDULE
02.12 REMOVE EXISTING ACOUSTICAL AND HARD CEILING, INCLUDING FRAMING, DRYWALL,
SUSPENSION GRID, TILES, WALL ANGLES, SUSPENSION WIRES, LIGHTS, FIXTURES, EXIT
SIGNS, AIR DIFFUSERS, GRILLES, SPEAKERS, SMOKE DETECTORS, TRACKS, EQUIPMENT,
AND DUCTWORK, ETC. COORDINATE WITH RELATED TRADES FOR SCOPE OF DEMOLITION.
PREPARE AREA TO RECEIVE NEW CEILING WHERE APPLICABLE. REF RCP AND FINISH PLAN.
02.13 REMOVE EXISTING FLOOR FINISHES COMPLETELY TO EXISTING CONCRETE FLOOR SLAB,
INCLUDING MASTIC, ADHESIVE AND WALL BASE. PATCH AND LEVEL SLAB AS REQUIRED TO
RECEIVE NEW FLOOR FINISHES. TYPICAL THROUGHOUT FLOOR
02.16 REMOVE ENTIRE DOOR ASSEMBLIES AS INDICATED BY RED DASHED LINE. INCLUDING
LEAVES, FRAME AND HARDWARE.
02.20 REMOVE WINDOW INCLUDING ALL FRAMES AND ASSEMBLIES. COORDINATE WITH NEW
WINDOW INSTALLATION.
02.61 APPROXIMATE LOCATION OF EDGE OF DEMO. COORDINATE WITH COR AND WITH PHASE IIB
ON EXACT LOCATION OF EDGE OF DEMOLITION
2. COORDINATE SCOPE OF DEMOLITION WITH THAT REQUIRED TO INSTALL EQUIPMENT PER VENDOR / COR /
ARCHITECT SPECIFICATIONS.
1. COORDINATE WITH COR ON EQUIPMENT TO BE REMOVED, DISPOSED OF, OR SALVAGED.
EQUIPMENT
3. REPAIR EXISTING SPRAY APPLIED FIRE PROOFING DISTURBED AND/OR DAMAGED DURING CONSTRUCTION.
2. THE INTEGRITY OF RELEVANT STRUCTURAL ELEMENTS SHALL BE MAINTAINED AT ALL TIMES THROUGHOUT
DEMOLITION.
1. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO
DEMOLITION.
STRUCTURAL
6. REMOVE DEAD END PIPING AND CONDUIT (FOR EXAMPLE: RISERS WITH NO FLOW, BRANCHES WITH NO FIXTURE).
EMPTY RISERS, MAINS, AND BRANCHES FOR FUTURE USE SHALL REMAIN.
5. VOIDS RESULTING FROM MPE DEMOLITION IN WALL, FLOOR, OR CEILING ASSEMBLIES TO REMAIN SHALL BE
PATCHED WITH SOLID MATERIALS MATCHING ADJACENT CONSTRUCTION.
4. REPAIR EXISTING PIPE AND DUCT INSULATION DAMAGED DURING DEMOLITION.
3. UTILITIES AND SYSTEMS IN AREAS OUTSIDE THE CONSTRUCTION LIMITS SHALL REMAIN (U.N.O.).
2. WHERE SMOKE DETECTORS AND/OR DAMPERS LOCATED IN RATED ASSEMBLIES TO REMAIN ARE REMOVED DURING DEMOLITION, NEW SMOKE DAMPERS AND/OR DETECTORS, INCLUDING ALL ELECTRICAL WIRING, SHALL BE
RE-INSTALLED AT NO COST.
1. COORDINATE REQUIRED SHUTDOWNS OF BUILDING SYSTEMS WITH THE OWNER. SHUTDOWNS SHALL BE DONE AT TIMES MOST CONVENIENT TO THE BUILDING OPERATION, SOME OF WHICH MAY BE DURING NIGHTS OR WEEKENDS.
ALL SHUTDOWNS ARE TO BE SCHEDULED A MINIMUM TWO WEEKS IN ADVANCE. PROVIDE TEMPORARY SERVICES
DURING INTERUPTIONSTOF EXISTING UTILITIES.
MPE SYSTEMS
4. COMPLY WITH REQUIREMENTS OF EPA, CODE OF FEDERAL REGULATIONS, NATIONAL EMISSIONS STANDARDS AND OSHA REGULATIONS ON HAZARDOUS MATERIALS AND ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL
GOVERNMENT REGULATIONS WHICH ARE INCORPORATED BY REFERENCE.
3. CONTRACTOR SHALL COORDINATE WITH COR ON RESPONSIBILITY OF REMOVAL OF HAZARDOUS MATERIALS
(KNOWN OR UNKNOWN) PRIOR TO SUBMISSION OF BID.
2. IF HAZARDOUS MATERIALS ARE SUSPECTED OR ENCOUNTERED, IMMEDIATELY SUSPEND WORK IN SUSPECTED AREA OF CONTAMINATION, WITHDRAW FROM AREA AND NOTIFY ARCHITECT/ENGINEER AND COR IN WRITING.
1. THE COR IN NO WAY CLAIMS ANY KNOWLEDGE OR RESPONSIBILITY PERTAINING TO THE IDENTIFICATION OR
PROPER AND SAFE REMOVAL OF HAZARDOUS MATERIALS.
HAZARDOUS MATERIALS
2. DO NOT DISABLE OR DISRUPT BUILDING FIRE OR LIFE SAFETY SYSTEMS WITHOUT PRIOR WRITTEN NOTICE TO COR AND LOCAL AUTHORITY HAVING JURISDICTION (AHJ). PROVIDE A MINIMUM OF 3 DAYS NOTICE TO COR PRIOR TO
DISRUPTION. COORDINATE WITH LOCAL AHJ REGARDING NOTICE REQUIREMENTS.
1. ALL NECESSARY PATHS OF EGRESS AND EXITS SHALL BE MAINTAINED 'PROTECTED AND CLEAR' UNLESS ALTERNATE METHODS OF EGRESS ARE PROVIDED THAT ARE ACCEPTABLE TO BUILDING CODE OFFICIALS.
RELOCATE SECURITY DEVICES, FIRE ALARM ITEMS, EXIT SIGNS, AND EMERGENCY LIGHTING AS REQUIRED DUE TO
DEMOLITION OR OBSTRUCTION BY TEMPORARY PARTITIONS.
REGULATORY
2. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH AND REPAIR ADJOINING SURFACES TO MATCH EXISTING AND PROVIDE
IMPERCEPTIBLE TRANSITION, (U.N.O.)
● CEILINGS: REMOVE ENTIRE CEILING SYSTEM AND CEILING MOUNTED ITEMS. STORE DEVICES INTENDED
FOR RE-USE.
● WALLS: REMOVE WALL COVERING SYSTEMS SUCH AS PANELING AND VINYL WALL COVERINGS. PATCH /
REPAIR HOLES OR DAMAGED AREAS AND SKIM-COAT ENTIRE SURFACE.
● FLOORS: REMOVE FINISH TO SUB-FLOOR, CLEAN ADHESIVES AND GLUES FROM SUBSTRATE, AND PREPARE
SUBSTRATE (LEVEL AND FILL AS NEEDED).
1. WHERE NEW FINISHES ARE SCHEDULED IN EXISTING SPACES:
ARCHITECTURAL / INTERIORS
7. COORDINATE WITH COR & REMOVE ALL OBSOLETE, UNNECESSARY, OR ABANDONED ITEMS IN DEMOLITION AREAS
THAT ARE NOT APPROPRIATE TO REMAIN FOR NEW WORK.
6. EXISTING CONDITIONS TO REMAIN: DAMAGED COMPONENTS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE VA. THIS INCLUDES DAMAGE DONE TO EXISTING SPACES ABOVE, BELOW, AND ADJACENT TO, AS
REQUIRED TO COMPLETE NEW WORK.
5. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED
DRAWINGS AND PRECONSTRUCTION PHOTOGRAPHS.
4. CEASE OPERATIONS IMMEDIATELY IF STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY COR. DO NOT RESUME
OPERATIONS UNTIL DIRECTED.
3. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. MAINTAIN FIRE-PROTECTION FACILITIES IN SERVICE DURING
SELECTIVE DEMOLITION OPERATIONS.
2. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH FACILITY'S NORMAL OPERATIONS AND WITH ADJACENT
BUILDING AREAS.
1. PROVIDE TEMPORARY DUST PARTITIONS, SECURITY DEVICES, AND OTHER MEANS NECESSARY FOR THE PROTECTION OF OCCUPANTS WHERE TRAFFIC IN CORRIDORS AND SPACES ADJACENT TO DEMOLITION / RENOVATION WORK ARE IMPACTED. COORDINATE WITH FACILITY'S INFECTION CONTROL OR COR TO MEET ALL
FACILITY OR REGULATORY REQUIREMENTS RELATED TO PROTECTION OF OCCUPANTS.
EXISTING CONDITIONS
7. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND VENDOR (IF APPLICABLE) DRAWINGS AND
SPECIFICATIONS FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.
6. EXISTING WARRANTIES: REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING SELECTIVE DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.
5. REMOVED & REINSTALLED ITEMS: CLEAN & REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACK OR CRATE AFTER CLEANING / REPAIR AND IDENTIFY CONTENTS OF CONTAINERS, PROTECT ITEMS FROM
DAMAGE DURING TRANSPORT / STORAGE, REINSTALL ITEMS IN LOCATIONS INDICATED.
4. REMOVED & SALVAGED ITEMS: CLEAN ITEMS, PACK OR CRATE AFTER CLEANING AND IDENTIFY CONTENTS OF
CONTAINERS, PROTECT AND TRANSPORT ITEMS TO FACILITY'S STORAGE AREA ON-SITE.
3. REMOVE CONSTRUCTION SHOWN DASHED ON DEMOLITION PLAN. REFERENCE LEGEND FOR MORE SPECIFIC
INFORMATION.
2. PRIOR TO START, HOLD A PRE-DEMOLITION CONFERENCE AT THE PROJECT SITE TO REVIEW METHODS AND PROCEDURES RELATED TO DEMOLITION. COORDINATE WITH COR REGARDING CONSTRUCTION ACCESS, TRANSPORTATION AND DISPOSAL OF DEBRIS, AND OTHER FACILITY REQUIREMENTS RELATED TO CONSTRUCTION.
1. COORDINATE SCOPE OF DEMOLITION WORK TO INSTALL NEW WORK SHOWN ELSEWHERE IN THE CONTRACT DOCUMENTS. (FOR EXAMPLE, IF NEW FINISHES ARE SCHEDULED FOR AN EXISTING AREA TO REMAIN, REMOVE EXISTING FINISHES PRIOR TO INSTALLATION OF NEW FINISHES EVEN IF NOT EXPLICITLY IDENTIFIED ON DEMOLITION
PLAN.)
GENERAL
GENERAL DEMOLITION NOTES
0 8' 16' 32'4'
NOTE: THIS DRAWING MUST BE
PRINTED IN COLOR FOR AN ACCURATE
DEMO EXSITING METAL STAIR AND
RAILING.
REMOVE EXISTING DOOR…