ATTACHMENT 1 - FINAL SPECIFICATIONS - CLC RENO SPOKANE - PART 1 of 2.pdf

PDF 6 MB Posted

Attached to
Y1DZ--668-318 Renovate and Expand Community Living Center Minor Construction - Spokane VAMC
Solicitation number
36C77623B0071
Issued by

About this file

This solicitation is for a renovation and expansion project at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The scope of work includes constructing a new south wing addition with 14 resident rooms, a dining area and nursing station. It also involves renovating portions of the existing north and east wings for utility and connection purposes. Renovations to the existing west wing include demolishing floor slabs, partitions and mechanical systems to construct 14 new resident rooms, a family room and support spaces. Bids are due by July 15, 2022. The award date is scheduled for August 15, 2022 with an anticipated notice to proceed on September 1, 2022 and contract completion by May 31, 2024. The solicitation is designated as a service-disabled veteran-owned small business set aside. The Department of Veterans Affairs Technology Acquisition Center in Austin, Texas issued the solicitation.

View the file

Other files

File Type Posted
Wage Determination WDWA20230017 MOD4.pdf PDF
36C77623B0071 0006.docx DOCX document
EP612 12.11.2023.pdf PDF
36C77623B0071 0005.docx DOCX document
MP103 12.12.2023.pdf PDF
CLC Technical Response Tracking Spreadsheet - 12.13.2023.pdf PDF
MH701 12.12.2023.pdf PDF
MH603 12.12.2023.pdf PDF
36C77623B0071 0004.docx DOCX document
Question 97 - formatrac-bendable-track_specifications-ipc.1196-rev9.pdf PDF
CLC Technical Response Tracking Spreadsheet - 12.4.2023.pdf PDF
Question 82 - CO-Series-Product-Sheet-PS-CO8 (1).pdf PDF
36C77623B0071 0003.docx DOCX document
Question 5 and 64 - 09 29 00 - Gyp Board.pdf PDF
CLC Technical Response Tracking Spreadsheet - FINAL.pdf PDF
Question 67 - Spokane Design Requirements - Design Amendments May 2021.pdf PDF
CLC - Master Submittal Register (Responding to item 4 on VA email from 11.15.2023.pdf PDF
Question 44 - Links word and excel Statement of SI Temp.pdf PDF
Lift count - CLC Spokane - 100_ CD Drawings_.pdf PDF
LIFT INFORMATION - LI-WVA-019-04- Existing Lifts .pdf PDF
Amendment 0002 Technical Question Tracker.pdf PDF
36C77623B0071 0002.docx DOCX document
LQ-610380-07 NEW LIFT INFO.pdf PDF
SF1442 Page 2 - Signature Page.pdf PDF
CLC Technical Response Tracking Spreadsheet - 10-26-2023.pdf PDF
Wage Determination WDWA20230017 MOD2.pdf PDF
Completed Site Visit Sign-In Sheet 10-17-23.pdf PDF
36C77623B0071 0001.docx DOCX document
ATTACHMENT 7 - DAVIS-BACON ACT WAGE DETERMINATION WDWA20230017 MOD1.pdf PDF
ATTACHMENT 5 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 3 of 3.pdf PDF
ATTACHMENT 2 - FINAL SPECIFICATIONS - CLC RENO SPOKANE - PART 2 of 2.pdf PDF
ATTACHMENT 4 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 2 of 3.pdf PDF
ATTACHMENT 3 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 1 of 3.pdf PDF
ATTACHMENT 6 - LIMITATIONS ON SUBCONTRACTING.docx DOCX document
ATTACHMENT 8 - SITE VISIT INSTRUCTIONS.pdf PDF
36C77623B0071.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Renovate and Expand Community Living Center (CLC) Mann-Grandstaff VA Medical Center (VAMC) 4815 N Assembly St, Spokane, WA 99205

100% Submittal Construction Documents (CD) VA Contract Number: 36C26018D0047 VA Task Order Number: 668‐318 VA Project Number: 668‐318 AES Project Number: VA201‐2101

3 APRIL 2023

IRRIGATION

CIVIL STRUCTURAL ARCHITECTURAL

FIRE PROTECTION MECHANICAL ELECTRICAL

3 APRIL 2023

3 APRIL 2023

3 APRIL 2023

Randy Stamp

Randy Typewritten Text 3 April 2023 rday Text Box 3 April 2023 rday RID CO Seal lforster Stamp lforster Stamp lforster Stamp

Renovate and Expand CLC 100% CD Phase

Mann-Grandstaff VA Medical Center

Project No. 668-318

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI001 COVER SHEET AND SHEET INDEX

GI002 CONSTRUCTION PHASING PLAN AND NOTES

CIVIL

CI001 ABBREVIATIONS, LEGENDS, AND SYMBOLS

CE101 SEDIMENT CONTROL PLAN

CD101 CIVIL DEMOLITION PLAN

CS101 SITE PLAN

CG101 GRADING PLAN

CU100 OVERALL UTILITY PLAN

CU101 SANITARY SEWER PLAN AND PROFILE

CU102 STORM SEWER PLAN

CI501 SEDIMENT CONTROL DETAILS

CI502 SEDIMENT CONTROL DETAILS

CI503 CIVIL CONSTRUCTION DETAILS

CI504 CIVIL CONSTRUCTION DETAILS

LANDSCAPE

LI100 COVER SHEET

LI101 DEMOLITION PLAN

LI102 IRRIGATION PLAN

LI501 IRRIGATION DETAILS

STRUCTURAL

SI001 STRUCTURAL NOTES

SI002 STRUCTURAL NOTES

SE100 STRUCTURAL PLAN - OVERALL

SE105 FOUNDATION PLAN - SOUTH WING

SE115 SLAB PLAN - SOUTH WING

SE125 WALL FRAMING PLAN - SOUTH WING

SE155 ROOF FRAMING PLAN

SE301 FRAMING ELEVATIONS

SE302 FRAMING ELEVATIONS

SE501 FOUNDATION DETAILS

SE502 FOUNDATION AND CMU DETAILS

SE503 STRUCTURAL FRAMING DETAILS

SE504 STRUCTURAL FRAMING DETAILS

SE505 COLD FORMED FRAMING DETAILS

SE506 COLD FORMED FRAMING DETAILS

00 01 15 - 2

ARCHITECTURAL

AI001 ABBREVIATIONS, GENERAL NOTES, LEGEND, AND SYMBOLS

AL100 LIFE SAFETY PLAN AND BUILDING CODE SUMMARY

AD100 DEMOLITION FLOOR PLAN - OVERALL

AD101 DEMOLITION FLOOR PLAN - EAST WING

AD102 DEMOLITION FLOOR PLAN - WEST WING

AD104 DEMOLITION FLOOR PLAN - PENTHOUSE

AD110 DEMOLITION REFLECTED CEILING PLAN DEMOLITION - OVERALL

AE100 FLOOR PLAN - OVERALL

AE102 FLOOR PLAN - WEST WING

AE104 FLOOR PLAN - PENTHOUSE

AE105 FLOOR PLAN - SOUTH WING

AE110 REFLECTED CEILING PLAN - OVERALL

AE112 REFLECTED CEILING PLAN - WEST WING

AE113 REFLECTED CEILING PLAN - NORTH WING

AE114 REFLECTED CEILING PLAN - SOUTH WING

AE122 FLOOR FINISH PLAN - WEST WING

AE125 FLOOR FINISH PLAN - SOUTH WING

AE132 FURNITURE AND EQUIPMENT PLAN - WEST PLAN

AE135 FURNITURE AND EQUIPMENT PLAN - SOUTH WING

AE142 SIGNAGE PLAN - WEST WING

AE145 SIGNAGE PLAN - SOUTH WING

AE150 ROOF PLAN - OVERALL

AE155 ROOF PLAN - SOUTH WING

AE201 EXTERIOR ELEVATIONS

AE202 EXTERIOR ELEVATIONS - EIFS

AE301 BUILDING SECTIONS

AE302 BUILDING SECTIONS

AE303 BUILDING SECTIONS

AE310 WALL SECTIONS

AE311 WALL SECTIONS

AE312 WALL SECTIONS

AE313 WALL SECTIONS

AE320 PARTITION TYPES

AE321 PARTITION TYPES AND DETAILS

AE401 ENLARGED FLOOR PLANS - EAST WING

AE402 ENLARGED FLOOR PLANS - WEST WING

AE404 ENLARGED FLOOR PLAN - SOUTH WING (WEST)

AE405 ENLARGED FLOOR PLAN - SOUTH WING (EAST)

AE406 ENLARGED PLANS AND ELEVATIONS - RESTROOMS

AE407 INTERIOR ELEVATIONS

AE501 PLAN DETAILS

AE502 ALUMINUM DOOR DETAILS

AE503 HOLLOW METAL DOOR DETAILS

AE504 WINDOW DETAILS AND SCHEDULE

AE505 ROOF DETAILS

AE506 ROOF DETAILS

AE507 INTERIOR ELEVATION, MILLWORK, AND MISCELLANEOUS DETAILS

AE508 CEILING AND MISCELLANEOUS DETAILS

AE601 DOOR AND SIGNAGE SCHEDULES AND TYPES

AE602 ROOM FINISH SCHEDULE

AE603 SCHEDULE INTERIOR, EXTERIOR FINISHES AND SIGNAGE DETAILS

AG901 PERSPECTIVE RENDERINGS

00 01 15 - 3

FIRE PROTECTION

FA100 FIRE ALARM SYSTEM PLAN - OVERALL

FA501 FIRE ALARM SYSTEM DETAILS

FX100 FIRE SPRINKLER SYSTEM PLAN - OVERALL

FX501 FIRE SPRINKLER SYSTEM DETAILS

MECHANICAL

MI001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

MD100 MECHANICAL HVAC - DEMO - OVERALL

MD102 MECHANICAL HVAC - DEMO - WEST WING

MD110 MECHANICAL PIPING - DEMO – OVERALL

MD112 MECHANICAL PIPING - DEMO - WEST WING

MD113 MECHANICAL PIPING - DEMO - NORTH WING

MH100 MECHANICAL HVAC - OVERALL

MH102 MECHANICAL HVAC - WEST WING

MH105 MECHANICAL HVAC- SOUTH WING

MP100 MECHANICAL PIPING - OVERALL

MP102 MECHANICAL PIPING - WEST WING

MP103 MECHANICAL PIPING - NORTH WING

MP104 MECHANICAL PIPING - PENTHOUSE

MP105 MECHANICAL PIPING - SOUTH WING

MP403 MECHANICAL PIPING PLAN - ENLARGED MECHANICAL ROOM 110

MP405 MECHANICAL PIPING PLAN - ENLARGED MECHANICAL ROOM S112

MH501 MECHANICAL DETAILS

MH502 MECHANICAL DETAILS

MH503 MECHANICAL DETAILS

MH504 MECHANICAL DETAILS

MH505 MECHANICAL DETAILS

MH506 MECHANICAL DETAILS

MH507 FAN COIL UNIT DETAILS

MH508 AIR SYSTEM FOR SOUTH WING EMERGENCY EPIDEMIC MODE

MH601 MECHANICAL SCHEDULES

MH602 MECHANICAL SCHEDULES

MH603 MECHANICAL SCHEDULES

MH604 MECHANICAL SCHEDULES

MH701 MECHANICAL CONTROLS

MH702 MECHANICAL CONTROLS

PLUMBING

PI001 PLUMBING GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

PD100 SUB-FLOOR SANITARY WASTE AND VENT - DEMO - OVERALL

PD120 DOMESTIC WATER - DEMOLITION - OVERALL

PD130 MEDICAL GAS - DEMO - OVERALL

PL100 SUB-FLOOR SANITARY WASTE AND VENT - OVERALL

PL102 SUB-FLOOR SANITARY WASTE AND VENT - WEST WING

PL105 SUB-FLOOR SANITARY WASTE AND VENT - SOUTH WING

PP100 DOMESTIC WATER - OVERALL

PL901 SANITARY WASTE AND VENT ISOMETRIC

PP100 DOMESTIC WATER - OVERALL

PP102 DOMESTIC WATER - WEST (HOSPICE) WING

00 01 15 - 4

PP103 DOMESTIC WATER - NORTH WING

PP105 DOMESTIC WATER - SOUTH WING

PG100 MEDICAL GAS – OVERALL

PS102 STORM SEWER – WEST WING

PS105 STORM SEWER – SOUTH WING

PP501 PLUMBING DETAILS

PP502 PLUMBING DETAILS

PP601 PLUMBING SCHEDULES

PL901 SANITARY WASTE AND VENT ISOMETRIC

PP901 DOMESTIC WATER ISOMETRIC

ELECTRICAL

EI001 ELECTRICAL SYMBOL LEGEND, ABBREVIATIONS, NOTES

ED100 DEMO POWER PLAN - OVERALL

ED102 DEMO POWER PLAN - WEST WING

ED104 DEMO POWER PLAN - PENTHOUSE

EDL102 DEMO LIGHTING PLAN - WEST WING

EDL103 DEMO LIGHTING PLAN - NORTH WING

EP100 POWER PLAN - OVERALL

EP101 POWER PLAN - EAST WING

EP102 POWER PLAN - WEST WING

EP104 POWER PLAN - PENTHOUSE

EP105 POWER PLAN - SOUTH WING

EP106 POWER PLAN - EMERGENCY FROM BUILDING 1

EP107 POWER PLAN - SOUTH WING ROOF

EL100 LIGHTING PLAN - OVERALL

EL101 LIGHTING PLAN - EAST WING

EL102 LIGHTING PLAN - WEST WING

EL103 LIGHTING PLAN - NORTH WING

EL105 LIGHTING PLAN - SOUTH WING

EP401 POWER ENLARGED PLANS

EL401 LIGHTING ENLARGED PLANS

EP501 POWER DETAILS

EP502 POWER DETAILS

EP503 POWER DETAILS - (A LA CARTE SCOPE) MSWB

EL501 LIGHTING DETAILS

EP601 ONE LINE DIAGRAM

EP611 (E) PANEL SCHEDULES 1

EP612 (E) PANEL SCHEDULES 2

EP613 (E) PANEL SCHEDULES 3

EP614 (E) PANEL SCHEDULES 4

EP615 MODIFIED PANEL SCHEDULES 1

EP616 MODIFIED PANEL SCHEDULES 2

EP617 NEW PANEL SCHEDULES 1

EP618 NEW PANEL SCHEDULES 2

EP621 MECHANICAL EQUIPMENT POWER SCHEDULE

EL601 LIGHTING SCHEDULE

TELECOMMUNICATION

TI001 TELECOM SYMBOLS LEGEND, ABBREVIATIONS, NOTES

TD100 DEMO TELECOM PLAN - OVERALL

TD102 DEMO TELECOM PLAN - WEST WING

TS100 TELECOM SITE PLAN

TN100 TELECOM PLAN - OVERALL

00 01 15 - 5

TN102 TELECOM PLAN - WEST WING

TN105 TELECOM PLAN - SOUTH WING

TN401 TELECOM ENLARGED PLANS

TN402 TELECOM ENLARGED PLANS

TN501 TELECOM DETAILS

TN502 TELECOM DETAILS

TN503 TELECOM DETAILS

TN601 TELECOM RISER DIAGRAM AND SCHEDULES

- - - END - - -

Project No. 668-318

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20 00 01 10 Table of Contents

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 03-20 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 03-19 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 01-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 31 00 Steel Decking 01-21 05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

Project No. 668-318

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 01-21 06 61 16 Solid Surface Fabrications 06 80 00 Glass Fiber Reinforced Columns

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 08 00 Facility Exterior Closure Commissioning 01-21 07 11 13 Bituminous Dampproofing 01-21 07 21 13 Thermal Insulation 07 22 00 Roof and Deck Insulation 01-21 07 24 00 Exterior Insulation and Finish Systems 07 41 13.16 Standing-Seam Metal Roof Panels 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 01-21 08 41 13 Aluminum Framed Windows and Storefronts 01-21 08 42 29.23 Sliding Automatic Entrances 08 71 00 Door Hardware 01-21 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 62 63 Stainless Steel Wall Base 01-21 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 67 23.40 Resinous Poured in Place Resilient Flooring (Epoxy Flooring) 01-21 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

Project No. 668-318

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

10 21 23 Cubical Curtain Tracks 01-21 10 22 19 Demountable Partitions 01-21 10 25 13 Patient Bed Service Walls 01-21 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet and Bath Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 73 00 Patient Lift System 08-20

DIVISION 12 – FURNISHINGS

12 24 13 Window Shades 08-17 12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-21

DIVISION 21 – FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 05 33 Heat Tracing for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 11-19 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 13 23 Sanitary Waste Interceptors 09-20 22 14 00 Facility Storm Drainage 09-15 22 15 00 General Service Compressed-Air Systems 09-20 22 31 11 Water Softeners 09-15 22 40 00 Plumbing Fixtures 09-15 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 02-20 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02-20

Project No. 668-318

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 01-23 23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 64 00 Packaged Water Chillers 03-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20 23 82 16 Air Coils 03-20

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10 Advanced Utility Metering System 02-10

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 22 00 Low-Voltage Transformers 01-18 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 24 19 Motor Control Centers 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15

Project No. 668-318

00 01 10-5

SECTION NO. DIVISION AND SECTION TITLES DATE

27 15 00 Communications Structured Cabling 01-16 27 51 16 Public Address and Mass Notification Systems 10-18 27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and Security 10-18 28 05 26 Grounding and Bonding for Electronic Safety and Security 09-11 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09-11 28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16 32 84 00 Planting Irrigation 08-16 32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 12-17

MISCELLANEOUS

Geotechnical Report 08-21 RBM Survey Report 09-21

01 00 00 ‐1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for:

B. BASE BID:

SOUTH WING ADDITION:

Fully enclosed functional building addition that provides connections to both east and west existing wings. The addition includes 14 resident rooms, a dining area, and a nursing station along with mechanical, electrical, and telecom rooms.

NORTH AND EAST WINGS RENOVATION:

(Work limited to utility: support and connections)

Demolition to include:

Work in existing Mech/Elec/Telecom rooms that coincide with work to be done in south and west wing. Remove suspended ceiling grid and ceiling tile at the north wing corridors with temporary storage off site for reinstallation after utility work is complete. The east wing demo includes telecom and electrical rooms and wall removal for new exit doors.

Construction to include:

For the North Wing, Fire Protection, MEP, Telecom: systems and components support. Reinstallation of north wing suspended ceiling (from off-site storage) and areas of new drywall suspended ceilings, see reflected ceiling plans. The east wing includes telecom and electrical renovation and installation of exit doors.

01 00 00 ‐2

WEST WING DEMOLITION AND RENOVATION TO INCLUDE:

DEMOLITION to include:

Floor slabs, interior partitions, ceilings, and associated mechanical, fire protection, and electrical systems and components. Existing patient lift systems to be removed and stored for future use.

RENOVATION to include:

Fully renovated wing that provides utility connections with both south and north facility wings. The renovation includes 14 resident rooms, a family room, along with a telecom room, soiled linen, and clean linen rooms.

C. DEDUCT:

WEST WING DEMOLITION AND RENOVATION TO INCLUDE:

DEMOLITION to include:

Floor slabs, interior partitions, ceilings, and associated mechanical, fire protection, and electrical systems and components. Existing patient lift systems to be removed and stored for future use.

RENOVATION to include:

Fully renovated wing that provides utility connections with both south and north facility wings. The renovation includes 14 resident rooms, a family room, along with a telecom room, soiled linen, and clean linen rooms.

D. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the

Contracting Officer.

E. Offices of AES GROUP, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the

Government without affirmations by Contracting Officer or his duly authorized representative.

F. Before placement and installation of work subject to tests by testing laboratory retained by the General Contractor, the

01 00 00 ‐3

Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection.

Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

G. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. BASE BID: SOUTH WING ADDITION, NORTH AND EAST WINGS RENOVATION,

WEST WING DEMOLITION AND RENOVATION.

B. DEDUCTS: WEST WING DEMOLITION AND RENOVATION.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

a. Flash badges are the least restrictive and require a valid

ID to obtain. Flash badge request take approximately three

01 00 00 ‐4 days to process. This badging requirement is the minimum for all employees working at the VA. This badge grants the contractor common physical access. Generally, for contractors working outside of the hospital. Flash badges are good for six months.

b. Non-PIV Card requires two forms of ID and a special agreement check (SAC) background check which includes fingerprints. This takes approximately two weeks to process. This badge grants the contractor restricted physical access. This badge is for contractors working inside of the hospital. Non-PIV is good for one year.

c. PIV card requires NACI and SAC background investigation, fingerprints and training and two forms of ID. This takes approximately 30 days to process. This badge grants the contractor restricted physical access and allows access to more sensitive areas. This will allow access to secure areas such as IT closets. Only a limited number of these badges will be granted, and these will generally be reserved for supervisors only. PIV is good for one year.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

C. Guards:(NOT USED)

01 00 00 ‐5

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See

Section 08 71 00, DOOR HARDWARE and coordinate.

3. The construction entrance gate into the facility along

Wellesley uses a Best blue core padlock. This gate is manually operated and must be secured every evening. Use of this gate may be revoked if the contractor cannot manage the security of it.

4. Construction areas will use a Best blue core lock wherever possible. Best blue keys can be purchased locally at AM

Hardware and will not be provided by the VA.

5. If keys are required for spaces with existing locks the contractor will be required to check a key out from the VA’s locksmith during normal operating hours. Any personnel in possession of a VA key will require a contractor PIV card as described in paragraph 1.5.B.1.c. If VA keys are lost or stolen the contractor will be held liable for rekeying any locks that were associated with any keys issued to them. The cost for rekeyingthese locks could be substantial.

E. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

01 00 00 ‐6

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting

Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any placard identified or labelled contractor vehicle entering the site and such request shall be submitted at least 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

Extended periods of parking in limited access areas such as entrances, roadways, loading docks and etc. shall require prior approval coordinated by the COR.

01 00 00 ‐7

2. Contractor designated parking area shall be defined as Area

101 of the site map. This area shall be described as the unpaved area beginning at the southwest corner of the campus and extending northward along the west fence line toward the new boiler plant and shall be the area between the west side of Lot D and the west fence (west of the drainage basin). The designated contractor parking area shall be shared by all identified contractor vehicles and shall not be dedicated to a sole contractor’s use. The designated contractor parking area shall NOT be maintained by the VA grounds service (to include but not be limited to: snow plowing, parking lines, mowing or etc.). All contractor vehicles must have a sign on the vehicle identifying the contractor, and a contact number for the driver on the dash. Contractors may not park in patient parking stalls or next to any building. Vehicles may park at the job site only if delivering materials or if the service vehicle is required for the work (i.e. welding rig, vac truck, etc.)

3. No General Contractor or Sub-Contractor privately owned vehicles (POVs) shall be allowed to park on the VA campus. All

POVs shall be parked off campus or remotely at the contractor’s expense. All contractors shall be required to carpool their employees to the campus to greatest extent possible and to park the contractor identified vehicles in the designated contractor parking area only as described in F.2.

above.

4. A limited number of 4 permits shall be issued for a General

Contractor for parking in the designated contractor parking area only. Only contractor labelled vehicles shall be allowed to park on campus in the designated contractor parking area or construction area as described in F2. above.

5. Traffic laws are in effect on the campus. VA police will issue tickets for all parking and moving violations (i.e.

01 00 00 ‐8 failure to wear seatbelts or failure to stop at stop signs).

These are federal tickets and have fines associated with them.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the

Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be coordinated with the COR.

E. Workers are subject to rules of the Medical Center applicable to their conduct.

01 00 00 ‐9

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by

Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to

Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR .

All such actions shall be coordinated with the COR or Utility

Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, 01 00 00 ‐10 electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Project Sequencing Plan:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish theCOR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COR and Contractor.

J. Part of West Wing will be vacated by Government in accordance with project beginning immediately after date of receipt of

Notice to Proceed and turned over to Contractor. Unless the West

Wing does not get remodeled and only the South Wing addition and the North Wing gets remodeled. See Bid options and plan on drawings.

K. North Wing and East wing will be occupied during performance of

Phase 1 work; but immediate areas of alterations will be vacated.

The East Wing, a portion of the North Wing, and the South wing will be occupied if Bid Option 2 is elected and Phase 2 and Phase

3 begin construction.

01 00 00 ‐11

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical

Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

L. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m

(seven feet) minimum height, around the construction area.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.

M. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for

01 00 00 ‐12 pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

N. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical

01 00 00 ‐13

Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

O. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

P. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

Q. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of

01 00 00 ‐14 traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

R. Work hours of the project engineers are Monday through Friday between 0700 and 1630. If assistance is needed from project engineers, such as gaining access to spaces, it must be done during these hours unless coordinated and authorized by the COR prior to the start of any work. Performing on-site work outside normal working hours will require approval from the Contracting

Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

S. Prior to daily start of operations and at the day’s completion, all contractors shall go to the boiler plant (building 44) for sign in or out as applicable.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting

Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, privacy curtains, lift systems etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

01 00 00 ‐15

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in the opinion of the COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled

"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by

Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this

01 00 00 ‐16 protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from the Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim

01 00 00 ‐17 those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The

Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant

Discharge Elimination System (NPDES) permit is required for this project. The Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

01 00 00 ‐18

1. Designating areas for equipment maintenance and repair;

2. Providing waste receptacles at convenient locations and provide regular collection of wastes;

3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials;

and

5. Providing adequately maintained sanitary facilities.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems

(including telephone) which are not scheduled for discontinuance or abandonment.

01 00 00 ‐19

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"

(FAR 52.236-2).

1.11 PHYSICAL DATA – SOIL CONDITIONS

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by

Shannon & Wilson – 5965 South 900 East, Murray, UT 84121.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

C. A copy of the soil report will be made available for inspection by bidders upon request to the COR, and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.12 PROFESSIONAL SURVEYING SERVICES

A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the

Contractor shall perform services specified herein and in other

01 00 00 ‐20 specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.13 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work.

The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the

Contracting Officer.