MP103 12.12.2023.pdf

PDF 313 KB Posted

Attached to
Y1DZ--668-318 Renovate and Expand Community Living Center Minor Construction - Spokane VAMC
Solicitation number
36C77623B0071
Issued by

About this file

This document includes mechanical construction plans and specifications for the renovation and expansion of a Community Living Center at the Spokane VA Medical Center, as well as information on the associated federal contract opportunity. The plans indicate the installation of mechanical piping, valves, equipment, and other components throughout the building. Piping for heating water, chilled water, steam, and other utilities are to be routed as shown. Equipment such as pumps, heat exchangers, air handlers, and humidifiers will be provided in specified locations. Access hatches must be included where required for maintenance. The solicitation is for minor construction services under contract number 36C77623B0071, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The work involves renovating and expanding the Community Living Center in Spokane, Washington.

View the file

Other files

File Type Posted
Wage Determination WDWA20230017 MOD4.pdf PDF
36C77623B0071 0006.docx DOCX document
EP612 12.11.2023.pdf PDF
36C77623B0071 0005.docx DOCX document
CLC Technical Response Tracking Spreadsheet - 12.13.2023.pdf PDF
MH701 12.12.2023.pdf PDF
MH603 12.12.2023.pdf PDF
36C77623B0071 0004.docx DOCX document
Question 97 - formatrac-bendable-track_specifications-ipc.1196-rev9.pdf PDF
CLC Technical Response Tracking Spreadsheet - 12.4.2023.pdf PDF
Question 82 - CO-Series-Product-Sheet-PS-CO8 (1).pdf PDF
36C77623B0071 0003.docx DOCX document
Question 5 and 64 - 09 29 00 - Gyp Board.pdf PDF
CLC Technical Response Tracking Spreadsheet - FINAL.pdf PDF
Question 67 - Spokane Design Requirements - Design Amendments May 2021.pdf PDF
CLC - Master Submittal Register (Responding to item 4 on VA email from 11.15.2023.pdf PDF
Question 44 - Links word and excel Statement of SI Temp.pdf PDF
Lift count - CLC Spokane - 100_ CD Drawings_.pdf PDF
LIFT INFORMATION - LI-WVA-019-04- Existing Lifts .pdf PDF
Amendment 0002 Technical Question Tracker.pdf PDF
36C77623B0071 0002.docx DOCX document
LQ-610380-07 NEW LIFT INFO.pdf PDF
SF1442 Page 2 - Signature Page.pdf PDF
CLC Technical Response Tracking Spreadsheet - 10-26-2023.pdf PDF
Wage Determination WDWA20230017 MOD2.pdf PDF
Completed Site Visit Sign-In Sheet 10-17-23.pdf PDF
36C77623B0071 0001.docx DOCX document
ATTACHMENT 7 - DAVIS-BACON ACT WAGE DETERMINATION WDWA20230017 MOD1.pdf PDF
ATTACHMENT 1 - FINAL SPECIFICATIONS - CLC RENO SPOKANE - PART 1 of 2.pdf PDF
ATTACHMENT 5 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 3 of 3.pdf PDF
ATTACHMENT 2 - FINAL SPECIFICATIONS - CLC RENO SPOKANE - PART 2 of 2.pdf PDF
ATTACHMENT 4 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 2 of 3.pdf PDF
ATTACHMENT 3 - FINAL DRAWINGS - CLC RENO SPOKANE - PART 1 of 3.pdf PDF
ATTACHMENT 6 - LIMITATIONS ON SUBCONTRACTING.docx DOCX document
ATTACHMENT 8 - SITE VISIT INSTRUCTIONS.pdf PDF
36C77623B0071.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FM

SHEET NOTES:

INSTALL GUIDES AND ANCHORS AS NECESSARY TO

SUPPORT PIPING THROUGHOUT THE BUILDING.

PROVIDE EXPANSION LOOPS IN MECHANICAL PIPING.

PROVIDE SHUTOFF VALVES AT ALL BRANCH

CONNECTIONS.

PROVIDE CONTROL VALVES FOR FAN COIL UNITS.

PROVIDE ACCESS HATCHES IN HARD CEILING FOR ALL

EQUIPMENT AS REQUIRED TO ACCESS FOR

MAINTENANCE SEE ARCHITECTURAL FOR LOCATION AND

SIZE.

AREA NOT IN SCOPE. IT IS SHOWN FOR

INFORMATION ONLY.

LIMITED MECHANICAL WORK.

1.

2.

3.

4.

5.

6.

KEY NOTES:

PROVIDE STEAM TO HOT WATER HEAT EXCHANGER

12-SWHX-1 IN 1ST FLOOR MECHANICAL ROOM 110. SEE

DETAIL #7 ON SHEET MH504 AND MECHANICAL

SCHEDULES FOR CONTINUATION.

PROVIDE HEATING WATER PUMPS 12-HWP-1 AND 12-

HWP-2 IN 1ST FLOOR MECHANICAL ROOM. SEE DETAIL #3

ON SHEET MH502 AND MECHANICAL SCHEDULES FOR

CONTINUATION.

ROUTE 4" HWS AND 4" HWR FROM HEATING WATER

PUMPS 12-HWP-1 AND 12-HWP-2 TO RESIDENT WING FAN

COILS AND 12-DOAS-1. SEE MECHANICAL DETAILS AND

SCHEDULES FOR CONTINUATION.

PROVIDE 1" LOW PRESSURE STEAM (LPS) LINE FROM 1ST

FLOOR MECHANICAL ROOM 110 TO HUMIDIFIER SECTION

OF 12-DOAS-1. SEE DETAILS ON SHEET MH504 FOR STEAM

PIPING DETAILS.

4" CHWS AND 4" CHWR TO AIR COOLED CHILLER 12-ACC-1

IN PENTHOUSE. SEE MECHANICAL SCHEDULES AND

SHEEET MP104 FOR CONTINUATION.

CONNECT EXISTING 2" HWS & EXISTING 2" HWR WHICH

SERVE THE EXISTING EAST WING BASEBOARD HEATERS

INTO THE NEW HYDRONIC HEATING HOT WATER PIPING

MAINS AT LOCATION INDICATED. ENSURE EAST WING

BASEBOARD HEATER REMAIN OPERATIONAL UPON

CONNECTION TO NEW HYDRONIC PIPING MAINS.

1.

2.

3.

4.

5.

6.

4" ø

C H

W R

4" ø

C H

W S

4" ø

H W

R

4" ø

H W

S

4"ø HWS 4"ø HWR

4"ø CHWS 4"ø CHWR

A B C D E F

G

H

J

126A

C1-10

C1-3

C1-7

C1-11

C1-2

119B

123 122A

115C

115A

109E

109D109C109A

C1-5

C1-4

2"ø HWR

2"ø HWS

TN N

PROJECT NUMBER

BUILDING

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANTS

321 4 5 6 7 8 9 10

DWG. OF

NAME:

FULLY SPRINKLERED

CONTRACTING OFFICER'S REPRESENTATIVE

FULL SIZE DWG: 30x42

PHONE:

EMAIL:11031 S. PIKES PEAK DRIVE #102 PARKER, COLORADO 80138 PH. 303.841-3922

RENOVATE AND EXPAND

COMMUNITY LIVING

CENTER (CLC)

SPOKANE, WA

668-318

100% SUBMITTAL

CONSTRUCTION

DOCUMENTS (CD)

NORTH

SOUTH

WEST EAST

BLDG. 1

/1

2/

:0 5:

P

M

MP103

MECHANICAL PIPING - NORTH WING

APRIL 2023 CDL TJH

101 183

David Arment 509-964-1889 David.Arment@va.gov

8'0 4' 16'

SCALE:1/8"=1'-0"

SCALE: 1/8" = 1'-0"

MECHANICAL PIPING - NORTH WING1

#2

REVISIONS DATE 3 APRIL 2023

Sheets
MP103 - MECHANICAL PIPING - NORTH WING

File details come from the government source that posted it. Updated .