Lift count - CLC Spokane - 100_ CD Drawings_.pdf
PDF 837 KB Posted
- Attached to
- Y1DZ--668-318 Renovate and Expand Community Living Center Minor Construction - Spokane VAMC
- Solicitation number
- 36C77623B0071
About this file
This document contains construction drawings for renovating and expanding the Community Living Center at the Spokane VA Medical Center. The drawings show floor plans for the overall project as well as the north, south, east and west wings. They include dimensions and notes specifying the scope of work. The project involves installing 12 wall/floor mounted lifts in the west wing and 14 ceiling mounted lifts in the south wing. Other work includes utility connections and suspended ceiling replacement in the north wing, and egress doors and comm/electrical rooms in the east wing. The related federal contract opportunity is solicitation number 36C77623B0071 to renovate and expand the Community Living Center minor construction at the Spokane VAMC, issued by the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
201761
T
E
NS E D
CI
L
S T
A
FO
E
O
IH
A RC
C
T
E
D
O
COL
RA
BRUCE A.
JONES
T
3 APRIL 2023
FLOOR PLAN SHEET NOTES:
THE USGS FINISHED FLOOR ELEVATION FOR THIS
PROJECT = 1897.82' ON CIVIL DRAWINGS, WHICH EQUALS
THE ARCHITECTURAL REFERENCE / DATUM FOR THE
FINISH FLOOR ELEVATION AT 100'-0".
NOTIFY THE VETERANS AFFAIRS COR OF DISCREPANCIES
IN THE CONTRACT DOCUMENTS BEFORE PROCEEDING
WITH WORK.
FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS
PRIOR TO ORDERING OR INSTALLING MATERIALS OR
EQUIPMENT.
INTERIOR DIMENSIONS ARE TO FACE OF STUD UNLESS
NOTED OTHERWISE.
REFER TO PARTITION TYPE SCHEDULE FOR INTERIOR
WALL CONSTRUCTION.
REFER TO STRUCTURAL DRAWINGS FOR FOUNDATION
PLANS AND DETAILS.
LOCATE INTERIOR DOOR FRAMES 4 INCHES FROM FINISH
FACE OF ADJACENT PARTITION AT HINGE SIDE, TYP UNO.
INTERIOR PARTITIONS AND DOORS ARE IDENTIFIED ON
ENLARGED FLOOR PLANS.
EXTERIOR DIMENSIONS ARE TAKEN TO THE FACE OF THE
CONCRETE FOUNDATION ON THE SOUTH WING.
DIMENSIONS SHOWN AT THE EXISTING BUILDING ARE
TAKEN TO THE FACE OF CMU WHICH IS ALSO THE FACE
OF THE CONCRETE FOUNDATION.
1.
2.
3.
4.
5.
6.
7.
8.
9.
AE201
AE201
2 2
5 5
6 6
7 7
A B C D E F
G
H
J
K
L
M
N
AE303
AE302
AE302
AE201
AE201
AE201
AE201
B.1 C.7 F.1
69' - 3"
39' - 0"
30' - 3"
9' - 0 1/2"
21' - 11"
30' - 11 1/2"
31' - 1 5/8"
125' - 0"
45.00° 12' - 1 1/2" 38' - 7 1/2" 48' - 5" 25' - 10"
/8
45.00°
13' - 8"
20' - 6"
20' - 6"
24' - 0"
7' - 0"
40' - 3"
2' - 0"
72' - 11 3/4"
4' - 8 1/4"
8'
/2
4'
1'
1"
/2
53' - 7"
2'
1/ 2"
/8
AE105
AE102
22' - 9"
25' - 6"FEC
F E
C
FEC
FEC
FEC
FEC
AE401
AE20
AE20
AE202
AE202
AE202
AE20
AE202
AE202
NOT IN SCOPE.
NORTH WING - LIMIT WORK TO UTILITIES FOR
SUPPORT AND CONNECTIONS ALONG WITH
SUSPENDED CEILING REMOVAL AND
REPLACEMENT.
EAST WING - LIMIT WORK ON EXTERIOR WALLS
AND DOORS TO PROVIDE TWO EGRESS DOORS,
AND COMM/ELECTRICAL ROOMS.
AREA OF NEW CEILINGS AND CEILING
FIXTURES (NORTH WING)
LEGEND:
TN N
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANTS
321 4 5 6 7 8 9 10
DWG. OF
NAME:
FULLY SPRINKLERED
CONTRACTING OFFICER'S REPRESENTATIVE
FULL SIZE DWG: 30x42
PHONE:
EMAIL:11031 S. PIKES PEAK DRIVE #102 PARKER, COLORADO 80138 PH. 303.841-3922
RENOVATE AND EXPAND
COMMUNITY LIVING
CENTER (CLC)
SPOKANE, WA
668-318
100% SUBMITTAL
CONSTRUCTION
DOCUMENTS (CD)
NORTH
SOUTH
WEST EAST
BLDG. 1
4/ 3/
:3
6:
P M
AE100
FLOOR PLAN - OVERALL
APRIL 2023 BAJ RJF
41 183
DAVID ARMENT
509-964-1889
David.Arment@va.gov
32'8'
SCALE:1/16"=1'-0"
0 16'
SCALE: 1/16" = 1'-0"
FLOOR PLAN - OVERALL1
REVISIONS DATE
lforster Polygonal Line lforster Line lforster Text Box
WEST WING TOTAL OF WALL/FLOOR MOUNTED LIFT:
12 TOTAL
lforster Polygonal Line lforster Line lforster Text Box
SOUTH WING TOTAL OF CEILING MOUNTED LIFT:
14 TOTAL
lforster Text Box
File details come from the government source that posted it. Updated .