Attachment 2B - AF 103 Template.pdf

PDF 289 KB Posted

Attached to
Wake Island (WI) B. 1120 Restoration
Solicitation number
FA521525R0009
Issued by

About this file

This document is an Air Force Base Civil Engineering Work Clearance Request (AF IMT 103) form used to coordinate and approve work that may disrupt base operations, utilities, or traffic flow. The form requires detailed information about a planned work project, including the type of facility/work involved (such as pavements, drainage systems, utility distribution), duration of clearance needed, and specific precautionary measures. The form requires review and approval from multiple base organizations including Civil Engineering, Communications, Security, Fire Protection, and Environmental departments before work can commence. It serves as a safety and coordination mechanism to prevent accidents and minimize customer inconvenience during base construction or maintenance activities.

View the file

Other files

File Type Posted
25 AUG 25- RENO Questions.pdf PDF
25 AUG 25- RENO Questions.xlsx XLSX spreadsheet
Bldg B_C_1120 1963.pdf PDF
1120 (C 520) Air Conditioning.pdf PDF
A_All Buildings 1963 (C_520_1120).pdf PDF
B1120 floorplan draft V3_Redacted Update.pdf PDF
Location Map c_1120.PDF PDF
c_520_1120_Mechanical 1967.pdf PDF
Electrial Site Plan.PDF PDF
1120 Photo Log.pdf PDF
Wake Island Concrete and Masonry Structures Feb 2020.pdf PDF
Utilities.pdf PDF
20170412 Wake Island Assessment Pre-Final Report 2017.pdf PDF
1118 and 1120 Structural Assessment and Repairs 2022.pdf PDF
Questions Answered Reno.xlsx XLSX spreadsheet
Amendment 01 - Question Set 1.docx DOCX document
Solicitation - FA521525R0009.pdf PDF
Attachment 1 - WI Restor Building 1120 SOW.pdf PDF
Attachment 2A - 611 CES Dig Permit Process 2024.pdf PDF
Attachment 7 - DD Form 1354.pdf PDF
Attachment 11 - WI Master Plan and Design Guide.pdf PDF
Attachment 12B - B1120 Interior photos portfolio.pdf PDF
Attachment 13 - Wage Determination.pdf PDF
Attachment 3 - 11 AF Satellite and Ground Terminal Request (Fillable).pdf PDF
Attachment 5 - 611th Tank Inventory Template.docx DOCX document
Attachment 6 - AF3000-3064-3065.pdf PDF
Attachment 9 - B1120 floorplan.pdf PDF
Attachment 10B - Wake Island Cargo Processing Guide.pdf PDF
Attachment 10C - WI Base Support Letter.pdf PDF
Attachment 12A - B1120 Exterior photos portfilio.pdf PDF
Attachment 4 - eSSS PRSC Commercial Satellite Terminal Policy Memorandum.pdf PDF
Attachment 8 - AF FORM 813 B1120.pdf PDF
Attachment 10A - SAR Request.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE PREPAREDBASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITYB. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND

I. OTHERC. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND

3. DURATION CLEARANCE REQUIRED

(DD MMM YY - DD MMM YY)

4. DATE OF CLEARANCE

5. SIGNATURE OF REQUESTING OFFICIAL 6. TELEPHONE NO. 7. ORGANIZATION

ORGANIZATION REMARKS (Use Reverse for additional REVIEWER'S NAME AND INITIALS

A. 611 CES/CEIE

B. AFCEC/CZOP

C. ACOMS

D. ASUS

A. ELECTRICAL DISTRIBUTION

B. STEAM DISTRIBUTION

C. WATER DISTRIBUTION

D. POL DISTRIBUTION

E. SEWER DISTRIBUTION

F. PAVEMENTS/ GROUNDS

G. FIRE PROTECTION

L. SAFETY

H. ENVIRONMENTAL

I. COMMS

10. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

11. OTHER (Specify)

13. REQUESTED CLEARANCE APPROVED DISAPPROVED

14. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 14a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.AF IMT 103, 19940801, V3

EMERGENCY

8.

K. SECURITY POLICE

J. BASE OPERATIONS

9.

12. SITE LEAD

(Manager or CE)

12a. DATE SIGNED

B O S

A F

Submit to: 611CES.CEOER.CustomerService@us.af.mil Attachment 2B

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

AF IMT 103, 19940801, V3 (REVERSE)

B. Location where work will take place (include maps)

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

A. Reason for request

C. How will work be accomplished (equipment, materials)

D. If digging, depth of excavation

E. If digging, will soil be returned to original location or placed elsewhere

F. Other comments (extended duration request, emergency work justification,etc)

AF IMT 103, 19940801, V3

19. Organization Comments Continued.

Waterline Dig Permit
WL Excavations
WL Excavations 1
Blank Page
has: Off
has not been staked or clearly marked: Off
2 TYPE OF FACILITYWORK INVOLVED: Excavation Permit.
A PAVEMENTS: Off
D FIRE DETECTION PROTECTION SYSTEMS: Off
G AIRCRAFT OR VEHICULAR TRAFFIC FLOW: Off
B DRAINAGE SYSTEMS: Off
E UTILITY: Off
OVERHEAD: Off
UNDERGROUND: Off
H SECURITY: Off
C RAILROAD TRACKS: Off
F COMM: Off
OVERHEAD_2: Off
UNDERGROUND_2: Off
I OTHER: Off
4 DATE OF CLEARANCE:
17a DATE SIGNED:
Text4:
Emergency: Off
Date:
Contract No:
WO No:
Clerance Date:
Requester:
Text11:
Organization:
Remarks/ Signature:
Date Signed:
Other:
E: Off
G: Off
T: Off
Remarks:
Commercial:
Location:
Reason:
Accomplishement:
Depth:
Materials:
Soil:
Electrical:
Steam:
Water:
POL:
Sewer:
Pavements Grounds:
Fire Protection:
Environmental:
Comms:
Base Ops:
Security Police:
Safety:
Text1:
Location 2:
Text3:
Text5:
Text6:
Text7:
Text8:
Text9:
Text10:
Text12:
Text13:
Text14:
Text15:
Text16:
Text17:
Text18:
Text19:
Text20:
Check Box23: Off
Check Box24: Off

File details come from the government source that posted it. Updated .