Attachment 2(e) Drawings Part_5_of_5 Birmingham EHRM 09-01-2022.pdf

PDF 5 MB Posted

Attached to
EHRM Birmingham Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77623B0026
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains patch panel schedules and cable schedules for infrastructure upgrades at the Veterans Affairs Medical Center in Birmingham, Alabama. The project involves upgrading the data cabling infrastructure including installing new patch panels, switches, fiber optic cabling and copper cabling. The schedules provide details on the proposed layout and connections of the new patch panels and cables to be installed in over 50 telecom rooms on multiple floors. Information includes the number and types of ports on each patch panel, room numbers, network switches, fiber counts and proposed cable labeling. The project is part of an overall Electronic Health Records Modernization initiative being implemented by the Department of Veterans Affairs.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Birmingham Infrastructure Upgrades, newest first.
File Type Posted
Attachment to Amendment 0008_Specification 01 33 00 Submittal Procedures 7-28-2023.pdf PDF
Amendment 0008_36C77623B0026_QAs and Revised Specs_28JUL2023.pdf PDF
Attachment to Amendment 0008_Specification Section 27 10 00 - Control and Signal Wiring_27JUL2023.pdf PDF
Amendment 0007_36C77623B0026_Spec 096519 Flooring_26JUL2023.pdf PDF
Attachment to Amendment 0007_Specification Section 096519 Resilient Tile Flooring_26JUL2023.pdf PDF
Site Visit Attendance Sheet_21JULY2023.pdf PDF
Amendment 0006_36C77623B0026_25JUL2023.pdf PDF
Amendment 0005_36C77623B0026_24JUL2023.pdf PDF
Amendment 0004_36C77623B0026_20JUL2023.pdf PDF
Amendment 0003_36C77623B0026_18JUL2023.pdf PDF
Amendment 0002 Attachment_Ethernet Jacket Color Table 3-2_Feb2016.pdf PDF
36C77623B0026_Amendment 0002_11JUL2023.pdf PDF
Amendment 0001_36C77623B0026 0001_1_30JUN2023.pdf PDF
Site Visit Attendance Sheet_21JUNE2023.pdf PDF
Signed Site Visit Attendance Sheet_21JUNE2023.pdf PDF
36C77623B0026_09JUN2023.docx DOCX document
Attachment 7(c) OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
Attachment 8 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 4 Scope of Work Birmingham EHRM 05-19-2023.pdf PDF
Attachment 2(c) Drawings Part_3_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 9 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
Attachment 5 Design Narrative Birmingham EHRM 08-18-2022.pdf PDF
Attachment 3(a) HazMaterials Survey Birmingham EHRM Part_1_of_2.pdf PDF
Attachment 1(b) Specifications Birmingham EHRM 08-31-2022_Part_2_of_2.pdf PDF
Attachment 10(b) Wage Determination AL20230096_ShelbyCounty_27JAN2023.pdf PDF
Attachment 10(a) Wage Determination AL20230087_JeffersonCounty_27JAN2023.pdf PDF
Attachment 7(b) OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
Attachment 7(a) OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
Attachment 2(d) Drawings Part_4_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 2(b) Drawings Part_2_of_5 Birmingham EHRM_09-01-2022.pdf PDF
Attachment 3(b) HazMaterial Survey Birmingham EHRM 09-01-2022_Part_2_of_2.pdf PDF
Attachment 6 Submittal Register Birmingham EHRM 08-18-2022.xlsx XLSX spreadsheet
Attachment 2(a) Drawings Part_1_of_5 521-20-901 Birmingham EHRM 09-01-2022 Rev.pdf PDF
Attachment 1(a) Specifications Part_1_of_2 Birmingham EHRM 08-31-2022.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIBER CONNECTOR HOUSING TYP

24 PORT PATCH PANEL TYP

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

VERTICLE CABLE MANAGER

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT PATCH PANEL TYP

24 PORT NETWORK SWITCH TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTION HOUSING TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL

24 PORT NETWORK SWITCH

FIBER CONNECTOR HOUSING TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BAR

48 PORT NETWORK SWITCH TYP

VERTICAL CABLE MANAGEMENT

24 PORT PATCH PANEL

FIBER CONNECTOR HOUSING TYP

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

FIBER CONNECTOR HOUSING TYP

VERTICAL CABLE MANAGER

48 PORT PATCH PANEL TYP

24 PORT NETWORK SWITCH TYP

HORIZONATAL CABLE MANAGEMENT TYP

RACK PDU

48 PORT NETWORK SWITCH TYP

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:3

A M

700 19th St. S.

Birmingham, AL 35233

EXISTING RACK ELEVATIONS

TK-302

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

NOT TO SCALE1 RACK 1-1209C-1 ELEVATION VIEW

NOT TO SCALE2 RACK 1-1302-1 ELEVATION VIEW

NOT TO SCALE3 RACK 1-1430-1 ELEVATION VIEW

NOT TO SCALE4 RACK 1-1430-2 ELEVATION VIEW

NOT TO SCALE5 RACK 1-1508-1 ELEVATION VIEW

NOT TO SCALE6 RACK 1-1508-2 ELEVATION VIEW

NOT TO SCALE7 RACK 1-1603-1 ELEVATION VIEW

NOT TO SCALE8 RACK 1-1904-1 ELEVATION VIEW

NO. DESCRIPTION DATE

VERTICAL CABLE MANAGER

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

HORIZONATAL CABLE MANAGEMENT

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

RACK GROUNDING BUSBAR

24 PORT PATCH PANEL TYP

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

FIBER CONNECTOR HOUSING TYP

48 PORT PATCH PANEL TYP

(2) 24 PORT PATCH PANEL

HORIZONTAL CABLE MANAGEMENT

FIBER CONNECTOR HOUSING

24 PORT NETWORK SWITCH TYP

24 PORT PATCH PANEL

48 PORT NETWORK SWITCH TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

VERTICAL CABLE MANAGER

48 PORT NETWORK SWITCH TYP

HORIZONATAL CABLE MANAGEMENT TYP

RACK GROUNDING BUSBAR

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

FIBER CONNECTOR HOUSING

24 PORT PATCH PANEL TYP

48 PORT PATCH PANEL TYP

24 PORT NETWORK SWITCH TYP

48 PORT NETWROK SWITCH TYP

FIBER CONNECTOR HOUSING

48 PORT PATCH PANEL

RACK PDU

RACK GROUNDING BUSBAR

RACK UPS

HORIZONTAL CABLE MANAGEMENT TYP

16 PORT PATCH PANEL TYP

FIBER CONNECTOR HOUSING

24 PORT PATCH PANEL TYP

48 PORT PATCH PANEL TYP

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:4

A M

700 19th St. S.

Birmingham, AL 35233

EXISITNG RACK ELEVATIONS

TK-303

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

NOT TO SCALE1 RACK 2-2112-1 ELEVATION VIEW

NOT TO SCALE2 RACK 2-2217-1 ELEVATION VIEW

NOT TO SCALE3 RACK 2-2302-1 ELEVATION VIEW

NOT TO SCALE4 RACK 2-2302-2 ELEVATION VIEW

NOT TO SCALE5 RACK 2-2348-1 ELEVATION VIEW

NOT TO SCALE6 RACK 2-2602-1 ELEVATION VIEW

NOT TO SCALE7 RACK 2-2714A-1 ELEVATION VIEW

NOT TO SCALE8 RACK 2-2714A-2 ELEVATION VIEW

48 PORT PATCH PANEL TYP

HORIZONATAL CABLE MANAGEMENT TYP

24 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

RACK PDU

24 PORT NETWORK SWITCH TYP

FIBER CONNECTOR HOUSING TYP

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

48 PORT NETWORK SWITCH TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

24 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

24 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

24 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

24 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

FIBER CONNECTOR HOUSING TYP

FIBER CONNECTOR HOUSING TYP

VERTICAL CABLE MANAGER

24 PORT PATCH PANEL TYP

HORIZONTAL CABLE MANAGEMENT

48 PORT PATCH PANEL

48 PORT NETWORK SWITCH TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

12 PORT PATCH PANEL TYP

HORIZONTAL CABLE MANAGEMENT

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

RACK GROUNDING BUSBAR

VERTICAL CABLE MANAGER

FIBER CONNECTOR HOUSING TYP

24 PORT PATCH PANEL TYP

48 PORT PATCH PANEL TYP

24 PORT NETWORK SWITCH TYP

48 PORT NETWORK SWITCH TYP

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:5

A M

700 19th St. S.

Birmingham, AL 35233

EXISITNG RACK ELEVATIONS

TK-304

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

NOT TO SCALE1 RACK 2-2904-1 ELEVATION VIEW

NOT TO SCALE2 RACK 3-3111-1 ELEVATION VIEW

NOT TO SCALE3 RACK 3-3217-1 ELEVATION VIEW

NOT TO SCALE4 RACK 3-3302-1 ELEVATION VIEW

NOT TO SCALE5 RACK 3-3314-1 ELEVATION VIEW

NOT TO SCALE6 RACK 3-3420-1 ELEVATION VIEW

NOT TO SCALE7 RACK 3-3526-1 ELEVATION VIEW

NOT TO SCALE8 RACK 3-3605-1 ELEVATION VIEW

48 PORT NETWORK SWITCH

HORIZONTAL CABLE MANAGEMENT

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

RACK PDU

48 PORT NETWORK SWITCH TYP

24 PORT PATCH PANEL TYP

FIBER CONNECTOR HOUSING TYP

VERTICAL CABLE MANAGER

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

HORIZONTAL CABLE MANAGEMENT TYP

RACK PDU

VOIP

24 PORT PATCH PANEL TYP

VERTICAL CABLE MANAGER

24 PORT NETWORK SWITCH TYP

RACK PDU

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

HORIZONTAL CABLE MANAGER

MISC. DEVICE

48 PORT NETWORK SWITCH

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH

48 PORT PATCH PANEL TYP

24 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

24 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

24 PORT PATCH PANEL TYP

FIBER CONNECTOR HOUSING TYP

24 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:5

A M

700 19th St. S.

Birmingham, AL 35233

EXISITNG RACK ELEVATIONS

TK-305

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

NOT TO SCALE1 RACK 3-3605-2 ELEVATION VIEW

NOT TO SCALE2 RACK 3-3711-1 ELEVATION VIEW

NOT TO SCALE3 RACK 3-3904-1 ELEVATION VIEW

NOT TO SCALE4 RACK 3-3904-2 ELEVATION VIEW

NOT TO SCALE5 RACK 4-4116-1 ELEVATION VIEW

NOT TO SCALE6 RACK 4-4214-1 ELEVATION VIEW

NOT TO SCALE7 RACK 4-4302-1 ELEVATION VIEW

NOT TO SCALE8 RACK 4-4302-2 ELEVATION VIEW

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

HORIZONTAL CABLE MANAGEMENT TYP

RACK GROUNDING BUSBAR

24 PORT PATCH PANEL TYP

FIBER CONNECTOR HOUSING TYP

VERTICAL CABLE MANAGER

48 PORT PATCH PANEL TYP

HORIZONTAL CABLE MANAGEMENT TYP

24 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

24 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

HORIZONTAL CABLE MANAGER

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

24 PORT PATCH PANEL TYP

MISC. DEVICE

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

24 PORT NETWORK SWITCH TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

24 PORT NETWORK SWITCH TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

VERTICAL CABLE MANAGER

HORIZONTAL CABLE MANAGER TYP

24 PORT PATCH PANEL TYP

RACK MTD WIREMOLD

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:0

A M

700 19th St. S.

Birmingham, AL 35233

EXISITNG RACK ELEVATIONS

TK-306

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

NOT TO SCALE1 RACK 4-4316-1 ELEVATION VIEW

NOT TO SCALE2 RACK 4-4316-2 ELEVATION VIEW

NOT TO SCALE3 RACK 4-4602-1 ELEVATION VIEW

NOT TO SCALE4 RACK 5-5116-1 ELEVATION VIEW

NOT TO SCALE5 RACK 5-5214-1 ELEVATION VIEW

NOT TO SCALE6 RACK 5-5302-1 ELEVATION VIEW

NOT TO SCALE7 RACK 5-5605-1 ELEVATION VIEW

NOT TO SCALE8 RACK 5-5717-1 ELEVATION VIEW

48 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH

24 PORT PATCH PANEL TYP

48 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH

24 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

24 PORT NETWORK SWITCH TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

48 PORT BIOMED NETWORK SWITCH

FIBER CONNECTOR HOUSING TYP

24 PORT BOIMED PATCH PANEL

48 PORT NETWORK SWITCH TYP

RACK PDU

OLD PDU (DEAD)

24 PORT PATCH PANEL TYP

FIBER CONNECTOR HOUSING TYP

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

RACK GROUNDING BUSBAR

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

VERTICAL CABLE MANAGER

HORIZONTAL CABLE MANAGER TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

VERTICAL CABLE MANAGER

HORIZONTAL CABLE MANAGER TYP

24 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

24 PORT NETWORK SWITCH TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:1

A M

700 19th St. S.

Birmingham, AL 35233

EXISITNG RACK ELEVATIONS

TK-307

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

NOT TO SCALE1 RACK 6-6121-1 ELEVATION VIEW

NOT TO SCALE2 RACK 6-6214-1 ELEVATION VIEW

NOT TO SCALE3 RACK 6-6302-1 ELEVATION VIEW

NOT TO SCALE4 RACK 6-6464-1 ELEVATION VIEW

NOT TO SCALE5 RACK 6-6604-1 ELEVATION VIEW

NOT TO SCALE6 RACK 7-7116-1 ELEVATION VIEW

NOT TO SCALE7 RACK 7-7217-1 ELEVATION VIEW

NOT TO SCALE8 RACK 7-7302-1 ELEVATION VIEW

48 PORT NETWORK SWITCH TYP

48 PORT NETWORK SWITCH TYP

RACK GROUNDING BUSBAR

24 PORT NETWORK SWITCH TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

24 PORT NETWORK SWITCH TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

48 PORT NETWORK SWITCH

48 PORT PATCH PANEL TYP

24 PORT PATCH PANEL TYP

RACK GROUNDING BUSBAR

FIBER CONNECTOR HOUSING TYP

24 PORT NETWORK SWITCH TYP

48 PORT PATCH PANEL TYP

48 PORT NETWORK SWITCH TYP

HORIZONTAL CABLE MANAGER

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:1

A M

700 19th St. S.

Birmingham, AL 35233

EXISITNG RACK ELEVATIONS

TK-308

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

NOT TO SCALE1 RACK 7-7614-1 ELEVATION VIEW

NOT TO SCALE2 RACK 8-8125-1 ELEVATION VIEW

NOT TO SCALE3 RACK 8-8216-1 ELEVATION VIEW

NOT TO SCALE4 RACK 8-8302-1 ELEVATION VIEW

NOT TO SCALE5 RACK 9-9115-1 ELEVATION VIEW

NOT TO SCALE6 RACK 9-9208-1 ELEVATION VIEW

NOT TO SCALE7 RACK 9-9302-1 ELEVATION VIEW

BASEMENT

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FOURTH FLOOR

FIFTH FLOOR

SIXTH FLOOR

SEVENTH FLOOR

EIGHTH FLOOR

NINTH FLOOR

MCR - 3431

A-SIDE FIBER

MCR - 3431

B-SIDE FIBER

TR4

TR3

G516B

TR3

TR2

G114B

TR2

1365F

TR1

G112

TR1

B103J

TR3

TR2

TR1

TR4

TR2

4714A

TR1

TR1

TR2

TR3

TR2

TR1

TR3

TR2

TR1

6332A

TR2

TR1

TR2

TR1

TR1

TR1

TR3

TR3

1A

TAG FIBER TYPE

A-SIDE OM4 AND OS1 FIBER

1B B-SIDE OM4 AND OS1 FIBER

1A

1A

1A

1A

1A

1A

1A

1A

1A 1B

1B1A

1A 1B

1B

1B

1B

1B

1A1B1B

1B

1B

1B 1B1A

1A 1B

1B1A

1B1A 1A 1B

1A 1B

1B1A

1A 1B 1B1A

1B1A

1B1A

1B1A

1B1A

1A 1B

1A 1B

1B1A 1A 1B RM

G306B

RM

RM

RM

RM

RM

RM

RM

RM

RM

RM

RM

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

(E) 1B

EXISTING FIBER TO BE CONNECTED TO B-SIDE

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:2

A M

700 19th St. S.

Birmingham, AL 35233

FIBER RISER DIAGRAM

TK-401

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

NO SCALE1 FIBER RISER DIAGRAM

NEW TELECOM EQUIPMENT SCHEDULE

ROOM# RACK #

CHANNEL

RACK CAT 6A CABLES

48 PORT PATCH

PANELS

6" VERTICAL CABLE

MANAGEMENT

10" VERTICAL

CABLE

MANAGEMENT

20A RACK

PDU 30A ZONE PDU RACK-MOUNTED UPS FIBER HOUSING MULTI-MODE FIBER (OM4) COUNT SINGLE MODE FIBER (OS1) COUNT NOTES

B103J-TR1 1 X 45 2 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side PROVIDE 6' RACK IN THIS ROOM

G112-TR1 1 X 202 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

G112-TR1 2 X 17 1 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

G114B-TR2 1 X 188 4 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

G114B-TR2 2 X 42 1 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

G516B-TR3 1 X 186 4 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

G516B-TR3 2 X 54 2 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

1904-TR1 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

1904-TR1 2 X 97 3 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

1365F-TR2 1 X 237 6 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

1510-TR3 1 X 216 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

1510-TR3 2 X 31 1 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

1419-TR4 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

1419-TR4 2 X 116 3 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

2904-TR1 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

2904-TR1 2 X 129 4 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

2718-TR2 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

2718-TR2 2 X 173 4 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

2327-TR3 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

2327-TR3 2 X 90 2 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

3904-TR1 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

3904-TR1 2 X 72 2 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

3718-TR2 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

3718-TR2 2 X 92 2 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

3436-TR3 1 X 288 6 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

3436-TR3 2 X 232 6 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

4201-TR1 1 X 192 4 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

4201-TR1 2 X 100 3 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

4714A-TR2 1 X 126 4 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

PROVIDE SHALLOW RACK WITH NO SECURITY

DOORS IN THIS ROOM

4625-TR3 1 X 97 3 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

4420-TR4 1 X 192 4 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

4420-TR4 2 X 151 4 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

5201-TR1 1 X 240 5 2 0 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

5201-TR1 2 X 79 3 2 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

5721-TR2 1 X 92 3 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

PROVIDE SHALLOW RACK WITH NO SECURITY

DOORS IN THIS ROOM

5603-TR3 1 X 125 4 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

6332A-TR1 1 X 137 4 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

6332A-TR1 2 X 99 3 2 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

6313-TR2 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

6313-TR2 2 X 138 4 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

6602-TR3 1 X 126 4 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

7201-TR1 1 X 240 5 1 1 2 1 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

7201-TR1 2 X 208 5 1 0 2 0 QTY 1 - 5000 VA 0 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

7613-TR2 1 X 200 5 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

8123-TR1 1 X 219 6 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

8217-TR2 1 X 175 5 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

9201-TR1 1 X 265 6 2 0 2 0 QTY 1 - 5000 VA 1 24 - A-Side, 24 - B-Side 12 - A-Side, 12 - B-Side

BIRMINGHAM ALABAMA

UTP PATCH CABLES

# OF SWITCHES 106

# OF PORTS 5088

CABLES IN CLOSET 5088

CABLES TO PHONES 5088

CABLES TO CPU 5088

TOTAL CABLES 15264

BIRMINGHAM ALABAMA

CABLE REQUIREMENTS

LENGTH (ft) # OF CABLES

2 763

3 2290

4 3053

5 3816

6 3053

7 1526

10 763

N

TRUE

NORTH

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:2

A M

700 19th St. S.

Birmingham, AL 35233

TELECOM ROOM DETAILS

TK-402

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

CABLE SCHEDULE

FIBER - OM4 FIBER - OS1

ORIGIN - DESTINATION LABEL ORIGIN - DESTINATION LABEL ORIGIN - DESTINATION LABEL ORIGIN - DESTINATION LABEL

MDA-A1 - B103J FMM[E15-43.1-24]/[B103J-45.1-24] MDA-B1 - B103J FMM[G16-43.1-24]/[B103J-45.25-48] MDA-A1 - B103J FSM[E15-38.1-12]/[B103J-45.49-60] MDA-B1 - B103J FSM[G16-38.1-12]/[B103J-45.61-72]

MDA-A1 - G112 FMM[E15-43.25-48]/[G112-1-45.1-24] MDA-B1 - G112 FMM[G16-43.25-48]/[G112-1-45.25-48] MDA-A1 - G112 FSM[E15-38.13-24]/[G112-1-45.49-60] MDA-B1 - G112 FSM[G16-38.13-24]/[G112-1-45.61-72]

MDA-A1 - G114B FMM[E15-43.49-72]/[G114B-1-45.1-24] MDA-B1 - G114B FMM[G16-43.49-72]/[G114B-1-45.25-48] MDA-A1 - G114B FSM[E15-38.25-36]/[G114B-1-45.49-60] MDA-B1 - G114B FSM[G16-38.25-36]/[G114B-1-45.61-72]

MDA-A1 - G516B FMM[E15-43.73-96]/[G516B-45.1-24] MDA-B1 - G516B FMM[G16-43.73-96]/[G516B-45.25-48] MDA-A1 - G516B FSM[E15-38.37-48]/[G516B-45.49-60] MDA-B1 - G516B FSM[G16-38.37-48]/[G516B-45.61-72]

MDA-A1 - 1904 FMM[E15-43.97-120]/[1904-1-45.1-24] MDA-B1 - 1904 FMM[G16-43.97-120]/[1904-1-45.25-48] MDA-A1 - 1904 FSM[E15-38.49-60]/[1904-1-45.49-60] MDA-B1 - 1904 FSM[G16-38.49-60]/[1904-1-45.61-72]

MDA-A1 - 1365F FMM[E15-43.121-144]/[1365F-45.1-24] MDA-B1 - 1365F FMM[G16-43.121-144]/[1365F-45.25-48] MDA-A1 - 1365F FSM[E15-38.61-72]/[1365F-45.49-60] MDA-B1 - 1365F FSM[G16-38.61-72]/[1365F-45.61-72]

MDA-A1 - 1510 FMM[E15-42.1-24]/[1510-1-45.1-24] MDA-B1 - 1510 FMM[G16-42.1-24]/[1510-1-45.25-48] MDA-A1 - 1510 FSM[E15-38.73-84]/[1510-1-45.49-60] MDA-B1 - 1510 FSM[G16-38.73-84]/[1510-1-45.61-72]

MDA-A1 - 1419 FMM[E15-42.25-48/[1419-1-45.1-24] MDA-B1 - 1419 FMM[G16-42.25-48/[1419-1-45.25-48] MDA-A1 - 1419 FSM[E15-38.85-96/[1419-1-45.49-60] MDA-B1 - 1419 FSM[G16-38.85-96/[1419-1-45.61-72]

MDA-A1 - 2904 FMM[E15-42.49-72/[2904-1-45.1-24] MDA-B1 - 2904 FMM[G16-42.49-72/[2904-1-45.25-48] MDA-A1 - 2904 FSM[E15-38.97-108/[2904-1-45.49-60] MDA-B1 - 2904 FSM[G16-38.97-108/[2904-1-45.61-72]

MDA-A1 - 2718 FMM[E15-42.73-96/[2718-1-45.1-24] MDA-B1 - 2718 FMM[G16-42.73-96/[2718-1-45.25-48] MDA-A1 - 2718 FSM[E15-38.109-120/[2718-1-45.49-60] MDA-B1 - 2718 FSM[G16-38.109-120/[2718-1-45.61-72]

MDA-A1 - 2327 FMM[E15-42.97-120]/[2327-1-45.1-24] MDA-B1 - 2327 FMM[G16-42.97-120]/[2327-1-45.25-48] MDA-A1 - 2327 FSM[E15-38.121-132]/[2327-1-45.49-60] MDA-B1 - 2327 FSM[G16-38.121-132]/[2327-1-45.61-72]

MDA-A1 - 3904 FMM[E15-42.121-144]/[3904-1-45.1-24] MDA-B1 - 3904 FMM[G16-42.121-144]/[3904-1-45.25-48] MDA-A1 - 3904 FSM[E15-38.133-144]/[3904-1-45.49-60] MDA-B1 - 3904 FSM[G16-38.133-144]/[3904-1-45.61-72]

MDA-A1 - 3718 FMM[E15-41.1-24]/[3718-1-45.1-24] MDA-B1 - 3718 FMM[G16-41.1-24]/[3718-1-45.25-48] MDA-A1 - 3718 FSM[E15-37.1-12]/[3718-1-45.49-60] MDA-B1 - 3718 FSM[G16-37.1-12]/[3718-1-45.61-72]

MDA-A1 - 3436 FMM[E15-41.25-48]/[3436-1-45.1-24] MDA-B1 - 3436 FMM[G16-41.25-48]/[3436-1-45.25-48] MDA-A1 - 3436 FSM[E15-37.13-24]/[3436-1-45.49-60] MDA-B1 - 3436 FSM[G16-37.13-24]/[3436-1-45.61-72]

MDA-A1 - 4201 FMM[E15-41.49-72]/[4201-1-45.1-24] MDA-B1 - 4201 FMM[G16-41.49-72]/[4201-1-45.25-48] MDA-A1 - 4201 FSM[E15-37.25-36]/[4201-1-45.49-60] MDA-B1 - 4201 FSM[G16-37.25-36]/[4201-1-45.61-72]

MDA-A1 - 4714A FMM[E15-41.73-96]/[4714A-1-45.1-24] MDA-B1 - 4714A FMM[G16-41.73-96]/[4714A-1-45.25-48] MDA-A1 - 4714A FSM[E15-37.37-48]/[4714A-1-45.49-60] MDA-B1 - 4714A FSM[G16-37.37-48]/[4714A-1-45.61-72]

MDA-A1 - 4625 FMM[E15-41.97-120/[4625-1-45.1-24] MDA-B1 - 4625 FMM[G16-41.97-120/[4625-1-45.25-48] MDA-A1 - 4625 FSM[E15-37.49-60/[4625-1-45.49-60] MDA-B1 - 4625 FSM[G16-37.49-60/[4625-1-45.61-72]

MDA-A1 - 4420 FMM[E15-41.120-144/[4420-1-45.1-24] MDA-B1 - 4420 FMM[G16-41.120-144/[4420-1-45.25-48] MDA-A1 - 4420 FSM[E15-37.61-72/[4420-1-45.49-60] MDA-B1 - 4420 FSM[G16-37.61-72/[4420-1-45.61-72]

MDA-A1 - 5201 FMM[E15-40.1-24/[5201-1-45.1-24] MDA-B1 - 5201 FMM[G16-40.1-24/[5201-1-45.25-48] MDA-A1 - 5201 FSM[E15-37.73-84/[5201-1-45.49-60] MDA-B1 - 5201 FSM[G16-37.73-84/[5201-1-45.61-72]

MDA-A1 - 5721 FMM[E15-40.25-48/[5721-1-45.1-24] MDA-B1 - 5721 FMM[G16-40.25-48/[5721-1-45.25-48] MDA-A1 - 5721 FSM[E15-37.85-96/[5721-1-45.49-60] MDA-B1 - 5721 FSM[G16-37.85-96/[5721-1-45.61-72]

MDA-A1 - 5603 FMM[E15-40.49-72/[5603-1-45.1-24] MDA-B1 - 5603 FMM[G16-40.49-72/[5603-1-45.25-48] MDA-A1 - 5603 FSM[E15-37.97-108/[5603-1-45.49-60] MDA-B1 - 5603 FSM[G16-37.97-108/[5603-1-45.61-72]

MDA-A1 - 6332A FMM[E15-40.73-96/[6332A-1-45.1-24] MDA-B1 - 6332A FMM[G16-40.73-96/[6332A-1-45.25-48] MDA-A1 - 6332A FSM[E15-37.109-120/[6332A-1-45.49-60] MDA-B1 - 6332A FSM[G16-37.109-120/[6332A-1-45.61-72]

MDA-A1 - 6313 FMM[E15-40.97-120/[6313-1-45.1-24] MDA-B1 - 6313 FMM[G16-40.97-120/[6313-1-45.25-48] MDA-A1 - 6313 FSM[E15-37.121-132/[6313-1-45.49-60] MDA-B1 - 6313 FSM[G16-37.121-132/[6313-1-45.61-72]

MDA-A1 - 6602 FMM[E15-40.121-144/[6602-1-45.1-24] MDA-B1 - 6602 FMM[G16-40.121-144/[6602-1-45.25-48] MDA-A1 - 6602 FSM[E15-37.133-144/[6602-1-45.49-60] MDA-B1 - 6602 FSM[G16-37.133-144/[6602-1-45.61-72]

MDA-A1 - 7201 FMM[E15-39.1-24/[7201-1-45.1-24] MDA-B1 - 7201 FMM[G16-39.1-24/[7201-1-45.25-48] MDA-A1 - 7201 FSM[E15-36.1-12/[7201-1-45.49-60] MDA-B1 - 7201 FSM[G16-36.1-12/[7201-1-45.61-72]

MDA-A1 - 7613 FMM[E15-39.25-48/[7613-1-45.1-24] MDA-B1 - 7613 FMM[G16-39.25-48/[7613-1-45.25-48] MDA-A1 - 7613 FSM[E15-36.13-24/[7613-1-45.49-60] MDA-B1 - 7613 FSM[G16-36.13-24/[7613-1-45.61-72]

MDA-A1 - 8123 FMM[E15-39.49-72/[8123-1-45.1-24] MDA-B1 - 8123 FMM[G16-39.49-72/[8123-1-45.25-48] MDA-A1 - 8123 FSM[E15-36.25-36/[8123-1-45.49-60] MDA-B1 - 8123 FSM[G16-36.25-36/[8123-1-45.61-72]

MDA-A1 - 8217 FMM[E15-39.73-96/[8217-1-45.1-24] MDA-B1 - 8217 FMM[G16-39.73-96/[8217-1-45.25-48] MDA-A1 - 8217 FSM[E15-36.37-48/[8217-1-45.49-60] MDA-B1 - 8217 FSM[G16-36.37-48/[8217-1-45.61-72]

MDA-A1 - 9201 FMM[E15-39.97-120/[9201-1-45.1-24] MDA-B1 - 9201 FMM[G16-39.97-120/[9201-1-45.25-48] MDA-A1 - 9201 FSM[E15-36.49-60/[9201-1-45.49-60] MDA-B1 - 9201 FSM[G16-36.49-60/[9201-1-45.61-72]

PRE-TERMINATED CABLE SCHEDULE

FIBER - OM4 COPPER

ORIGIN - DESTINATION LABEL ORIGIN - DESTINATION LABEL

MDA-A2 - HDA-A1 FMM[E17-41.1-24]/[G04-45.1-24] MDA-A2 - HDA-A1 UTP[E17-45.1-48]/[G04-43.1-48]

MDA-A2 - HDA-A2 FMM[E17-41.25-48]/[E05-45.1-24] MDA-A2 - HDA-A2 UTP[E17-44.1-48]/[E05-43.1-48]

MDA-A2 - HDA-B1 FMM[E17-41.49-72-]/[G15-45.1-24] MDA-B2 - HDA-B1 UTP[G18-45.1-48]/[G15-43.1-48]

MDA-A2 - HDA-B2 FMM[E17-41.73-96]/[E14-45.1-24] MDA-B2 - HDA-B2 UTP[G18-44.1-48]/[E14-43.1-48]

MDA-B2 - HDA-A1 FMM[G18-41.1-24]/[G04-45.25-48] HDA-A2 - ED1 UTP[E05-39.1-24]/[E06-43.1-24]

MDA-B2 - HDA-A2 FMM[G18-41.25-48]/[E05-45.25-48] HDA-A2 - ED2 UTP[E05-39.25-48]/[E07-43.1-24

MDA-B2 - HDA-B1 FMM[G18-41.49-72-]/[G15-45.25-48] HDA-A2 - ED3 UTP[E05-38.1-24]/[E08-43.1-24]

MDA-B2 - HDA-B2 FMM[G18-41.73-96]/[E14-45.25-48] HDA-A2 - ED4 UTP[E05-38.25-48]/[E09-43.1-24]

HDA-A2 - ED1 FMM[E05-41.1-12]/[E06-45.1-12] HDA-A2 - ED5 UTP[E05-37.1-24]/[E10-43.1-24]

HDA-A2 - ED2 FMM[E05-41.13-24]/[E07-45.1-12] HDA-A2 - ED6 UTP[E05-37.25-48]/[E11-43.1-24]

HDA-A2 - ED3 FMM[E05-41.25-36]/[E08-45.1-12] HDA-A2 - ED7 UTP[E05-36.1-24]/[E12-43.1-24]

HDA-A2 - ED4 FMM[E05-41.37-48]/[E09-45.1-12] HDA-A2 - ED8 UTP[E05-36.25-48]/[E13-43.1-24]

HDA-A2 - ED5 FMM[E05-41.49-60]/[E10-45.1-12] HDA-A1 - ED9 UTP[G04-39.1-24]/[G05-43.1-24]

HDA-A2 - ED6 FMM[E05-41.61-72]/[E11-45.1-12] HDA-A1 - ED10 UTP[G04-39.25-48]/[G06-43.1-24]

HDA-A2 - ED7 FMM[E05-41.73-84]/[E12-45.1-12] HDA-A1 - ED11 UTP[G04-38.1-24]/[G07-43.1-24]

HDA-A2 - ED8 FMM[E05-41.85-96]/[E13-45.1-12] HDA-A1 - ED12 UTP[G04-38.25-48]/[G08-43.1-24]

HDA-A1 - ED9 FMM[G04-41.1-12]/[G05-45.1-12] HDA-A1 - ED13 UTP[G04-37.1-24]/[G09-43.1-24]

HDA-A1 - ED10 FMM[G04-41.13-24/[G06-45.1-12] HDA-A1 - ED14 UTP[G04-37.25-48]/[G10-43.1-24]

HDA-A1 - ED11 FMM[G04-41.25-36/[G07-45.1-12] HDA-A1 - ED15 UTP[G04-36.1-24]/[G11-43.1-24]

HDA-A1 - ED12 FMM[G04-41.37-48/[G08-45.1-12] HDA-A1 - ED16 UTP[G04-36.25-48]/[G12-43.1-24]

HDA-A1 - ED13 FMM[G04-41.49-60/[G09-45.1-12] HDA-A1 - ED17 UTP[G04-35.1-24]/[G13-43.1-24]

HDA-A1 - ED14 FMM[G04-41.61-72/[G10-45.1-12] HDA-A1 - ED18 UTP[G04-35.25-48]/[G14-43.1-24]

HDA-A1 - ED15 FMM[G04-41.73-84/[G11-45.1-12] HDA-B2 - ED1 UTP[E14-39.1-24]/[E06-43.25-48]

HDA-A1 - ED16 FMM[G04-41.85-96/[G12-45.1-12] HDA-B2 - ED2 UTP[E14-39.25-48]/[E07-43.25-48]

HDA-A1 - ED17 FMM[G04-41.97-108/[G13-45.1-12] HDA-B2 - ED3 UTP[E14-38.1-24]/[E08-43.25-48]

HDA-A1 - ED18 FMM[G04-41.109-120/[G14-45.1-12] HDA-B2 - ED4 UTP[E14-38.25-48]/[E09-43.25-48]

HDA-B2 - ED1 FMM[E14-41.1-12]/[E05-45.13-24] HDA-B2 - ED5 UTP[E14-37.1-24]/[E10-43.25-48]

HDA-B2 - ED2 FMM[E14-41.13-24]/[E06-45.13-24] HDA-B2 - ED6 UTP[E14-37.25-48]/[E11-43.25-48]

HDA-B2 - ED3 FMM[E14-41.25-36]/[E07-45.13-24] HDA-B2 - ED7 UTP[E14-36.1-24]/[E12-43.25-48]

HDA-B2 - ED4 FMM[E14-41.37-48]/[E08-45.13-24] HDA-B2 - ED8 UTP[E14-36.25-48]/[E13-43.25-48]

HDA-B2 - ED5 FMM[E14-41.49-60]/[E09-45.13-24] HDA-B1 - ED9 UTP[G15-39.1-24]/[G05-43.25-48]

HDA-B2 - ED6 FMM[E14-41.61-72]/[E10-45.13-24] HDA-B1 - ED10 UTP[G15-39.25-48]/[G06-43.25-48]

HDA-B2 - ED7 FMM[E14-41.73-84]/[E11-45.13-24] HDA-B1 - ED11 UTP[G15-38.1-24]/[G07-43.25-48]

HDA-B2 - ED8 FMM[E14-41.85-96]/[E13-45.13-24] HDA-B1 - ED12 UTP[G15-38.25-48]/[G08-43.25-48]

HDA-B1 - ED9 FMM[G15-41.1-12]/[G05-45.13-24] HDA-B1 - ED13 UTP[G15-37.1-24]/[G09-43.25-48]

HDA-B1 - ED10 FMM[G15-41.13-24/[G06-45.13-24] HDA-B1 - ED14 UTP[G15-37.25-48]/[G10-43.25-48]

HDA-B1 - ED11 FMM[G15-41.25-36/[G07-45.13-24] HDA-B1 - ED15 UTP[G15-36.1-24]/[G11-43.25-48]

HDA-B1 - ED12 FMM[G15-41.37-48/[G08-45.13-24] HDA-B1 - ED16 UTP[G15-36.25-48]/[G12-43.25-48]

HDA-B1 - ED13 FMM[G15-41.49-60/[G09-45.13-24] HDA-B1 - ED17 UTP[G15-35.1-24]/[G13-43.25-48]

HDA-B1 - ED14 FMM[G15-41.61-72/[G10-45.13-24] HDA-B1 - ED18 UTP[G15-35.25-48]/[G14-43.25-48]

HDA-B1 - ED15 FMM[G15-41.73-84/[G11-45.13-24]

HDA-B1 - ED16 FMM[G15-41.85-96/[G12-45.13-24]

HDA-B1 - ED17 FMM[G15-41.97-108/[G12-45.13-24]

HDA-B1 - ED18 FMM[G15-41.109-120/[G14-45.13-24]

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:3

A M

700 19th St. S.

Birmingham, AL 35233

CABLE SCHEDULES

TK-403

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

NEW TELECOM EQUIPMENT SCHEDULE

ROOM# RACK #

CHANNEL

RACK

SERVER

RACK CABINET CAT 6A CABLES

48 PORT PATCH

PANELS

6" VERTICAL CABLE

MANAGEMENT

10" VERTICAL

CABLE

MANAGEMENT

20A RACK

PDU 30A ZONE PDU RACK-MOUNTED UPS FIBER HOUSING MULTI-MODE FIBER (OM4) COUNT SINGLE MODE FIBER (OS1) COUNT NOTES

MCR

MDA-A1,

E15 X 0 0 1 0 2 0 CENTRAL UPS 10 24 A-SIDE TO EACH TR 12 A-SIDE TO EACH TR

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

MDA-A2,

E17 X 48 EACH TO HDA-A1 AND HDA-A2 2 1 1 2 0 CENTRAL UPS 1

24 A-SIDE TO HDA-A1, HDA-A2, HDA-

B1, HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

MDA-A3,

E18 X 0 0 1 0 2 0 CENTRAL UPS 0

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

MDA-B1,

G16 X 0 0 1 1 2 0 CENTRAL UPS 1 24 B-SIDE TO EACH TR 12 B-SIDE TO EACH TR

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

MDA-B2,

G18 X 48 EACH TO HDA-B1 AND HDA-B2 2 1 0 2 0 CENTRAL UPS 8

24 B-SIDE TO HDA-A1, HDA-A2, HDA-

B1, HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

HDA-A1,

G04 X 48 TO MDA-A2, 24 TO EACH ED8 TO ED17 5 2 0 2 0 CENTRAL UPS 6

24 A-SIDE TO MDA-A2, 24 B-SIDE TO

MDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

HDA-A2,

E05 X 48 TO MDA-A2, 24 TO EACH ED1 TO ED7 8 2 0 2 0 CENTRAL UPS 6

24 A-SIDE TO MDA-A2, 24 B-SIDE TO

MDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

HDA-B1,

G15 X 48 TO MDA-B2, 24 TO EACH ED8 TO ED17 5 2 0 2 0 CENTRAL UPS 6

24 A-SIDE TO MDA-A2, 24 B-SIDE TO

MDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

HDA-B2,

E14 X 48 TO MDA-B2, 24 TO EACH ED1 TO ED7 8 2 0 2 0 CENTRAL UPS 6

24 A-SIDE TO MDA-A2, 24 B-SIDE TO

MDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-1,

E06 X 24 TO HDA-A2, 24 TO HDA-B2 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A2, 12 TO HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-2,

E07 X 24 TO HDA-A2, 24 TO HDA-B2 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A2, 12 TO HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-3,

E08 X 24 TO HDA-A2, 24 TO HDA-B2 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A2, 12 TO HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-4,

E09 X 24 TO HDA-A2, 24 TO HDA-B2 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A2, 12 TO HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-5,

E10 X 24 TO HDA-A2, 24 TO HDA-B2 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A2, 12 TO HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-6,

E11 X 24 TO HDA-A2, 24 TO HDA-B2 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A2, 12 TO HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-7,

E12 X 24 TO HDA-A2, 24 TO HDA-B2 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A2, 12 TO HDA-B2

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-8,

E13 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-9,

G05 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-10,

G06 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-11,

G07 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-12,

G08 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-13,

G09 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-14,

G10 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-15,

G11 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-16,

G12 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-17,

G13 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

MCR

ED-18,

G13 X 24 TO HDA-A1, 24 TO HDA-B1 1 0 0 2 0 CENTRAL UPS 1 12 TO HDA-A1, 12 TO HDA-B1

TRUNK CABLE/MPO CONNECTIONS REQUIRED

FOR CABLING WITHIN MCR

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:3

A M

700 19th St. S.

Birmingham, AL 35233

MCR TELECOM EQUIPMENT

SCHEDULE

TK-404

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G114B-TR2 RACK # : 1 PATCH PANEL # : A

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G323-1 PORT 13 G113B-1 PORT 25 G113A-1 PORT 37 G113E-5

PORT 2 G323-2 PORT 14 G113B-2 PORT 26 G113A-2 PORT 38 G113E-6

PORT 3 G323-3 PORT 15 G113B-3 PORT 27 G318G-1 PORT 39 G113D-1

PORT 4 G323-4 PORT 16 G113B-4 PORT 28 G318G-2 PORT 40 G113D-2

PORT 5 G323-5 PORT 17 G113B-5 PORT 29 G318F-1 PORT 41 G113D-3

PORT 6 G323-6 PORT 18 G113B-6 PORT 30 G318F-2 PORT 42 G113D-4

PORT 7 G323-7 PORT 19 G113C-1 PORT 31 G318F-3 PORT 43 G113D-5

PORT 8 G323-8 PORT 20 G113C-2 PORT 32 G318F-4 PORT 44 G113D-6

PORT 9 G114-1 PORT 21 G113-1 PORT 33 G113E-1 PORT 45 G318-1

PORT 10 G114-2 PORT 22 G113-2 PORT 34 G113E-2 PORT 46 G318-2

PORT 11 G114-3 PORT 23 G113-3 PORT 35 G113E-3 PORT 47 G318-3

PORT 12 G114-4 PORT 24 G113-4 PORT 36 G113E-4 PORT 48 G318-4

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G114B-TR2 RACK # : 1 PATCH PANEL # : B

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G14-1 PORT 13 G921-3 PORT 25 G917-1 PORT 37 G914-3

PORT 2 G14-2 PORT 14 G921-4 PORT 26 G917-2 PORT 38 G914-4

PORT 3 G14-3 PORT 15 G920-1 PORT 27 G917-3 PORT 39 G909-1

PORT 4 G14-4 PORT 16 G920-2 PORT 28 G917-4 PORT 40 G909-2

PORT 5 G14-5 PORT 17 G919-1 PORT 29 G916-1 PORT 41 G909-3

PORT 6 G14-6 PORT 18 G919-2 PORT 30 G916-2 PORT 42 G909-4

PORT 7 G922-1 PORT 19 G27-1 PORT 31 G915-1 PORT 43 G909-5

PORT 8 G922-2 PORT 20 G27-2 PORT 32 G915-2 PORT 44 G909-6

PORT 9 G922-3 PORT 21 G918-1 PORT 33 G915-3 PORT 45 G909-7

PORT 10 G922-4 PORT 22 G918-2 PORT 34 G915-4 PORT 46 G909-8

PORT 11 G921-1 PORT 23 G918-3 PORT 35 G914-1 PORT 47 G909-9

PORT 12 G921-2 PORT 24 G918-4 PORT 36 G914-2 PORT 48 G9090-10

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G114B-TR2 RACK # : 1 PATCH PANEL # : C

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G909-11 PORT 13 G908-1 PORT 25 G113G-3 PORT 37 G318B-1

PORT 2 G909-12 PORT 14 G908-2 PORT 26 G113G-4 PORT 38 G318B-2

PORT 3 G913-1 PORT 15 G908-3 PORT 27 G318E-1 PORT 39 G318B-3

PORT 4 G913-2 PORT 16 G908-4 PORT 28 G318E-2 PORT 40 G318B-4

PORT 5 G912-1 PORT 17 G21A-1 PORT 29 G318D-1 PORT 41 G318A-1

PORT 6 G912-2 PORT 18 G21A-2 PORT 30 G318D-2 PORT 42 G318A-2

PORT 7 G910-1 PORT 19 G21A-3 PORT 31 G318D-3 PORT 43 G317-1

PORT 8 G910-2 PORT 20 G21A-4 PORT 32 G318D-4 PORT 44 G317-2

PORT 9 G906-1 PORT 21 G113F-1 PORT 33 G318D-5 PORT 45 G318-5

PORT 10 G906-2 PORT 22 G113F-2 PORT 34 G318D-6 PORT 46 G318-6

PORT 11 G907-1 PORT 23 G113G-1 PORT 35 G318C-1 PORT 47 G318-7

PORT 12 G907-8 PORT 24 G113G-2 PORT 36 G318C-2 PORT 48 G318-8

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G114B-TR2 RACK # : 1 PATCH PANEL # : D

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G300-1 PORT 13 G201-5 PORT 25 G201E-3 PORT 37 G209-3

PORT 2 G300-2 PORT 14 G201-6 PORT 26 G201E-4 PORT 38 G209-4

PORT 3 G300-3 PORT 15 G201-7 PORT 27 G201E-5 PORT 39 G209-5

PORT 4 G300-4 PORT 16 G201-8 PORT 28 G201E-6 PORT 40 G209-6

PORT 5 G300-5 PORT 17 G201C-1 PORT 29 G201E-7 PORT 41 G209-7

PORT 6 G300-6 PORT 18 G201C-2 PORT 30 G201E-8 PORT 42 G209-8

PORT 7 G201A-1 PORT 19 G201B-1 PORT 31 G210-1 PORT 43 G207-3

PORT 8 G201A-2 PORT 20 G201B-2 PORT 32 G210-2 PORT 44 G207-4

PORT 9 G201-1 PORT 21 G212-1 PORT 33 G207-1 PORT 45

PORT 10 G201-2 PORT 22 G212-2 PORT 34 G207-2 PORT 46

PORT 11 G201-3 PORT 23 G201E-1 PORT 35 G209-1 PORT 47

PORT 12 G201-4 PORT 24 G201E-2 PORT 36 G209-2 PORT 48

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G114B-TR2 RACK # : 2 PATCH PANEL # : A

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 RCCG69R-1 PORT 13 RCCG70R-1 PORT 25 G209-10 PORT 37 G321-1

PORT 2 G114B-TR2-1 PORT 14 G318D-7 PORT 26 G210-11 PORT 38 G14-7

PORT 3 G323-9 PORT 15 G318-9 PORT 27 G207-3 PORT 39 G919-3

PORT 4 G113B-7 PORT 16 RCCG71R-2 PORT 28 G512D-1 PORT 40 G918-5

PORT 5 G903-1 PORT 17 RCCG71R-3 PORT 29 G512D-2 PORT 41 G914-5

PORT 6 RCCG75R-1 PORT 18 G212-3 PORT 30 G300-7 PORT 42 G909-13

PORT 7 G317-1 PORT 19 G212-4 PORT 31 RCCG77R-1 PORT 43

PORT 8 RCCG71R-1 PORT 20 G210E-1 PORT 32 RCCG76R-1 PORT 44

PORT 9 RCCG68R-1 PORT 21 G210A-1 PORT 33 G201-9 PORT 45

PORT 10 G317K-1 PORT 22 G210-3 PORT 34 G201A-3 PORT 46

PORT 11 G317-3 PORT 23 G209-9 PORT 35 G300-8 PORT 47

PORT 12 G317-4 PORT 24 G206-1 PORT 36 RCCG78R-1 PORT 48

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G516B-TR3 RACK # : 1 PATCH PANEL # : A

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G518-1 PORT 13 G316-5 PORT 25 G317-3 PORT 37 G312-1

PORT 2 G518-2 PORT 14 G316-6 PORT 26 G317-4 PORT 38 G312-2

PORT 3 G518-3 PORT 15 G316-7 PORT 27 G317-5 PORT 39 G312-3

PORT 4 G518-4 PORT 16 G316-8 PORT 28 G317-6 PORT 40 G312-4

PORT 5 G518-5 PORT 17 G316-9 PORT 29 G317-7 PORT 41 G312-5

PORT 6 G518-6 PORT 18 G316-10 PORT 30 G317-8 PORT 42 G312-6

PORT 7 G518-7 PORT 19 G517-1 PORT 31 G313A-1 PORT 43 G312-7

PORT 8 G518-8 PORT 20 G517-2 PORT 32 G313A-2 PORT 44 G312-8

PORT 9 G316-1 PORT 21 G517-3 PORT 33 G313A-3 PORT 45 G312-9

PORT 10 G316-2 PORT 22 G517-4 PORT 34 G313A-4 PORT 46 G312-10

PORT 11 G316-3 PORT 23 G317-1 PORT 35 G313B-1 PORT 47 G312A-1

PORT 12 G316-4 PORT 24 G317-2 PORT 36 G313B-2 PORT 48 G312A-2

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : BASEMENT ROOM # : B103J-TR1 RACK # : 1 PATCH PANEL # : A

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 RCCB20R-1 PORT 13 B101-3 PORT 25 B101-15 PORT 37

PORT 2 RCCB20R-2 PORT 14 B101-4 PORT 26 B101-16 PORT 38

PORT 3 RCCB20R-3 PORT 15 B101-5 PORT 27 RCCB15R-1 PORT 39

PORT 4 RCCB20R-4 PORT 16 B101-6 PORT 28 RCCB15R-2 PORT 40

PORT 5 RCCB20R-5 PORT 17 B101-7 PORT 29 RCCB20R-11 PORT 41

PORT 6 RCCB20R-6 PORT 18 B101-8 PORT 30 RCCB20R-12 PORT 42

PORT 7 RCCB20R-7 PORT 19 B101-9 PORT 31 BC112-1 PORT 43

PORT 8 RCCB20R-8 PORT 20 B101-10 PORT 32 BC112-2 PORT 44

PORT 9 RCCB20R-9 PORT 21 B101-11 PORT 33 PORT 45

PORT 10 RCCB20R-10 PORT 22 B101-12 PORT 34 PORT 46

PORT 11 B101-1 PORT 23 B101-13 PORT 35 PORT 47

PORT 12 B101-2 PORT 24 B101-14 PORT 36 PORT 48

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : BASEMENT ROOM # : B103J-TR1 RACK # : 1 PATCH PANEL # : B

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 B103B-1 PORT 13 SD103-1 PORT 25 PORT 37

PORT 2 B103B-2 PORT 14 PORT 26 PORT 38

PORT 3 B103C-1 PORT 15 PORT 27 PORT 39

PORT 4 RCCB20R-13 PORT 16 PORT 28 PORT 40

PORT 5 B101-17 PORT 17 PORT 29 PORT 41

PORT 6 RCCB15R-3 PORT 18 PORT 30 PORT 42

PORT 7 B101-18 PORT 19 PORT 31 PORT 43

PORT 8 RCCB15R-4 PORT 20 PORT 32 PORT 44

PORT 9 RCCB15R-5 PORT 21 PORT 33 PORT 45

PORT 10 RCCB20R-14 PORT 22 PORT 34 PORT 46

PORT 11 BC112-5 PORT 23 PORT 35 PORT 47

PORT 12 RCCB20R-15 PORT 24 PORT 36 PORT 48

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:4

A M

700 19th St. S.

Birmingham, AL 35233

NEW PATCH PANEL

SCHEDULES - BASEMENT

AND GROUND FLOOR

TK-405

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

BIRMINGHAM FLOOR # : GROUND ROOM # : G516B-TR3 RACK # : 1 PATCH PANEL # : B

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G409-1 PORT 13 G418-1 PORT 25 G403-5 PORT 37 G505-9

PORT 2 G409-2 PORT 14 G418-2 PORT 26 G403-6 PORT 38 G505-10

PORT 3 G410-1 PORT 15 G418-3 PORT 27 G402-1 PORT 39 G505-11

PORT 4 G410-2 PORT 16 G418-4 PORT 28 G402-2 PORT 40 G505-12

PORT 5 G411-1 PORT 17 G404-1 PORT 29 G505-1 PORT 41 G505-13

PORT 6 G411-2 PORT 18 G404-2 PORT 30 G505-2 PORT 42 G505-14

PORT 7 G411-3 PORT 19 G404-3 PORT 31 G505-3 PORT 43 G505-15

PORT 8 G411-4 PORT 20 G404-4 PORT 32 G505-4 PORT 44 G505-16

PORT 9 G411-5 PORT 21 G403-1 PORT 33 G505-5 PORT 45 G505-17

PORT 10 G411-6 PORT 22 G403-2 PORT 34 G505-6 PORT 46 G505-18

PORT 11 G413-1 PORT 23 G403-3 PORT 35 G505-7 PORT 47 G506-1

PORT 12 G413-2 PORT 24 G403-4 PORT 36 G505-8 PORT 48 G506-2

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G516B-TR3 RACK # : 1 PATCH PANEL # : C

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G504C-1 PORT 13 G504C-13 PORT 25 G524-7 PORT 37 G5108-3

PORT 2 G504C-2 PORT 14 G504C-14 PORT 26 G524-8 PORT 38 G5108-4

PORT 3 G504C-3 PORT 15 G504C-15 PORT 27 G524-9 PORT 39 G5108-5

PORT 4 G504C-4 PORT 16 G504C-16 PORT 28 G524-10 PORT 40 G5108-6

PORT 5 G504C-5 PORT 17 G504B-1 PORT 29 G520-1 PORT 41 G5108-7

PORT 6 G504C-6 PORT 18 G504B-2 PORT 30 G520-2 PORT 42 G5108-8

PORT 7 G504C-7 PORT 19 G524-1 PORT 31 G507-1 PORT 43 G5108-9

PORT 8 G504C-8 PORT 20 G524-2 PORT 32 G507-2 PORT 44 G5108-10

PORT 9 G504C-9 PORT 21 G524-3 PORT 33 G507-3 PORT 45 G5108-11

PORT 10 G504C-10 PORT 22 G524-4 PORT 34 G507-4 PORT 46 G5108-12

PORT 11 G504C-11 PORT 23 G524-5 PORT 35 G508-1 PORT 47 RCCG66R-1

PORT 12 G504C-12 PORT 24 G524-6 PORT 36 G508-2 PORT 48 RCCG66R-2

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G516B-TR3 RACK # : 1 PATCH PANEL # : D

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G317F-1 PORT 13 G512E-3 PORT 25 G501C-1 PORT 37 G501C-13

PORT 2 G317F-2 PORT 14 G512E-4 PORT 26 G501C-2 PORT 38 G501C-14

PORT 3 G317F-3 PORT 15 G512E-5 PORT 27 G501C-3 PORT 39 G501B-1

PORT 4 G317F-4 PORT 16 G512E-6 PORT 28 G501C-4 PORT 40 G501B-2

PORT 5 G317D-1 PORT 17 G512F-1 PORT 29 G501C-5 PORT 41 C501A-1

PORT 6 G317D-2 PORT 18 G512F-2 PORT 30 G501C-6 PORT 42 C501A-2

PORT 7 RCCG63R-1 PORT 19 G501-1 PORT 31 G501C-7 PORT 43

PORT 8 RCCG63R-2 PORT 20 G501-2 PORT 32 G501C-8 PORT 44

PORT 9 RCCG63R-3 PORT 21 G501-3 PORT 33 G501C-9 PORT 45

PORT 10 RCCG63R-4 PORT 22 G501-4 PORT 34 G501C-10 PORT 46

PORT 11 G512E-1 PORT 23 G501-5 PORT 35 G501C-11 PORT 47

PORT 12 G512E-2 PORT 24 G501-6 PORT 36 G501C-12 PORT 48

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G516B-TR3 RACK # : 2 PATCH PANEL # : A

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G516-1 PORT 13 G312A-5 PORT 25 G313A-5 PORT 37 G506-1

PORT 2 RCCG79R-1 PORT 14 RCCG75R-1 PORT 26 G313A-6 PORT 38 G504B-3

PORT 3 G317-5 PORT 15 G409-3 PORT 27 RCCG71R-7 PORT 39 G507-5

PORT 4 G317-2 PORT 16 G3411-7 PORT 28 G518-9 PORT 40 G507-6

PORT 5 RCCG71R-4 PORT 17 G3411-8 PORT 29 GXX-1 PORT 41 G508-13

PORT 6 G316-11 PORT 18 RCCG73R-1 PORT 30 G523-1 PORT 42 G508-14

PORT 7 G517-5 PORT 19 G416-1 PORT 31 G402B-1 PORT 43 G512B-1

PORT 8 RCCG71R-5 PORT 20 G418-5 PORT 32 RCCG73R-2 PORT 44 G534-11

PORT 9 RCCG71R-6 PORT 21 RCCG73R-2 PORT 33 G524A-1 PORT 45 RCCG61R-1

PORT 10 G317-9 PORT 22 G405-2 PORT 34 G505-19 PORT 46 RCCG79R-2

PORT 11 G313-1 PORT 23 G313C-1 PORT 35 G505-20 PORT 47 G513-1

PORT 12 G312-9 PORT 24 G313B-3 PORT 36 G505A-1 PORT 48 G512-2

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : GROUND ROOM # : G516B-TR3 RACK # : 2 PATCH PANEL # : B

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 G317-6 PORT 13 PORT 25 PORT 37

PORT 2 G317D-5 PORT 14 PORT 26 PORT 38

PORT 3 G317H-1 PORT 15 PORT 27 PORT 39

PORT 4 G512E-7 PORT 16 PORT 28 PORT 40

PORT 5 G512F-3 PORT 17 PORT 29 PORT 41

PORT 6 RCCG67R-1 PORT 18 PORT 30 PORT 42

PORT 7 PORT 19 PORT 31 PORT 43

PORT 8 PORT 20 PORT 32 PORT 44

PORT 9 PORT 21 PORT 33 PORT 45

PORT 10 PORT 22 PORT 34 PORT 46

PORT 11 PORT 23 PORT 35 PORT 47

PORT 12 PORT 24 PORT 36 PORT 48

REVISIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JEREMY A. MAXIE

8/30/22

EE-113847

/3

/2

:4

:4

A M

700 19th St. S.

Birmingham, AL 35233

NEW PATCH PANEL

SCHEDULES - GROUND

FLOOR

TK-406

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

8/18/2022 JAM NVF, NDZ

B

IM

/0

-1

-0

V

A B h a m

E

H R

M M

-E

S E

R

IE

S -R

.r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

BIRMINGHAM FLOOR # : 1ST ROOM # : 1904-1 RACK # : 1 PATCH PANEL # : A

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 1925-1 PORT 13 1911-1 PORT 25 1920-3 PORT 37 1913-3

PORT 2 1925-2 PORT 14 1911-2 PORT 26 1920-4 PORT 38 1913-4

PORT 3 1924-1 PORT 15 1911-3 PORT 27 1926-1 PORT 39 1909-1

PORT 4 1924-2 PORT 16 1911-4 PORT 28 1926-2 PORT 40 1909-2

PORT 5 1923-1 PORT 17 1910-1 PORT 29 1927-1 PORT 41 1908-1

PORT 6 1923-2 PORT 18 1910-2 PORT 30 1927-2 PORT 42 1908-2

PORT 7 1922-1 PORT 19 1912-1 PORT 31 1927-3 PORT 43 1914-1

PORT 8 1922-2 PORT 20 1912-2 PORT 32 1927-4 PORT 44 1914-2

PORT 9 1921-1 PORT 21 1912-3 PORT 33 1918-1 PORT 45 1914-3

PORT 10 1921-2 PORT 22 1912-4 PORT 34 1918-2 PORT 46 1914-4

PORT 11 1921-3 PORT 23 1920-1 PORT 35 1913-1 PORT 47 1915-1

PORT 12 1921-4 PORT 24 1920-2 PORT 36 1913-2 PORT 48 1915-2

48-PORT COPPER CONDUCTOR PANEL SHEET

BIRMINGHAM FLOOR # : 1ST ROOM # : 1904-1 RACK # : 1 PATCH PANEL # : B

PORT # ROOM # PORT # ROOM # PORT # ROOM # PORT # ROOM #

PORT 1 1928-1 PORT 13 XX-1 PORT 25 1101-7 PORT 37 1101-19

PORT 2 1928-2 PORT 14 XX-2 PORT 26 1101-8 PORT 38 1101-20

PORT 3 1928-3 PORT 15 XX-3 PORT 27 1101-9 PORT 39 1101-21

PORT 4 1928-4 PORT 16 XX-4 PORT 28 1101-10 PORT 40 1101-22

PORT 5 1929-1 PORT 17 1101M-1 PORT 29 1101-11 PORT 41 1101-23

PORT 6 1929-2 PORT 18 1101M-2 PORT 30 1101-12 PORT 42 1101-24

PORT 7 1929-3 PORT 19 1101-1 PORT 31 1101-13 PORT 43 1101-25

PORT 8 1929-4 PORT 20 1101-2 PORT 32 1101-14 PORT 44 1101-26

PORT 9 1930-1 PORT 21 1101-3 PORT 33 1101-15 PORT 45 1101-27

PORT 10 1930-2 PORT 22 1101-4…

This is the start of the file's text. The full file is on GovTribe.