Attachment 5 - Landscape.pdf

PDF 4 MB Posted

Attached to
Y1DZ--VHA Minor Construction - Project 650-318 - New Otis CBOC for Providence VAMC
Solicitation number
36C77624R0087
Issued by

About this file

This document appears to be a landscape plan and details for the Replacement Outpatient Clinic Design at Coast Guard Cape Cod, a federal contract opportunity solicited by the Department of Veterans Affairs.

The landscape plan provides site-specific details on the layout, planting palette, and landscaping requirements for the new outpatient clinic facility. It includes a plant species list with quantities, sizes, and spacing, as well as landscape details for tree, shrub, and perennial plantings, edging, and island construction. The plan covers site preparation, topsoil and mulching requirements, irrigation, and plant guarantee/replacement terms. This information would be relevant for contractors bidding on the 36C77624R0087 solicitation to construct the new outpatient clinic at the U.S. Coast Guard Air Station in Cape Cod, Massachusetts.

View the file

Other files

File Type Posted
36C77624R0087 0009.docx DOCX document
36C77624R0087 0008 Request for Propsoals 9.18.2024.docx DOCX document
36C77624R0087 00008 - Wage Determination 9.18.24.pdf PDF
36C77624R0087 0008 Request for Propsoals 9.18.2024.docx DOCX document
36C77624R0087 0008.docx DOCX document
36C77624R0087 0006.docx DOCX document
Answers to RFIs - 36C77624R0087 amendment 0006 Mass..docx DOCX document
36C77624R0087 0007.docx DOCX document
36C77624R0087 0006.docx DOCX document
Rhoad Island Note regarding FAR 52.229-3.docx DOCX document
USCG Cape Cod - SNELL STATEMENT OF SPECIAL INSPECTIONS - SNELL DSS 2024-06-24.pdf PDF
Answers to RFIs - 36C77624R0087 amendment 0006.docx DOCX document
S06 - Wage Determination 6-14-24.pdf PDF
AMENDMENT 0005 PRICE COST SCHEDULE.docx DOCX document
S06 36C77624R0087 0005.docx DOCX document
Answers to RFIs - 36C77624R0087 amendment 0005.docx DOCX document
01 00 00-VA SPEC-GENERAL REQUIREMENTS_Add1.pdf PDF
S06 36C77624R0087 0004.docx DOCX document
S06 36C77624R0087 0003.docx DOCX document
S06 36C77624R0087 0002.docx DOCX document
Attachment 9 - Architectural 4 of 5.pdf PDF
36C77624R0087 0001.docx DOCX document
Attachment 9 - Architectural 4 of 5.zip ZIP file
Attachment 19 - Telecom.pdf PDF
Attachment 17 - Electrical 1 of 2.pdf PDF
Attachment 1 - Specifications_Rev_05.2024.pdf PDF
Attachment 22 - Small Business Subcontracting Plan Template.docx DOCX document
Attachment 12 - Fire Alarm.pdf PDF
36C77624R0087_1.docx DOCX document
Attachment 20 - Brand Name - Redacted.pdf PDF
Attachment 13 - Fire Protection.pdf PDF
Attachment 11 - Structural.pdf PDF
Attachment 4 - Civil.pdf PDF
Attachment 10 - Architectural 5 of 5.pdf PDF
Attachment 9 - Architectural 4 of 5.pdf PDF
Attachment 16 - Mechanical 2 of 2.pdf PDF
Attachment 7 - Architectural 2 of 4.pdf PDF
Attachment 8 - Architectural 3 of 4.pdf PDF
Attachment 21 - wage determination.pdf PDF
Attachment 2 - General.pdf PDF
Attachment 23 - Division Breakdown Pricing.xls XLS spreadsheet
Attachment 6 - Architectural 1 of 4.pdf PDF
Attachment 14 - Plumbing.pdf PDF
Attachment 18 - Electrical 2 of 2.pdf PDF
Attachment 3 - Existing Conditions.pdf PDF
Attachment 15 - Mechanical 1 of 2.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAST IRON

MANHOLE

COVER

CONNERY AVENUE

CONNERY AVENUE

D

UP #8UP #9UP #10 UP #601/7

TELEPHONE

MANHOLE COVERT

UP #7A

B-3'

B-2'

B-3'

B-3'

B-3'

B-3'

B-2' B-2'

B-2'

B-3'

B-2'

B-3'

B-4'

B-4'

B-5'

B-9'

B-8'

B-4'

B-5'

B-5'

B-5'

B-6'

B-3'

B-5'

B-8'

B-6'

B-5'

B-4'

B-3'

B-5'

B-6'

B-4'

B-18'

B-4'

B-3'

B-2'

B-3'

B-5'

B-4'

B-4'

B-4'

B-3'

B-4'

B-3'

B-3'

B-4'

B-2'

B-4'

B-5'

B-5'

B-5'

B-5'

B-3'

B-2'

B-3'

B-2'

B-2'

B-3'

B-2'

B-2'

B-2'

B-8'

BOULDER

OUTCROP

BOULDER

OUTCROP

BOULDER

OUTCROP

BOULDER

OUTCROP

GAS

LINE POST

GAS

LINE POST

APPROX. GAS

MAIN

APPROX. GAS

MAIN

FD

FD

FD

FD

FD

130 133

147148 149

1 13 8 13

141142

142 141

141 134

7 11 6 11

2 112

134 134 134 134

133 133

133 133

132 132 132 132 132

131 131 131 131

131 131

129 129

129 129 129 129

128 128

128 128

127 127

126 126

124 124 124

123 123

122 122 122 12 2 122

121 121

117 117

118 118

135 135 135 135

130 130 130

125125125

120120120

116 116

111111 112112

113 114

118 118

110110

115115

126125

121120

W

W

S

PS

W

W

FMFMFMFMFMFM V

T

C

C

G

C

C C

C

C

C

C

C

C

C

CCCCC

C C C C CC

C C

CCCCCCC

C C

C C

CCC

AR

AR

AR

LTE

LTE

LTE

DRK

AGR16

AGR

EP

EP

AT

AT

DRK

QBB

QA

QA

QA

AGR

AGR

EP

EP 9

AT

AT

PPR

QR

PVR

AMU

DRK

EP

AT

AT

CFA

DRK

AMU

EP

EP

PS r

Pr r

QA-r

QR r

Allow area to naturalize. Do not mow. On a yearly basis, remove any invasive or undesirable trees or shrubs as they occur.

Seed Slope with: New England Wetland Plants Erosion Control/ Restoration Mix for Dry Slopes. All Tree and Shrubs are restoration grade, available from New England Wetland Plants

Pr r

PS r

QA-r

QA-r

PS r

QR r

PS r

Pr r

QA-r

QA-r

DRK

DRK

DRK

DRK

AMU

AMU

AT

AT

AMU

AMU

AT

AT

CAS

AMA

AMA

AMA

IVL

IVL

AML

AML

AML

ADW

ADW

ADW

ADW

AML

HXP

HXP

HXP

HXP

AML

TCF

TCF

TCF

TCF

HXP

TCF

CKS

AMA

IVL

IVL

HXP

HXP

HXP

TCF

TCF

IGG

IVL

PVR

EP

ADW

GMC

Project Sign

3" Mulch (Typ.)

Place 18" Topsoil in all Parking Lot Islands

Place 18" Topsoil in all Parking Lot Islands

Place 3" Mulch in Parking Lot Islands

Place 3" Mulch in Parking Lot Islands

3" Mulch (Typ.)

Granite Cobble and 4"x8" Pavers laid Flush in Ground in a Soldier Course Pattern (Typ.) See Detail L002

Granite Cobble and 4"x8" Pavers laid Flush in Ground in a Soldier Course Pattern (Typ.) See Detail L002

SA-r

SA-r

SA-r

SA-r

SA-r

VL-r 4

VL-r

VL-r

VL-r

CRH5

CRH

CRH

AMM3

AMM

AMM

AMM

AMM

AMM

Place 18" Topsoil in all Planting Beds along the North, East and West Sides of Building

TCFFlag Pole

PVR

CAS

CSC

3' wide planter with 3" mulch. Soil flush with surrounding patio.

CFA

Note: All deciduous and evergreen trees shall have a tree irrigation bag installed after planting excpet for restoration grade trees.

VA FORM 08 - 6231

L001

LANDSCAPE PLAN

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

SCALE: 1" = 20'20' 80'40'

PH: 321.345.9026

Melbourne, Florida 32904

305 East Dr., Suite H, COA/CA Lic. No. 31120 www.abovegroupinc.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT REPLACEMENT OUTPATIENT

CLINIC DESIGN AT COAST GUARD

CAPE COD

650-318

BJH BJH

BUILDING 1

100% CONSTRUCTION

DOCUMENTS

CAPE COD, MA

11/23/2022

FULLY SPRINKLERED

Revisions Date

TRUE NORTH

Plant Species List ID Qty Botanical Name Common Name Scheduled Size Remarks

ADW 34 Aster dumosus 'Wood's Blue' Wood's Blue Aster 1 gal. 18" o.c.

AGR 48 Andropogon gerardii 'Red October' Red October Big Bluestem 1 gal. 18" o.c.

AMA 25 Azalea x 'Millenium' Millenium Azalea 18" - 24" cont., 3' o.c.

AML 37 Aruncus x 'Misty Lace' Misty Lace Goatsbeard 1 gal. 18" o.c.

AMM 32 Aronia melanocarpa 'Morton' Iroquois Beauty Chokeberry 2' - 2.5' cont., 5' o.c.

AMU 79 Aronia melanocarpa 'UCONNAM012' Ground Hug Chokeberry 15" - 18" cont., 3' o.c.

AR 3 Acer rubrum 'Redpointe' Redpointe Red Maple 2" - 2.5" cal. B&B AT 85 Asclepias tuberosa Butterfly Weed 1 gal. 18" o.c.

CAS 47 Carex appalachia Appalachian Sedge 2 qt. cont., 15" o.c.

CFA 4 Cornus florida 'Appalachian Spring' Appalachian Spring' Eastern Dogwood 2" - 2.5" cal. B&B CKS 1 Cornus kousa 'Snow Tower' Snow Tower Kousa Dogwood 2" - 2.5" cal. B&B CRH 17 Cornus racemosa 'Hurzam' Huron Gray Dogwood 2' - 2.5' cont., 5' o.c.

CSC 3 Clethra alnifolia 'Sixteen Candles' Sixteen Candles Summersweet 15" - 18" cont., 30" o.c.

DRK 72 Diervilla rivularis 'Kodiak Red' Kodiak Red Bush Honeysuckle 15" - 18" cont., 42" o.c.

EP 86 Echinacea pallida Pale Coneflower 1 gal. 18" o.c.

GMC 33 Geranium maculatum Spotted Cranesbill 1 gal. 18" o.c.

HXP 86 Heuchera x 'Paris' Paris Coral Bells 1 gal. 12" o.c.

IGG 10 Ilex glabra 'Gem Box' Gem Box Inkberry 15" - 18" cont., 3' o.c.

IVL 28 Itea virginica 'Little Henry' Little Henry Sweetspire 15" - 18" cont., 3' o.c.

LTE 4 Liriodendron tulipifera 'Emerald City' Emerald CityTulip Tree 2" - 2.5" cal. B&B PPR 12 Pinus rigida Pitch Pine 5' - 6' B&B Pr r 17 Pinus rigida Pitch Pine 5 gal. cont.

PS r 15 Pinus strobus Eastern White Pine 5 gal. cont.

PVR 50 Panicum virgatum 'Rostrahlbusch' Red Switch Grass 1 gal. 24" o.c.

QA 7 Quercus alba White Oak 2" - 2.5" cal. B&B

QA-r 10 Quercus alba White Oak 5 gal. cont.

QBB 7 Quercus bicolor 'Beacon' Beacon Oak 2" - 2.5" cal. B&B QR 2 Quercus rubra Red Oak 2" - 2.5" cal. B&B

QR r 7 Quercus rubra Red Oak 5 gal. cont.

SA-r 28 Spiraea alba var. latifolia Meadowsweet 2' - 3' cont.

TCF 106 Tiarella cordifolia Allegheny Foamflower 1 qt. 12" o.c.

VL-r 17 Viburnum lentago Nannyberry Viburnum 2' - 3' cont.

Notes:

1. All areas outside of mulch planting areas shall have 4" of Loam and seed.

2. All trees shall have either "Tree Diaper" or "Tree Gator" watering products installed as noted after planting and according to manufactures recommendations.

Barry J. Hosmer ASLA Landscape Architecture Land Planning

196 Whitney Avenue Portland, Maine 04102

207-874-0248 11-23-22

VA FORM 08 - 6231

L002

LANDSCAPE DETAILS

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PH: 321.345.9026

Melbourne, Florida 32904

305 East Dr., Suite H, COA/CA Lic. No. 31120 www.abovegroupinc.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT REPLACEMENT OUTPATIENT

CLINIC DESIGN AT COAST GUARD

CAPE COD

650-318

BJH BJH

BUILDING 1

100% CONSTRUCTION

DOCUMENTS

CAPE COD, MA

11/23/2022

FULLY SPRINKLERED

Revisions Date

Install tree so trunk flare junction is level with or 1" - 2" above existing grade.

Trunk caliper shall meet ANSI Z60 current edition for root ball size.

Cut and remove burlap from top 1/3 of ball. If Non-biodegradeable material present remove entirely

Existing soil.

Slope sides of loosened soil.

Prior to mulching, lightly tamp soil around the root ball in 6" lifts to brace tree. Do not over compact.

When the planting hole has been backfilled, pour water around the root ball to settle the soil.

3" layer of mulch.

No more than 1" of mulch on top of root ball. (See specifications for mulch).

Bottom of root ball rests on existing or recompacted soil.

Central leader. (Tree Canopy detail).

SECTION VIEW

Round-topped soil berm 4" high x 8" wide above root ball surface shall be constructed around the root ball. Berm shall begin at root ball periphery.

Notes:

1- Trees shall be of quality prescribed in crown observations and root observations details and specifications.

2- See specifications for further requirements related to this detail.

Finished grade.

Plant mix as specified or use:

Loosened soil. Dig and turn the soil to reduce compaction to the area and depth shown.

3x widest dimension of root ball

SECTION VIEW

6' -0

2'

-0

Two (2) two inch x two inch stakes. Install approximately 2" away from the edge of the root ball. Stake location shall not interfere with permanent branches.

PLAN VIEW

Ties.

Stakes.

Remove nursery stake. If central leader needs to be straightened or held erect, it is acceptable to attach a 1#2" x 8' bamboo pole to the central leader and trunk.

32"+ long non - abrasive ties.

Prevailing wind.

Plant Notes:

1. The Landscape Contractor is advised that a full set of detailed written landscape specifications and related sections are in Section 32 90 00 of the specification book.

2. The Landscape Contractor is advised of the existence of underground utilities. The Landscape Contractor shall verify utilities prior to commencing construction. Call DIGSAFE at 1-888-344-7233

3. The Landscape Contractor shall be responsible for repairing any utilities, walks, paving, curbing, etc. damaged in the performance of this job at no cost to the Owner. The Landscape Contractor shall notify the Landscape Architect immediately if they encounter any site conditions, which will not allow them to carry out the landscape installation according to the drawings.

4. Planting of trees shall not occur until all erosion control is in place and all grading and paving is completed.

Submit a sample of the topsoil with NPK, pH, calcium, aluminum effective cation exchange capacity tests and fertility recommendations as well as bulk density test of the sample. Topsoil shall be friable void of weeds, stones greater than 3/4” diameter, sticks and other debris. Topsoil shall contain, 70–80% sand, 5-20% clay, 18-20% silt, 5.0-8% organic matter and a pH of 6-6.9. Notify the Landscape Architect immediately if there is standing water or other factors, which would prohibit the installation of plant material.

5. All plants shall have a normal habit of growth for the species and shall be sound, healthy and free of disease and insects. All plants shall be legibly tagged with the proper complete botanical name. They shall conform to the measurements on the Plant List and shall conform to ANSI Z60.1 - Nursery Stock, latest revision. Prior to plant installation, the Landscape Contractor shall submit a written affidavit of all plant species, cultivars, varieties, sizes and quantities that they propose to install with the name, phone number and location of all nurseries where plant material has been grown. All plants shall be grown in a latitude north of Washington D.C.

The Landscape Architect will inspect all plants at the place of growth or upon delivery for conformity to the plant list and specifications. Such approval shall not affect the right of inspection and rejection during the progress of work. The Landscape Architect and Owner reserve the right to inspect, select and tag all plant material at the place of growth or select and approve a representative sample of each type of shrub, perennial, groundcover or annual. The samples selected will serve as a minimum standard for all plants of the same species used for this work.

6. The top 1/3 of wire baskets and burlap on trees shall be cut and removed. All other plant material including trees shall have all non-biodegradable materials (string, wire, pots, etc.) removed at the time of planting.

Circling roots or roots that would later girdle the plant shall be straightened, cut or the root ball shall be cut utilizing a split ball technique.

7. Backfill mix shall be composed of an 80/20, top soil/ peat moss mix. Planting pits shall be excavated to three times the diameter and to the same depth of the plant root ball. Backfill1/2 of the pit at a time, and compact. See Note 8 and install slow release fertilizer after first backfill lift. Setting the tree/shrub: Each tree/ shrub shall be planted such that the trunk flare junction is level with or 1” above existing grade. All trees/shrubs where the planting depth is incorrect shall be rejected. All trees and shrubs shall have a 3” soil saucer constructed at the perimeter of the planting pit.

8. All plantings shall have slow release granular fertilizer installed at the time of planting. The fertilizer shall be a granular soil amendment with an NPK of 3-4-3 and with beneficial rhizosphere bacteria and mycorrhizal fungi, kelp meal and humic acid installed applied according to manufacturers instructions. The day of plant installation and after the plants are installed in each area, apply a water soluble liquid root biostimulant with a NPK of 1-0-3 with seaplant extract, humic acid and vitamins all plants. Mix and apply according to manufacturers instructions. The landscape contractor shall submit a sample of the slow release fertilize and copies of the label of the liquid root biostimulant prior to plant installation. The Landscape Contractor shall not install any plant material unless appropriate watering equipment is on site. All plants shall be adequately watered the day of installation or these plants will be rejected and replaced by the Landscape Contractors at no cost to the owner.

9. All trees shall have 2 stakes and guys. Stakes shall be 2” x 2” hardwood of sufficient length to guy above the first branches. Guys shall be flexible guying chain or an approved equal. Submit a sample of guying prior to installation. Any plants with broken or damaged root balls will be rejected. The landscape contractor shall remove all stakes after 1 year. All trees shall have tree watering bags installed at the time of planting and shall be filled twice a week from April thru November. Tree watering bags shall be either a cone shaped 20 gallon bag or a donut shaped 15 gallon bag for low branched trees.

10. Mulch to be installed to a depth of 3" after normal settling including the seasonal color area. Mulch shall be medium shredded Hemlock bark, dark brown in color. Do not place mulch in contact with the tree trunk.

The Landscape Contractor shall submit a 1 L (1 quart) sample prior to installation.

11. All plants shall have their locations staked and approved by the Landscape Architect prior to plant installation.

Plants shall be spaced according to the plan and as noted in the Plant Species List. All plants shall be oriented for best appearance and arranged to evenly occupy the space where they are planted.

12. Plant species and plant size substitutions will not be allowed unless first approved by the Landscape Architect.

Any substituted plants installed without prior approval will be rejected.

13. All plants shall be guaranteed for two years. The landscape contractor at no cost to the owner shall replace any plants that die during the guarantee.

14. Allow deciduous and evergreen shrubs to grow together to form a continuous plant mass.

15. The contractor shall supply the quantities of plants sufficient to complete the work shown on all of the drawings. If quantities of plants listed in the plant species list do not correlate with the plantings indicated on the drawings, the quantities on the drawings shall govern. Any discrepancies between the plant list and the drawings shall not entitle the landscape contractor to additional remuneration. Notify the Landscape Architect immediately if discrepancies are detected.

16. Under no circumstance shall snow be plowed and piled on planting areas. This will result in crushing and death of the plant materialand void the one year warranty.

See Architectural Drawings for Sign Details

Shrub (Typ.)

Perennial (Typ.)

Ornametal Tree (Typ.)

Notes:

1- Shrubs shall be of quality prescribed in the root observations detail and specifications.

2- See specifications for further requirements related to this detail.

Plant Mix as secified or use Loosened soil. Dig and turn the soil to reduce the compaction to the area and depth shown.

Rootball:

4" high x 8" wide round - topped soil berm above root ball surface shall be constructed around the root ball.

Berm shall begin at root ball periphery.

Prior to mulching, lightly tamp soil around the root ball in 6" lifts to brace shrub. Do not over compact. When the planting hole has been backfilled, pour water around the root ball to settle the soil.

3" layer of mulch.

No more than 1" of mulch on top of root ball. (See specifications for mulch).

Root ball rests on existing or recompacted soil.

Slope sides of loosened soil.

Existing soil.

Finished grade.

Shrub.

SECTION VIEW

3 times widest dimension of root ball Cut and remove burlap from top 1/3 of ball. If Non-biodegradeable material, pots, etc., present remove entirely

Crown Islands:

6" < 6', 9" < 9', 12"> 10'

Planting Soil Mix:

See Notes and Specifications

Note: Notify Owner in case of poor drainage or ground water

Gravel or compacted subgrade

2"

Unilock Hollandstone 8"x 4"x 2 3/8" Color: Sierra

Granite Cobble - Standard 9"x 5"x 5" Swenson Granite, Color Gray

Planting Bed - 18" Loam

6"

6" Gravel 4" 4"

Native Soil

Lawn

Shrub (Typ.)

Perennial (Typ.)

See Architectural Drawings for Sign Details

Sidewalk Lawn Edge Planting Bed Drip Edge

Building

Perennial (Typ.)

Shrub (Typ.)

Tree Planting Detail Scale: Not To Scale1

Tree Staking Detail Scale: Not To Scale2

Shrub Planting Detail Scale: Not To Scale3

Typical Section - Landscaped Island Scale: Not To Scale4

Cobbel and Paver Edge Detail Scale: Not To Scale5

Sign Elevation - Landscape Scale: Not To Scale6

Sign Cross Section - Landscape Scale: Not To Scale7

Planting Bed Cross Section - North Scale: Not To Scale8

Barry J. Hosmer ASLA Landscape Architecture Land Planning

196 Whitney Avenue Portland, Maine 04102

207-874-0248 11-23-22

File details come from the government source that posted it. Updated .