ATTACHMENT 3 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 1 of 3.pdf
PDF 5 MB Posted
- Attached to
- Y1DZ--668-318 Renovate and Expand Community Living Center Minor Construction - Spokane VAMC
- Solicitation number
- 36C77623B0071
About this file
This solicitation is for a minor construction project to renovate and expand the Community Living Center at the Spokane VA Medical Center. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin.
The project involves renovating and expanding the existing Community Living Center to add 9,258 square feet in a new south wing addition and renovating 6,536 square feet in the existing west wing. Renovations will also be performed in the north wing to support utility connections. The work includes demolishing existing structures, installing new mechanical, electrical and telecommunications systems, and constructing the addition. The period of performance is 420 calendar days from notice to proceed. Proposals are due by September 22, 2023 and award is expected in April 2023. Pricing is to be provided using VA Form 10-1386 for the base bid work and listed deduct alternates.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
201761
T
ENS E D
CI
L
S
TA
FOE
O
IHA RC
C
T E
D
OCOL RA
BRUCE A.
JONES
T
3 APRIL 2023
MANN-GRANSTAFF
VA MEDICAL CENTER
W. FRANCIS AVE.
W. INDIAN TRAIL RD.
N. 5 MILES RD. N.
C
OU
NT
RY
H
OM
ES
B
LV
D.
N. DRISCOLL BLVD.
N.
A
SH
S
T.
N.
M
AP
LE
S T.
HW
Y
N.
M
ON
RO
E
ST
N.
W
AL
L
ST
N.
A
S T.
E. WELLESLEY AVE.WELLESLEY AVE.
W. GARLAND AVE. E. EMPIRE AVE.
E. FRANCIS AVE.
N.
A
SS
EM
BL
Y
ST
W. NORTHWEST BLVD.
SPOKANE RIVER
PROJECT
SITE
HW
Y
HW
Y
RESERVE RD.
MEMORIAL CIR.
INDEPENDENCE DR.
IN
DE
PE
ND
EN
CE
D R.
N.
A
SS
EM
BL
Y
ST
WELLESLEY AVE.
W. BROAD AVE.
W. OLYMPIC AVE.
W. QUEEN AVE.
RE
SE
RV
E
RD
FR
EE
DO
N
W
AY
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANTS
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER'S REPRESENTATIVE
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #102 PARKER, COLORADO 80138 PH. 303.841-3922
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
668-318
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
4/ 3/
:5
3:
P M
GI001
COVER SHEET AND SHEET INDEX
APRIL 2023 BAJ RJF
1 183
DAVID ARMENT
509-964-1889 David.Arment@va.gov
RENOVATE AND EXPAND
MANN-GRANDSTAFF VA MEDICAL CENTER
SPOKANE, WASHINGTON
VA SIGNATORIES
ELT
CHIEF, ENGINEERING SERVICE
CHIEF, CLC
CHIEF, POLICE
CHIEF, LOGISTICS SERVICE
PATIENT SAFETY
INFECTION CONTROL
CHIEF, OIT
RENDERING
SHEET INDEX
SHEET
NUMBER SHEET NAME
DRAWING
SEQUENCE #
AE132 FURNITURE AND EQUIPMENT PLAN - WEST PLAN 51
AE135 FURNITURE AND EQUIPMENT PLAN - SOUTH WING 52
AE142 SIGNAGE PLAN - WEST WING 53
AE145 SIGNAGE PLAN - SOUTH WING 54
AE150 ROOF PLAN - OVERALL 55
AE155 ROOF PLAN - SOUTH WING 56
AE201 EXTERIOR ELEVATIONS 57
AE202 EXTERIOR ELEVATIONS - EIFS 58
AE301 BUILDING SECTIONS 59
AE302 BUILDING SECTIONS 60
AE303 BUILDING SECTIONS 61
AE310 WALL SECTIONS 62
AE311 WALL SECTIONS 63
AE312 WALL SECTIONS 64
AE313 WALL SECTIONS 65
AE320 PARTITION TYPES 66
AE321 PARTITION TYPES AND DETAILS 67
AE401 ENLARGED FLOOR PLANS - EAST WING 68
AE402 ENLARGED FLOOR PLANS - WEST WING 69
AE404 ENLARGED FLOOR PLAN - SOUTH WING (WEST) 70
AE405 ENLARGED FLOOR PLAN - SOUTH WING (EAST) 71
AE406 ENLARGED PLANS AND ELEVATIONS - RESTROOMS 72
AE407 INTERIOR ELEVATIONS 73
AE501 PLAN DETAILS 74
AE502 ALUMINUM DOOR DETAILS 75
AE503 HOLLOW METAL DOOR DETAILS 76
AE504 WINDOW DETAILS AND SCHEDULE 77
AE505 ROOF DETAILS 78
AE506 ROOF DETAILS 79
AE507 INTERIOR ELEVATION, MILLWORK, AND MISCELLANEOUS DETAILS 80
AE508 CEILING AND MISCELLANEOUS DETAILS 81
AE601 DOOR AND SIGNAGE SCHEDULES AND TYPES 82
AE602 ROOM FINISH SCHEDULE 83
AE603 SCHEDULE INTERIOR, EXTERIOR FINISHES AND SIGNAGE DETAILS 84
AG901 PERSPECTIVE RENDERINGS 85
FIRE PROTECTION
FA100 FIRE ALARM SYSTEM PLAN - OVERALL 86
FA501 FIRE ALARM SYSTEM DETAILS 87
FX100 FIRE SPRINKLER SYSTEM PLAN - OVERALL 88
FX501 FIRE SPRINKLER SYSTEM DETAILS 89
MECHANICAL
MI001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS 90
MD100 MECHANICAL HVAC - DEMO - OVERALL 91
MD102 MECHANICAL HVAC - DEMO - WEST WING 92
MD110 MECHANICAL PIPING - DEMO - OVERALL 93
MD112 MECHANICAL PIPING - DEMO - WEST WING 94
MD113 MECHANICAL PIPING - DEMO - NORTH WING 95
MH100 MECHANICAL HVAC - OVERALL 96
MH102 MECHANICAL HVAC - WEST WING 97
MH105 MECHANICAL HVAC- SOUTH WING 98/
MP100 MECHANICAL PIPING - OVERALL 99
MP102 MECHANICAL PIPING - WEST WING 100
MP103 MECHANICAL PIPING - NORTH WING 101
MP104 MECHANICAL PIPING - PENTHOUSE 102
MP105 MECHANICAL PIPING - SOUTH WING 103
SHEET INDEX
SHEET
NUMBER SHEET NAME
DRAWING
SEQUENCE #
GENERAL
GI001 COVER SHEET AND SHEET INDEX 1
GI002 CONSTRUCTION STEPS PLAN AND NOTES 2
CIVIL
CI001 ABBREVIATIONS, LEGENDS, AND SYMBOLS 3
CE101 SEDIMENT CONTROL PLAN 4
CD101 CIVIL DEMOLITION PLAN 5
CS101 SITE PLAN 6
CG101 GRADING PLAN 7
CU100 OVERALL UTILITY PLAN 8
CU101 SANITARY SEWER PLAN AND PROFILE 9
CU102 STORM SEWER PLAN 10
CI501 SEDIMENT CONTROL DETAILS 11
CI502 SEDIMENT CONTROL DETAILS 12
CI503 CIVIL CONSTRUCTION DETAILS 13
CI504 CIVIL CONSTRUCTION DETAILS 14
LANDSCAPE
LI100 COVER SHEET 15
LI101 DEMOLITION PLAN 16
LI102 IRRIGATION PLAN 17
LI501 IRRIGATION DETAILS 18
STRUCTURAL
SI001 STRUCTURAL NOTES
SI002 STRUCTURAL NOTES
SE100 STRUCTURAL PLAN - OVERALL
SE105 FOUNDATION PLAN - SOUTH WING
SE115 SLAB PLAN - SOUTH WING
SE125 WALL FRAMING PLAN - SOUTH WING
SE155 ROOF FRAMING PLAN
SE301 FRAMING ELEVATIONS
SE302 FRAMING ELEVATIONS
SE501 FOUNDATION DETAILS
SE502 FOUNDATION DETAILS
SE503 STRUCTURAL FRAMING DETAILS
SE504 STRUCTURAL FRAMING DETAILS
SE505 COLD FORMED FRAMING DETAILS
SE506 COLD FORMED FRAMING DETAILS
ARCHITECTURAL
AI001 ABBREVIATIONS, GENERAL NOTES, LEGEND, AND SYMBOLS 34
AL100 LIFE SAFETY PLAN AND BUILDING CODE SUMMARY 35
AD100 DEMOLITION FLOOR PLAN - OVERALL
AD101 DEMOLITION FLOOR PLAN - EAST WING 37
AD102 DEMOLITION FLOOR PLAN - WEST WING 38
AD104 DEMOLITION FLOOR PLAN - PENTHOUSE 39
AD110 DEMOLITION REFLECTED CEILING PLAN DEMOLITION - OVERALL 40
AE100 FLOOR PLAN - OVERALL 41
AE102 FLOOR PLAN - WEST WING 42
AE104 FLOOR PLAN - PENTHOUSE 43
AE105 FLOOR PLAN - SOUTH WING 44
AE110 REFLECTED CEILING PLAN - OVERALL 45
AE112 REFLECTED CEILING PLAN - WEST WING 46
AE113 REFLECTED CEILING PLAN - NORTH WING 47
AE114 REFLECTED CEILING PLAN - SOUTH WING 48
AE122 FLOOR FINISH PLAN - WEST WING 49
AE125 FLOOR FINISH PLAN - SOUTH WING 50
VICINITY MAP
N
CAMPUS MAP
COMMUNITY LIVING CENTER (CLC)
N
COMMUNITY LIVING
CENTER (CLC)
BLDG 12
MAIN HOSPITAL BUILDING
BLDG 1
SHEET INDEX
SHEET
NUMBER SHEET NAME
DRAWING
SEQUENCE #
MP403 MECHANICAL PIPING PLAN - ENLARGED MECHANICAL ROOM 110 104
MP405 MECHANICAL PIPING PLAN - ENLARGED MECHANICAL ROOM S112 105
MH501 MECHANICAL DETAILS 106
MH502 MECHANICAL DETAILS 107
MH503 MECHANICAL DETAILS 108
MH504 MECHANICAL DETAILS 109
MH505 MECHANICAL DETAILS 110
MH506 MECHANICAL DETAILS 111
MH507 FAN COIL UNIT DETAILS 112
MH508 AIR SYSTEM FOR SOUTH WING EMERGENCY EPIDEMIC MODE 113
MH601 MECHANICAL SCHEDULES 114
MH602 MECHANICAL SCHEDULES 115
MH603 MECHANICAL SCHEDULES 116
MH604 MECHANICAL SCHEDULES 117
MH701 MECHANICAL CONTROLS 118
MH702 MECHANICAL CONTROLS 119
PLUMBING
PI001 PLUMBING GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS 120
PD100 SUB-FLOOR SANITARY WASTE AND VENT - DEMO - OVERALL 121
PD120 DOMESTIC WATER - DEMOLITION - OVERALL 122
PD130 MEDICAL GAS - DEMO - OVERALL 123
PL100 SUB-FLOOR SANITARY WASTE AND VENT - OVERALL 124
PL102 SUB-FLOOR SANITARY WASTE AND VENT - WEST WING 125
PL105 SUB-FLOOR SANITARY WASTE AND VENT - SOUTH WING 126
PP100 DOMESTIC WATER - OVERALL 127
PP102 DOMESTIC WATER - WEST (HOSPICE) WING 128
PP103 DOMESTIC WATER - NORTH WING 129
PP105 DOMESTIC WATER - SOUTH WING 130
PG100 MEDICAL GAS - OVERALL 131
PS102 STORM SEWER - WEST WING 132
PS105 STORM SEWER - SOUTH WING 133
PP501 PLUMBING DETAILS 134
PP502 PLUMBING DETAILS 135
PP601 PLUMBING SCHEDULES 136
PL901 SANITARY WASTE AND VENT ISOMETRIC 137
PP901 DOMESTIC WATER ISOMETRIC 138
ELECTRICAL
EI001 ELECTRICAL SYMBOL LEGEND, ABBREVIATIONS, NOTES 139
ED100 DEMO POWER PLAN - OVERALL 140
ED102 DEMO POWER PLAN - WEST (HOSPICE) WING 141
ED104 DEMO POWER PLAN - PENTHOUSE 142
EDL102 DEMO LIGHTING PLAN - WEST(HOSPICE) WING 143
EDL103 DEMO LIGHTING PLAN - NORTH WING 144
EP100 POWER PLAN - OVERALL 145
EP102 POWER PLAN - WEST WING 146
EP104 POWER PLAN - PENTHOUSE 147
EP105 POWER PLAN - SOUTH WING 148
EP106 POWER PLAN - EMERGENCY FROM BUILDING 1 149
EL100 LIGHTING PLAN - OVERALL 150
EL101 LIGHTING PLAN - EAST WING 151
EL102 LIGHTING PLAN - WEST WING 152
EL103 LIGHTING PLAN - NORTH WING 153
EL105 LIGHTING PLAN - SOUTH WING 154
EP401 POWER ENLARGED PLANS 155
EL401 LIGHTING ENLARGED PLANS 156
SHEET INDEX
SHEET
NUMBER SHEET NAME
DRAWING
SEQUENCE #
EP501 POWER DETAILS 157
EP502 POWER DETAILS 158
EL501 LIGHTING DETAILS 159
EP601 ONE LINE DIAGRAM 160
EP611 (E) PANEL SCHEDULES 1 161
EP612 (E) PANEL SCHEDULES 2 162
EP613 (E) PANEL SCHEDULES 3 163
EP614 (E) PANEL SCHEDULES 4 164
EP615 MODIFIED PANEL SCHEDULES 1 165
EP616 MODIFIED PANEL SCHEDULES 2 166
EP617 NEW PANEL SCHEDULES 1 167
EP618 NEW PANEL SCHEDULES 2 168
EP621 MECHANICAL EQUIPMENT POWER SCHEDULE 169
EL601 LIGHTING SCHEDULE 170
TELECOMMUNICATION
TI001 TELECOM SYMBOLS LEGEND, ABBREVIATIONS, NOTES 171
TD100 DEMO TELECOM PLAN - OVERALL 172
TD102 DEMO TELECOM PLAN - WEST WING 173
TS100 TELECOM SITE PLAN 174
TN100 TELECOM PLAN - OVERALL 175
TN102 TELECOM PLAN - WEST WING 176
TN105 TELECOM PLAN - SOUTH WING 177
TN401 TELECOM ENLARGED PLANS 178
TN402 TELECOM ENLARGED PLANS 179
TN501 TELECOM DETAILS 180
TN502 TELECOM DETAILS 181
TN503 TELECOM DETAILS 182
TN601 TELECOM RISER DIAGRAM AND SCHEDULES 183
REVISIONS DATE
2 2
5 5
6 6
7 7
A B C D E F
G
H
J
K
L
M
N
B.1 C.7 F.1
ROOM 110 WILL INCLUDE
NEW MECHANICAL WORK,
SEE MECH. DWGS.
ROOM 107 AND 108 WILL
INCLUDE NEW
ELECTRICAL/TELECOM
WORK, SEE ELEC. AND
TELECOM DWGS.
CONSTRUCTION STEP NOTES:
THE USGS FINISHED FLOOR ELEVATION FOR THIS PROJECT =
1897.82' ON CIVIL DRAWINGS, WHICH EQUALS THE
ARCHITECTURAL REFERENCE / DATUM FOR THE FINISH FLOOR
ELEVATION AT 100'-0".
BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS AND
NOTIFY THE VETERANS AFFAIRS(VA) CONTRACTING OFFICER'S
REPRESENTATIVE (COR) OF DISCREPANCIES BEFORE
PROCEEDING WITH WORK.
PROVIDE A NON-DISRUPTIVE AND ENVIRONMENTALLY
PROTECTED PROCESS FOR THE EXISTING FUNCTIONING
FACILITY OPERATIONS IMMEDIATELY ADJACENT TO AND IN THE
SURROUNDING AREAS WITH RESPECT TO THE AREAS OF
CONSTRUCTION ACTIVITY.
COORDINATE HAZARDOUS MATERIAL ABATEMENT AND
DEMOLITION WORK FOR BOTH EXTERIOR AND INTERIOR AREAS.
PREFERENCE SHALL BE GIVEN TO COMPLETING THIS WORK IN
CONJUNCTION WITH DRYING-IN THE STRUCTURE AND BEFORE
INSTALLATION OF ANY TYPE OF MAJOR SYSTEMS SUCH AS AIR
HANDLERS, CHILLERS, DUCTING, FINISH WORK IN PROGRESS.
MAINTAIN TEMPORARY PARTITIONING AND OTHER MEASURES AS
REQUIRED FOR INFECTION CONTROL IN ORDER TO SEPARATE
DAY-TO-DAY HOSPITAL AND CLC ACTIVITIES FROM
CONSTRUCTION ACTIVITIES. CONTROL OF CONSTRUCTION
TRAFFIC, NOISE, DUST, AND INCLEMENT WEATHER BETWEEN
THE EXISTING FACILITY AND NEW WORK SHALL INCLUDE SAFETY,
PROTECTIVE BARRIERS, AND APPROPRIATE HOURS OF WORK
BASED ON IMPOSITION OF WORK ACTIVITY TO LIMIT THE IMPACT
OF CONSTRUCTION.
PROVIDE FOR ERECTION OF THE BUILDING SHELL AND DRY-IN OF
ADDITION AREA PRIOR TO REMOVING THE EXISTING ROOFING
MATERIALS AND OTHER WORK RELATED TO TIE-INS FOR
DUCTING, VENTING, PLUMBING AND CIRCULATION THAT OPENS
THE EXISTING BUILDING UP TO THE ENVIRONMENT.
UTILITY PENETRATIONS FOR TIE-INS BETWEEN NEW AND
EXISTING SHALL BE PERFORMED WITHOUT AFFECTING DAY-TO-
DAY HOSPITAL AND CLC OPERATIONS TO THE GREATEST EXTENT
POSSIBLE. COORDINATE WITH VA PROVIDING NOTIFICATION AND
LEAD TIME AS REQUIRED BY DIVISION 01 SPECIFICATIONS.
COORDINATION IS REQUIRED BETWEEN THE CONTRACTOR AND
THE COR TO ESTABLISH THE MOST EFFICIENT METHOD FOR
BRINGING THE ADDITION INTO FULL OPERATION. THE INTERFACE
OF SYSTEMS AND INFRASTRUCTURE FOR MECHANICAL, FIRE
PROTECTION, ELECTRICAL, AND TELECOMMUNICATIONS
BETWEEN THE EXISTING AND NEW AREAS SHALL BE IDENTIFIED
AND COORDINATED PRIOR TO CONSTRUCTION IN ORDER TO
DEVELOP A SPECIFIC APPROACH TO ALLEVIATE DOWN TIME FOR
HOSPITAL AND CLC OPERATIONS AND TEMPORARY RELOCATION
OF HOSPITAL AND CLC PATIENTS AND PERSONNEL.
THE CONSTRUCTION STEPS SHALL BE DIVIDED INTO THREE
COMPONENTS TO INCLUDE THE FOLLOWING AREAS:
AREAS
SOUTH WING ADDITION 9,258 GSF
WEST WING RENOVATION 6,536 GSF (DEDUCT)
NORTH WING RENOVATION 1,972 GSF (PARTIAL)
TOTAL 20,811 GSF
1.
2.
3.
4.
5.
6.
7.
8.
9.
NOTE:
SERVICE FOR THE BOTH NORTH AND EAST WINGS MUST
REMAIN ACTIVE FOR THE DURATION OF CONSTRUCTION.
CONSTRUCTION STEPS:
SOUTH WING (BASE BID) ADDITION
FULLY ENCLOSED FUNCTIONAL BUILDING ADDITION THAT
PROVIDES CONNECTIONS TO BOTH EAST AND WEST EXISTING
WINGS. THE ADDITION INCLUDES 14 RESIDENT ROOMS, A DINING
AREA, AND A NURSING STATION ALONG WITH MECHANICAL,
ELECTRICAL, AND TELECOM ROOMS.
WEST WING (BASE BID) RENOVATION
DEMOLITION TO INCLUDE:
FLOOR SLABS, INTERIOR PARTITIONS, CEILINGS, AND ASSOCIATED
MECHANICAL, FIRE PROTECTION, AND ELECTRICAL SYSTEMS AND
COMPONENTS. EXISTING PATIENT LIFT SYSTEMS TO BE REMOVED
AND STORED FOR FUTURE USE.
CONSTRUCTION TO INCLUDE:
FULLY RENOVATED WING THAT PROVIDES UTILITY CONNECTIONS
WITH BOTH SOUTH AND NORTH FACILITY WINGS. THE RENOVATION
INCLUDES 14 RESIDENT ROOMS, A FAMILIY ROOM, ALONG WITH A
TELECOM ROOM, SOILED LINEN, AND CLEAN LINEN ROOMS.
NORTH AND EAST WINGS (BASE BID) RENOVATION
(WORK LIMITED TO UTILITY: SUPPORT AND CONNECTIONS)
DEMOLITION TO INCLUDE:
WORK IN EXISTING MECH/ELEC/TELECOM ROOMS THAT COINCIDE
WITH WORK TO BE DONE IN SOUTH AND WEST WING. REMOVE
SUSPENDED CEILING GRID AND CEILING TILE AT THE NORTH WING
CORRIDORS WITH TEMPORARY STORAGE OFF SITE FOR
REINSTALLATION AFTER UTILITY WORK IS COMPLETE. THE EAST
WING DEMO INCLUDES TELECOM AND ELECTRICAL ROOMS AND
WALL REMOVAL FOR NEW EXIT DOORS.
CONSTRUCTION TO INCLUDE:
FOR THE NORTH WING, FIRE PROTECTION, MEP, TELECOM:
SYSTEMS AND COMPONENTS SUPPORT. REINSTALLATION OF
NORTH WING SUSPENDED CEILING (FROM OFF-SITE STORAGE)
AND AREAS OF NEW DRYWALL SUSPENDED CEILINGS, SEE
REFLECTED CEILING PLANS. THE EAST WING INCLUDES TELECOM
AND ELECTRICAL RENOVATION AND INSTALLATION OF EXIT DOORS
NOT IN SCOPE OF WORK
DEDUCT:
WEST WING (BASE BID) RENOVATION
DEMOLITION TO INCLUDE:
FLOOR SLABS, INTERIOR PARTITIONS, CEILINGS, AND ASSOCIATED
MECHANICAL, FIRE PROTECTION, AND ELECTRICAL SYSTEMS AND
COMPONENTS. EXISTING PATIENT LIFT SYSTEMS TO BE REMOVED
AND STORED FOR FUTURE USE.
CONSTRUCTION TO INCLUDE:
FULLY RENOVATED WING THAT PROVIDES UTILITY CONNECTIONS
WITH BOTH SOUTH AND NORTH FACILITY WINGS. THE RENOVATION
INCLUDES 14 RESIDENT ROOMS, A FAMILIY ROOM, ALONG WITH A
TELECOM ROOM, SOILED LINEN, AND CLEAN LINEN ROOMS.
TN N
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANTS
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER'S REPRESENTATIVE
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #102 PARKER, COLORADO 80138 PH. 303.841-3922
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
668-318
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
9/
/2
:2 0:
P
M
GI002
CONSTRUCTION STEPS PLAN AND
NOTES
APRIL 2023 BAJ RJF
2 183
DAVID ARMENT
509-964-1889 David.Arment@va.gov
SCALE: 1/16" = 1'-0"
FLOOR PLAN - CONSTRUCTION STEPS1
EXISTING
NEW
EXISTIN
G
NEW
EXISTING
NEW
EXISTING
NEW
32'8'
SCALE:1/16"=1'-0"
0 16'
REVISIONS DATE
201761
T
ENS E D
CI
L
S
TA
FO
E
O
IHA RC
C
T E
D
OCOL RA
BRUCE A.
JONES
T
5 JULY 2023
LINETYPE LEGEND:
CABLE, COAXIAL - EXISTING
CABLE, COAXIAL
CABLE, FIBER OPTIC - EXISTING
CABLE, FIBER OPTIC
CONSTRUCTION FENCE (CF)
DOMESTIC WATER - EXISTING
DOMESTIC WATER
DRAINAGE BASIN BOUNDARY
ELECTRICAL, OVERHEAD - EXISTING
ELECTRICAL, OVERHEAD
ELECTRICAL, UNDERGROUND - EXISTING
ELECTRICAL, UNDERGROUND
FENCE
FLOWLINE
LINEAR FEATURE - DEMOLITION
LIMITS OF CONSTRUCTION
NATURAL GAS - EXISTING
NATURAL GAS
SANITARY SEWER - EXISTING
SANITARY SEWER
SEDIMENT CONTROL LOG
SILT FENCE (SF)
STORM SEWER - EXISTING
STORM SEWER
MAJOR CONTOUR - EXISTING
MAJOR CONTOUR
MINOR CONTOUR - EXISTING
MINOR CONTOUR
PROPERTY LINE
PROPERTY SETBACK/EASMENT
TELECOM, OVERHEAD - EXISTING
TELECOM, OVERHEAD
TELECOM, UNDERGROUND - EXISTING
TELECOM, UNDERGROUND
CONTOUR LABEL - EXISTING
CONTOUR LABEL
W
SYMBOL LEGEND:
BENCHMARK/ELEVATION
CHECK DAM (CD)
EQUIPMENT, ELECTRICAL
FIRE HYDRANT
CLEAN OUT
CONCRETE WASHOUT AREA (CWA)
CULVERT PROTECTION (CP)
CURB SOCK (CS)
HANDICAP PARKING
IRRIGATION CONTROL BOX
INLET PROTECTION (IP)
LIGHT POLE
MANHOLE, ELECTRIC
MANHOLE, SANITARY SEWER
MANHOLE, STORM SEWER
MANHOLE, TELEPHONE/COMMUNICATION
MANHOLE, WATER
METER, ELECTRIC
METER, GAS
METER, WATER
PANEL POINT
POWER POLE
PUMP/ WELL HEAD
SEDIMENT CONTROL BMP
TRANSFORMER
TREE, CONIFEROUS
TREE, DECIDUOUS
VALVE, BUTTERFLY
VALVE, GATE
VEHICLE TRACKING CONTROL (VTC)
WELL
E
S
D
W
SYMBOL LEGEND:
AREA FOR DEMOLITION
ASPHALT
CONCRETE
FLOODPLAIN
FLOODWAY
GRASSED AREA
GRAVEL
SOIL, DISTURBED
SOIL, UNDISTURBED
WETLANDS
E
G
SS
SD x
GAS
GASx
SS x
WTRx
WTR
SD
X X
EO x
EO
EU x
EU
TELOx
TELO
TELUx
TELU
FO
FO x
CTV
CTVx
SF
T
SCL
E
X X X X X X X X X X X
ABBREVIATIONS:
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
ADA AMERICANS WITH DISABILITIES
ACT
APA AMERICAN PLYWOOD
ASSOCIATION
AGGR AGGREGATE
ALT ALTERNATE OR ALTITUDE
APPROX APPROXIMATE
ASCE AMERICAN SOCIETY OF CIVIL
ENGINEERS
ASPH ASPHALT
AWG AMERICAN WIRE GAUGE
B&F BELL AND FLANGE
B&S BELL AND SPIGOT
BCV BUTTERFLY CHECK VALVE
BF BOTTOM FACE
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BLDG BUILDING
BM BEAM OR BENCHMARK
BRG BEARING
BV BALL VALVE
CB CATCH BASIN OR CEMENT BASE
CD CONSTRUCTION DOCUMENTS
CEM CEMENT
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND
CI CAST IRON OR CURB INLET
CIP CAST-IN-PLACE OR CAST IRON
PIPE
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LINE, CLASS, OR CLOSE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT/CONTRACTING
OFFICER
COMM COMMUNICATION
CONC CONCENTRIC OR CONCRETE
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
COV COVER OR CUT OFF VALVE
CRSI CONCRETE REINFORCING STEEL
INSTITUTE
CS CURB SOCK
CSB CONCRETE SPLASH BLOCK
CSP CONCRETE SEWER PIPE
CTR CENTER, CONTOUR, OR COOLING
TOWER RETURN
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER OR CUBIC
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CV CONTROL VALVE
CWA CONCRETE WASHOUT AREA
d PENNY (NAIL)
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DI DROP INLET
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIST DISTANCE
DIV DIVISION
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DRAIN OR DRIVE
DS DOWNSPOUT
DW DOMESTIC WATER
DWG DRAWING
E EAST
EA EACH
EC EDGE OF CURB
EJ EXPANSION JOINT
EL EASEMENT LINE OR ELEVATION
EOS EDGE OF SLAB
EP EDGE OF PAVEMENT (PAVING)
EPA ENVIRONMENTAL PROTECTION
AGENCY
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EDGE OF SHOULDER
ESMT EASEMENT
EW EACH WAY
EXIST EXISTING
EXP EXPANSION
EXST GR EXISTING GRADE
F FIRE LINE; FEMALE; FAHRENHEIT
FFE FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FLG FLANGE
FL FLOW LINE
FOC FACE OF CURB
FP FIRE PROTECTION OR FLAGPOLE
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET OR FOOT
FTG FOOTING
G GROUND OR NATURAL GAS
GA GAGE
GAL GALLON
GC GENERAL CONTRACTOR
GEN GENERATOR
GIP GALVANIZED IRON PIPE
GPD GALLONS PER DAY
GT GREASE TRAP
GTV GATE VALVE
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HANDICAP/HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDWL HEADWALL
HH HAND HOLE
HORIZ HORIZONTAL
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
ID INSIDE DIAMETER
INCL INCLUDED
INFO INFORMATION
INV INVERT
IP IRON PIPE
IRREG IRREGULAR
IW IRRIGATION WATER
L ANGLE
LAT LATITUDE
LF LINEAR FEET (FOOT)
LIN LINEAR
LNG LONGITUDE
LOC LOCATION
LONG LONGITUDINAL
LOS LINE OF SIGHT
LPT LOW POINT
LT LIGHT
MAINT MAINTENANCE
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION
SYSTEM
MAX MAXIMUM
MB MAIL BOX
MED MEDIUM
MEMO MEMORANDUM
MER MERIDIAN
MFD MANUFACTURED
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MTG MEETING
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
NDS NATIONAL DESIGN SPECIFICATION
FOR WOOD CONSTRUCTION
NIC NOT IN CONTRACT
NOM NOMINAL
NRCP NON-REINFORCED CONCRETE
PIPE
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OFD OVERFLOW DRAIN
OPNG OPENING
OZ OUNCE
PA PIPE ANCHOR
PB PULL BOX
PC POINT OF CURVE
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PG PRESSURE GAGE OR PROFILE
GRADE
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PK GAR PARKING GARAGE
PK LOT PARKING LOT
PMPSCT PUMP SUCTION
PE POLYETHYLENE (PLASTIC)
PP POLYPROPYLENE (PLASTIC)
PREP PREPARATION
PREV PREVIOUS
PRKG PARKING
PROP PROPERTY
PRV PRESSURE REGULATOR VALVE
OR PRESSURE RELIEF VALVE
PS CONC PRESTRESSED CONCRETE
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POST TENSIONED
PVC POLYVINYL CHLORIDE (PLASTIC)
QTR QUARTER
QTY QUANTITY
R RADIUS OR RANGE
RC REINFORCED CONCRETE
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RDC REDUCER
RE RESIDENT ENGINEER
REBAR REINFORCING STEEL BARS
REQ REQUIRE
RFI REQUEST FOR INFORMATION
ROW RIGHT OF WAY
RV RELIEF VALVE
RW ROADWAY
SAN SANITARY
SB SPLASH BLOCK
SCHED SCHEDULE
SCL SEDIMENT CONTROL LOG
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SECT SECTION
SF SILT FENCE
SJ SCORED JOINT
SMH STEAM MANHOLE
SMP SUMP PUMP
SOV SHUT OFF VALVE
SP STANDPIPE OR SUMP PIT
SP EL SPOT ELEVATION
SPKLR SPRINKLER
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SR STEAM RETURN
SS SANITARY SEWER
SSA STABILIZED STAGING AREA
SSP STAINLESS STEEL PIPE
STA STATION
STD STANDARD
STM STEAM/STORM
SURF SURFACE
SURV SURVEY
SWR SEWER
SYM SYMBOL
TAN TANGENT
TELE TELEPHONE
TEMP TEMPORARY
THRU THROUGH
TBC TOP BACK OF CURB
TOW TOP OF WALL
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TYP TYPICAL
UFC UNIFORM FACILITIES CRITERIA
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
VB VALVE BOX
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VERT VERTICAL
VIF VERIFY IN FIELD
VOL VOLUME
VTC VEHICLE TRACKING CONTROL
W WASTE, WEST, OR WIDE
WP WATER PUMP
WTR WATER
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
668-318
DAVID ARMENT
504-964-1889 David.Arment@va.govREVISIONS DATE APRIL 2023
CONTRACTING OFFICER'S REPRESENTATIVE
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
ARCHITECT/ENGINEER OF RECORD
11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
Group, Inc.
ABBREVIATIONS, LEGENDS, AND
SYMBOLS
CI001
RIDRID
rday RID CO Seal
SF
SFSFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
VTC
SSA
CS
CS
CWA
25.21' CONSTRUCTION
ACCESS TO WELLESEY
SECURITY GATE
ACCESS TO PARKING
AND LAYDOWN AREA
APPROXIMATE DISTANCE 700 FT
SF
SF
CONSTRUCTION
ACCESS ONLY SIGN
CONSTRUCTION
ACCESS
LI
M
IT
S
O F
C O
N
ST
R U
C
TI
O N
IP
IP
LIM
ITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
668-318
DAVID ARMENT
504-964-1889 David.Arment@va.govREVISIONS DATE APRIL 2023
CONTRACTING OFFICER'S REPRESENTATIVE
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
ARCHITECT/ENGINEER OF RECORD
11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
Group, Inc.
SEDIMENT CONTROL PLAN
CE101
RIDRID
SHEET NOTES:
1. ENSURE ALL SEDIMENT CONTROLS ARE IN PLACE PRIOR TO EARTH DISTURBING
ACTIVITIES.
2. MAINTAIN SEDIMENT CONTROL MEASURES IN UNPAVED AREAS UNTIL
ESTABLISHMENT OF VEGETATIVE COVER.
3. SEE SHEETS CI501 AND CI502 FOR SEDIMENT CONTROL DETAILS.
4. LAY DOWN AREA (SSA) IS EXISTING AND LOCATED AT THE SOUTH END OF PARKING
LOT D. COORDINATE LOCATION WITH COR.
N
0' 20'10'
SCALE: 1" = 10'
EROSION CONTROL BMP LEGEND
LOC LIMITS OF CONSTRUCTION
CF CONSTRUCTION FENCE
RRC RRB FOR CULVERT PROTECTION
SF SILT FENCE
SSA STABILIZED STAGING AREA
VTC VEHICLE TRACKING CONTROL
CWA CONCRETE WASHOUT
SCL SEDIMENT CONTROL LOG
CS CURB SOCK
IP INLET PROTECTION
SYMBOL LEGEND
CONCRETE WASHOUT AREA (CWA)
FLOW DIRECTION
LIMITS OF CONSTRUCTION
SEDIMENT CONTROL BMP TAG
SEDIMENT CONTROL LOG
SEEDING AND MULCHING
SILT FENCE
SCL
SF
AutoCAD SHX Text
UNDERGROUND CATV/COMM
AutoCAD SHX Text
ADA DOME RAMP
AutoCAD SHX Text
DW #1814
AutoCAD SHX Text
WELLESLEY AVE.
AutoCAD SHX Text
INDEPENDENCE DRIVE
AutoCAD SHX Text
STEAM TUNNEL
X
X X
X X
X
X X
X X
XXXXXXXX
X
X X
X X
X X
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
COVERED ENTRY
LI
M
IT
S
O F
C O
N
ST
R U
C
TI
O N
LIM
ITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
668-318
DAVID ARMENT
504-964-1889 David.Arment@va.govREVISIONS DATE APRIL 2023
CONTRACTING OFFICER'S REPRESENTATIVE
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
ARCHITECT/ENGINEER OF RECORD
11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
Group, Inc.
CIVIL DEMOLITION PLAN
CD101
RIDRID
SHEET NOTES:
1. TIME REMOVAL OF PAVING AND CURB AND GUTTER TO
COINCIDE WITH PAVING OPERATIONS.
2. PROTECT EXISTING MANHOLES TO REMAIN FROM DAMAGE.
3. PROTECT TREES TO REMAIN.
4. COORDINATE REMOVAL OF EXISTING UTILITIES WITH
INSTALLATION TO MINIMIZE OR AVOID INTERRUPTION OF
SERVICES TO THE FACILITY. COORDINATE OUTAGES WITH
COR.
KEY NOTES:
1. REMOVE PAVING AND ALL BASE COURSE MATERIAL. PROTECT
ADJACENT ITEMS TO REMAIN
2. REMOVE FENCE AND ALL FOUNDATIONS.
3. REMOVE 8" DIAMETER PVC SEWER LINE. PROVIDE BY-PASS TO
ALLOW FOR CONTINUED FUNCTION OF SANITARY SEWER
DURING DEMOLITION AND INSTALLATION OF PIPING AND
MANHOLES.
4. REMOVE DRY WELL, PROTECT PIPING TO REMAIN.
5. REMOVE COAXIAL CABLE. PROVIDE TEMPORARY
CONNECTIONS TO MINIMIZE OUTAGES TO SWITCHOVER.
OUTAGES CANNOT EXCEED 48 HOURS..
6. REMOVE TREE
7. RELOCATE SHRUB
8. ABANDON IN PLACE BEYOND VA PROPERTY
9. PROTECT EXISTING WALKWAY IN PLACE
10. CLEAR BUILDING AREA
11. REMOVE EXISTING PAVEMENT MARKINGS
12. REMOVE EXISTING CURB, GUTTER AND BASE COURSE
MATERIAL. PROTECT REMAINING CURB IN PLACE.
13. REMOVE EXISTING CONCRETE SIDEWALK AND BASE COURSE
MATERIAL.
14. EXISTING IRRIGATION LINE SEE IRRIGATION PLANS FOR DEMO
AND CONSTRUCTION.
N
0' 20'10'
SCALE: 1" = 10'
AutoCAD SHX Text
GREEN HOUSE
AutoCAD SHX Text
COMMUNITY LIVING CENTER
AutoCAD SHX Text
IRRIGATION CONTROL VAULT #1546
AutoCAD SHX Text
UNDERGROUND CATV/COMM
AutoCAD SHX Text
IRRIGATION WATERLINE
AutoCAD SHX Text
B-01-21(APPROX.)
AutoCAD SHX Text
B-02-21(APPROX.)
AutoCAD SHX Text
B-03-21 (APPROX.)
AutoCAD SHX Text
ADA DOME RAMP
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP A
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP E
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
ELECTRICAL METER - LOOP A
AutoCAD SHX Text
ELECTRICAL METER - LOOP E
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.83'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
SS MH#1010
AutoCAD SHX Text
SS MH#2115
AutoCAD SHX Text
DI #1014 (GRAVEL BTM)
AutoCAD SHX Text
DI #1023
AutoCAD SHX Text
DI #5095
AutoCAD SHX Text
DI #5156
AutoCAD SHX Text
DW #5244
AutoCAD SHX Text
DW #1183
AutoCAD SHX Text
DW #1814
AutoCAD SHX Text
DW #1843
AutoCAD SHX Text
DW #2116
AutoCAD SHX Text
DW #2234
AutoCAD SHX Text
DW #2306
AutoCAD SHX Text
DW #5986
AutoCAD SHX Text
DW #5948
AutoCAD SHX Text
DW #5187
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
WELLESLEY AVE.
AutoCAD SHX Text
INDEPENDENCE DRIVE
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
AutoCAD SHX Text
CP#4
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#1
AutoCAD SHX Text
CP#8
AutoCAD SHX Text
CP#7
AutoCAD SHX Text
CP#6
AutoCAD SHX Text
CP#5
AutoCAD SHX Text
AC
AutoCAD SHX Text
STEAM TUNNEL
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
D
D
D
D
D D
D
D
S
S
CO
CO
CO
CO
FH (E)
FH (E)
25' PHYS SEC SETBACK
' P
H
YS
S
EC
S
ET
BA
C
K
25' PHYS SEC SETBACK
BUILDING
ADDITION
C1C2L1C3
L2
10.00'CONC WALK
CONC WALK
9'
.0
9'
N:73902.99 E:66303.43
6.00'
CONC WALK
6.00'
CONC W
ALK
L4 C4
C5
C
C7
C8C9
C10
C11 L3
6.86'
9' 5'9'
N:73926.56 E:66330.38
N:73745.82 E:66339.68
N:73721.24 E:66462.53
LI
M
IT
S
O F
C O
N
ST
R U
C
TI
O N
LIM
ITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
LINE TABLE
LINE #
L1
L2
LENGTH
19.09
18.44
DIRECTION
N87° 50' 44.48"E
N3° 38' 09.16"W
CURVE TABLE
CURVE #
C1
C2
C3
LENGTH
4.89
3.20
3.19
RADIUS
40.54
10.00
2.00
DELTA
6.92
18.32
91.48
CHORD
DIRECTION
N66° 03' 53"E
N78° 41' 03"E
N42° 06' 18"E
CHORD
LENGTH
4.89
3.18
2.86
LINE TABLE
LINE #
L3
L4
LENGTH
3.57
4.07
DIRECTION
S78° 16' 35.15"E
S79° 17' 47.85"E
CURVE TABLE
CURVE #
C4
C5
C6
C7
C8
C9
C10
C11
LENGTH
34.34
13.46
20.04
34.29
43.88
37.94
13.08
15.71
RADIUS
30.00
31.01
10.00
42.84
60.00
18.08
21.45
15.00
DELTA
65.59
24.87
114.83
45.86
41.91
120.24
34.95
60.02
CHORD
DIRECTION
S46° 30' 06"E
S26° 08' 29"E
S18° 50' 25"W
N80° 48' 40"W
N78° 49' 58"W
N39° 40' 00"W
N59° 10' 38"E
N71° 42' 51"E
CHORD
LENGTH
32.50
13.36
16.85
33.39
42.91
31.35
12.88
15.00
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
668-318
DAVID ARMENT
504-964-1889 David.Arment@va.govREVISIONS DATE APRIL 2023
CONTRACTING OFFICER'S REPRESENTATIVE
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
ARCHITECT/ENGINEER OF RECORD
11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
Group, Inc.
SITE PLAN
CS101
RIDRID
SHEET NOTES:
1. SOD ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES.
2. LINE AND CURVE INFORMATION IS TOP BACK OF CURB.
BASIS OF BEARINGS AND CONTROL
1. SURVEY PERFORMED DURING THE WEEK OF 6/21/2021
2. PROJECT IS IN GRID BEARING AND GROUND DISTANCE.
3. HZ COORDINATES IN NAD83( 2011 ) USFT WASHINGTON NORTH ZONE 4601 SPC
TRUNCATED AND RAISED TO GROUND IN TBC ABOUT POINT #1
4. ELEVATION IS NAVD 88 (USED GEOID 18) ELEVATION HELD ON #1
5. SEE SURVEY FOR ADDITIONAL INFORMATION ON CONTROL POINTS
· Truncation: N: -200,000 E: -2,400,000
· CSF=1.000118914
· Ø = 2°29'51"
Mann-Grandstaff VA CLC Control Point Table
POINT NORTHING EASTING ELEV DESCRIPTION
1 73907.17 66111.69 1889.97 SET MAG NAIL IN PARKING LOT ISLAND
2 73713.81 66126.67 1886.84 FOUND 1" RPC STAMPED "A&C-INC-CONTROL"
4 73690.33 66399.30 1891.98
SET 5/8" X 24" REBAR WITH RPC STAMPED
"RPA CONTROL"
5 73757.68 66589.02 1898.74
6 73834.56 66531.64 1897.60
7 73995.37 66536.80 1905.61
8 74040.42 66363.86 1910.14
N
0' 20'10'
SCALE: 1" = 10'
KEY NOTES:
1. RELOCATE DISABLED PARKING SIGNS. RE-STRIPE SPACES.
2. MATCH EXISTING ELEVATION.
AutoCAD SHX Text
GREEN HOUSE
AutoCAD SHX Text
COMMUNITY LIVING CENTER
AutoCAD SHX Text
B-01-21(APPROX.)
AutoCAD SHX Text
B-02-21(APPROX.)
AutoCAD SHX Text
B-03-21 (APPROX.)
AutoCAD SHX Text
ADA DOME RAMP
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP A
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP E
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
ELECTRICAL METER - LOOP A
AutoCAD SHX Text
ELECTRICAL METER - LOOP E
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.83'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
DI #1014 (GRAVEL BTM)
AutoCAD SHX Text
DI #1023
AutoCAD SHX Text
DI #5095
AutoCAD SHX Text
DI #5156
AutoCAD SHX Text
DW #5244
AutoCAD SHX Text
DW #1183
AutoCAD SHX Text
DW #1843
AutoCAD SHX Text
DW #2116
AutoCAD SHX Text
DW #2234
AutoCAD SHX Text
DW #2306
AutoCAD SHX Text
DW #5986
AutoCAD SHX Text
DW #5948
AutoCAD SHX Text
DW #5187
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
WELLESLEY AVE.
AutoCAD SHX Text
INDEPENDENCE DRIVE
AutoCAD SHX Text
CP#4
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#1
AutoCAD SHX Text
CP#8
AutoCAD SHX Text
CP#7
AutoCAD SHX Text
CP#6
AutoCAD SHX Text
CP#5
AutoCAD SHX Text
AC
AutoCAD SHX Text
STEAM TUNNEL
D
D
D
D D
D
D
S
S
CO
CO
CO
CO
FF ELEV
=1897.82
FG 1897.25
FG 1897.30
FG 1897.27
FG 1897.27
FG 1897.31
FG 1897.79
FG 1897.31
FG 1897.46
FG 1897.42
FG 1897.26
FG 1896.90
FG 1897.71
FG 1897.71
FG 1897.43
FG 1897.30
FG 1897.31
FG 1896.96
FG 1897.23
FG 1897.14
FG 1897.48
FG 1897.05
LI
M
IT
S
O F
C O
N
ST
R U
C
TI
O N
LIM
ITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
25' PHYS SEC SETBACK
' P
H
YS
S
EC
S
ET
BA
C
K
25' PHYS SEC SETBACK
95.70
TC/FG
97.10
TC
95.76
TC
95.81
TC
96.73
TC
96.89
TC
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
668-318
DAVID ARMENT
504-964-1889 David.Arment@va.govREVISIONS DATE APRIL 2023
CONTRACTING OFFICER'S REPRESENTATIVE
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
ARCHITECT/ENGINEER OF RECORD
11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
Group, Inc.
GRADING PLAN
CG101
RIDRID
N
0' 20'10'
SCALE: 1" = 10'
KEY NOTES
1. INSTALL CONCRETE CURB AND GUTTER SEE DETAIL ON SHEET CI504.
2. TRANSITION CURB FROM 6" CURB HEIGHT TO 0" SEE DETAIL ON SHEET CI504.
3. INSTALL CONCRETE SIDEWALK SEE DETAIL ON SHEET CI504.
4. REMOVE AND REPLACE EXISTING PAVEMENT MARKINGS, MARKING TO BE
INSTALLED IN THE SAME LOCATION. SEE HORIZONTAL CONTROL SHEET FOR
DIMENSIONS.
5. SAWCUT EXISTING PAVEMENT, INSTALL CURB & GUTTER TO MATCH EXISTING
PAVEMENT ELEVATION.
6. MATCH EXISTING ELEVATION.
7. RESEED ALL AREAS DISTURBED BY CONSTRUCTION.
AutoCAD SHX Text
GREEN HOUSE
AutoCAD SHX Text
COMMUNITY LIVING CENTER
AutoCAD SHX Text
ADA DOME RAMP
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.83'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
DI #1014 (GRAVEL BTM)
AutoCAD SHX Text
DI #1023
AutoCAD SHX Text
DI #5095
AutoCAD SHX Text
DI #5156
AutoCAD SHX Text
DW #5244
AutoCAD SHX Text
DW #1183
AutoCAD SHX Text
DW #1843
AutoCAD SHX Text
DW #2116
AutoCAD SHX Text
DW #2234
AutoCAD SHX Text
DW #2306
AutoCAD SHX Text
DW #5986
AutoCAD SHX Text
DW #5948
AutoCAD SHX Text
DW #5187
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
WELLESLEY AVE.
AutoCAD SHX Text
INDEPENDENCE DRIVE
AutoCAD SHX Text
AC
AutoCAD SHX Text
STEAM TUNNEL
SS SS SS SS
D
D
D
D
D D
D
D
S
SS
SS
S
SSSSSSSSSSSS
C
TV
C
TV
C
TV
C
TV
CTV
CTV
SS
CO
CO
CO
CO
LI
M
IT
S
O F
C O
N
ST
R U
C
TI
O N
LIM
ITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
668-318
DAVID ARMENT
504-964-1889 David.Arment@va.govREVISIONS DATE APRIL 2023
CONTRACTING OFFICER'S REPRESENTATIVE
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
ARCHITECT/ENGINEER OF RECORD
11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
Group, Inc.
UTILITY PLAN - OVERALL
CU100
RIDRID
N
0' 20'10'
SCALE: 1" = 10'
SHEET NOTES:
1. SEE TELECOM SITE PLAN FOR ADDITIONAL INFORMATION ON
TELECOM/COAXIAL CABLE AND EQUIPMENT.
2. SEE SHEET CU101 FOR SANITARY SEWER LINE PLAN AND
PROFILE
3. SEE SHEET CU102 FOR STORM DRAINAGE STRUCTURES.
4. PROVIDE DETECTABLE WARNING TAPE AT ALL UTILITIES.
KEY NOTES:
1. PEDESTAL FOR COAXIAL BUILDING CONNECTION
AutoCAD SHX Text
GREEN HOUSE
AutoCAD SHX Text
COMMUNITY LIVING CENTER
AutoCAD SHX Text
IRRIGATION CONTROL VAULT #1546
AutoCAD SHX Text
IRRIGATION WATERLINE
AutoCAD SHX Text
ADA DOME RAMP
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP A
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP E
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
ELECTRICAL METER - LOOP A
AutoCAD SHX Text
ELECTRICAL METER - LOOP E
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.83'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
SS MH#1010
AutoCAD SHX Text
SS MH#2115
AutoCAD SHX Text
DI #1014 (GRAVEL BTM)
AutoCAD SHX Text
DI #1023
AutoCAD SHX Text
DI #5095
AutoCAD SHX Text
DI #5156
AutoCAD SHX Text
DW #5244
AutoCAD SHX Text
DW #1183
AutoCAD SHX Text
DW #1843
AutoCAD SHX Text
DW #2116
AutoCAD SHX Text
DW #2234
AutoCAD SHX Text
DW #2306
AutoCAD SHX Text
DW #5986
AutoCAD SHX Text
DW #5948
AutoCAD SHX Text
DW #5187
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
WELLESLEY AVE.
AutoCAD SHX Text
INDEPENDENCE DRIVE
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
AutoCAD SHX Text
CP#4
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#1
AutoCAD SHX Text
CP#8
AutoCAD SHX Text
CP#7
AutoCAD SHX Text
CP#6
AutoCAD SHX Text
CP#5
AutoCAD SHX Text
AC
AutoCAD SHX Text
STEAM TUNNEL
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
D
D
D
D D
D
D
C
TV
C
TV
C
TV
C
TV
CTV
CTV
INV. OUT (SW): 1894.28
S
S
S
S SS SS SS SS
SS
SS
SSSSSSSSSSSS
SS MH #2115 (E)
N: 73728.46 E: 66519.94
RIM ELEV.: 1896.56
INV. OUT (W): 1890.51
SS MH #---- 2
N: 73721.52 E: 66288.80
RIM ELEV.: 1889.75
INV. IN (N): 1884.74
INV. IN (E): 1884.74
INV. OUT (W): 1884.54
SS MH #---- 1
N: 73712.58 E: 66462.33
RIM ELEV.: 1895.18
INV. IN (E): 1889.08
INV. OUT (W): 1888.91
SS MH #1010 (E)
N: 73718.31 E: 66181.95
RIM ELEV.: 1887.74
INV. IN (E): 1881.78
CO
CO
CO
CO
SS
BUILDING CONNECTION 1
N: 73798.82 E: 66298.25
RIM ELEV.: 1889.93
INV. IN (SW): 1886.41
BUILDING CONNECTION 2
N: 73777.77 E: 66301.72
RIM ELEV.: 1891.62
INV. IN (SW): 1886.01
CLEAN OUT 1
N: 73791.12 E: 66286.71
RIM ELEV.: 1896.88
INV. IN (S): 1886.13
INV. OUT (NE): 1886.13
CLEAN OUT 2
N: 73768.21 E: 66287.40
RIM ELEV.: 1894.29
INV. OUT (NE): 1885.67
INV. OUT (S): 1885.67
INV. OUT (N): 1885.67
106.90' of 8" PVC @ 2.58% (E)
59.76' of 8" PVC @ 2.40% 173.76' of 8" PVC @ 2.40%
.7
1' o f 8 " P
VC
.0
0%
22.92' of 8" PVC @ -2.00%
13.87' of 8" PVC @ -2.00%
17.22' of 8" PVC @ -2.00%
LI
M
IT
S
O F
C O
N
ST
R U
C
TI
O
N LIM
ITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
SANITARY LINE
1880.00
1885.00
1890.00
1895.00
1900.00
-0+50.00 0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 4+50.00
106.90' of 8" PVC @ 2.58%
SS
M
H
(E
N : 7
.3
E:
.9
R
IM
E
LE
V.
:1
7.
IN
V.
IN
(E
.7
SS
M
H
- 2
N : 7
.5
E:
.8
R
IM
E
LE
V.
:1
9.
IN
V.
IN
(N
.7
IN
V.
IN
(E
.7
IN
V.
O U
T (W
.5
173.76' of 8" PVC @ 2.40%
SS
M
H
- 1
N : 7
.5
E:
.3
R
IM
E
LE
V.
:1
5.
IN
V.
IN
(E
.0
IN
V.
O
U T
(W
.9
59.76' of 8" PVC @ 2.40%
SS
M
H
(E
N : 7
.4
E:
.9
R
IM
E
LE
V.
:1
6.
IN
V.
O U
T (W
.5
EXISTING GRADE
GRADE
IRRIGATION LINE
DEPTH UNKNOWN
IRRIGATION LINE
DEPTH UNKNOWN
COAXIAL CABLE
DEPTH UNKNOWN
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
668-318
DAVID ARMENT
504-964-1889 David.Arment@va.govREVISIONS DATE APRIL 2023
CONTRACTING OFFICER'S REPRESENTATIVE
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
ARCHITECT/ENGINEER OF RECORD
11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
Group, Inc.
SANITARY SEWER PLAN AND PROFILE
CU101
RIDRID
SHEET NOTES:
1. SEE TELECOM SITE PLAN FOR ADDITIONAL INFORMATION ON
TELECOM/COAXIAL CABLE AND EQUIPMENT.
2. SEE SHEET CU102 FOR STORM DRAINAGE STRUCTURES.
3. PROVIDE DETECTABLE WARNING TAPE AT ALL UTILITIES.
N
0' 20'10'
SCALE: 1" = 10'
AutoCAD SHX Text
IRRIGATION CONTROL VAULT #1546
AutoCAD SHX Text
IRRIGATION WATERLINE
AutoCAD SHX Text
B-01-21(APPROX.)
AutoCAD SHX Text
B-02-21(APPROX.)
AutoCAD SHX Text
B-03-21 (APPROX.)
AutoCAD SHX Text
ADA DOME RAMP
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP A
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP E
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
ELECTRICAL METER - LOOP A
AutoCAD SHX Text
ELECTRICAL METER - LOOP E
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
SS MH#1010
AutoCAD SHX Text
SS MH#2115
AutoCAD SHX Text
DI #1014 (GRAVEL BTM)
AutoCAD SHX Text
DI #1023
AutoCAD SHX Text
DW #1183
AutoCAD SHX Text
DW #2116
AutoCAD SHX Text
DW #2234
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
WELLESLEY AVE.
AutoCAD SHX Text
INDEPENDENCE DRIVE
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
AutoCAD SHX Text
CP#4
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#5
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
SFSFSFSFSF
SF
SF
SF
SF
SF
SF
SS SS SS SS
SS
SS
SSSSSSSSSSSS
C
TV
C
TV
C
TV
C
TV
CTV
CTV
SS
SF
SF
SF
SF
SF
SF SF
D
D
D
D
D
D
D
D
D
DW #4
N: 73818.86 E: 66353.51
RIM ELEV.: 1897.09
SUMP ELEV: 1884.09
INV. OUT (SW): 1894.09
DW #3
N: 73809.06 E: 66377.59
RIM ELEV.: 1896.85
SUMP ELEV: 1893.85
INV. IN (NW): 1893.85
INV. OUT (S): 1893.85
DW #2
N: 73793.00 E: 66422.35
RIM ELEV.: 1897.17
SUMP ELEV: 1894.17
INV. IN (NE): 1894.17
INV. OUT (S): 1894.17
DW #1
N: 73795.22 E: 66457.40
RIM ELEV.: 1897.43
SUMP ELEV: 1889.07
INV. OUT (SE): 1894.07
DW #9
N: 73723.67 E: 66488.05
RIM ELEV.: 1892.16
SUMP ELEV: 1891.14
INV. OUT (NW): 1891.14
DW #8
N: 73717.99 E: 66429.46
RIM ELEV.: 1894.93
SUMP ELEV: 1891.93
INV. OUT (N): 1891.93
DW #7
N: 73727.91 E: 66368.04
RIM ELEV.: 1894.34
SUMP ELEV: 1885.21
INV. OUT (N): 1885.21
DW #6
N: 73751.72 E: 66320.21
RIM ELEV.: 1894.11
SUMP ELEV: 1885.63
INV. OUT (NE): 1885.63
DW #5
N: 73762.76 E: 66300.88
RIM ELEV.: 1896.34
SUMP ELEV: 1893.34
INV. OUT (NE): 1893.34
INLET #1
N: 73816.61 E: 66366.02
RIM ELEV.: 1896.91
SUMP ELEV: 1893.99
INV. OUT (SE): 1893.99 INLET #2
N: 73799.77 E: 66430.96
RIM ELEV.: 1896.94
SUMP ELEV: 1894.28
INV. OUT (SW): 1894.28
LI
M
IT
S
O F
C O
N
ST
R U
C
TI
O N
LIM
ITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
668-318
DAVID ARMENT
504-964-1889 David.Arment@va.govREVISIONS DATE APRIL 2023
CONTRACTING OFFICER'S REPRESENTATIVE
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
ARCHITECT/ENGINEER OF RECORD
11031 S. PIKES PEAK DRIVE #202 PARKER, COLORADO 80138 PH. 303.841-3922
Group, Inc.
STORM SEWER PLAN
CU102
RIDRID
SHEET NOTES:
1. SEE TELECOMM SITE PLAN FOR ADDITIONAL INFORMATION ON
TELECOMM/COAXIAL CABLE AND EQUIPMENT.
2. SEE SHEET CU101 FOR SANITARY SEWER LINE PLAN AND
PROFILE
3. PROVIDE DETECTABLE WARNING TAPE AT ALL UTILITIES.
N
0' 20'10'
SCALE: 1" = 10'
AutoCAD SHX Text
GREEN HOUSE
AutoCAD SHX Text
COMMUNITY LIVING CENTER
AutoCAD SHX Text
IRRIGATION CONTROL VAULT #1546
AutoCAD SHX Text
IRRIGATION WATERLINE
AutoCAD SHX Text
ADA DOME RAMP
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP A
AutoCAD SHX Text
ELECTRICAL VAULT - LOOP E
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
EMPTY VAULT
AutoCAD SHX Text
ELECTRICAL METER - LOOP A
AutoCAD SHX Text
ELECTRICAL METER - LOOP E
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.83'
AutoCAD SHX Text
FINISHED FLOOR ELEV. 1897.82'
AutoCAD SHX Text
SS MH#1010
AutoCAD SHX Text
SS MH#2115
AutoCAD SHX Text
DI #1014 (GRAVEL BTM)
AutoCAD SHX Text
DI #1023
AutoCAD SHX Text
DI #5095
AutoCAD SHX Text
DI #5156
AutoCAD SHX Text
DW #5244
AutoCAD SHX Text
DW #1183
AutoCAD SHX Text
DW #1843
AutoCAD SHX Text
DW #2116
AutoCAD SHX Text
DW #2234
AutoCAD SHX Text
DW #2306
AutoCAD SHX Text
DW #5986
AutoCAD SHX Text
DW #5948
AutoCAD SHX Text
DW #5187
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
EDGE OF BUILDING FOUNDATION CONCRETE
AutoCAD SHX Text
WELLESLEY AVE.
AutoCAD SHX Text
INDEPENDENCE DRIVE
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
AutoCAD SHX Text
CP#4
AutoCAD SHX Text
CP#2
AutoCAD SHX Text
CP#1
AutoCAD SHX Text
CP#8
AutoCAD SHX Text
CP#7
AutoCAD SHX Text
CP#6
AutoCAD SHX Text
CP#5
AutoCAD SHX Text
AC
AutoCAD SHX Text
STEAM TUNNEL
AutoCAD SHX Text
8" PVC SANITARY SEWER LINE
SILT FENCE INSTALLATION NOTES
1. SEE SEDIMENT CONTROL PLAN, SHEET CE101, FOR LOCATION(S) OF SILT FENCE
2. ALL SILT FENCE SHALL BE IN GOOD CONDITION AND FREE OF ANY DEFECTS INCLUDING RIPS, HOLES AND OBVIOUS WEAR.
3. A 6" x 2" ANCHOR TRENCH SHALL BE EXCAVATED WITH TRENCHER, OR WITH SILT FENCE INSTALLATION MACHINE. ROAD
GRADERS, BACKHOES, AND OTHER SIMILAR MACHINERY SHALL NOT BE USED.
4. A 10" DEEP ANCHOR SLIT SHALL BE FORMED IF USING A STATIC SLICING METHOD.
5. EXCAVATED MATERIAL SHALL BE PLACED ON UPHILL SIDE OF ANCHOR TRENCH.
6. THE ANCHOR TRENCH SHALL BE FREE OF ROCKS OR OTHER DEBRIS PRIOR TO THE PLACEMENT OF THE SILT FENCE.
7. THE ANCHOR TRENCH SHALL BE BACKFILLED WITH SOIL THAT IS FREE OF ROCKS AND DEBRIS. BOTH SIDES OF THE
TRENCH SHALL BE COMPACTED BY HAND, USING A VIBRATORY PLATE COMPACTOR, JUMPING JACK TAMPER OR BY
WHEEL ROLLING WITH A SKID STEER OR TRACTOR.
8. SILT FENCE STAKES SHALL BE MADE OF WOOD AND HAVE THE FOLLOWING DIMENSIONS: 1 1/2" x 1 1/2" x 48"
9. STAKES SHALL BE PLACED ON THE DOWNHILL SIDE OF THE SILT FENCE FABRIC AND PLACED ON 10.0' CENTERS OR LESS.
STAKES SHALL BE EMBEDDED A MINIMUM OF 12" INTO THE GROUND. A WOODEN LATH SHALL BE BE ATTACHED TO THE OPPOSING (UPHILL) SIDE OF THE STAKE FOR ADDED STRENGTH AND SUPPORT. THE LATH SHALL HAVE THE FOLLOWING DIMENSIONS 1 1/2" x 1/4" x 24".
10. SILT FENCE SHALL BE PULLED TIGHT AS IT IS ANCHORED TO THE STAKES. THERE SHOULD NOT BE NOTICEABLE SAG
ALONG ANY PORTION OF THE SILT FENCE AFTER IT HAS BEEN ANCHORED TO THE STAKES.
11. SILT FENCE FABRIC SHALL BE ANCHORED TO THE STAKES AND LATHS USING 1" HEAVY DUTY STAPLES OR NAILS WITH 1" HEADS. STAPLES AND NAILS SHOULD BE PLACED EVERY THREE INCHES ALONG THE SILT FENCE FABRIC.
12. SILT FENCE FABRIC SHALL MEET THE FOLLOWING MANDATORY REQUIREMENTS:
- GRAB TENSILE STRENGTH ASTM D 4632 >= 124 LBS
- MULLEN BURST STRENGTH ASTM D 3786 >= 300PSI
- PUNCTURE STRENGTH ASTM D 4833 >= 60 LBS
- TRAPEZOID TEAR STRENGTH ASTM D 4533 >= 65 LBS
- UV RESISTANCE ASTM D 4355 >= 80% @ 500 HR
- FLOW RATE ASTM D 4491 >= 10 GAL/MIN/FT2
13. AN ORIGINAL PRODUCT SPECIFICATION SHEET FROM THE SILT FENCE MANUFACTURER SHALL BE MADE AVAILABLE AT THE REQUEST OF THE COR. THE PRODUCT SPECIFICATION SHEET SHALL PROVIDE THE RESULTS FOR THE TEST
METHODS ABOVE.
14. SILT FENCE JOINTS SHALL BE CONNECTED ACCORDING THE TO ATTACHED DRAWING.
SILT FENCE INSPECTION AND MAINTENANCE NOTES
1. THE EROSION CONTROL SUPERVISOR SHALL INSPECT SILT FENCE AT THE FOLLOWING INTERVALS:
- IMMEDIATELY FOLLOWING INITIAL INSTALLATION
- EVERY 14 DAYS WHILE THE SITE IS UNDER ACTIVE CONSTRUCTION
- AFTER ANY STORM EVENT THAT CAUSES SOIL EROSION
- ONCE A MONTH FOLLOWING THE END OF CONSTRUCTION, UNTIL VEGETATIVE COVER HAS REACHED A
CONSISTENT DENSITY OF AT LEAST 70% OF FULL VEGETATIVE COVER.
- IMMEDIATELY FOLLOWING STRONG WINDS.
2. ACCUMULATED SEDIMENT SHALL BE REMOVED ONCE THE UPSTREAM SEDIMENT HAS REACHED A DEPTH OF 6-INCHES.
3. SILT FENCE SHALL REMAIN IN PLACE AND PROPERLY MAINTAINED UNTIL VEGETATIVE COVER HAS REACHED A
CONSISTENT DENSITY OF AT LEAST 70% OF FULL VEGETATIVE COVER AND EROSION AND SEDIMENTATION IS NO LONGER
A POSSIBILITY AS DETERMINED BY THE COR.
4. SILT FENCE SHALL BE REPLACED WHEN THERE IS ANY SIGNS OF WEAR.
5. WHEN THE SILT FENCE IS REMOVED ANY DISTURBED AREAS ASSOCIATED WITH THE INSTALLATION, MAINTENANCE, AND/OR REMOVAL OF THE SILT FENCE SHALL BE RESEEDED PER VA SPECIFICATIONS.
" M
IN
6" M
IN
2" M
IN
BURY 10" MIN OF SILT FENCE
FABRIC OR 10" DEEP IF USING
STATIC SLICING METHOD
COMPACTED
BACKFILL
EXISTING
GROUND
1 1/2" x 1/4" STAKE OR LATH
ON THE
UPHILL SIDE OF SILT FENCE
FABRIC
SILT FENCE
GEOTEXTILE
1 1/2" x 1 1/2" x 48" WOODEN STAKE
ON DOWNHILL SIDE
OF SILT FENCE FABRIC
UNDISTURBED
VEGETATION
ON DOWN SLOPE
2"
MIN
SILT FENCE SECTION
JOINT SECTION
FLOW
NOTE:
THICKNESS OF GEOTEXTILE HAS
BEEN EXAGGERATED
POSTS SHALL BE JOINED AS
SHOWN, THEN ROTATED
180° IN DIRECTION SHOWN
AND DRIVEN INTO THE
GROUND
POSTS SHALL
OVERLAP AT JOINTS
SO THAT NO GAPS
EXIST IN SILT FENCE
JOIN
FIRST
ROTATE
SECOND
SCALE:1
SILT FENCE (SF)
NOT TO SCALE
CONCRETE WASHOUT AREA INSTALLATION NOTES:
1. LOCATION(S) OF CONCRETE WASHOUT AREA(S) SHALL BE COORDINATED ON SITE WITH THE RE/COR. LOCATE WASHOUT STRUCTURE(S) A MINIMUM OF 50 FEET AWAY FROM OPEN CHANNELS, STORM DRAIN INLETS, SENSITIVE AREAS, WETLANDS, BUFFERS AND WATER COURSES AND AWAY FROM CONSTRUCTION TRAFFIC.
2. SIZE WASHOUT STRUCTURE FOR VOLUME NECESSARY TO CONTAIN WASH WATER AND SOLIDS AND MAINTAIN AT
LEAST 4 INCHES OF FREEBOARD. MINIMUM DIMENSIONS ARE SHOWN.
3. PREPARE SOIL BASE FREE OF ROCKS OR OTHER DEBRIS THAT MAY CAUSE TEARS OR HOLES IN THE LINER. FOR LINER, USE 10 MIL OR THICKER UV RESISTANT, IMPERMEABLE SHEETING, FREE OF HOLES AND TEARS OR OTHER
DEFECTS THAT COMPROMISE IMPERMEABILITY OF THE MATERIAL.
4. INSTALL THE CONCRETE WASHOUT AREA PRIOR TO ANY CONCRETE PLACEMENT ON SITE.
5. VEHICLE TRACKING CONTROL IS REQUIRED AT THE ACCESS POINT.
6. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS
NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF
CONCRETE TRUCKS AND PUMP RIGS.
7. EXCAVATED MATERIAL SHALL BE UTILIZED IN PERIMETER BERM CONSTRUCTION.
8. PROVIDE A SIGN FOR THE WASHOUT IN CLOSE PROXIMITY TO THE FACILITY.
9. ALTERNATE METHODS ARE ACCEPTABLE BASED ON COR APPROVAL.
CONCRETE WASHOUT AREA MAINTENANCE NOTES:
1. REPAIR, ENLARGE, OR CLEAN THE CONCRETE WASHOUT AREA AS NECESSARY TO MAINTAIN CAPACITY FOR
WASTED CONCRETE.
3. KEEP CONCRETE WASHOUT STRUCTURE WATER TIGHT. REPLACE IMPERMEABLE LINER IF DAMAGED (E.G., RIPPED OR PUNCTURED). EMPTY OR REPLACE WASHOUT STRUCTURE THAT IS 75 PERCENT FULL, AND DISPOSE OF ACCUMULATED MATERIAL PROPERLY. DO NOT REUSE PLASTIC LINER. WET-VACUUM STORED LIQUIDS THAT HAVE NOT EVAPORATED AND DISPOSE OF IN AN APPROVED MANNER. PRIOR TO FORECASTED RAINSTORMS, REMOVE LIQUIDS OR COVER STRUCTURE TO PREVENT OVERFLOWS. REMOVE HARDENED SOLIDS, WHOLE OR BROKEN UP, FOR DISPOSAL OR RECYCLING. MAINTAIN RUNOFF DIVERSION AROUND EXCAVATED WASHOUT
STRUCTURE UNTIL STRUCTURE IS REMOVED.
4. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN
APPROVED WASTE SITE.
5. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL RE-SEEDED PER VA
SPECIFICATIONS.
6. INSPECT WEEKLY, DURING AND AFTER ANY STORM EVENT.
A
CI501
8' MIN
8' M
IN
8' MIN
12" MIN
" M
IN
SANDBAG
SIGN
3:1
3:1 3:1
3:1
VTC
BERM
BERM
BERM
BERM AROUND
PERIMETER
SANDBAG OR
EQUIVALENT
IMPERMEABLE
SHEETING LINER
GROUND
SURFACE
SCALE:2
CONCRETE WASHOUT AREA (CWA)
NOT TO SCALE
SCALE:A CWA SECTION
NOT TO SCALE
CURB SOCK INSTALLATION NOTES:
1. PLACE SOCKS UP GRADIENT OF INLET FLUSH WITH CURB.
2. USE NO FEWER THAN (2) 6" DIAMETER SOCKS IN SEQUENCE, UP GRADIENT OF INLET.
NO FEWER THAN 6 SOCKS SHALL BE USED IF THE 4" SIZE IS CHOSEN.
3. MAINTAIN SEDIMENT CONTROL MEASURES AT ALL TIMES DURING EARTH DISTURBING
ACTIVITIES.
INLET
FLOW
SCALE:3 CURB SOCK
NOT TO SCALE
3'-0"6" A
T C
U R
BS
3/4" GRAVEL
1/4" MESH OR BURLAP
WIRE TIE ENDS
5'-0"
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .