This amendment modifies a solicitation for Electronic Health Records Modernization infrastructure upgrades at the Veterans Affairs Medical Center in Birmingham, Alabama. The contractor shall furnish all labor, materials, supervision, quality control, project management and services necessary to complete upgrades to digital communication cabling and controls in accordance with revised specifications attached to this amendment. Questions from prospective bidders are addressed, clarifying that EMT conduit is acceptable for DDC cabling and that BIM modeling is required. The amendment reminds bidders to submit all required documentation and confirms registration, certification and SAM compliance by the bid due date to avoid being deemed non-responsive.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0008 521-20-901
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
36C776
Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
To all Offerors/Bidders
36C77623B0026
07-28-2023
X
X X
X 1
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM) INFRASTRUCTURE UPGRADES, VA MEDICAL CENTER (VAMC) BIRMINGHAM, ALABAMA
a. Prospective Bidder's questions and the Government's response to those questions are shown on the next page.
b. Prospective Bidders are reminded to review Section 2.8 Bid Submission in the solicitation for all of the submittal documentation in addition to the Bid Price that are required to be submitted by Bid Due Date and Time. Failure to submit all required documents/data and being compliant with UEI registration, NAICS Code assignment and SDVOSB status in SAM, as well as, being certified in SBA as a verified SDVOSB firm, may render your bid as non-responsive pursuant to FAR 14.301 Responsiveness of Bids.
EHRM Birmingham Infrastructure Upgrades Amendment 0008
c. The following are a prospective Bidder’s questions and the Government’s response to those questions:
Q66: References - DDC Controls – Specification 23 09 23 3.1 (B)(2) Indicates to “Install digital communication cables in conduit and in accordance with Specification Section 27 15 00, Communications Horizontal Cabling.”
Specification 27 15 00 has not been included for this project.
Specification 27 05 33 3.1 (D)(1) Specifies “Rigid steel, IMC, or rigid aluminum. Different type conduits mixed indiscriminately in same system is not permitted” in Furred or Suspended Ceilings and Walls.
Specification 27 05 33 3.1 (E)(1)(a) Specifies “Provide rigid steel, IMC or rigid aluminum” when conduits are exposed.
Question - Rigid conduit is excessive for this system installation. Is EMT conduit an acceptable raceway for DDC Control Cabling?
A66: Specification Section 27 10 00 Control and Signal Wiring (10-page attachment) is incorporated herein as part of this amendment. Install digital communication cables in accordance with Specification Section 27 10 00. EMT conduit is an acceptable raceway for DDC Control Cabling.
Q67: DIV 01 Specifications make multiple references to BIM. Please confirm that BIM Modeling is a requirement for this solicitation.
A67: See the revised Specification Section 01 33 00 Submittal Procedures (8-page attachment) incorporated herein as part of this amendment.
End of Document