This is an equipment inventory attachment detailing the boiler and related systems at Naval Submarine Base New London in Groton, Connecticut. The facility operates six boilers with varying specifications and ages: Boiler #1 (Babcock and Wilcox, built 1960, 76,500 pph capacity, 150 psi design pressure); Boiler #1S (Cleaver Brooks, built 2011, 1200 BHP rating, 775 psi design pressure); Boiler #2 (Babcock and Wilcox, built 1960, 76,500 pph capacity, 775 psi design pressure); Boiler #3 (Babcock and Wilcox, built 1965, 76,500 pph capacity, 775 psi design pressure); Boiler #4 (Cleaver Brooks, built 2011, 1200 BHP rating, 150 psi design pressure); and Boiler #6 (Energy Resources Inc. Heat Recovery Steam Generator, 50,000 pph maximum steam capacity, 200 psi average). The facility also includes two deaerators (Chicago Heater Company units built in 1990 and 1993, each with 350,000 pph capacity at 50 psig), a hot water production system, and approximately 8 linear miles of steam distribution piping ranging from 2 to 14 inches in diameter, with nominal operating pressures of 600, 200, 125, and 5 psig.

This inventory directly supports the associated Boiler Maintenance & Repair solicitation (N4008526R0173), an Unrestricted, Firm-Fixed-Price Indefinite-Delivery Indefinite-Quantity contract for boiler maintenance and repair services at the Naval Submarine Base. The contract consists of a one-year base period plus four optional twelve-month periods, with award to the lowest-priced technically acceptable offeror based on evaluation factors of price, corporate experience, and past performance. Contractors must be registered in SAM prior to award and meet the $19.0 Million small business size standard under NAICS Code 238220.

View the file

Other files

File Type Posted
Solicitation Amendment N4008526R01730005.pdf PDF
Attachment 4 J-0200000-08 Boilers ELINS-Updated Amendment 0005.xlsx XLSX spreadsheet
Solicitation Amendment 004 N4008526R01730004.pdf PDF
Attachment 1 General Contract Information.docx DOCX document
Solicitation Amendment 003 N4008526R01730003.pdf PDF
Attachment 21 Corporate Experience.docx DOCX document
Solicitation Amendment002 N4008526R01730002.pdf PDF
Solicitation Amendment001 N4008526R01730001.pdf PDF
Solicitation -N4008526R0173.pdf PDF
Solicitation -N4008526R0173.pdf PDF
Attachment 1 General Contract Information.docx DOCX document
Attachment 9 0100000 C Boilers.pdf PDF
Attachment 11 0200000 F Boilers.pdf PDF
Attachment 4 J-0200000-08 Boilers ELINS.xlsx XLSX spreadsheet
Attachment 7 J020000006 Install Spill Control Plan.pdf PDF
Attachment 12 0200000 J Boilers.pdf PDF
Attachment 16 1502000 PAP Boilers.pdf PDF
Attachment 17 Solicitation Question Sheet.docx DOCX document
Solicitation - N4008526R0173.pdf PDF
Attachment 8 J020000009 UEM Contractor Outage Process.pdf PDF
Attachment 10 0200000 C Boilers.pdf PDF
Attachment 14 1502000 F Boilers.pdf PDF
Attachment 20 Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 21 Corporate Experience.docx DOCX document
Attachment 2 J150200006 BLDG 29 Boiler Specifications.pdf PDF
Attachment 3 J150200003 Map.pdf PDF
Attachment 5 NEPA.pdf PDF
Attachment 13 1502000 C Boilers.pdf PDF
Attachment 15 1502000 J Boilers.pdf PDF
Attachment 18 DBA WD CT20260024 Mod 2.pdf PDF
Attachment 19 SCA 2015-4111 Rev 35.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Boiler #1Boiler #1S
Babcock and WilcoxCleaver Brooks
National Board # 20583National Board #17317
Built 1960Built 2011
Capacity 76,500 pphDesign Pressure 150 psi
Design Pressure 775 psiRating 1200 BHP
Steam Temp 500ᵒFType: Firetube
Heating Surface 7895 ft2Model # CBL-200X-1200-150ST
Economizer heating surface 3030ft2
Economizer pressure 825 psi
Boiler #2Boiler #3
Babcock and WilcoxBabcock and Wilcox
National Board # 20582National Board # 21838
Built 1960Built 1965
Capacity 76,500 pphCapacity 76,500 pph
Design Pressure 775 psiDesign Pressure 775 psi
Steam Temp 500ᵒFSteam Temp SAT
Heating Surface 7895 ft2Heating Surface 6934 ft2
Economizer heating surface 3030ft2Economizer heating surface 3030ft2
Economizer pressure 825 psiEconomizer pressure 825 psi
Boiler #4Boiler #6
Cleaver BrooksEnergy Resources Inc.
National Board #17454Heat recovery Steam Generator
Built 2011Model# S3-2616
Design Pressure 150 psiNational Board # 3225
Rating 1200 BHPAverage AWP 200 psi
Type: FiretubeHeating Surface 17,882 ft2
Model # CBL-200X-1200-150STMaximum Steam Capacity 50,000 pph
Deaerator #1Deaerator #2
Chicago Heater CO.Chicago Heater CO.
Built: 1990Built: 1993
Diameter: 7’5” Height 8’Diameter: 7’8” Height 6’4”
Capacity: 350,000 PPH 50 psigCapacity: 350,000 PPH 50 psig
Steel ConstructionSteel Construction
Hot Water Production SystemSteam Distribution
Piping Sizes Vary From 2” TO 14”Approximately 8 linear miles of piping
Piping sizes range from 1” to 8”
Nominal steam piping pressures are 600 psig, 200 psig, 125 psig, and 5 psig.

J-1502000-09 Boiler and Related Equipment Inventory

File details come from the government source that posted it. Updated .