CLC - Master Submittal Register (Responding to item 4 on VA email from 11.15.2023.pdf

PDF 323 KB Posted

Attached to
Y1DZ--668-318 Renovate and Expand Community Living Center Minor Construction - Spokane VAMC
Solicitation number
36C77623B0071
Issued by

About this file

This document outlines 444 required submittals for a federal construction contract to renovate and expand a Community Living Center at the Spokane VA Medical Center. Key submittals include a project schedule, health and safety plan, waste management plan, sustainability documents, shop drawings, manufacturer data and literature, samples, warranties, and closeout documentation. Submittals are grouped by construction specification section and include items such as concrete, masonry, metals, thermal and moisture protection, equipment, furnishings, special construction, conveyances, plumbing, HVAC, fire suppression, communications, security, and utilities. Response dates are provided, with many submittals due prior to construction for approval. This comprehensive submittal register identifies all required contractor documentation for a major medical facility renovation and expansion project administered by the Department of Veterans Affairs.

View the file

Other files

File Type Posted
Wage Determination WDWA20230017 MOD4.pdf PDF
36C77623B0071 0006.docx DOCX document
EP612 12.11.2023.pdf PDF
36C77623B0071 0005.docx DOCX document
MP103 12.12.2023.pdf PDF
CLC Technical Response Tracking Spreadsheet - 12.13.2023.pdf PDF
MH701 12.12.2023.pdf PDF
MH603 12.12.2023.pdf PDF
36C77623B0071 0004.docx DOCX document
Question 97 - formatrac-bendable-track_specifications-ipc.1196-rev9.pdf PDF
CLC Technical Response Tracking Spreadsheet - 12.4.2023.pdf PDF
Question 82 - CO-Series-Product-Sheet-PS-CO8 (1).pdf PDF
36C77623B0071 0003.docx DOCX document
Question 5 and 64 - 09 29 00 - Gyp Board.pdf PDF
CLC Technical Response Tracking Spreadsheet - FINAL.pdf PDF
Question 67 - Spokane Design Requirements - Design Amendments May 2021.pdf PDF
Question 44 - Links word and excel Statement of SI Temp.pdf PDF
Lift count - CLC Spokane - 100_ CD Drawings_.pdf PDF
LIFT INFORMATION - LI-WVA-019-04- Existing Lifts .pdf PDF
Amendment 0002 Technical Question Tracker.pdf PDF
36C77623B0071 0002.docx DOCX document
LQ-610380-07 NEW LIFT INFO.pdf PDF
SF1442 Page 2 - Signature Page.pdf PDF
CLC Technical Response Tracking Spreadsheet - 10-26-2023.pdf PDF
Wage Determination WDWA20230017 MOD2.pdf PDF
Completed Site Visit Sign-In Sheet 10-17-23.pdf PDF
36C77623B0071 0001.docx DOCX document
ATTACHMENT 7 - DAVIS-BACON ACT WAGE DETERMINATION WDWA20230017 MOD1.pdf PDF
ATTACHMENT 1 - FINAL SPECIFICATIONS - CLC RENO SPOKANE - PART 1 of 2.pdf PDF
ATTACHMENT 5 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 3 of 3.pdf PDF
ATTACHMENT 2 - FINAL SPECIFICATIONS - CLC RENO SPOKANE - PART 2 of 2.pdf PDF
ATTACHMENT 4 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 2 of 3.pdf PDF
ATTACHMENT 3 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 1 of 3.pdf PDF
ATTACHMENT 6 - LIMITATIONS ON SUBCONTRACTING.docx DOCX document
ATTACHMENT 8 - SITE VISIT INSTRUCTIONS.pdf PDF
36C77623B0071.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTAL SUBMITTALS 444 0 % 0.00% 0.00 0.00%

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review Period

Ret. Date Sub. Date Ret. Date

1 Security Plan 01 00 00 1.5.A Precon

2 Key Control 01 00 00 1.5.C Precon

3 Document Control 01 00 00 1.5.D Precon

4 Warranty management plan 01 00 00 1.12 Close out

5 CPM Schedule (Baseline) 01 32 16.15 1.1.A Precon

6 CPM Consultant (Name & Quals) 01 32 16.15 1.3A Precon

7 Complete Project Schedule 01 32 16.15 1.5.A Precon

8 Monthly Schedule Update Reports 01 32 16.15 1.9 Precon

9 Proof of OSHA 30 01 35 26 1.8A Precon

10 Proof of OSHA 10 hours 01 35 26 1.8D Precon

11 Health and Safety/Accident plan 01 35 26 1.4 Precon

12 Activity Hazard Analyses (Infection control, etc.) 01 35 26 1.5 Precon

13 Fire Safety Plan 01 35 26 1.14 Precon

14 Availability of Specifications Listed in the GSA index 01 42 19 1.2 Precon

15 Availability for Examinations of Specifications 01 42 19 1.3 Precon

16 Availability of Specifications Not Listed in the GSA index 01 42 19 1.4 Precon

17 Preconstruction Submittals 01 45 00 1.3 Precon

18 Design Data 01 45 00 1.3 Precon

19 Test Reports 01 45 00 1.3 As Required

20 Requirements 01 45 29 1.3 Precon

21 Earthwork 01 45 29 3.1 Precon

22 Landscaping 01 45 29 3 2 Precon

23 Asphalt Concrete Paving 01 45 29 3.3 Precon

24 Concrete 01 45 29 3.5 Precon

25 Reinforcement 01 45 29 3.6 Precon

26 Structural Steel 01 45 29 3.8 Precon

27 Steel Decking 01 45 29 3.9 Precon

28 General Requirements 01 45 35 1.3 Precon

29 Qualifications 01 45 35 Precon

01 32 16 .15 Project Schedules

01 45 00 Quality Control

01 35 26 Safety Requirements

Division 1- General Requirements 01 00 00 General Requirements

01 42 19 Reference Standards

01 45 29 Testing Laboratory Services

01 45 35 Special Inspections

Wednesday, November 22, 2023 Contractor Approved Back to Subs/suppliers

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

G and C Fab-Con, LLC Page 1 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review Period

Ret. Date Sub. Date Ret. Date

Wednesday, November 22, 2023 Contractor Approved Back to Subs/suppliers

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

30 Fabricators Special Inspection 01 45 35 2.1 Precon

31 Responsibilties Matrix 01 45 35 3.1 Precon

32 Defective Work 01 45 35 3.2 Precon

33 Submittals 01 57 19 1.4 Shop Drawings, 34 Submittals 01 57 19 1.4 Samples

35 Submittals 01 57 19 1.4 Product Data

36 Protection of Environmental Resources 01 57 19 1.5 Precon

37 Temporary Signs 01 58 16 2.1 Precon

38 Installation 01 58 16 3.1 Precon

39 Location 01 58 16 3.2 Precon

40 Demolition Debris Management Plan 01 74 19 1.5B Precon

41 Designated Manager of Waste Management Plan 01 74 19 1.5C Precon

42 Summary - Construction & Demolition Debris Diversion and Disposal 01 74 19 1.5D As Required

43 Target Waste Diversion Rate 01 74 19 1.5E Precon

44 Final Report - Results of Implementation of Waste Management Plan 01 74 19 1.5F Closeout

45 Sustainability Action Plan 01 81 13 1.5B Precon

46 Low Pollutant-Emitting Materials Tracking Spreadsheet 01 81 13 1.5C Precon

47 Construction Indoor Air Quality Management Plan 01 81 13 1.5D Precon

48 Product Data 01 81 13 1.5E As Required

49 Sustainable Construction Progress Reports 01 81 13 1.5F As Required

50 Closeout Submittals 01 81 13 1.5G Closeout

51 Systems to Be Commissioned 01 91 00 1.7 Precon

52 VA Responsibilities 01 91 00 1.9 Precon

53 Contractor's Responsibilities 01 91 00 1.1 Precon

54 Commissioning Documentation 01 91 00 1.12 Precon

55 Commissioning Process Roles & Responsibilities 01 91 00 3.1 Precon

56 Startup, Initial Checout, & Prefuctional Checklists 01 91 00 3.2 Precon

57 Protection 02 41 00 1.3 Precon

58 Utility Services 02 41 00 1.4 Precon

59 Demolition 02 41 00 3.1 Precon

01 81 13 Sustainable Construction Requirements

02 83 33.13 Lead-Based Paint Removal and Disposal

Division 2 - Existing Conditions 02 41 00 - Demolition

01 91 00 General Commissioning Requirements

01 74 19 Construction Waste Management

01 57 19 Temporary Environmental Controls

01 58 16 Temporary Interior Signage

G and C Fab-Con, LLC Page 2 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

60 Submittals - Manufacturer's Data 02 83 33.13 1.6 Literature and Data

61 Submittals - Manufacturer's Data 02 83 33.13 1.6 Test Reports

62 Submittals 02 83 33.13 1.6 Qualifications

63 Submittals 02 83 33.13 1.6 Record Documents

64 Submittals 02 83 33.13 1.6 Certificates

65 Submittals 03 30 00 1.6 Shop Drawings

66 Submittals 03 30 00 1.6 Test Reports

67 Submittals - Manufacturer's Data 03 30 00 1.6 Certificates

68 Submittals 03 30 00 1.6 Qualifications

Division 4 - Masonry

69 Submittals 04 05 13 1.4 Test Reports

70 Submittals - Manufacturer's Data 04 05 13 1.4 Literature and Data

71 Submittals 04 05 13 1.4 Certificates

72 Submittals 04 05 13 1.4 Qualifications

73 Submittals - Manufacturer's Data 04 05 16 1.4 Literature and Data

74 Submittals 04 05 16 1.4 Test Reports

75 Submittals 04 05 16 1.4 Certificates

76 Submittals - Manufacturer's Data 04 20 00 1.4 Literature and Data

77 Submittals 04 20 00 1.4 Certificates

78 Submittals 04 20 00 1.4 Samples

Division 5 - Metals

79 Submittals 05 12 00 1.4 Test Reports

80 Submittals 05 12 00 1.4 Certificates

81 Submittals 05 12 00 1.4 Qualifications

82 Submittals - Manufacturer's Data 05 31 00 1.4 Literature and Data

83 Submittals 05 31 00 1.4 Shop Drawings

84 Submittals 05 31 00 1.4 Certificates

85 Submittals 05 31 00 1.4 Qualifications

86 Submittals 05 40 00 1.4 Shop Drawings

87 Submittals - Manufacturer's Data 05 40 00 1.4 Literature and Data

88 Submittals 05 50 00 1.4 Drawings

89 Quality Assurance 05 50 00 1.4 Manufacturer Data

05 40 00 Cold-Formed Metal Framing

05 50 00 Metal Fabrications

Division 3 - Concrete 03 30 00 Cast-in-Place Concrete

04 05 13 Masonry Mortaring

05 12 00 Structural Steel Framing

04 05 16 Masonry Grouting

04 20 00 Unit Masonry

05 31 00 Steel Decking

G and C Fab-Con, LLC Page 3 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

Division 6 - Wood, Plastics and Composites

90 Submittals - Manufacturer's Data 06 10 00 1.3 Literature and Data

91 Submittals 06 10 00 1.3 Shop Drawings

92 Product Delivery, Storage and Handling 06 10 00 1.4 Storage

93 Preinstallation Meetings 06 20 00 1.4 Pre Con

94 Submittals 06 20 00 1.5 As Required

95 Submittals 06 61 16 1.4 Shop Drawings

96 Submittals 06 61 16 1.4 Samples

97 Submittals - Manufacturer's Data 06 61 16 1.4 Product Data

98 Submittals 06 61 16 1.4 Maintenance Data

99 Submittals 06 80 00 1.4 Shop Drawings

100 Submittals 06 80 00 1.4 Samples

101 Submittals - Manufacturer's Data 06 80 00 1.4 Literature and Data

102 Submittals 06 80 00 1.4 As Required

103 Submittals - Manufacturer's Data 07 11 13 1.4 Literature and Data

104 Manufacturer's Literature and Data 07 21 13 1.4C Product Data

105 Sustainable Construction Submittals 07 21 13 1.4D Product Data

106 Submittals 07 22 00 1.4 Drawings

107 Submittals 07 22 00 1.4 Samples

108 Submittals - Manufacturer's Data 07 22 00 1.4 Literature and Data

109 Submittals 07 22 00 1.4 Qualifications

110 Submittals 07 24 00 1.5 Product Data

111 Submittals 07 24 00 1.5 Samples

112 Submittals 07 24 00 1.5 Qualifications

113 Submittals 07 24 00 1.5 Test Reports

114 Preinstallation Meetings 07 41 13.16 1.3 Pre Con

115 Submittals 07 41 13.16 1.4 As Required

116 Preinstallation Meetings 07 54 23 1.4 Pre Con

117 Submittals 07 54 23 1.5 As Required

07 22 00 Roof and Deck Insulation

07 24 00 Exterior Insulation and Finish Systems

07 41 13.16 Standing-Seam Metal Roof Panels

07 54 23 Thermoplastic Polyolefin (TPO) Roofing

Division 7 - Thermal and Moisture Protection

07 21 13 Thermal Insulation

06 20 00 Finish Carpentry

06 61 16 Solid Surface Fabrications

06 80 00 Glass Fiber Reinforce Columns

07 11 13 Bituminous Dampproofing

06 10 00 Rough Carpentry

G and C Fab-Con, LLC Page 4 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

118 Submittals 07 60 00 1.5 Shop Drawings

119 Manufacturer's Literature and Data 07 60 00 1.5 Literature and Data

120 Submittals 07 60 00 1.5 Certificates

121 Submittals 07 72 00 1.4 Shop Drawings

122 Sustainable Design Submittals 07 84 00 1.3B Product Data

123 Installer Qualifications 07 84 00 1.3C Qualifications

124 Manufacturer's Literature and Data 07 84 00 1.3D Product Data

125 List of Classifications 07 84 00 1.3E Product Data

126 Test Reports 07 84 00 1.3F Test Reports

127 Certificates 07 84 00 1.3G Product Data

128 Sustainable Design Submittals 07 92 00 1.5B Product Data

129 Installer Qualifications 07 92 00 1.5C Qualifications

130 Contractor Certification 07 92 00 1.5D Certifications

131 Manufacturer's Installation Instructions 07 92 00 1.5E Product Data

132 Cured Samples 07 92 00 1.5F Samples

133 Manufacturer's Literature and Data 07 92 00 1.5G Product Data

134 Manufacturer Warranty 07 92 00 1.5H Warranty Information

135 Preinstallation Meetings 07 95 13 1.4 Pre Con

136 Submittals 07 95 13 1.5 As Required

137 Submittal Drawings 08 11 13 1.4B Drawings

138 Manufacturer's Literature and Data 08 11 13 1.4C Product Data

139 Sustainable Construction Submittals 08 11 13 1.4D Product Data

140 Test Reports 08 11 13 1.4E Test Reports

141 Qualifications 08 11 13 1.4F Qualifications

142 Submittal Drawings 08 14 00 1.4B Drawings

143 Manufacturer's Literature and Data 08 14 00 1.4C Product Data

144 Sustainable Construction Submittals 08 14 00 1.4D Product Data

145 Test Reports 08 14 00 1.4E Test Reports

146 Operation and Maintenance Data 08 14 00 1.4F Product Data

07 72 00 Roof Accessories

07 95 13 Expansion Joint Cover Assemblies

08 31 13 Access Door and Frames

07 60 00 Flashing and Sheet Metal

07 84 00 Firestopping

Division 8 - Openings

07 92 00 Joint Sealants

08 11 13 Hollow Metal Frames

08 14 00 Interior Wood Doors

G and C Fab-Con, LLC Page 5 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

147 Submittals 08 31 13 2 As Required

148 Preinstallation Meetings 07 95 13 1.4 Pre Con

149 Submittals 07 95 13 1.5 As Required

150 Submittals 08 42 29.2 1.6 Shop Drawings

151 Hardware Schedules 08 71 00 1.6A/B Schedules

152 Samples and Manufacturer's Literature 08 71 00 1.6C Samples / Product Data

153 Certificate of Compliance 08 71 00 1.6D Certificates

154 Test Reports 08 71 00 1.6D Test Reports

155 Submittals 08 71 13 1.4 Shop Drawings

156 Manufacturer's Literature and Data 08 71 13 1.4 Literature and Data

157 Submittals 08 71 13 1.4 O&M Manuals

158 Submittals 08 80 00 1.5 Certificates

159 Submittals 08 80 00 1.3 Test Reports

160 Manufacturer's Literature and Data 09 22 16 1.4B Product Data

161 Manufacturer's Literature and Data 09 29 00 1.4B Product Data

162 Certificates 09 29 00 1.4C Certificates

163 Submittals 09 30 13 1.3 Product Data

164 Preinstallation Meetings 09 51 00 1.4 Pre Con

165 Submittals 09 51 00 1.5 As Required

166 Submittals 09 62 63 1.4 Samples

167 Manufacturer's Literature and Data 09 65 13 1.3B Product Data

168 Samples 09 65 13 1.3C Samples

169 Sustainable Construction Submittals 09 65 13 1.3D Product Data

170 Operation and Maintenance Data 09 65 13 1.3E Product Data

171 Submittals 09 65 19 1.3 Samples

09 05 16 Subsurface Preparation for Floor Finishes

09 62 63 Stainless Steel Wall Base

09 51 00 Acoustical Ceilings

09 30 13 Ceramic/Porcelain Tiling

08 41 13 Aluminum Framed Windows and Storefronts

08 42 29.23 Sliding Automatic Entrances

08 71 13 Automatic Door Operators

08 80 00 Glazing

09 65 19 Resilient Tile Flooring

08 71 00 Door Hardware

09 65 13 Resilient Base and Accessories

Division 9 - Finishes

09 29 00 Gypsum Board

09 22 16 Non-Structural Metal Framing

G and C Fab-Con, LLC Page 6 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

172 Submittals 09 67 23.40 1.3 Samples

173 Sustainable Construction Submittals 09 91 00 1.3B Product Data

174 Painter Qualifications 09 91 00 1.3C Qualifications

175 Manufacturer's Literature and Data 09 91 00 1.3D Product Data

176 Sample Panels / Markers 09 91 00 1.3E/F Samples

177 Manufacturer's Certificates 09 91 00 1.3G Certificates

178 Submittals 10 14 00 1.4 Shop Drawings

179 Submittals 10 21 23 1.2 Samples

180 Preinstallation Meetings 10 22 19 1.3 Pre Con

181 Submittals 10 22 19 1.4 As Required

182 Submittals 10 25 13 1.3 As Required

183 Submittals 10 26 00 1.4 As Required

184 Submittals 10 28 00 1.4 As Required

185 Submittals 10 44 13 1.2 Product Data

186 Submittals 11 73 00 1.4 Shop Drawings

187 Submittals 12 24 13 1.4 Product Data

188 Submittals 12 36 00 1.3 Samples

189 Submittals 13 05 41 1.4 Shop Drawings

190 Submittals 21 13 13 1.4 Shop Drawings

12 36 00 Countertops

12 24 13 Window Shades

13 05 41 Seismic Restraint Requirements for NonSturctural Components

21 13 13 Wet-Pipe Sprinkler Systems

Division 13 - Special Construction

Division 21 - Fire Suppression

Division 10 - Specialties

Division 11 - Equipment

Division 12 - Furnishings

10 14 00 Signage

10 21 23 Cubical Curtain Tracks

10 22 19 Demountable Partitions

10 25 13 Patient Bed Service Walls

10 26 00 Wall and Door Protection

10 28 00 Toilet and Bath Accessories

10 44 13 Fire Extinguisher Cabinets

11 73 00 Patient Lift System

09 67 23.40 Resinous Poured in Place Resilient Flooring (Epoxy Flooring)

09 91 00 Painting

G and C Fab-Con, LLC Page 7 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

191 Submittals - Manufacturer's Data 22 05 12 1.4 Literature and Data

192 Submittals 22 05 12 1.4 Shop Drawings

193 Submittals 22 05 12 1.4 O&M Manuals

194 Submittals 22 05 12 1.4 Certification

195 Submittals - Manufacturer's Data 22 05 19 1.4 Literature and Data

196 Submittals 22 05 19 1.4 O&M Manuals

197 Submittals - Manufacturer's Data 22 05 23 1.4 Literature and Data

198 Submittals 22 05 23 1.4 Test and Balance reports

199 Submittals 22 05 23 1.4 O&M Manuals

200 Submittals - Manufacturer's Data 22 05 33 1.4 Literature and Data

201 Submittals 22 05 33 1.4 Shop Drawings

202 Submittals 22 05 33 1.4 O&M Manuals

203 Submittals - Manufacturer's Data 22 05 33 1.4 Literature and Data

204 Submittals 22 05 33 1.4 Shop Drawings

205 Submittals 22 05 33 1.4 Samples

206 Submittals - Manufacturer's Data 22 11 00 1.4 Literature and Data

207 Submittals 22 11 00 1.4 O&M Manuals

208 Quality Assurance 22 11 00 1.4 Welder’s Qualifications

209 Submittals - Manufacturer's Data 22 11 23 1.4 Literature and Data

210 Submittals 22 11 23 1.4 Test Reports

211 Quality Assurance 22 11 23 1.5 Certifications

212 Submittals - Manufacturer's Data 22 13 00 1.4 Literature and Data

213 Submittals 22 13 00 1.4 Shop Drawings

214 Submittals 22 13 00 1.4 O&M Manuals

215 Submittals - Manufacturer's Data 22 13 23 1.4 Literature and Data

216 Submittals 22 13 23 1.4 Shop Drawings

217 Submittals 22 13 23 1.4 O&M Manuals

Division 22 _ Plumbing 22 05 12 General Motor Requirements for Plumbing Equipment

22 05 33 Heat Tracing for Plumbing Piping

22 05 23 General-Duty Valves for Plumbing Piping

22 05 19 Meters and Gages for Plumbing Piping

22 07 11 Plumbing Insulation

22 11 00 Facility Water Distribution

22 11 23 Domestic Water Pumps

22 13 00 Facility Sanitary and Vent Piping

22 13 23 Sanitary Waste Interceptors

22 14 00 Facility Storm Drainage

G and C Fab-Con, LLC Page 8 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

218 Submittals - Manufacturer's Data 22 14 00 1.4 Literature and Data

219 Submittals 22 14 00 1.4 Shop Drawings

220 Submittals - Manufacturer's Data 22 15 00 1.4 Literature and Data

221 Submittals 22 15 00 1.4 Test Reports

222 Submittals 22 15 00 1.4 Certifications

223 Submittals 22 15 00 1.4 Seismic Restraint

224 Submittals 22 15 00 1.4 O&M Manuals

225 Submittals - Manufacturer's Data 22 31 00 1.4 Literature and Data

226 Submittals 22 31 00 1.4 Drawings

227 Submittals - Manufacturer's Data 22 40 00 1.4 Literature and Data

228 Submittals 22 40 00 1.4 Operating Instructions

229 Submittals - Manufacturer's Data 22 62 00 1.4 Literature and Data

230 Submittals 22 62 00 1.4 Letter

231 Submittals 22 62 00 1.4 Certification

232 Submittals - Manufacturer's Data 22 63 00 1.4 Literature and Data

233 Submittals 22 63 00 1.4 Letter

234 Submittals 22 62 00 1.4 Certification

23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment

235 Submittals 23 05 12 1.4 Shop Drawings

236 Submittals 23 05 12 1.4 Certification

237 Submittals 23 05 12 1.4 Training Plan

238 Submittals 23 05 12 1.4 Instructor Qualifications

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

239 Submittals 23 05 41 1.4 Shop Drawings

240 Quality Assurance 23 05 41 1.3 Noise levels

241 Submittals 23 05 41 1.4 Product Data

242 Submittals 23 05 41 1.4 Samples

243 Submittals 23 05 41 1.4 Seismic restraint

244 Submittals 23 05 41 1.4 Load Calculations

23 05 93 Testing, Adjusting, and Balancing for HVAC

245 Quality Assurance 23 05 93 1.3 Qualifications

246 Quality Assurance - TAB Criteria 23 05 93 1.4 Flow rate tolerance

22 62 00 Vacuum Systems for Laboratoru and Healthcare Facilities

22 63 00 Gas Systems for Laboratory and Healthcare Facilities

Division 23 - Heating, Ventilating, & Air Conditioning (HVAC)

22 15 00 General Service Compressed-Air Systems

22 31 11 Water Softeners

22 40 00 Plumbing Fixtures

G and C Fab-Con, LLC Page 9 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

247 Submittals 23 05 93 1.4 Reports

248 Start up and Testing 23 05 93 3.3 Demonstration

23 07 11 HVAC and Boiler Plant Insulation

249 Submittals - Insulation material 23 07 11 1.4 product data

250 Submittals 23 07 11 1.4 Samples

23 09 23 Direct-Digital Control System for HVAC

251 Manufacturers Literature and Data 23 09 23 1.7B product data

252 Certificates 23 09 23 1.7C certificates

253 Software Licenses 23 09 23 1.7D close out

254 Performance report 23 09 23 1.7G Test Reports

255 Shop Drawings 23 09 23 1.7A shop drawings

256 Training (32 Hours of instruction, 16 hours of on-the-job) 23 09 23 1.8 close out

257 Validation Test plan 23 09 23 3.2B close out

258 Start up and Testing 23 09 23 3.3 Demonstration

23 21 13 Hydronic Piping

259 Submittals - Manufacturer's Data 23 21 13 1.4 Literature and Data

260 Submittals - Manufacturer's Data 23 21 13 1.4 Certified Data Report

261 Submittals - Quals 23 21 13 1.4 Welder’s Qualifications

262 Submittals 23 21 13 1.4 O&M Manuals

263 Start up and Testing 23 21 13 3.9 Demonstration

23 21 23 Hydronic Pumps

264 Submittals - Manufacturer's Data 23 21 23 1.4 Literature and Data

265 Submittals - Manufacturer's Data 23 21 23 1.4 Characteristic Curves

266 Submittals - Quals 23 21 23 1.4 O&M Manuals

267 Quality Assurance 23 21 23 1.5 Test Reports

268 Start up and Testing 23 21 23 3.2 Demonstration

23 22 13 Steam and Condensate Heating Piping

269 Submittals - Manufacturer's Data 23 22 13 1.4 Literature and Data

270 Submittals - Manufacturer's Data 23 22 13 1.4 Certified Data Report

271 Submittals 23 22 13 1.4 O&M Manuals

272 Quality Assurance 23 22 13 1.5 Welder’s Qualifications

273 Start up and Testing 23 22 13 3.2 Demonstration

23 22 23 Steam Condensate Pumps

274 Submittals - Manufacturer's Data 23 22 23 1.3 Literature and Data

275 Submittals - Manufacturer's Data 23 22 23 1.3 Characteristic Curves

276 Submittals 23 22 23 1.3 O&M Manuals

277 Quality Assurance 23 22 23 1.5 Spare Parts

278 Start up and Testing 23 22 23 3.2 Demonstration

G and C Fab-Con, LLC Page 10 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

23 23 00 Refrigerant Piping

279 Quality Assurance 23 23 00 1.3 As Required

280 Submittals 23 23 00 1.3 Shop Drawings

281 Submittals 23 23 00 1.4 Certification

282 Submittals 23 23 00 1.4 Design Manual

23 25 00 HVAC Water Treatment

283 Submittals - Manufacturer's Data 23 25 00 1.4 Literature and Data

284 Quality Assurance 23 25 00 1.3 Technical Services

285 Quality Assurance 23 25 00 1.3 Reports

286 Submittals 23 25 00 1.4 Data Sheet

287 Submittals 23 25 00 1.4 O&M Manuals

23 31 00 HVAC Ducts and Casings

288 Quality Assurance 23 31 00 1.4 Air Leakage Tests & Criteria

289 Submittals - Manufacturer's Data 23 31 00 1.4 Literature and Data

290 Submittals 23 31 00 1.4 Coordination Drawings:

23 34 00 HVAC Fans

291 Quality Assurance 23 34 00 1.3 Performance Criteria

292 Submittals - Manufacturer's Data 23 34 00 1.4 Literature and Data

293 Submittals - Manufacturer's Data 23 34 00 1.4 O&M Manuals

294 Submittals - Manufacturer's Data 23 34 00 1.4 Noise levels

295 Start up and Testing 23 34 00 3.3 Demonstration

23 36 00 Air Terminal Units

296 Submittals - Manufacturer's Data 23 36 00 1.4 Literature and Data

297 Submittals 23 36 00 1.4 Samples

298 Submittals - Manufacturer's Data 23 36 00 1.4 Certified Data Report

299 Submittals 23 36 00 1.4 O&M Manuals

23 37 00 Air Outlets and Inlets

300 Submittals - Manufacturer's Data 23 37 00 1.4 Literature and Data

301 Submittals 23 37 00 1.4 Coordination Drawings:

23 64 00 Package Water Chillers

302 Submittals - Manufacturer's Data 23 64 00 1..6 Literature and Data

303 Submittals 23 64 00 1..6 O&M Manuals

304 Submittals 23 64 00 1..6 Test Reports

305 Examination 23 64 00 3.1 Exact Location

306 Start up and Testing 23 64 00 3.3 Demonstration

23 81 00 Decentralized Unitary HVAC Equipment

307 Submittals - Manufacturer's Data 23 81 00 1.4 Literature and Data

308 Submittals 23 81 00 1.4 Certification

G and C Fab-Con, LLC Page 11 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

309 Submittals 23 81 00 1.4 O&M Manuals

310 Start up and Testing 23 81 00 3.4 Demonstration

23 82 16 Air Coils

311 Submittals - Manufacturer's Data 23 82 16 1.4 Literature and Data

312 Submittals 23 82 16 1.4 O&M Manuals

313 Submittals 23 82 16 1.4 Certification

314 Start up and Testing 23 82 16 3.2 Demonstration

25 10 10 Advanced Utility Metering System

315 Submittals - Manufacturer's Data 25 10 10 1.7 Product Data

316 Submittals 25 10 10 1.7 Shop Drawings

317 Submittals 25 10 10 1.7 Qualification Data

318 Submittals - Drawings 25 10 10 1.7 Details

26 05 11 Requirements for Electrical Installations

319 Spare Parts List(s) (ordering Instructions) 26 05 11 1.12E product data

320 O&M Manuals 26 05 11 1.12.F O&M Manuals

321 Samples 26 05 11 1.12.H samples

322 Wire (12") 26 05 11 1.12H1 samples

323 Conduit Coupling, Bushing and Termination Fitting 26 05 11 1.12H2 samples

324 Conduit Hangers, clamps, supports 26 05 11 1.12H3 samples

325 Duct Sealing Compound 26 05 11 1.12H4 samples

326 Receptacle, Toggle Switch, Outlet Box, Manual Motor Starter, etc. 26 05 11 1.12H5 samples

327 Training (Agenda, Trainer Certs) 26 05 11 1.16 close out

26 05 19 Low-Voltage Electrical Power Conductors and Cables

328 Manufacturers Literature and Data 26 05 19 1.4A1 product data

329 Certs (2 weeks prior to final Mfg.. Cert & Installer Cert) 26 05 19 1.4A2 Close out

26 05 26 Grounding and Bonding for Electrical Systems

330 Shop Drawings 26 05 26 1.4A1 shop drawings

331 Test Reports (2 weeks prior to final Inspection) 26 05 26 1.4A2 reports

332 Certificates for proper grounding tests. 26 05 26 1.4A3 certificates

26 05 33 Raceway and Boxes for Electrical Systems

333 Shop Drawings 26 05 33 1.4.A1 shop drawings

334 Certificates of proper installation 26 05 33 1.4.A2 certificates

26 05 73 Overcurrent Protective Device Coordination Study

335 Submittals 26 05 73 1.4 As Required

26 09 23 Lighting Controls

336 Submittals 26 09 23 1.4 As Required

26 22 00 Low-Voltage Transformers

Division 26 - Electrical

G and C Fab-Con, LLC Page 12 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

337 Submittals 26 22 00 1.4 As Required

26 14 13 Distribution Switchboards

338 Submittals 26 14 13 1.5 As Required

26 24 16 Panel boards

339 Shop Drawings 26 24 16 1.4.A1 shop drawings

340 O&M Manuals (Submit Simultaneously with Shop Drawings) 26 24 16 1.4.A2 shop drawings

341 Certs (2 weeks prior to final Mfg.. Cert & Installer Cert) 26 24 16 1.4.A3 certificates

26 24 19 Motor Control Centers

342 Submittals 26 14 13 1.5 As Required

26 27 26 Wiring Devices

343 Shop Drawings 26 27 26 1.4A1 shop drawings

344 O&M Manuals (Submit Simultaneously with Shop Drawings) 26 27 26 1.4A2 shop drawings

345 Certs (2 weeks prior to final Mfg.. Cert & Installer Cert) 26 27 26 1.4A3 certificates

26 29 11 Motor Controllers

346 Submittals 26 29 11 1.4 As Required

26 29 21 Enclosed Switches and Circuit Breakers

347 Shop Drawings 26 29 21 1.4.A1 shop drawings

348 O&M Manuals 26 29 21 1.4A2 O&M Manuals

349 Certs (2 weeks prior to final Mfg.. Cert & Installer Cert) 26 29 21 1.4A3 certificates

350 Spare Parts 26 29 21 3.3.A Spare Parts

26 43 13 Surge Protective Devices

351 Submittals 26 43 13 1.4 As Required

26 51 00 Interior Lighting

352 Shop Drawings 26 51 00 1.4.A1 shop drawings

353 O&M Manuals 26 51 00 1.4.A2 O&M Manuals

354 Certs (2 weeks prior to final Mfg.. Cert & Installer Cert) 26 51 00 1.4.A3 certificates

355 Test Reports 26 51 00 3.2 Test reports

356 Verification Test Reports 26 51 00 3.3.A close out

26 56 00 Exterior Lighting

357 Submittals 26 56 00 1.4 As Required

358 Parts List 27 05 11 1.7B Product Data

359 Manufacturers Literature and Data 27 05 11 1.7C Product Data

360 Source quality control 27 05 11 1.7D certificates

361 Installer qualifications 27 05 11 1.7E Qualifications

362 Delegated Design Submittals 27 05 11 1.7F drawings

363 Anchors 27 05 11 1.7G product data

27 05 11 Requirements for Communications Installations

Division 27 - Communications

G and C Fab-Con, LLC Page 13 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

364 Test Equipment List 27 05 11 1.7H product data

365 Submittal Drawings 27 05 11 1.7I drawings

366 Sustainable Design Submittals 27 05 11 1.7J Product Data

367 Certified test reports 27 05 11 1.7K Test reports

368 Warranty Certificate 27 05 11 1.8A1 certificates

369 Certificate of Inspection 27 05 11 1.8A2 certificates

370 Record Documents 27 05 11 1.8A3 close out

371 Instruction manuals and software 27 05 11 1.8A4 close out

372 Operation and Maintenance Manuals 27 05 11 1.8B O&M Manuals

373 Wiring Diagrams 27 05 11 1.8C drawings

374 Service Qualifications 27 05 11 1.8D Qualifications

375 Maintenance Material Submittals (12in. Of Wire, couplings, hangars, etc.) 27 05 11 1.9 Samples

376 Qualifications 27 05 11 1.10 Qualifications

377 Location of Access panel 27 05 11 3.3B drawings

378 Field Quality Control 27 05 11 3.6 Test reports

379 Training 27 05 11 3.8 close out

380 Product Data 27 05 26 1.3.A Product Data

381 Shop Drawings 27 05 26 1.3.A Shop Drawings

382 Grounding plan 27 05 26 1.3.B drawings

383 Certs (2 weeks prior to final Mfg.. Cert & Installer Cert) 27 05 26 1.3.C certificates

384 Quality Control 27 05 26 3.2 Test reports

385 Product Data 27 05 33 1.3.A Product Data

386 Shop Drawings 27 05 33 1.3.A Shop Drawings

387 Certs (2 weeks prior to final Mfg.. Cert & Installer Cert) 27 05 33 1.3.B certificates

388 Testing 27 05 33 3.2 Test reports

389 Pre-Functional Checklist(s) 27 08 00 1.4B Close Out

390 Test Reports 27 08 00 3.1A Test reports

391 Performance Test Reports (Final Test reports) 27 08 00 3.1B Test reports

392 Training (Agenda, Trainer Certs) 27 08 00 1.4C, 3.2 Close Out

393 Manufacturer's Literature & Data 27 10 00 1.3.B Product Data

394 Environmental requirements 27 10 00 1.3.C Surveys

395 Power Requirements 27 10 00 1.3.D List

396 Conduit requirements 27 10 00 1.3.E List

397 Maintenance Personel contact information 27 10 00 1.3.F1 close out

27 05 26 Grounding and Bounding for Communications Systems

27 05 33 Raceways and Boxes for Communications Systems

27 08 00 Commissioning of Communications Systems

27 10 00 Network Cabling

G and C Fab-Con, LLC Page 14 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

398 OEM sweep test tags 27 10 00 1.3.F2 Test reports

399 Spare Parts 27 10 00 1.3.F3 Spare Parts

400 Spare Parts 27 10 00 1.3.F4 Spare Parts

401 System Documentation 27 10 00 1.3.F5 drawings

402 Testing 27 10 00 3.3 Test reports

403 Pictoral room layouts 27 11 00 1.3.B1 drawings

404 Manufacturer's Literature & Data 27 11 00 1.3.B2 Product Data

405 Environmental requirements 27 11 00 1.3.C reports

406 Pictoral room layouts 27 15 00 1.3.A1 drawings

407 Manufacturer's Literature & Data 27 15 00 1.3.A2 Product Data

408 Certs (2 weeks prior to final Mfg.. Cert & Installer Cert) 27 15 00 1.3.B certificates

409 Certificate of Inspection 27 15 00 1.3C certificates

410 Field Quality Control 27 15 00 3.2 Test reports

411 Deficiency Report 27 15 00 3.3.A4 As Required

412 Submittals 27 51 16 A 1.8 Product Data

413 Submittals 27 52 23 1.8 Product Data

414 Submittals 28 05 13 1.5 As Required

415 Submittals 28 05 26 1.3 As Required

416 Submittals 28 05 28.33 1.5 As Required

417 Contractor Qualifications (4 references, technician certification) 28 13 00 1.3.E Qualifications

418 Pre-Installation As-Built design package 28 13 00 1.4.C drawings

419 Shop Drawings 28 13 00 1.4.D drawings

420 Manufacturer's Literature & Data 28 13 00 1.4.F Product Data

421 Manufacturer's Certification 28 13 00 1.4.G certificates

422 System Readiness Checklist (Signed by Tech) 28 13 00 1.4.H commissioning

423 Group 1 technical data package 28 13 00 1.4.J phased

424 Group 2 technical data package 28 13 00 1.4.K phased

425 Group 3 technical data package 28 13 00 1.4.L phased

27 51 16 Public Address and Mass Notification Systems

27 52 23 Nurse Call and Code Blue Systems

28 13 00 Physical Access Control

27 11 00 Telcommunications Room Fittings

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

28 05 13 Conductors and Cables for Electronic Safety and Security

28 05 26 Grounding and Bonding for Electronic Safety and Security

27 15 00 Communications Structured Cabling

Division 28 - Electronic Safety and Security

G and C Fab-Con, LLC Page 15 of 16

CONTRACT VA-36C26018D0047

Renovate and Expand the CLC

Submittals on Site

Category Sub

DATE

NEEDED

Rec'd Date Upload Date Review

Total Submitted

Submittal Specification

Sub ACTION

Contractor

Contractor

ACTION

Approval Return Date to

Sub/Supplier

Sub Resubmit

Reg.

Item No.

Description / Paragraph Sec. Transmit No.

Para.

A= APPROVED B=APPROVED AS NOTED C=APPROVED AS NOTED - RESUBMIT E=DISAPPROVED, RESUBMIT

426 Group 4 technical data package 28 13 00 1.4.M phased

427 Group 5 technical data package 28 13 00 1.4.N phased

428 FIPS 201 Certificates 28 13 00 1.4.O certificates

429 System Readiness Checklist (Signed by Tech) 28 13 00 1.4.Q commissioning

430 Software Licenses 28 13 00 3.9 close out

431 Field Quality Control 28 13 00 3.10 Test reports

432 Commissioning 28 13 00 3.12 commissioning

433 Demonstration and training (4 hours of instruction with additional modules) 28 13 00 3.4B Close Out

434 Submittals 28 23 00 1.5 As Required

435 Start up and Testing 28 23 00 3.2 Demonstration

436 Submittals 28 31 00 1.4 As Required

437 Submittals 31 20 00 1.4 As Required

438 Submittals 32 05 23 1.5 As Required

439 Submittals 32 12 16 1.5 As Required

440 Submittals 32 17 23 1.4 As Required

441 Submittals 32 84 00 1.4 As Required

442 Submittals 32 90 00 1.6 As Required

443 Submittals 33 30 00 1.8 As Required

444 Submittals 33 40 00 1.8 As Required

33 40 00 Storm Sewer Utilities

32 84 00 Planting Irrigation

32 17 23 Pavement Markings

32 12 16 Asphalt Paving

32 05 23 Cement and Concrete for Exterior Improvements

33 30 00 Sanitary Sewer Utilities

Division 33 - Utilities

Division 32 - Exterior Improvements

Division 31 - Earthwork

28 23 00 Video Surveillance

28 31 00 Fire Detection and Alarm

31 20 00 Earthwork

32 90 00 Planting

G and C Fab-Con, LLC Page 16 of 16

Register