Attachment 23 - Division Breakdown Pricing.xls
XLS spreadsheet 234 KB Posted
- Solicitation number
- 36C77624R0087
About this file
This document appears to be an Estimate Worksheet for a Division Breakdown Pricing template, which provides a detailed cost estimate breakdown for various construction divisions and associated labor and materials costs.
The template includes line items for 34 standard construction divisions, such as Division 1 - General Requirements, Division 3 - Concrete, Division 7 - Thermal and Moisture Protection, Division 22 - Plumbing, and Division 26 - Electrical. Each division has line items for labor and materials quantities, unit costs, and total costs. The overall estimate totals include overhead, profit, and bonds. This template would likely be used to support a federal construction project bid or proposal.
The related federal contract opportunity is a solicitation (RFP) from the Department of Veterans Affairs (VA) for a minor construction project to construct a replacement outpatient clinic at the US Coast Guard Air Station. The solicitation number is 36C77624R0087 and the project is titled "VHA Minor Construction - Project 650-318 - New Otis CBOC for Providence VAMC".
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMATION
| DATE | ||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | SHEET NO. | SHEETS | ||||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | |||||||||||||||||
| PO # | V.A. MEDICAL CENTER | NO DESIGN | PRELIMINARY | |||||||||||||||||
| COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | |||||||||||||||
| X | FINAL | OTHER | ||||||||||||||||||
| Name | x | 100 | DESIGN | (SPECIFY) | ||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | |||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | ||||||||
| DIVISION 0-SPECIAL SECTIONS | $0 | |||||||||||||||||||
| DIVISION 1-GENERAL REQUIREMENTS | $0.00 | |||||||||||||||||||
| DIVISION 2-EXISTING CONDITIONS | $0.00 | |||||||||||||||||||
| DIVISION 3-CONCRETE | $0 | |||||||||||||||||||
| DIVISION 4-MASONRY | $0 | |||||||||||||||||||
| DIVISION 5-METALS | $0 | |||||||||||||||||||
| DIVISION 6-WOOD AND PLASTIC | $0 | |||||||||||||||||||
| DIVISION 7-THERMAL AND MOISTURE PROTECTION | $0 | |||||||||||||||||||
| DIVISION 8-DOORS AND WINDOWS | $0 | |||||||||||||||||||
| DIVISION 9-FINISHES | $0 | |||||||||||||||||||
| DIVISION 10-SPECIALTIES | $0 | |||||||||||||||||||
| DIVISION 11-EQUIPMENT | $0 | |||||||||||||||||||
| DIVISION 12-FURNISHINGS | $0 | |||||||||||||||||||
| DIVISION 13-SPECIAL CONSTRUCTION | $0 | |||||||||||||||||||
| DIVISION 14-CONVEYING EQUIPMENT | $0 | |||||||||||||||||||
| DIVISION 21-FIRE SUPPRESSION | $0 | |||||||||||||||||||
| DIVISION 22-PLUMBING | $0 | |||||||||||||||||||
| DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING | $0 | |||||||||||||||||||
| DIVISION 26-ELECTRICAL | $0 | |||||||||||||||||||
| DIVISION 27-COMMUNICATIONS | $0 | |||||||||||||||||||
| DIVISION 28-ELECTRONIC SAFETY AND SECURITY | $0 | |||||||||||||||||||
| DIVISION 31-EARTHWORK | $0 | |||||||||||||||||||
| DIVISION 32-EXTERIOR IMPROVEMENTS | $0 | |||||||||||||||||||
| DIVISION 33-UTILITIES | $0 | |||||||||||||||||||
| DIVISION 34-TRANSPORTATION | $0 | |||||||||||||||||||
| SUB-TOTAL | $0 | |||||||||||||||||||
| OVERHEAD (10%) | $0 | |||||||||||||||||||
| PROFIT (10%) | $0 | |||||||||||||||||||
| BONDS (3%) | $0 | |||||||||||||||||||
| TOTAL: | $0 | |||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 0 Special Sections
| DATE | ||||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | 2 | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | |||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | x | NO DESIGN | PRELIMINARY | |||||||||||||||||
| 0 | COMPLETED | DESIGN | ||||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | |||||||||||||||||
| FINAL | OTHER | |||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | ||||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | |||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | ||||||||||
| Division 0 Special Sections | ||||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| SECTION TOTAL: | $0 | |||||||||||||||||||||
| VA FORM 10-6238 |
&C&A &C&D
Div 1 General Requirements
| DATE | ||||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | 3 | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | |||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | x | NO DESIGN | PRELIMINARY | |||||||||||||||||
| 0 | COMPLETED | DESIGN | ||||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | |||||||||||||||||
| FINAL | OTHER | |||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | ||||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | |||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | ||||||||||
| Divison 1 General Requirements | ||||||||||||||||||||||
| $0.00 | $0 | |||||||||||||||||||||
| HR | $0.00 | SF | $0.00 | $0 | ||||||||||||||||||
| HR | $0.00 | SF | $0.00 | $0 | ||||||||||||||||||
| HR | $0.00 | SF | $0.00 | $0 | ||||||||||||||||||
| HR | $0.00 | SF | $0.00 | $0 | ||||||||||||||||||
| HR | $0.00 | SF | $0.00 | $0 | ||||||||||||||||||
| HR | $0.00 | SF | $0.00 | $0 | ||||||||||||||||||
| HR | $0.00 | SF | $0.00 | $0 | ||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| SECTION TOTAL: | $0 | |||||||||||||||||||||
| VA FORM 10-6238 |
Div 2 Existing Conditions
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | x | NO DESIGN | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 2 Existing Conditions | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| $0.00 | ea | $0.00 | $0 | ||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&C&A &C&D
Div 3 Concrete
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | x | NO DESIGN | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 3 Concrete | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| $0.00 | ea | $0.00 | $0 | ||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&C&A &C&D
Div 4 Masonry
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | x | NO DESIGN | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 4 Masonry | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| $0.00 | ea | $0.00 | $0 | ||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&C&A &C&D
Div 5 Metals
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | x | NO DESIGN | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 5 Metals | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| $0.00 | ea | $0.00 | $0 | ||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&C&A &C&D
Div 6 Wood & Plastic
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | x | NO DESIGN | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 6 Wood & Plastic | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| $0.00 | ea | $0.00 | $0 | ||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&C&A &C&D
Div 7 Thermal & Moisture Protec
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 7 Thermal & Moisture Protection | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 8 Doors & Windows
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 8 Doors & Windows | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 9 Finishes
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 9 Finishes | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 10 Specialties
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 10 Specialties | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 11 Equipment
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 11 Equipment | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 12 Furnishings
| DATE | ||||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | 0 | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | |||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | |||||||||||||||||
| 0 | COMPLETED | DESIGN | ||||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | |||||||||||||||||
| FINAL | OTHER | |||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | ||||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | |||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | ||||||||||
| Division 12 Furnishings | ||||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | ||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| $0.00 | $0.00 | $0 | ||||||||||||||||||||
| SECTION TOTAL: | $0 | |||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 13 Special Construction
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 13 Special Construction | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Division 14 Conveying Equipment
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 14 Conveying Equipment | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 21 Fire Suppression
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 21 Fire Suppression | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 22 Plumbing
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 22 Plumbing | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 23 HVAC
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 23 Heat, Ventilating, and Air Conditioning | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 26 Electrical
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 26 Electrical | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 27 Communications
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 27 Communications | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 28 Electronic Safety & Secu
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 28 Electronic Safety & Security | |||||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 31 Earthwork
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 31 Earthwork | |||||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| Hr | $0.00 | $0.00 | $0 | ||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 32 Exterior Improvements
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 32 Exterior Improvements | |||||||||||||||||||||
| Hr | $0.00 | LF | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | LS | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 33 Utilities
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 33 Utilities | |||||||||||||||||||||
| Hr | $0.00 | LF | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | LS | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
Div 34 Transportation
| DATE | |||||||||||||||||||||
| CONSTRUCTION PROGRAM - ESTIMATE WORKSHEET | Dec-99 | SHEET NO. | OF | SHEETS | |||||||||||||||||
| PROJECT NO. | LOCATION | PROJECT NAME | TYPE OF ESTIMATE | ||||||||||||||||||
| PO # | V.A. MEDICAL CENTER | Dec-99 | NO DESIGN | X | PRELIMINARY | ||||||||||||||||
| 0 | COMPLETED | DESIGN | |||||||||||||||||||
| ESTIMATOR | NEW | ALT | INDEX NO. | BUILDING NO(S) | DRAWING NO. | ||||||||||||||||
| FINAL | OTHER | ||||||||||||||||||||
| Name | X | 100 | DESIGN | (SPECIFY) | |||||||||||||||||
| CODE | SYSTEM/SUBSYSTEM | LABOR | MATERIALS | ||||||||||||||||||
| A | B | C | D | QUANTITY | UNIT | $/UNIT | TOTAL | QUANTITY | UNIT | $/UNIT | TOTAL | TOTAL | |||||||||
| Division 34 Transportation | |||||||||||||||||||||
| Hr | $0.00 | LF | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | LS | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| Hr | $0.00 | Ea | $0.00 | $0 | |||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| $0.00 | $0.00 | $0 | |||||||||||||||||||
| SECTION TOTAL: | $0 | ||||||||||||||||||||
| VA FORM 10-6238 |
&A &C&D
File details come from the government source that posted it. Updated .