Attachment 14 1502000 F Boilers.pdf

PDF 62 KB Posted

Attached to
Boiler Maintenance & Repair
Solicitation number
N4008526R0173
Issued by

About this file

This document is Section F (Deliveries or Performance) from a federal contract solicitation for project 1502000 – Facility Investment. It specifies six deliverables required throughout the contract performance period, with varying submission timelines and distribution frequencies.

The Certification and Licenses deliverable must be submitted within 15 days after award or as requested by the Contracting Officer, with one copy distributed to the COR, submitted once initially and then as requested. Discharges of Sewer Compatible (MISC) Wastewater must be submitted on the first work day of each month in two copies to COR/EV on a quarterly distribution basis. Material Samples, Manufacturer's Data, and Certificates of Compliance all require submission five days prior to use, with two copies each distributed to COR/ET as required. Deviations from Manufacture's Design also requires submission five days prior to use, with two copies distributed to COR/UEM Engineering. The Material Samples, Manufacturer's Data, Certificate of Compliance, and Deviations from Manufacture's Design deliverables are all contingent upon actual use and follow an "as required/prior to use" frequency structure, indicating they are conditional submissions tied to project implementation.

View the file

Other files

File Type Posted
Solicitation Amendment N4008526R01730005.pdf PDF
Attachment 4 J-0200000-08 Boilers ELINS-Updated Amendment 0005.xlsx XLSX spreadsheet
Solicitation Amendment 004 N4008526R01730004.pdf PDF
Solicitation Amendment 003 N4008526R01730003.pdf PDF
Attachment 1 General Contract Information.docx DOCX document
Attachment 21 Corporate Experience.docx DOCX document
Solicitation Amendment002 N4008526R01730002.pdf PDF
Solicitation Amendment001 N4008526R01730001.pdf PDF
Solicitation -N4008526R0173.pdf PDF
Solicitation -N4008526R0173.pdf PDF
Attachment 4 J-0200000-08 Boilers ELINS.xlsx XLSX spreadsheet
Attachment 7 J020000006 Install Spill Control Plan.pdf PDF
Attachment 12 0200000 J Boilers.pdf PDF
Attachment 16 1502000 PAP Boilers.pdf PDF
Attachment 17 Solicitation Question Sheet.docx DOCX document
Attachment 1 General Contract Information.docx DOCX document
Attachment 9 0100000 C Boilers.pdf PDF
Attachment 11 0200000 F Boilers.pdf PDF
Attachment 2 J150200006 BLDG 29 Boiler Specifications.pdf PDF
Attachment 3 J150200003 Map.pdf PDF
Attachment 5 NEPA.pdf PDF
Attachment 6 J150200007 NLON Inventory.xlsx XLSX spreadsheet
Attachment 13 1502000 C Boilers.pdf PDF
Attachment 15 1502000 J Boilers.pdf PDF
Attachment 18 DBA WD CT20260024 Mod 2.pdf PDF
Attachment 19 SCA 2015-4111 Rev 35.pdf PDF
Solicitation - N4008526R0173.pdf PDF
Attachment 8 J020000009 UEM Contractor Outage Process.pdf PDF
Attachment 10 0200000 C Boilers.pdf PDF
Attachment 20 Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 21 Corporate Experience.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1502000 – Facility Investment

SECTION F: DELIVERIES OR PERFORMANCE

DELIVERABLES

Annex/ Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original/ Copies

Number of Copies (includin g original)

1502000/ 2.2.1

N/A

Certification and Licenses

Within 15 days after award or as requested by the

KO

COR 1 Once for initial submittal, then as requested

1502000/ 2.3

N/A Discharges of Sewer Compatible (MISC)

Wastewater

First work day of the month

COR/EV 2 Quarterly

1502000/4 Attachment J- 1502000-08

/1.6.1

N/A Material Samples 5 days prior to use

COR/ET 2 As required/ Prior to use

1502000/4 Attachment J- 1502000-08

/1.6.2

N/A Manufacturer’s Data 5 days prior to use

COR/ET 2 As required/ Prior to use

1502000/4 Attachment J- 1502000-08

/1.6.3

N/A Certificate of Compliance

5 days prior to use

COR/ET 2 As required/ Prior to use

1502000/4 Attachment J- 1502000-08 /3

N/A Deviations from Manufacture’s

Design

5 days prior to use

COR/UEM

Engineering

2 As required/ Prior to use