Attachment 12 0200000 J Boilers.pdf

PDF 266 KB Posted

Attached to
Boiler Maintenance & Repair
Solicitation number
N4008526R0173
Issued by

About this file

This file is Section J of a federal contract solicitation containing definitions, acronyms, directives, forms, and supporting attachments.

The document serves as a comprehensive reference guide for contract administration and performance. Attachment J-0200000-01 provides detailed definitions of 50+ key terms and acronyms relevant to facilities maintenance and management, including Component Inventory Management Units (CIMU), Unit Priced Labor (UPL) Hours, Fixed Burden Rate (FBR), Frequency of Service schedules (ranging from daily to biennial), and roles such as Contracting Officer (KO), Contracting Officer's Representative (COR), and Performance Assessment Representative (PAR). Attachment J-0200000-02 references separate wage determinations under the Service Contract Act and Davis-Bacon Act. Attachment J-0200000-03 lists applicable directives and references including U.S. Army Corps of Engineers Safety and Health Requirements (EM 385-1-1), OSHA regulations, Navy environmental and energy programs, and the MAXIMO computerized maintenance management system. Attachment J-0200000-04 specifies that invoicing shall be submitted via the S-17.4.14.2 iRAPT system (formerly WAWF). Attachment J-0200000-05 identifies six required reporting forms: Contractor Crane Operating Checklist for Critical Lifts, Crane and Rigging Gear Accident Report, Crane and Rigging Gear Near Miss Report, Contractor Incident Reporting System (CIRS), Contractor Quality Inspection and Surveillance Report, and Monthly On-Site Labor Report. Attachments J-0200000-06 through J-0200000-09 reference separate documents covering Installation Spill Control Plan, Contractor Hazardous Material Inventory Log, Exhibit Line Item Numbers, and Contractor Planned Utility Outage Process.

View the file

Other files

File Type Posted
Solicitation Amendment N4008526R01730005.pdf PDF
Attachment 4 J-0200000-08 Boilers ELINS-Updated Amendment 0005.xlsx XLSX spreadsheet
Solicitation Amendment 004 N4008526R01730004.pdf PDF
Solicitation Amendment 003 N4008526R01730003.pdf PDF
Attachment 1 General Contract Information.docx DOCX document
Attachment 21 Corporate Experience.docx DOCX document
Solicitation Amendment002 N4008526R01730002.pdf PDF
Solicitation Amendment001 N4008526R01730001.pdf PDF
Solicitation -N4008526R0173.pdf PDF
Solicitation -N4008526R0173.pdf PDF
Attachment 1 General Contract Information.docx DOCX document
Attachment 9 0100000 C Boilers.pdf PDF
Attachment 11 0200000 F Boilers.pdf PDF
Attachment 4 J-0200000-08 Boilers ELINS.xlsx XLSX spreadsheet
Attachment 7 J020000006 Install Spill Control Plan.pdf PDF
Attachment 16 1502000 PAP Boilers.pdf PDF
Attachment 17 Solicitation Question Sheet.docx DOCX document
Attachment 2 J150200006 BLDG 29 Boiler Specifications.pdf PDF
Attachment 3 J150200003 Map.pdf PDF
Attachment 5 NEPA.pdf PDF
Attachment 6 J150200007 NLON Inventory.xlsx XLSX spreadsheet
Attachment 13 1502000 C Boilers.pdf PDF
Attachment 15 1502000 J Boilers.pdf PDF
Attachment 18 DBA WD CT20260024 Mod 2.pdf PDF
Attachment 19 SCA 2015-4111 Rev 35.pdf PDF
Solicitation - N4008526R0173.pdf PDF
Attachment 8 J020000009 UEM Contractor Outage Process.pdf PDF
Attachment 10 0200000 C Boilers.pdf PDF
Attachment 14 1502000 F Boilers.pdf PDF
Attachment 20 Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 21 Corporate Experience.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT

NUMBER

ATTACHMENT TITLE

J-0200000-01 DEFINITIONS AND ACRONYMS

J-0200000-02 WAGE DETERMINATIONS

J-0200000-03 DIRECTIVES, INSTRUCTIONS, AND REFERENCES

J-0200000-04 INVOICE FORM

J-0200000-05 FORMS

J-0200000-06 INSTALLATION SPILL CONTROL PLAN

J-0200000-07 CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG

J-0200000-08 EXHIBIT LINE ITEM NUMBERS

J-0200000-09 CONTRACTOR PLANNED UTILITY OUTAGE PROCESS

ATTACHMENT J-0200000-01

DEFINITIONS AND ACRONYMS

Definition Description Assessment A general term referring to either a survey or inspection of a facility to determine condition.

Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.

Business Management System (BMS)

A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.

Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.

One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.

Component Inventory Management Unit

(CIMU)

An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.

Confined Work Space A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.

Contracting Officer

(KO)

That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

Contracting Officer’s Representative (COR)

The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or SPAR.

Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.

Contractor Representative

That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.

Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.

Definition Description Electronic Operation And Maintenance And Support Information (eOMSI)

A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.

Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.

Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.

Facility A building or structure designed and created to serve a particular function.

Fixed Burden Rate

(FBR)

The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:

$100,000.00 + ($100,000.00 x 10%) = $110,000.00

The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.

Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.

Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.

Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.

Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.

Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.

Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.

Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.

Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.

Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.

Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.

Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.

Government Furnished Property (GFP)

Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

Infrastructure Condition Assessment Program

(ICAP)

A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.

Definition Description Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.

Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.

Load Handling Equipment

A term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used WITH RIGGING to raise, lower and/or horizontally move a load.

Maintenance And Repair

The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.

NAVFAC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.

Performance Assessment

A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

Performance Assessment Representative (PAR)

The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.

Pre-Expended Bin Materials And Supplies

The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.

Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.

Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract

Property Management Program

A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.

Quality Assurance

(QA)

The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.

Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.

R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".

Real Property Inventory Equipment (RPIE)

A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.

Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.

An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.

Definition Description Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.

Unit Priced Labor (UPL) Hour

The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity;

costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.

Acronym Title ACO Administrative Contracting Officer BW Biweekly CDR Contract Discrepancy Report CIA Controlled Industrial Area CIMU Component Inventory Management Unit CMMS Computerized Maintenance Management System COR Contracting Officer Representative COR Condition of Readiness DBH Diameter at Breast Height DCR Direct Condition Rating DoD Department of Defense DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract FSCM Facility Support Contract Manager GIS Geospatial Information System GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials HCA Head Contracting Agency ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MAP Maintenance Action Plan MDI Mission Dependency Index MEP Mechanical, Electrical and Plumbing MPAS Monthly Performance Assessment Summary MRI Mission Readiness Index MSDS Material Safety Data Sheets NAVFAC Naval Facilities Engineering Command NMCI Navy Marine Corps Intranet NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative PAW Performance Assessment Worksheet PEO Program Executive Officer PM Project Manager PM Planned Maintenance or Preventative Maintenance

Acronym Title PRCSP Permit Required Confined Space Program PWS Performance Work Statement PWO Public Works Officer Q Quarterly QC Quality Control RPIE Real Property Inventory Equipment RSL Remaining Service Life SC Security Clearances SM Semimonthly SPAR Senior Performance Assessment Representative TE Technical Exhibit VIQ Variation in Quantity WBS Work Breakdown Structure

ATTACHMENT J-0200000-02

WAGE DETERMINATIONS

Service Contract Act and Davis-Bacon Act Determinations.

SEE SEPARATE ATTACHMENTS

ATTACHMENT J-0200000-03

DIRECTIVES, INSTRUCTIONS, AND REFERENCES

Reference Title

EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements

P.L. 91-596 Occupational Safety and Health Act

40 CFR 136 Code of Federal Regulations

NAVFACINST 11013.40A NAVFAC PARTNERING POLICY

National Plumbing Code National Standard Plumbing Code

UFGS-22 00 00

UNIFIED FACILITIES GUIDE SPECIFICATIONS, PLUMBING, GENERAL

PURPOSE

UG-2029-ENV

GUIDANCE MANUAL FOR PREPARATION OF NAVY SHORE

INSTALLATION POLLUTION PREVENTION PLAN UPDATES

UFC-3-230-02 UNIFIED FACILITIES CRITERIA WATER TREATMEMT

OPNAVINST 5090 ENVIRONMENTAL READINESS PROGRAM MANUAL

BMS S-17.4.14.2 Wide Area Work Flow

RCSA 22a-430-3 through 4 General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits

DON GPP Green Procurement Program Implementation Guide

Subase Basic Map Subase Basic Map

SUBASE SWPPP SUBASE Stormwater Pollution Prevention Plan SOP_WW_373_RepairStmCon d_dscgs Repair of Steam Condensate Discharges

GP\MNCCHPW General Permit for the Discharge of Minor Boiler Blowdown SUBASE New London Instruction 4101.2 Energy Conservation Program

SECNAVINST 4101.3A Department of the Navy Energy Program

MAXIMO (MUG) Maximo User Guide (MUG) v1.0 - 7APR15

DBIDS SOP Defense Biometrics Identification System Standard Operating Procedures

ATTACHMENT J-0200000-04

INVOICE FORM

SEE ATTACHED S-17.4.14.2 iRAPT (formerly WAWF) Invoices

ATTACHMENT J-0200000-05

FORMS

J-0200000-05A Contractor Crane Operating Checklist for Critical Lifts J-0200000-05B Crane and Rigging Gear Accident Report J-0200000-05C Crane and Rigging Gear Near Miss Report J-0200000-05D Contractor Incident Reporting System (CIRS) J-0200000-05E Contractor Quality Inspection and Surveillance Report J-0200000-05F Monthly On site Labor Report

ATTACHMENT J-0200000-05A

ATTACHMENT "A"

CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS YES NO

1 Does the operator know the weight of the load to be lifted?

2 Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?

3 Is the crane level and on firm ground?

4 Are outriggers required?

5 If so, are outriggers fully extended and down, and the load off the wheels?

If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?

If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?

Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?

9 Has the hook been centered over the load in such a manner to prevent swing (deflection, side loading, load-moment)?

10 Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?

11 Is the lift swing path clear of obstructions?

12 If rotation of the load being lifted is hazardous, is tag line or restraint line being used?

13 Are personnel prevented from standing or passing under a suspended load?

14 Are personnel prevented from entering the load fall zone?

15 Is the crane operator's attention diverted?

16 Are proper signals being used at all times?

17 If radio communications are used is the frequency isolated to the crane team?

18 Do the operations ensure that side and tip loading is prohibited?

Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?

20 If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in NAVFAC P-307?

21 Is the lift a critical lift?

If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?

23 Is Attachment "A" current, filled out completely, and posted in the crane?

Contractor Name (Print Legibly):

Contractor Name (Signature):

Location: Date:

ATTACHMENT J-0200000-05B

CRANE AND RIGGING GEAR ACCIDENT REPORT

Accident Category: Crane Accident Rigging Gear Accident From:

UIC:

To: Navy Crane Center Bldg. 491 NNSY Portsmouth, VA 23709 Fax: 757-967-3808

Activity: Report No:

Crane No: Category: Accident Date: Time: hrs:

Category of Service: SPS GPS Crane Type: Crane Manufacturer:

Was Crane/Rigging Gear Being Used in SPS: Yes No Was Crane/Rigging Gear Being Used in a Complex Lift/Critical Non-Crane Rigging Operation: Yes No

Location: Weather:

Crane Capacity: Hook Capacity: Weight of Load on hook:

Fatality or Permanent Disability? Yes No Material/Property Cost Estimate:

Reported to NAVSAFECEN? Yes No

Accident Type:

Personal Injury Overload Derail Damaged Rigging Gear

Load Collision Two Blocked Dropped Load Damaged Crane

Crane Collision Damaged Load Other: Specify

Cause of Accident:

Improper Operation Equipment Failure Inadequate Visibility

Improper Rigging Switch Alignment inadequate Communication

Track Condition Procedural Failure Other: Specify

Chargeable to:

Crane Walker Rigger Operator

Maintenance Management/Supervision Other: Specify

Crane Function:

Travel Hoist Rotate Luffing Telescoping Other N/A

Is this accident indicative of a recurring problem? Yes No

If yes, list Accident Report Nos.:

ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE ACTIONS TAKEN AS ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes.

Preparer:

Phone:

E-mail:

Code:

Date:

Concurrences: (Include Code, Signature and Date) Code: Date:

Code: Date:

Certifying Official (Crane Accident Only):

Code:

Date:

ATTACHMENT J-0200000-05B

CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in.

The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.

1. Accident Category: Indicate either crane accident or rigging gear accident.

2. From: The naval activity that is responsible for reporting the accident and UIC number.

3. Activity: The naval activity where the accident took place.

4. Report No.: The activity assigned accident number (e.g., 95-001).

5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

7. Accident Date: The date the accident occurred.

8. Time: The time (24 hour clock) the accident occurred (e.g., 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.

12. SPS: Was the crane or rigging gear being used in an SPS lift?

13. Complex lift: Was the crane or rigging gear being used in a complex lift?

14. Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).

15. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).

16. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.

18. Weight of Load on Hook: If applicable, the weight of the load on the hook.

19. Fatality or Permanent Disability?: Check yes or no.

20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.

21. Reported to NAVSAFECEN?: Self-explanatory.

22. Accident Type: Check all that apply.

23. Cause of Accident: Check all that apply.

24. Chargeable to: Check all that apply.

25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.

26. Is this a recurring problem?: Check yes or no. Identify any other similar accidents.

27. Situation Description/Corrective Actions: Self-explanatory.

28. Preparer: Self-explanatory.

29. Concurrences: Self-explanatory.

30. Certifying Official (Crane Accidents Only): Self-explanatory.

31. Brief Description: No more than one paragraph summarizing the resultant incident.

32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.

33. Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident. Short Term Corrective Actions are those actions taken that will allow return to work in short time frame. Long Term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’, etc.

ATTACHMENT J-0200000-05C

CRANE AND RIGGING GEAR NEAR MISS REPORT

Near Miss Category: Crane Near Miss Rigging Gear Near Miss

From:

UIC:

To: Navy Crane Center Bldg 491 NNSY Portsmouth, VA 23709 Fax (757) 967-3808 nfsh_ncc_accident@navy.mil

Activity: Report No:

Crane/Equipment No: Category: Near Miss Date: Time:

hrs

Category of Service: SPS GPS Crane /Equipment Type: Crane/Equipment Manufacturer:

Location: Weather:

Crane/Equipment Capacity: Hook Capacity: Weight of Load on Hook:

Is this near miss indicative of a recurring problem? Yes No

If yes, list report numbers:

In the space below, include a brief description of the event and corrective actions taken to prevent recurrence:

Preparer:

Phone and email

Code Date

ATTACHMENT J-0200000-05C

CRANE AND RIGGING GEAR NEAR MISS INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in.

The e-mail address is nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.

1. Near Miss Category: Indicate either crane or rigging gear near miss.

2. From: The naval activity that is responsible for reporting the near miss and UIC number.

3. Activity: The naval activity where the near miss took place.

4. Report No.: The activity assigned near miss number (e.g., 95-001).

5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

7. Near Miss Date: The date the near miss occurred.

8. Time: The time (24 hour clock) the near miss occurred (e.g., 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the near miss (e.g., mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.

12. Location: The detailed location where the near miss took place (e.g., building 213, dry dock 5).

13. Weather: The weather conditions at time of the near miss (e.g., wind, rain, cold).

14. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

15. Hook Capacity: The capacity of the hook involved in the near miss at the maximum radius of the operation, if applicable.

16. Weight of Load on Hook: If applicable, the weight of the load on the hook.

17. Is this a recurring problem?: Check yes or no. Identify any other similar near misses or accidents.

18. Situation Description/Corrective Actions: Self-explanatory.

19. Preparer: Self-explanatory.

ATTACHMENT J-0200000-05D

Contractor Incident Reporting System (CIRS)

SEE SEPARATE ATTACHMENT

ATTACHMENT J-0200000-05E

Contractor Quality Inspection and Surveillance Report

ATTACHMENT J-0200000-05F

Monthly On-Site Labor Report

ATTACHMENT J-0200000-06

INSTALLATION SPILL CONTROL PLAN

ATTACHMENT J-0200000-07

CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG

ATTACHMENT J-0200000-08

EXHIBIT LINE ITEM NUMBERS

ATTACHMENT J-0200000-09

CONTRACTOR PLANNED UTILITY OUTAGE PROCESS

File details come from the government source that posted it. Updated .