This is a NEPA Environmental Checklist completed by NAVFAC PWD New London for a Boiler Maintenance Contract (Project Number 1733441) scheduled to begin September 1, 2024. The project involves providing maintenance and repair services to boilers and other related equipment basewide at the Naval Submarine Base New London. The project area consists of 100% impervious surfaces with no ground disturbance, tree removal, or excavation activities planned. All work will be issued through non-recurring task orders.

The Environmental Division determined the proposed action qualifies for Categorical Exclusion (CATEX) #8 as routine repair and maintenance of existing facilities and equipment, requiring no further NEPA analysis. However, eight specific environmental requirements must be implemented, including: compliance with all Federal, State, and local environmental regulations; review of existing facility HAZMAT surveys prior to any disturbance; coordination of regulated waste management through the Hazardous Waste Program Office; notification of the EV Division for any dewatering or wastewater discharge activities; provision of adequately sized spill pallets for the 55-gallon DEF drum; coordination with the Air Program Manager to address boiler technical documentation discrepancies; and adherence to soil management procedures for Buildings 29, 318, and 490 located within an Installation Restoration site. The environmental review remains valid for one year from the signature date of December 18, 2023, with Christopher Koproski serving as the Environmental Point of Contact.

View the file

Other files

File Type Posted
Solicitation Amendment N4008526R01730005.pdf PDF
Attachment 4 J-0200000-08 Boilers ELINS-Updated Amendment 0005.xlsx XLSX spreadsheet
Solicitation Amendment 004 N4008526R01730004.pdf PDF
Solicitation Amendment 003 N4008526R01730003.pdf PDF
Attachment 1 General Contract Information.docx DOCX document
Attachment 21 Corporate Experience.docx DOCX document
Solicitation Amendment002 N4008526R01730002.pdf PDF
Solicitation Amendment001 N4008526R01730001.pdf PDF
Solicitation -N4008526R0173.pdf PDF
Solicitation -N4008526R0173.pdf PDF
Attachment 4 J-0200000-08 Boilers ELINS.xlsx XLSX spreadsheet
Attachment 7 J020000006 Install Spill Control Plan.pdf PDF
Attachment 12 0200000 J Boilers.pdf PDF
Attachment 16 1502000 PAP Boilers.pdf PDF
Attachment 17 Solicitation Question Sheet.docx DOCX document
Attachment 1 General Contract Information.docx DOCX document
Attachment 9 0100000 C Boilers.pdf PDF
Attachment 11 0200000 F Boilers.pdf PDF
Attachment 2 J150200006 BLDG 29 Boiler Specifications.pdf PDF
Attachment 3 J150200003 Map.pdf PDF
Attachment 6 J150200007 NLON Inventory.xlsx XLSX spreadsheet
Attachment 13 1502000 C Boilers.pdf PDF
Attachment 15 1502000 J Boilers.pdf PDF
Attachment 18 DBA WD CT20260024 Mod 2.pdf PDF
Attachment 19 SCA 2015-4111 Rev 35.pdf PDF
Solicitation - N4008526R0173.pdf PDF
Attachment 8 J020000009 UEM Contractor Outage Process.pdf PDF
Attachment 10 0200000 C Boilers.pdf PDF
Attachment 14 1502000 F Boilers.pdf PDF
Attachment 20 Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 21 Corporate Experience.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON

NEW FORM EFFECTIVE 07/10/2020. The PWD Environmental Division (EV) uses this NEPA Environmental Checklist (EC) to determine the environmental requirements associated with a proposed project. Complete the first 2 pages of the form, attach a site map and a SOW or 1391, and then submit to EV. Submit the complete EC with required attachments a minimum of 15 days prior to a project’s scheduled start date. If there are modifications to the project scope or if work has not been initiated within 1 year of the signature date, please contact EV for review/approval prior to initiating the project.

GENERAL PROJECT INFORMATION

1 Activity Requesting: NAVFAC PWD New London Utilities

2 Activity POC / Phone / email: Lynne Kronk 860-694-4517

3 Name of Project: Boiler Maintenance Contract

4 Project Number (if any): 1733441

5 Project Location: Basewide

6 Project Type: Boiler Maintenance and Repair

7 Description of the Project: Provide Maintenance and Repair services to boilers and other related equipment

8 Why is this project needed? Provide Maintenance and Repair services to boilers and other related equipment

9 Date project scheduled to begin? 09/01/2024

PLANNING QUESTIONS

10a Total Project Area (sq. ft.) - (Include clear zones, soil disruption/disturbance area, lay down areas, etc)

N/A

10b Percentage of Project Area - that is currently Impervious (asphalt, bldgs, etc.) 100

10c Percentage of Project Area - that will be Impervious once project completed 100

10d Percentage of Project Area - that will be disturbed (excavated, graded, etc) 0

11 How will Stormwater be managed in the long-term (post-construction)? N/A

12 How will Sanitary Sewage (wastewater) be managed in the long-term? N/A

Will there be actions conducted in the water (dredging, new pilings, removal etc.)? If so indicate state what action(s).

No

14 Will there be actions conducted in an area under an Agriculture outlease? No

DESIGN RELATED QUESTIONS YES NO UNSURE

15 Will trees be removed?

Will emission-generating equipment (e.g. bull dozer, back hoe, etc.) be utilized during construction? If yes, please list equipment.

17 Will the project remove, install or utilize a petroleum storage tank, that is >=55-gallons?

18 Will the project remove or install an Oil Water Separator?

19 Will the project relocate excavated material at the Installation? If yes where is it going?

Will the construction / repair actions generate by-products (power washing water, haz. waste, state regulated waste such as asbestos, PCB items, transformers, capacitors, switches, light ballasts, lead paint chips, florescent bulbs, waste oil, solvents, etc)? If so indicate what type of waste(s) will be generated.

Will the construction / repair actions require de-watering from excavations, trenches or manholes? If yes, circle where de-watering will occur?

DESIGN RELATED QUESTIONS YES NO UNSURE

Will there be new hard pipe connections or modifications to existing hard pipe connections using water from Groton Utilities, the Thames, or wells?

Will new hard pipe connections or modifications to existing hard pipe connections discharge wastewater to the sanitary sewer, storm sewer or the Thames River? If so circle discharge type.

Will there be UST or AST installation, modification, or removal? If so indicate which type of tank and which action.

Will there be installation, repair, modification or removal of any system containing refrigerants

(e. g. freon, halon)?

Will there be modifications, destruction, or disturbance of the shoreline, streams, groundwater tables, surface water bodies, or wetlands? If so, explain.

Will there be any excavation and/or dewatering with the potential to impact the designated CT Coastal Zone (i.e., 1,000 feet inland from the MHW line)? If so, what type of activity will occur that can potentially impact the coastal zone area?

New proposed use and/or application of pesticides, rodenticides and herbicides? If so, indicate which type.

29 Will the project require pile driving?

OPERATIONAL RELATED QUESTIONS YES NO UNSURE

Will emission-generating equipment be installed (ex. paint booth, emergency generators)? If so, what type of equipment will be installed?

Will there be any new processes or maintenance activities conducted? If so, describe what they are.

ADDITIONAL COMMENTS

Type here:

This contract is 100% Non-recurring services with work issued through task orders.

Craig Schuller 860-694-2715 craig.schuller.civ@us.navy.mil 10/31/2023

Checklist Preparer, phone number and e-mail (if Same as Question #2 – Type “SAME”) Date

NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON

SUMMARY OF ENVIRONMENTAL REQUIREMENTS

(To Be Completed by Environmental Division Only)

PLEASE NOTE: The Environmental review provided is only valid for 1 year. If the project scope has been modified or checklist has expired, please contact the SUBASENLON PW Environmental Division to re-evaluate the project.

Name of Project: Boiler Maintenance and Repair contract

Project Number: 1733441

PLANNING REQUIREMENTS (Issues That Can Effect the Project’s Timeline, Cost, or Site Location)

Environmental Aspect YES NO Environmental Requirement Project Impacts

National Env Policy Act (NEPA) CATEX CATEX = 1 week; EA = 12 months; EIS = 24 months Can’t award till NEPA complete

Threatened or Endangered Species

Consultation with USFWS and/or NMFS required. Process may take 6 months

Marine Mammal Protection Act IHA or LOA

Consultation with NMFS May take 4 to 18 months

Wetland Impacts Permits and possibly mitigation required.

May take 7 months after

NEPA

Navigable Water Impacts Permits required.

Takes 2-7 months after

NEPA

Agriculture Outlease Consultations with NAVFAC Real Estate required.

Process may take 1 to 3 months.

Tree Mitigation Compensation for tree loss or mitigation is required.

This may add costs to project.

Coastal Zone Mgmt Act Coastal Consistency Determination (CCD) is required.

See Comment #2 Process takes 90 days.

Cultural Resources Consultations with SHPO required.

Process may take 1 to 6 months

Major Air Emission Source Permit is required. Process takes 6 months

Construction Emissions Air Conformity Record of Non-Applicability is required. This process takes a week.

Installation Restoration Land-use controls exist or Consultation w/ EPA required. See Requirement #8 Process may take 4 months

Petroleum Contamination Follow guidance in CNRMA POL SOP.

This may add costs to project.

DESIGN REQUIREMENTS (Issues To Be Addressed In Design Phase)

Storm Water Best Mgmt Practices, Erosion & Sediment Control

Required for projects that include excavation or other land disturbance.

Incorporate into the design.

CT Storm Water Mgmt Permit Required for projects that will disturb ≥ 1 acre of land. Obtain before construction.

De-watering, Wastewater Mgmt Protective measures required for managing excess waters.

Incorporate into the design.

Beach & Dune Management Protective measures required for impact beaches & dunes Incorporate into the design.

Spill Preventative Measures Secondary containment required for tanks ≥ 55 gal Incorporate into the design.

OPERATIONAL REQUIREMENTS (Issues To Be Addressed Prior To Use)

New Industrial Process Environmental Department Site Inspection required. Required before operation.

New Waste Generating Activity Environmental Department Site Inspection required. Required before operation.

ADDITIONAL REQUIREMENTS or COMMENTS

Comment 1 The proposed action is within the scope of CATEX #8:

- CATEX #8: Routine repair and maintenance of buildings, facilities, vessels, aircraft, ranges, and equipment associated with existing operation and activities (e.g. localized pest management activities, minor erosion control measures, painting, refitting, general building/structural repair, landscaping, grounds maintenance).

None of the exclusions from reliance on a CATEX applies in this case; therefore, the proposed action does not require further NEPA analysis. The applicability of this CATEX determination requires full implementation of all environmental requirements identified below.

Comment 2 Work at Buildings 29, 318, 490, 553 and 554 occurs in the coastal zone; however, a Coastal Consistency Determination is not required because the project scope does not include activities identified on CT DEEP's list of federal activities subject to consistency review, as established in the CT Coastal Management Plan. In addition, the project does not have the potential to significantly affect state coastal resources and/or uses.

Requir 1 Work shall comply with all Federal, State, and local environmental regulations as well as with all applicable Navy requirements. SUBASENLON PWD EV shall be the point of contact for all questions related to environmental rules or regulations.

Requir 2 Existing facility HAZMAT surveys shall be reviewed prior to any facility disturbance. If suspect hazardous materials (such as asbestos and lead paint) are present and are anticipated to be disturbed under the scope of the project, surveys shall be conducted by qualified individuals in advance of construction activity. All survey results shall be provided to the PW NLON EV Division.

Requir 3 Management, storage, and disposal of any regulated waste shall be coordinated in advance with the PW NLON EV Division Hazardous Waste Program Office (x4298).

- All regulated waste shall be manifested through the Hazardous Waste Program Office.

- Any regulated waste generated under the scope of this project shall be managed, stored, and disposed of in accordance with the SUBASENLON Hazardous Waste Management Plan and SUBASENLON policies and instructions.

- Non-regulated solid waste (i.e., general trash, construction debris, and recyclable items) shall be properly managed and disposed of in accordance with Federal, State, Navy, and local regulations.

Requir 4 PW NLON EV Division shall be notified immediately of any actions that require dewatering activities under the scope of this project, including drain-down of any water piping and equipment. Discharge to the stormwater system is prohibited. Permitted discharges to sanitary are allowed in accordance with the General Permit for the Discharge of Wastewaters from Significant Industrial Users (SIU GP). No discharge shall occur without prior approval from the PW NLON EV Division Wastewater Program Manager (x2525).

Requir 5 PW NLON EV Division shall be notified immediately of any actions that require wastewater discharges under the scope of this project. No discharges shall occur without prior approval from with the PW NLON EV Division Wastewater Program Manager (x2525).

Requir 6 Provide adequately sized spill pallet for the 55-gallon drum of DEF located indoors by the south maintenance door per Section5(b)(9)(A), Containment, page 20 of the General Permit for the Discharge of Stormwater Associated with Industrial Activity. Contractor/Project Lead shall coordinate with PW NLON EV Division Stormwater Program Manager (x5191) for spill-prevention compliance.

Requir 7 Contractor/Project Lead shall coordinate with PW NLON EV Air Program manager (x5192) to address discrepancies in boiler technical documentation prior to commencing work:

- J-1502000-06: remove turbine language.

- Boiler 4 is also due on both fuels by 26 April 2024

- The ITT forms need to be submitted to the CTDEEP 60 days before the test date. Final report to the CTDEEP is 60 days after the tests (not 45)

- DG1 & 2 may take 2 days now due to EPA required low load testing along with the normal high load tests

- Excel file J-1502000-07 NLON Inventory: boiler specs are incorrect

Requir 8 Buildings 29, 318, and 490 occur within an IR site/zone. However, no ground-disturbing activities are included in the scope of work. If ground-disturbing activities are planned, a dig permit shall be obtained prior to the initiation of such activity and soil management procedures detailed in the dig permit and the SUBASE Soil Management SOP shall be followed.

Christopher Koproski, Installation Environmental Program Director; x3976;

christopher.r.koproski.civ@us.navy.mil

Environmental POC; phone number and email Signature and Date mailto:christopher.r.koproski.civ@us.navy.mil

Activity Requesting:
NAVFAC PWD New London Utilities:
Lynne Kronk 8606944517:
Name of Project:
Boiler Maintenance Contract:
1733441:
Project Location:
Basewide:
Project Type:
Boiler Maintenance and Repair:
09012024:
NA:
100:
100_2:
0:
NA_2:
NA_3:
No:
No_2:
DESIGN RELATED QUESTIONS:
Will trees be removed:
undefined:
undefined_2:
undefined_3:
undefined_4:
undefined_5:
undefined_6:
undefined_7:
undefined_8:
undefined_9:
Will the project remove or install an Oil Water Separator:
undefined_10:
undefined_11:
undefined_12:
undefined_13:
undefined_14:
undefined_15:
undefined_16:
undefined_17:
undefined_18:
undefined_19:
undefined_20:
undefined_21:
DESIGN RELATED QUESTIONS_2:
undefined_22:
undefined_23:
undefined_24:
undefined_25:
undefined_26:
undefined_27:
undefined_28:
undefined_29:
undefined_30:
undefined_31:
undefined_32:
undefined_33:
undefined_34:
undefined_35:
undefined_36:
undefined_37:
undefined_38:
undefined_39:
undefined_40:
undefined_41:
undefined_42:
Will the project require pile driving:
undefined_43:
undefined_44:
undefined_45:
OPERATIONAL RELATED QUESTIONS:
undefined_46:
undefined_47:
undefined_48:
undefined_49:
undefined_50:
undefined_51:
Boiler Maintenance and Repair contract:
1733441_2:
National Env Policy Act NEPA:
CATEX:
CATEX 1 week EA 12 months EIS 24 months:
undefined_52:
undefined_53:
undefined_54:
undefined_55: Off
Consultation with NMFS:
Wetland Impacts:
undefined_56:
undefined_57:
undefined_58:
undefined_59:
Permits required:
Agriculture Outlease:
undefined_60:
undefined_61:
Tree Mitigation:
undefined_62:
undefined_63:
undefined_64:
undefined_65:
Cultural Resources:
undefined_66:
undefined_67:
Consultations with SHPO required:
undefined_68:
undefined_69:
Permit is required:
undefined_70:
undefined_71:
undefined_72:
undefined_73:
undefined_74:
undefined_75:
undefined_76:
undefined_77:
undefined_78:
undefined_79:
undefined_80:
undefined_81:
undefined_82:
undefined_83:
undefined_84:
undefined_85:
undefined_86:
undefined_87:
undefined_88:
undefined_89:
Comment 1:
Comment 2:
Requir 1:
Requir 2:
Requir 3:
Requir 4:
Requir 5:
Requir 6:
Requir 7:
Requir 8:
Christopher Koproski Installation Environmental Program Director x3976 christopherrkoproskicivusnavymil:
2023-12-18T12:05:19-0500
KOPROSKI.CHRISTOPHER.R.1013633343

File details come from the government source that posted it. Updated .