Attachment 2 - General.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77624R0087
About this file
This document is a set of construction drawings and specifications for a Replacement Outpatient Clinic at US Coast Guard Air Station located in Barnstable, Massachusetts, under Solicitation Number 36C77624R0087.
The construction drawings provide detailed plans for the new 16,521 SF outpatient clinic facility, including architectural, structural, mechanical, electrical, plumbing, and technology systems. Key design features include a fully sprinklered building, 3 egress doors, a fire alarm system, and various clinic spaces such as exam rooms, mental health consult rooms, a multi-purpose room, and support spaces. The project is classified as a Life Safety Protected (LSP) building under the VA's design requirements. The construction is planned for one story with a maximum 32'-6" height. The work is to be procured through a competitive solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. No other specific details about the procurement are provided in this document.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED
Department of Veterans Affairs Medical Center
ABOVE GROUP, INC.
MECHANICAL ELECTRICAL PLUMBING
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
WBRC
ARCHITECTURAL STRUCTURAL
30 DANFORTH ST., SUITE 306
PORTLAND, ME 04101
207.828.4511 P
NORTHEAST CIVIL
SOLUTIONS
CIVIL
381 PAYNE ROAD
SCARBOROUGH, ME 04074
207.883.1000 P
BI
M
- C on st ru ct
R ep la ce m en t O ut pa tie nt C lin ic
/0
C on st . R ep la ce . O ut pa tie nt
C lin ic
R
.rv t
2/ 9/
:5
8:
P M
GI001
COVER SHEET REPLACEMENT OUTPATIENT
CLINIC DESIGN AT COAST
GUARD CAPE COD
JOINT BASE CAPE COD, BARNSTABLE MA
650-318
BUILDING 1
02/10/2023 JFR KDB
100% CONSTRUCTION
DOCUMENTS
REPLACEMENT OUTPATIENT CLINIC DESIGN
AT COAST GUARD CAPE COD
CONNERY AVE, JOINT BASE CAPE COD, BARNSTABLE MA PROJECT #: 650-318
DRAWING LIST
SHEET NUMBER SHEET NAME
FIRE ALARM DRAWINGS
FA001 FIRE ALARM LEGEND, ABBREVIATIONS AND NOTES
FA101 PARTIAL FIRST FLOOR PLAN - FIRE ALARM - WEST
FA102 PARTIAL FIRST FLOOR PLAN - FIRE ALARM - EAST
FA501 FIRE ALARM DETAILS
FA601 FIRE ALARM DIAGRAMS
FIRE PROTECTION DRAWINGS
FP001 FIRE PROTECTION LEGENDS & SYMBOLS
FP111 FIRE PROTECTION HAZARD CLASSIFICATIONS
FP112 PARTIAL FIRST FLOOR PLAN - FIRE PROTECTION - WEST
FP113 PARTIAL FIRST FLOOR PLAN - FIRE PROTECTION - EAST
FP501 FIRE PROTECTION DETAILS
PLUMBING DRAWINGS
P-001 PLUMBING LEGENDS, SYMBOLS, & NOTES
PS101 PARTIAL UNDERSLAB PLAN - PLUMBING GRAVITY - WEST
PS102 PARTIAL UNDERSLAB PLAN - PLUMBING GRAVITY - EAST
PS111 PARTIAL FIRST FLOOR PLAN - PLUMBING GRAVITY - WEST
PS112 PARTIAL FIRST FLOOR PLAN - PLUMBING GRAVITY - EAST
PS121 PLUMBING GRAVITY - ROOF PLAN
PP111 PARTIAL FIRST FLOOR PLAN - PLUMBING PRESSURE - WEST
PP112 PARTIAL FIRST FLOOR PLAN - PLUMBING PRESSURE - EAST
P-401 PLUMBING ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-601 PLUMBING ISOMETRICS - PRESSURE
P-602 PLUMBING ISOMETRICS - GAS & STORM
P-603 GRAVITY ISOMETRICS - SANITARY
P-801 PLUMBING SCHEDULES
MECHANICAL DRAWINGS
M-001 MECHANICAL LEGENDS AND SYMBOLS
MH101 PARTIAL FIRST FLOOR PLAN - MECHANICAL HVAC - WEST
MH102 PARTIAL FIRST FLOOR PLAN - MECHANICAL HVAC - EAST
MH103 FIRST FLOOR PLAN - MECHANCAL PRESSURIZATION
MH104 ROOF PLAN - MECHANICAL
MP101 PARTIAL FIRST FLOOR PLAN - MECHANICAL PIPING - WEST
MP102 PARTIAL FIRST FLOOR PLAN - MECHANICAL PIPING - EAST
M-401 MECHANICAL ENLARGED PLANS
M-402 MECHANICAL ENLARGED PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-505 MECHANICAL DETAILS
M-701 MECHANICAL CONTROLS
M-702 MECHANICAL CONTROLS
M-703 MECHANICAL CONTROLS
M-801 MECHANICAL SCHEDULES
ELECTRICAL DRAWINGS
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
E-100 ELECTRICAL SITE PLAN
E-101 UTILITY SITE PLAN
E-201 PARTIAL FIRST FLOOR PLAN - ELEC. LIGHTING - WEST
E-202 PARTIAL FIRST FLOOR PLAN - ELEC. LIGHTING - EAST
E-203 PARTIAL FIRST FLOOR PLAN - ELEC. POWER - WEST
E-204 PARTIAL FIRST FLOOR PLAN - ELEC. POWER - EAST
E-205 PARTIAL FIRST FLOOR PLAN - ELEC. EQUIPMENT - WEST
E-206 PARTIAL FIRST FLOOR PLAN - ELEC. EQUIPMENT - EAST
E-207 ELECTRICAL ROOF PLAN
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-503 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAM
E-801 ELECTRICAL SCHEDULES
E-802 ELECTRICAL PANEL SCHEDULES
E-803 ELECTRICAL PANEL SCHEDULES
EC100 ELECTRICAL SITE CALC
TELECOM DRAWINGS
T-001 TECHNOLOGY LEGEND AND SYMBOLS
T-101 TECHNOLOGY SITE PLAN
TA101 TECHNOLOGY PA/AV - WEST
TA102 TECHNOLOGY PA/AV - EAST
TN101 TECHNOLOGY DATA/NURSE CALL - WEST
TN102 TECHNOLOGY DATA/NURSE CALL - EAST
TS101 TECHNOLOGY ACCESS/CCTV/INTRUSION - WEST
TS102 TECHNOLOGY ACCESS/CCTV/INTRUSION - EAST
T-401 TECHNOLOGY ENLARGED PLANS
T-501 TECHNOLOGY DETAILS
T-601 TECHNOLOGY RISERS AND DIAGRAMS
DRAWING LIST
SHEET NUMBER SHEET NAME
GENERAL DRAWINGS
GI001 COVER SHEET
GI002 SYMBOLS AND ABBREVIATIONS
GI003 LIFE SAFETY
CIVIL DRAWINGS
C001 EXISTING CONDITIONS PLAN
C002 DEMOLITION PLAN
C003 SITE LAYOUT PLAN
C004 ALIGNMENT & LOCATION PLAN
C005 SIGNAGE AND STRIPPING PLAN
C006 UTILITY PLAN
C007 GRADING PLAN
C008 DRAINAGE PLAN
C009 EROSION & SEDIMENTATION CONTROL PLAN
C010 EROSION & SEDIMENTATION CONTROL NOTES & DETAILS
C011 CONSTRUCTION DETAILS SHEET 1
C012 CONSTRUCTION DETAILS SHEET 2
C013 CONSTRUCTION DETAILS SHEET 3
C014 CONSTRUCTION DETAILS SHEET 4
C015 CONSTRUCTION DETAILS SHEET 5
C016 CONSTRUCTION DETAILS SHEET 6
C017 CONSTRUCTION DETAILS SHEET 7
C018 WATER MAIN EXTENSION – KEY PLAN
C019 WATER MAIN EXTENSION PLAN SHEET 1 -STA. 0+00 TO STA. 14+00
C020 WATER MAIN EXTENSION PLAN SHEET 2 -STA. 14+00 TO STA. 28+00
L001 LANDSCAPE PLAN
L002 LANDSCAPE DETAILS
ARCHITECTURAL DRAWINGS
AE100 FIRST FLOOR REFERENCE PLAN
AE101 FIRST FLOOR PLAN – WEST
AE102 FIRST FLOOR PLAN – EAST
AE103 ROOF PLAN
AE104 REFLECTED CEILING PLAN – WEST
AE105 REFLECTED CEILING PLAN – EAST
AE201 BUILDING ELEVATIONS
AE202 EXTERIOR ENLARGED ELEVATIONS
AE203 3D VIEWS
AE204 INTERIOR ELEVATIONS
AE205 INTERIOR ELEVATIONS
AE206 INTERIOR ELEVATIONS
AE207 INTERIOR ELEVATIONS
AE208 INTERIOR ELEVATIONS
AE209 ENTRY SIGN ELEVATIONS AND DETAILS
AE301 BUILDING SECTIONS
AE302 EXTERIOR WALL SECTIONS
AE303 EXTERIOR WALL SECTIONS
AE401 ENLARGED RESTROOM PLANS
AE402 ENLARGED RESTROOM PLANS
AE403 ENTRANCE CANOPY PLANS, SECTIONS & DETAILS
AE501 PLAN DETAILS
AE502 SECTION DETAILS
AE503 SECTION DETAILS
AE520 INTERIOR DETAILS
AE601 PARTITION TYPES & DETAILS
AE602 EXTERIOR WALL TYPES & DETAILS
AE603 TYPICAL ROOF DETAILS
AE604 DOOR TYPES, DETAILS, AND SCHEDULE
AE605 WINDOW TYPES AND DETAILS
AE608 SCHEDULE FOR FINISHES
AF701 FINISH PLAN – WEST
AF702 FINISH PLAN – EAST
AF703 SIGNAGE PLAN - WEST
AF704 SIGNAGE PLAN - EAST
AF705 FIRST FLOOR EQUIPMENT PLAN
AF706 MIDMARK ELEVATIONS
AF707 MIDMARK ELEVATIONS
AF708 MIDMARK ELEVATIONS
AF709 MIDMARK ELEVATIONS
AF710 MIDMARK ELEVATIONS
AF711 MIDMARK ELEVATIONS
AF712 SIGNAGE DETAILS
STRUCTURAL DRAWINGS
S-001 STRUCTURAL NOTES
S-010 GRID DIMENSIONS
S-101 FOUNDATION PLAN - WEST
S-102 FOUNDATION PLAN - EAST
S-103 FIRST FLOOR PLAN – WEST
S-104 FIRST FLOOR PLAN-EAST
S-105 SLAB CONTROL JOINT PLAN
S-106 ROOF FRAMING PLAN – WEST
S-107 ROOF FRAMING PLAN-EAST
S-108 SNOW DRIFT PLAN - WEST
S-109 SNOW DRIFT PLAN - EAST
S-200 SCHEDULES
S-300 TYPICAL DETAILS
S-400 BUILDING SECTIONS
S-410 SECTIONS
S-411 SECTIONSPROJECT LOCATION © Google MapsAREA OF WORK
Revisions Date
NOTE: REFER TO STRUCTURAL, MECHANICAL,
AND/OR ELECTRICAL DRAWINGS FOR
ABBREVIATIONS SPECIFIC TO EACH DISCIPLINE.
AB ANCHOR BOLT, AUGER BORING
ABI ALTERNATE BID ITEM
AC ACOUSTIC AIR CONDITIONING, ASPHALTIC
CONCRETE
AD ACCESS DOOR
ADD ALT ADDITIVE ALTERNATE
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
AP ACCESS PANEL
APC ACOUSTIC PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASB ASBESTOS
ASPH ASPHALT
AUTO AUTOMATIC
AWP ACOUSTIC WALL PANEL
BDRM BEDROOM
BIT. CONC BITUMINOUS CONCRETE
BJ BAR JOIST
BLDG BUILDING
BLK BLOCK
BM BEAM, BENCHMARK
BOT BOTTOM
BRD BOARD
BRG BEARING
BS BOTTOM OF STEP
BSMT BASEMENT
BTWN BETWEEN
BW BOTTOM OF WALL
CAB CABINET
CAP CAPACITY
CC CENTER TO CENTER
CEM CEMENT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIR CIRCULATING
CJ CONSTRUCTION JOINT, CONTROL JOINT
CLG CEILING
CLO CLOSET
CLR CLEAR
CENTERLINE
CMU CONCRETE MASONRY UNITS
CMU G1 GLAZED CMU, ONE SIDE
CMU G2 GLAZED CMU, TWO SIDES
CO CLEANOUT
COL COLUMN
COMP'T COMPARTMENT
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CS/CI CONTRACTOR SUPPLIED/ CONTRACTOR INSTALLED
CS/OI CONTRACTOR SUPPLIED/OWNER INSTALLED
CSK COUNTER SUNK
CT CERAMIC TILE
CTE CONNECT TO EXISTING
CTR CENTER
CUH CABINET UNIT HEATER
Ø DIAMETER
DF DRINKING FOUNTAIN
DFD DOOR FRAME DIMENSION
DH DOUBLE HUNG
DIA DIAMETER
DIM DIMENSION
DN DOWN
DTL DETAIL
DWG DRAWING
E EAST
EA EACH
EL, ELEV ELEVATION
ELEC ELECTRIC
EMERG EMERGENCY
EPS EXTRUDED POLYSTYRENE
EQ EQUAL
EQUIP EQUIPMENT
ETC ETCETERA
EW EACH WAY
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP JT EXPANSION JOINT
EXT EXTERIOR
FBO FURNISHED BY OTHERS
FCO FLOOR CLEAN-OUT
FD FLOOR DRAIN, FOOTING DRAIN
FE FIRE EXTINGUISHER
FF FINISH FLOOR
FFE FINISHED FLOOR ELEVATION
FG FINISH GRADE, FIBERGLASS
FHC FIRE HOSE CABINET
FIG FIGURE
FIN FINISH
FO FUEL OIL
FOF FACE OF FOUNDATION
FOR FUEL OIL RETURN
FOS FACE OF STUD, FUEL OIL SUPPLY
FOUND FOUNDATION
FP FIREPROOF
FR FRAME, FIRE RETARDANT
FRT FIRE RETARDANT TREATED
FS FLOOR SINK
FT FOOT, FEET, FINNED TUBE
FTG FOOTING
FWP FABRIC WALL PANEL
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GF/GI GOVT. FURNISHED/GOVT. INSTALLED
GF/CI GOVT. FURNISHED/CONTRACTOR INSTALLED
GI GALVANIZED IRON
GOV'T GOVERNMENT
GPM GALLONS PER MINUTE
GR GRADE
GRAN GRANULAR
GRD GROUND
GWB GYPSUM WALLBOARD
GYP GYPSUM
HGT HEIGHT
H&V HEATING AND VENTILATING
HB HOSE BIB
HC HANDICAPPED
HCWD HOLLOW CORE WOOD DOOR
HDC HANDICAPPED
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
IN INSIDE DIAMETER
INCL INCLUSIVE
INFO INFORMATION
INSUL INSULATION, INSULATED
INT INTERIOR
IWP IMPACT RESISTANT WALL PROTECTION
JAN JANITOR CLOSET
JCT JUNCTION
KV KILOVOLT
KW KILOWATT
LAB LABORATORY
LAV LAVATORY
LBS POUNDS
LF LINEAR FEET
LFC LINOLEUM FLOOR COVERING
LGR LEDGER
LP LOW POINT
LR LIVING ROOM
LT LIGHT
LWC LIGHT WEIGHT CONCRETE
LVL LAMINATED VENEER LUMBER
MACH MACHINE
MANUF MANUFACTURER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MC MEDICINE CABINET
MCB METAL CORNER BEAD
MECH MECHANICAL
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MM MILLIMETER
MO MASONRY OPENING
MR MOISTURE RESISTANT
MS METAL STRIP
MTD MOUNTED
MTL METAL
N NORTH
N.I.C. NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVER ALL
OB GL OBSCURE GLASS
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OS/CI OWNER SUPPLIED/CONTRACTOR INSTALLED
OS/OI OWNER SUPPLIED/OWNER INSTALLED
OVHD, OH OVERHEAD
P-1 PLUMBING FIXTURE TYPE
PART PARTITION
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLAST PLASTIC
PLYWD PLYWOOD
PNL PANEL
PNTD PAINTED
POL POLISHED
PRELIM PRELIMINARY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, POINT, PRESSURE TREATED
PT DISP PAPER TOWEL DISPENSER
PVC POLY VINYL CHLORIDE
PVMT PAVEMENT
QT QUARRY TILE
R RADIUS, RISER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN, ROAD
RECEP RECEPTACLE
REF REFRIGERATOR
REINF REINFORCEMENT
REQ'D REQUIRED
REV REVISION
RF RESINOUS FLOOR
RL RAIN LEADER
RM ROOM
RO ROUGH OPENING
RS RESILIENT STAIR ACCESSORY
RT RUBBER TILE
S SOUTH
S DISP SOAP DISPENSER
S&V STAIN AND VARNISH
SCONC SEALED CONCRETE
SCWD SOLID CORE WOOD DOOR
SCH, SCHED SCHEDULE
SCR SUPPLY CEILING REGISTER
SECT SECTION
SF SQUARE FEET
SH SINGLE HUNG
SHT SHEET
SIM SIMILAR
SL SLOPE
SPECS SPECIFICATIONS
SQ SQUARE
SQ FT SQUARE FEET
SS SERVICE SINK, SANITARY SEWER, STAINLESS STEEL
SSURFACE SOLID SURFACE
ST STREET
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUP SUPPORT
SUSP SUSPEND
SV SHEET VINYL
SYM SYMMETRICAL
T TOP, TANGENT, THERMOMETER
TB TACK BOARD
TBA TOILET BATH ACCESSORIES
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T.O.C. TOP OF CONCRETE
T.O.M. TOP OF MASONRY
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
TEL TELEPHONE
TEMP TEMPERATURE, TEMPORARY
TERM TERMINAL
THK THICK
THRU THROUGH
TLT TOILET
TP TOILET PARTITION
TPH TOILET PAPER HOLDER
TRAN TRANSOM
TS TOP OF STEP, TOP OF SILL
TV TELEVISION
TYP TYPICAL
TYPE "X" UL APPROVED GWB
U&D UP AND DOWN
UC UNDERCUT
UNO UNLESS NOTED OTHERWISE
UV UNIT VENTILATOR
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
W WEST
WAIN WAINSCOT
WB RESILIENT WALL BASE
WC WALL COVERING
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WIDTH, WINDOW DIMENSION, WOOD
WGL WIRE GLASS
WP WATERPROOF, WEATHERPROOF
WS WEATHERSTRIPPING
WT WEIGHT
WW WELDED WIRE FABRIC
ROWS IDENTIFIED BY
LETTERS DECREASING
TOWARD THE TOP OF
SHEET
DRAWING
REFERENCED
FROM ANOTHER
SHEET
DRAWING TITLE
DRAWING COORDINATE
INDICATOR
SCALE OF DRAWING
COLUMNS IDENTIFIED BY
NUMBERS INCREASING TOWARD
THE RIGHT SIDE OF SHEET.
F
E
D
1 2 3 4
1 View Name
1/8" = 1'-0" R101
F1
SCALE: 1/8" = 1'-0"
4' 8'0 16'
B3
D
C
B
A
SHEET NUMBER DETAIL
IS DRAWN ON
ROOM NAME
ROOM NUMBER
BREAK LINE
GRAPHIC SCALE
REVISION NUMBER
REVISION CLOUD
ELEVATION MARKER - SECTION
ELEVATION MARKER - PLAN
DOOR
NUMBER
REFERENCE
WINDOW TYPE REFERENCE
WALL TYPE REFERENCE
COLUMN GRID REFERENCE
SHEET NUMBER ELEVATION
IS DRAWN ON
INTERIOR ELEVATION
REFERENCE
BUILDING / WALL
SECTION
NUMBER
SHEET NUMBER BUILDING /
WALL SECTION IS DRAWN
ON
BUILDING ELEVATION
NUMBER
SHEET NUMBER
ELEVATION IS DRAWN ON
MATCH LINE
2 HOUR RATED FIRE BARRIER
1 HOUR RATED FIRE BARRIER
DETAIL NUMBER
SYMBOLS
LINETYPES
SMOKE PARTITION
STEEL & OTHER METAL PATTERN
CONCRETE BLOCK PATTERN
STONE CUT PATTERN
TERRA COTTA
CARPET AND PAD PATTERN
TILE,
ACOUSTICAL
CEILING
PATTERN
WOOD FLOORING PATTERN
BRICK PATTERN, GLAZED
SAND CLAY GRAVEL PATTERN
BRICK PATTERN
EROSION AND
SEDIMENTATION
CONTROL,
FILTRATION BED PATTERN
EARTHWORK GRAVEL
PATTERN, POROUS
FILL
EARTHWORK ROCK PATTERN
EARTHWORK PATTERN,
COMPACTED FILL
PATTERN
RIPRAP PATTERN
SAND PATTERN
GLASS ELEVATION PATTERN
GYPSUM BOARD FINISH PATTERN
SEALANT AND BACKER ROD
INSULATION,
RIGID
BOARD PATTERN
INSULATION,
LOOSE
FILL PATTERN
WOOD FINISH PATTERN
PARTICLE BOARD PATTERN
ORIENTED STRAND BOARD PATTERN
WOOD, GLUED-LAMINATED PATTERN
WOOD FRAMING,
CONTINUOUS
PATTERN
WOOD BLOCKING OR SHIM PATTERN
HATCH PATTERNS
EARTH, UNDISTURBED PATTERN
EARTH, CRUSHED
ROCK
GRAVEL PATTERN
EARTH, CRUSHED
ROCK
GRAVEL PATTERN
PLYWOOD PATTERN
10'-0"
Room name
B
M2
A101
SIM
CONCRETE POURED IN
PLACE, PRECAST
ALUMINUM PATTERN
ASPHALT SHINGLE PATTERN
KEYNOTE TAG
A101
1 1
A1
AE101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
WBRCINC.COM
B
IM
/0
C o n s tr u c t R e p la c e m e n t O u tp a ti e n t
C lin ic /4
V A
C B
O C
C A
P E
C O
D
A R
C H
R
.r v t
/3
/2
:5
:3
P M
GI002
SYMBOLS AND ABBREVIATIONS REPLACEMENT OUTPATIENT
CLINIC DESIGN AT COAST
GUARD CAPE COD
JOINT BASE CAPE COD, BARNSTABLE MA
650-318
BUILDING 1
02/10/2022 JRB BRS
100% CONSTRUCTION
DOCUMENTS
Revisions Date
F E
C
FEC
FEC
F E
C
FEC
BCDGH
A
WC STORAGE
VESTIBULE
WAITING
WAITING
RECEPTION
RECEPTION
WORKROOM
NURSE MANAGER
VOLUNTEER
TOILET PUBLIC
TOILET PUBLIC
MULTI-PURPOSE
ROOM
MULTI-PURPOSE
ROOM
EXAM
GROUP THERAPY
ROOM, MENTAL
HEALTH
CONSULT RM,
MENTAL HLTH
CONSULT RM,
MENTAL HLTH
CONSULT RM,
MENTAL HLTH
CONSULT RM,
MENTAL HLTH
CONSULT RM,
MENTAL HLTH
CONSULT RM,
MENTAL HLTH
CONSULT RM,
MENTAL HLTH
UTILITY SOILED
UTILITY CLEAN
MECHANICAL
EXAM / AUDIOLOGY
EXAM / EYE TEST
TOILET PATIENT
EXAM / TELE-HEALTH
EXAM / MENTAL
HEALTH
EXAM/TRIAGE
SOCIAL WORKER
CLOSET
MED ROOM
TOILET STAFF
ELEC
EXAM / TRIAGE
SPECIMEN
COLLECTION
TOILET WMN'S
TOILET PATIENT
EXAM RM WOMEN'S
HEALTH
ULTRASOUND
TREATMENT
EXERCISE AREA
EXAM
CLOSET
EXAM / PT/OT
EXAM / TELE-HEALTH
TOILET PROC.
TOILET STAFF
PROCEDURE ROOM,
GENERAL
TEAM WORK AREA
OFFICE
OFFICE
WORKSTATIONS,
MENTAL HEALTH
STAFF LOUNGE &
LOCKERS
STORAGE MEDICAL &
GENERAL
ELECTRICAL ROOM
COMMUNICATIONS
P R
IN
T
/F A
X
IN OUT
IN
IN OUT
P A
T H
PATH 1
108' - 3"
DOOR 1
DOOR 2
DOOR 3
67'-4" EXIT SEPARATION REQUIRED
E X
IT
S
E P
A R
A T
IO
N
P R
O V
ID
E
D
F.9
201'-1" TOTAL DISTANCE
COMMON PATH OF TRAVEL: 66'
M A
X D
E A
D E
N D
JANITOR CLOSET
EF C.6 C.5 B.7D.5D.6D.7E.5F.5F.7H.1H.2
1.3
A.4
1.5
1.9
2.5
2.4
C.3D.3
2.7
3.3
3.6
3.1
D.9
3.7
F.3 B.8C.7 B.2F.6 F.2
44" MIN
CODE SUMMARY - NFPA 101 (2021)
OCCUPANCY
FLOOR AREA (GROSS SF) (IBC 2021)
FLOOR MAX. OCCUPANCY
MAX TRAVEL DISTANCE TO EXIT ACCESS
MAX DEAD END CORRIDOR
MAX COMMON PATH OF TRAVEL
MIN. CORRIDOR WIDTH > 50 OCCUPANTS
BUSINESS (B)
16,521 SF
SEE CHART BELOW
126' - 6"
19' - 6"
66'
72"
APPLICABLE BUILDING CODES:
- VETERAN AFFAIRS FIRE PROTECTION DESIGN MANUAL (2021, 8TH EDITION)
- NFPA 101 (2021)
- NFPA 10 (2022)
- NFPA 13 (2022)
- NFPA 72 (2022)
- NFPA 90A (2021)
- NFPA 99 (2021)
- IBC (2021) - WHEN SPECIFICALLY REFERENCED IN VA DOCUMENTS AND FOR ITEMS NOT ADDRESSED IN NFPA 101
- NFPA NATIONAL FIRE CODES (EXCEPT NFPA 5000 AND NFPA 900)
- VA SEISMIC DESIGN REQUIREMENTS, H-18-8
- NATIONAL ELECTRICAL CODE (2020)
- INTERNATIONAL PLUMBING CODE (2021)
- ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE PG-18-13
- PSRDM LIFE SAFETY PROTECTED (LSP)
LEGEND:
EXIT
NEW FIRE EXTINGUISHER CABINET
SEE DETAIL A9/AE520
NEW HAZARDOUS AREA
SMOKE PARTITION
SCOPE OF WORK LINE
DEAD END DISTANCE
FEC
BUILDING HEIGHT (IBC 2021) 32' - 6"
CONSTRUCTION TYPE
FIRE ALARM SYSTEM ADDRESSABLE; NFPA-72 2022 COMPLIANT
SUPPRESSION SYSTEM FULLY SPRINKLERED; NFPA-13 2022 COMPLIANT
II (000)
NUMBER OF STORIES (IBC 2021) 1 STORY
NUMBER OF EXITS 3
EGRESS CAPACITY DOOR 1 = 68" / 0.2 = 340 PERSONS
DOOR 2 = 34" / 0.2 = 170 PERSONS
DOOR 3 = 34" / 0.2 = 170 PERSONS
75'
92,000 SF
SEE CHART BELOW
300'
50'
100'
44"
253 PEOPLE (MAX PER OCCUPANCY) X 0.2
IN / PERSON = 50.6" REQUIRED
ALLOWABLE PROVIDED
PSRDM CLASSIFICATION LIFE SAFETY PROTECTED (LSP)
OCCUPANT LOADING
USE AREA (ft2)FLOOR OCCUPANT LOAD FACTOR (ft2/person)
OCCUPANTS
BUSINESS 10,136GROUND 150 GROSS 68
WAITING
TEAM WORK AREA (147) AND
WORKSTATIONS (155)
MULTIPURPOSE
TREATMENT EXERCISE AREA
STORAGE
15 NET
50 GROSS
15 NET
50 GROSS
500 GROSS
TOTAL 253
MECHANICAL 500 GROSS
2,640
1,121
18STAFF LOUNGE 15 NET259
COMMON PATH OF TRAVEL
NOTES:
1. EGRESS DOOR WITH DELAYED EGRESS FUNCTION MEETING NFPA REQUIREMENTS
OUTLINED IN 7.2.1.6.1. CARD READER FUNCTION DISABLED DURING FIRE ALARM.
2. MIN. REQUIRED EGRESS WIDTH IS 44". DOOR SWING DOES NOT IMPEDE THIS
CLEARANCE.
TOTAL TRAVEL DISTANCE
INTERIOR FINISHES
EXITS / EXIT ACCESS: CLASS A OR B
OTHER: CLASS A, B OR C
EXITS / EXIT ACCESS: CLASS A OR B
OTHER: CLASS A, B OR C
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
WBRCINC.COM
B
IM
/0
C o n s tr u c t R e p la c e m e n t O u tp a ti e n t
C lin ic /4
V A
C B
O C
C A
P E
C O
D
A R
C H
R
.r v t
/2
/2
:4
:4
P
M
GI003
LIFE SAFETY REPLACEMENT OUTPATIENT
CLINIC DESIGN AT COAST
GUARD CAPE COD
JOINT BASE CAPE COD, BARNSTABLE MA
650-318
BUILDING 1
02/10/2022 JRB BRS
100% CONSTRUCTION
DOCUMENTS
1/8" = 1'-0"
F1 FIRST FLOOR CODE REVIEW PLAN
Revisions Date
0' 4' 8' 16' 32'
SCALE: 1/8" = 1'-0"
File details come from the government source that posted it. Updated .