Attachment 2B - AF 103 Template.pdf
PDF 289 KB Posted
- Attached to
- Wake Island (WI) B. 1120 Restoration
- Solicitation number
- FA521525R0009
About this file
This document is an Air Force Base Civil Engineering Work Clearance Request (AF IMT 103) form used to coordinate and approve work that may disrupt base operations, utilities, or traffic flow. The form requires detailed information about a planned work project, including the type of facility/work involved (such as pavements, drainage systems, utility distribution), duration of clearance needed, and specific precautionary measures. The form requires review and approval from multiple base organizations including Civil Engineering, Communications, Security, Fire Protection, and Environmental departments before work can commence. It serves as a safety and coordination mechanism to prevent accidents and minimize customer inconvenience during base construction or maintenance activities.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE PREPAREDBASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
(See Instructions on Reverse)
1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.
2. TYPE OF FACILITY/WORK INVOLVED
G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS D. FIRE DETECTION & PROTECTION SYSTEMS
H. SECURITYB. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND
I. OTHERC. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND
3. DURATION CLEARANCE REQUIRED
(DD MMM YY - DD MMM YY)
4. DATE OF CLEARANCE
5. SIGNATURE OF REQUESTING OFFICIAL 6. TELEPHONE NO. 7. ORGANIZATION
ORGANIZATION REMARKS (Use Reverse for additional REVIEWER'S NAME AND INITIALS
A. 611 CES/CEIE
B. AFCEC/CZOP
C. ACOMS
D. ASUS
A. ELECTRICAL DISTRIBUTION
B. STEAM DISTRIBUTION
C. WATER DISTRIBUTION
D. POL DISTRIBUTION
E. SEWER DISTRIBUTION
F. PAVEMENTS/ GROUNDS
G. FIRE PROTECTION
L. SAFETY
H. ENVIRONMENTAL
I. COMMS
10. COMMERCIAL UTILITY COMPANY
TELEPHONE
GAS
ELECTRIC
11. OTHER (Specify)
13. REQUESTED CLEARANCE APPROVED DISAPPROVED
14. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 14a. DATE SIGNED
PREVIOUS EDITIONS ARE OBSOLETE.AF IMT 103, 19940801, V3
EMERGENCY
8.
K. SECURITY POLICE
J. BASE OPERATIONS
9.
12. SITE LEAD
(Manager or CE)
12a. DATE SIGNED
B O S
A F
Submit to: 611CES.CEOER.CustomerService@us.af.mil Attachment 2B
INSTRUCTIONS
The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.
AF IMT 103, 19940801, V3 (REVERSE)
B. Location where work will take place (include maps)
18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)
A. Reason for request
C. How will work be accomplished (equipment, materials)
D. If digging, depth of excavation
E. If digging, will soil be returned to original location or placed elsewhere
F. Other comments (extended duration request, emergency work justification,etc)
AF IMT 103, 19940801, V3
19. Organization Comments Continued.
| Waterline Dig Permit |
| WL Excavations |
| WL Excavations 1 |
| Blank Page |
| has: Off |
| has not been staked or clearly marked: Off |
| 2 TYPE OF FACILITYWORK INVOLVED: Excavation Permit. |
| A PAVEMENTS: Off |
| D FIRE DETECTION PROTECTION SYSTEMS: Off |
| G AIRCRAFT OR VEHICULAR TRAFFIC FLOW: Off |
| B DRAINAGE SYSTEMS: Off |
| E UTILITY: Off |
| OVERHEAD: Off |
| UNDERGROUND: Off |
| H SECURITY: Off |
| C RAILROAD TRACKS: Off |
| F COMM: Off |
| OVERHEAD_2: Off |
| UNDERGROUND_2: Off |
| I OTHER: Off |
| 4 DATE OF CLEARANCE: |
| 17a DATE SIGNED: |
| Text4: |
| Emergency: Off |
| Date: |
| Contract No: |
| WO No: |
| Clerance Date: |
| Requester: |
| Text11: |
| Organization: |
| Remarks/ Signature: |
| Date Signed: |
| Other: |
| E: Off |
| G: Off |
| T: Off |
| Remarks: |
| Commercial: |
| Location: |
| Reason: |
| Accomplishement: |
| Depth: |
| Materials: |
| Soil: |
| Electrical: |
| Steam: |
| Water: |
| POL: |
| Sewer: |
| Pavements Grounds: |
| Fire Protection: |
| Environmental: |
| Comms: |
| Base Ops: |
| Security Police: |
| Safety: |
| Text1: |
| Location 2: |
| Text3: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Check Box23: Off |
| Check Box24: Off |
File details come from the government source that posted it. Updated .