Attachment 2(a) Drawings Part_1_of_5 521-20-901 Birmingham EHRM 09-01-2022 Rev.pdf

PDF 14 MB Posted

Attached to
EHRM Birmingham Infrastructure Upgrades
Solicitation number
36C77623B0026
Issued by

About this file

This document provides details for a federal solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks a contractor to complete Electronic Health Records Modernization Infrastructure Upgrades to the Veterans Affairs Medical Center in Birmingham, Alabama. The solicitation number is 36C77623B0026 and the contractor shall furnish all labor, material, supervision, quality control, project management and services necessary to modernize infrastructure and support implementation of an upgraded electronic health records system.

View the file

Other files

File Type Posted
Attachment to Amendment 0008_Specification 01 33 00 Submittal Procedures 7-28-2023.pdf PDF
Amendment 0008_36C77623B0026_QAs and Revised Specs_28JUL2023.pdf PDF
Attachment to Amendment 0008_Specification Section 27 10 00 - Control and Signal Wiring_27JUL2023.pdf PDF
Amendment 0007_36C77623B0026_Spec 096519 Flooring_26JUL2023.pdf PDF
Attachment to Amendment 0007_Specification Section 096519 Resilient Tile Flooring_26JUL2023.pdf PDF
Site Visit Attendance Sheet_21JULY2023.pdf PDF
Amendment 0006_36C77623B0026_25JUL2023.pdf PDF
Amendment 0005_36C77623B0026_24JUL2023.pdf PDF
Amendment 0004_36C77623B0026_20JUL2023.pdf PDF
Amendment 0003_36C77623B0026_18JUL2023.pdf PDF
36C77623B0026_Amendment 0002_11JUL2023.pdf PDF
Amendment 0002 Attachment_Ethernet Jacket Color Table 3-2_Feb2016.pdf PDF
Amendment 0001_36C77623B0026 0001_1_30JUN2023.pdf PDF
Signed Site Visit Attendance Sheet_21JUNE2023.pdf PDF
Site Visit Attendance Sheet_21JUNE2023.pdf PDF
36C77623B0026_09JUN2023.docx DOCX document
Attachment 1(a) Specifications Part_1_of_2 Birmingham EHRM 08-31-2022.pdf PDF
Attachment 2(d) Drawings Part_4_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 4 Scope of Work Birmingham EHRM 05-19-2023.pdf PDF
Attachment 10(a) Wage Determination AL20230087_JeffersonCounty_27JAN2023.pdf PDF
Attachment 2(c) Drawings Part_3_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 2(b) Drawings Part_2_of_5 Birmingham EHRM_09-01-2022.pdf PDF
Attachment 5 Design Narrative Birmingham EHRM 08-18-2022.pdf PDF
Attachment 8 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 7(c) OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
Attachment 1(b) Specifications Birmingham EHRM 08-31-2022_Part_2_of_2.pdf PDF
Attachment 3(b) HazMaterial Survey Birmingham EHRM 09-01-2022_Part_2_of_2.pdf PDF
Attachment 7(a) OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
Attachment 3(a) HazMaterials Survey Birmingham EHRM Part_1_of_2.pdf PDF
Attachment 9 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
Attachment 10(b) Wage Determination AL20230096_ShelbyCounty_27JAN2023.pdf PDF
Attachment 7(b) OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
Attachment 2(e) Drawings Part_5_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 6 Submittal Register Birmingham EHRM 08-18-2022.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

N

PROJECT LOCATION

REVISIONS

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

/3

/2

:2

:4

P M

700 19th St. S.

Birmingham, AL 35233

COVER SHEET

GI001

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

August 18, 2022 AN TWM

B

IM

/0

-1

-0

V

A B h a m

E

H R

M V

A B h a m

-E H

R M

-A rc h it e c tu re .r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

Dallas, TX 75204-8589

3232 McKinney Avenue, Suite 800

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

(214) 526-1144

BIRMINGHAM VA MEDICAL CENTER

ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES - BIRMINGHAM, AL

PROJECT NO. 521-20-901

CONTRACT NO. 36C77621C0111

100% CONSTRUCTION DOCUMENTS

PROJECT DESCRIPTION:

PROJECT BUILDING:

VA BIRMINGHAM HEALTHCARE SYSTEM (VABHCS)

700 19th Street

Birmingham, AL 35233

BASIC DEFINITIONS

"OWNER": THE OWNER IS UNITED STATES GOVERNMENT DEPT. OF VETERANS AFFAIRS AND

IS REFERRED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER.

THE TERM "OWNER" MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S

AUTHORIZED REPRESENTATIVE.

"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE

RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BEWTEEN THE GENERAL CONTRACTOR

AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE

CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF THEIR AUTHORITY AS DELEGATED BY

THE CONTRACTING OFFICER.

"CONTRACTING OFFICER'S REPRESENTATIVE", COR: MEANS THE CONTRACTING OFFICER'S

AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE

CONTRACTOR'S (PLURAL) PERFORMANCE.

"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE

CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES

ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR

TO FULFILL THE CONTRACTOR'S OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR

A PART OF THE PROJECT.

"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE

CONTRACT DOCUMENTS.

"DRAWINGS", "SHOP DRAWINGS" OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF

CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN,

LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS,

SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.

"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION

REPRESENTATIVE OF THE PROJECT.

"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER

DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED

THROUGHOUT THE DRAWINGS AS IF SINGULAR IN NUMBER.

"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT

AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND

OF SPECIALTY WORK IN CONNECTION WITH THIS PROJECT.

"FURNISH" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS,

TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING,

PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY

OTHER ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.

"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH

UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS, SLEEVES,

SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL,

DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP,

INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL ACCESSORIES,

SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.

"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT

LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND

OTHER ITEMS REQUIRED TO COMPLETE THE REFERENCED TASK.

"BY OWNER"; "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED

TO THE JOB SITE AND INSTALLED BY THE OWNER.

"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT,

BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS

SPECIFIED OR SHOWN.

OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS

CAN BE FOUND IN THE LEGEND AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN

DIVISION 0 AND 1 OF THE PROJECT MANUAL.

THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO, UPGRADING FACILITY FIBER THROUGHOUT THE BUILDINGS TO EACH TELECOMMUNICATION ROOM, PROVIDE A REDUNDANT FIBER RUN THROUGHOUT THE FACILITY TO EACH TELECOMMUNICATION ROOM, PROVIDE REDUNDANT FIBER MAINS TO THE DEMARCATION ROOM FROM THE PROVIDER POINT, INSTALL ADDITIONAL TELECOMMUNICATION ROOM OUTLETS, INSTALL NEW ELECTRICAL OUTLETS THROUGHOUT THE FACILITY, PROVIDE ADDITIONAL OUTLETS IN EACH TELECOMMUNICATIONS ROOM, UPGRADE FACILITY POWER DISTRIBUTION AS REQUIRED, UPGRADE FACILITY HVAC DISTRIBUTION AS REQUIRED, HHAZARDOUS MATERIAL ABATEMENT.

GENERAL PROJECT NOTES

1. CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING TO BECOME FAMILIAR

WITH THE EXISTING SITE CONDITIONS, SECURITY PROVISIONS, LAYDOWN AREA AND

OTHER SITE SPECIFIC GENERAL CONDITIONS WHICH MAY AFFECT THE BID VALUE FOR

THIS PROJECT.

2. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL

SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL

WHICH FORM A PART OFTHE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL

INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT

OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR

CLARIFICATION SEVEN DAYS BEFORE BEGINING WORK ON THE AFFECTED ACTIVITIES.

3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO

THE START OF WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN DIMENSIONS

OR CONDITIONS.

4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND

NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY

DESCRIPTION AS MAY BE NECESSARY TO COMPLETE THE SCOPE OF WORK DEFINED ON

THE DRAWINGS AND SPECIFICATIONS.

5. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS

(HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC.), CERTIFICATIONS,

INSPECTIONS, DEPARTMENT APPROVALS, ETC. FOR WORK PERFORMED UNDER THIS

CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATIONS,

INSPECTIONS AND AGENCY APPROVALS TO THE COR.

6. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS,

ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND SUPPLEMENTARY

CONDITIONS OF THE CONTRACT.

7. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR THE PROPER

PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND

METHODS OF CONTRUCTION, SAFETY AND SECURITY ON SITE.

8. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR

THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL

BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS

FOR FINISHES AND SUBSTRATES AFFECTED.

9. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN

SECURITY DURING ALL CONSTRUCTION WORK.

10 PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, WITHOUT

ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE

COURSE OF CONSTRUCTION.

11. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL

GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINING EACH CONSTRUCTION

ACTIVITY.

12. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE

PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS

CONTRACT.

13. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND

PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS.

14. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN

PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY

WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT

WHICH DEVELOPS DEFECTS, EXCEPT FROM ORDINARY WEAR AND TEAR, WITHIN ONE (1)

YEAR FROM THE DATE OF THE FINAL ACCEPTANCE BY THE OWNER.

15. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER OUTAGES

AND SHUTDOWNS. POWER OUTAGES AND SHUTDOWNS MUST BE SCHEDULED WITH THE

COR, TWO WEEKS PRIOR TO OUTAGE.

16. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED

MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING,

EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO

MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF

DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS AND

ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR PORTIONS THEREOF TO BE REMOVED,

RELOCATED, REVISED OR ABANDONDED.

17. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL

BE CORRECTED AT NO EXPENSE TO THE OWNER OR ARCHITECT/ENGINEER OR RECORD

(EOR).

18. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE

MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF

CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE

BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK CLEAN.

19. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF

WASTE FROM THE SITE, CHECK WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND

TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE

BE USED WITHOUT PRIOR APPROVAL FROM THE COR. ALL BUILDING INTERIOR STAGING

AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL

TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS

SHALL NOT BE STORED IN CORRIDORS AT ANY TIME.

20. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR

TO START OF WORK.

21. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING,

AND TEMPORARY SUPPORTS AND RESTRAINS IN THE SOLE RESPONSIBILITY OF THE

CONTRACTOR.

22. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL BE EXCESSIVE.

RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.

23. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE

CORRECTIVE ACTION.

24. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL

FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR

SOILED DURING THE COURSE OF CONSTRUCTION.

25. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND

STORED IN A SAFE PLACE TO PREVENT DAMAGE; WHEN DAMAGED, REPLACED AT NO

EXPENSE TO THE OWNER.

26. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH

PROVISIONS OF THE TECHNICAL SPECIFICATIONS.

27. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT

SCALE THE DRAWINGS. ITEMS WRONGLY LOCATED BY DRAWING SCALING SHALL BE

CORRECTED AT THE CONTRACTORS EXPENSE AND AT NO ADDITIONAL COST TO THE

GOVERNMENT OR AE.

28. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S

EXISTING SIGNAGE SYSTEMS.

29. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL

CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO

MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE

THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR HOLIDAYS AT NO

ADDITIONAL COST TO THE GOVERNMENT.

30. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE

EXISTING REINFORCEMENT, STRUCTURAL MEMBER, AND UTILITIES TO MAINTAIN

ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT,

STRUCTURE, AND UTILITIES. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING

(NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASABLE, CONSTRACTOR SHALL USE

GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS

REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3)

WEEKS PRIOR TO EVENT; WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE

NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON THE THREE (3) WEEK LOOK

AHEAD SCHEDULE.

31. PROTECT EXISTING FIRE SUPRESSION SYSTEMS DURING CONSTRUCTION.

32. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT

AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE

CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE

CONDITION ACKNOWLEDGEMENT. REMIDIATION WOULD BE COMPENSATED BY

ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.

NO. DESCRIPTION DATE

08/18/2022

REVISIONS

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

/3

/2

:3

:4

P M

700 19th St. S.

Birmingham, AL 35233

SHEET INDEX

GI002

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

August 18, 2022 Checker Author

B

IM

/0

-1

-0

V

A B h a m

E

H R

M V

A B h a m

-E H

R M

-A rc h it e c tu re .r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

Dallas, TX 75204-8589

3232 McKinney Avenue, Suite 800

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

(214) 526-1144

SHEET INDEX

SHEET

NUMBER SHEET NAME 1

C O

N S

T R

U C

T

IO

N I S

S U

E

/1

/2

TK-436 NEW PATCH PANEL SCHEDULES - FIFTH FLOOR

TK-437 NEW PATCH PANEL SCHEDULES - SIXTH FLOOR

TK-438 NEW PATCH PANEL SCHEDULES - SIXTH FLOOR

TK-439 NEW PATCH PANEL SCHEDULES - SIXTH FLOOR

TK-440 NEW PATCH PANEL SCHEDULES - SEVENTH FLOOR

TK-441 NEW PATCH PANEL SCHEDULES - SEVENTH FLOOR

TK-442 NEW PATCH PANEL SCHEDULES - EIGHTH FLOOR

TK-443 NEW PATCH PANEL SCHEDULES - NINTH FLOOR

TK-444 TELECOM BONDING DETAIL - BASEMENT, GROUND AND FIRST FLOORS

TK-445 TELECOM BONDING DETAIL - SECOND, THIRD, FOURTH AND FIFTH FLOORS

TK-446 TELECOM BONDING DETAILS - SIXTH, SEVENTH, EIGHTH AND NINTH FLOORS

TK-501 NEW RACK ELEVATIONS

TK-502 NEW RACK ELEVATIONS

TK-503 NEW RACK ELEVATIONS

TK-504 NEW RACK ELEVATIONS

TK-505 NEW RACK ELEVATIONS

TK-506 NEW MCR RACK ELEVATIONS

TK-507 NEW MCR RACK ELEVATIONS

SHEET INDEX

SHEET

NUMBER SHEET NAME 1

C O

N S

T R

U C

T

IO

N I S

S U

E

/1

/2

TN-108.1 TELECOM REMODEL PLAN - EIGHTH FLOOR - AREA 1 & 2

TN-108.2 TELECOM REMODEL PLAN - EIGHTH FLOOR - AREA 3

TN-108.3 ENLARGED TELECOM REMODEL PLANS - EIGHT FLOOR

TN-108.4 TELECOM DISTANCE ASSESSMENT - 8TH FLOOR

TN-109 TELECOM REMODEL PLAN - NINTH FLOOR

TN-109.1 TELECOM REMODEL PLAN - NINTH FLOOR - AREA 1 & 2

TN-109.2 TELECOM REMODEL PLAN - NINTH FLOOR - AREA 3

TN-109.3 ENLARGED TELECOM REMODEL PLANS - NINTH FLOOR

TN-109.4 TELECOM DISTANCE ASSESSMENT - 9TH FLOOR

TN-110 TELECOM REMODEL PLAN - TENTH FLOOR

TN-111 TELECOM REMODEL PLAN - ELEVENTH FLOOR

TK-001 TELECOM DETAILS

TK-002 MCR TELECOM GRID

TK-201 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR

TK-202 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR

TK-203 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR

TK-204 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR

TK-205 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR

TK-206 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR

TK-207 EXISTING PATCH PANEL SCHEDULES - GROUND & FIRST FLOOR

TK-208 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-209 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-210 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-211 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-212 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-213 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-214 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-215 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-216 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR

TK-217 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR

TK-218 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR

TK-219 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR

TK-220 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR

TK-221 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR

TK-222 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR

TK-223 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR

TK-224 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR

TK-225 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR

TK-226 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR

TK-227 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR

TK-228 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR

TK-229 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR

TK-230 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR

TK-231 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR

TK-232 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR

TK-233 EXISTING PATCH PANEL SCHEDULES - THIRD & FOURTH FLOOR

TK-234 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-235 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-236 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-237 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-238 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-239 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-240 EXISTING PATCH PANEL SCHEDULES - FOURTH & FIFTH FLOOR

TK-241 EXISTING PATCH PANEL SCHEDULES - FIFTH FLOOR

TK-242 EXISTING PATCH PANEL SCHEDULES - FIFTH FLOOR

TK-243 EXISTING PATCH PANEL SCHEDULES - FIFTH & SIXTH FLOOR

TK-244 EXISTING PATCH PANEL SCHEDULES - FIFTH & SIXTH FLOOR

TK-245 EXISTING PATCH PANEL SCHEDULES - SIXTH FLOOR

TK-246 EXISTING PATCH PANEL SCHEDULES - SIXTH FLOOR

TK-247 EXISTING PATCH PANEL SCHEDULES - SIXTH FLOOR

TK-248 EXISTING PATCH PANEL SCHEDULES - SIXTH FLOOR

TK-249 EXISTING PATCH PANEL SCHEDULES - SIXTH & SEVENTH FLOOR

TK-250 EXISTING PATCH PANEL SCHEDULES - SEVENTH FLOOR

TK-251 EXISTING PATCH PANEL SCHEDULES - SEVENTH FLOOR

TK-252 EXISTING PATCH PANEL SCHEDULES - SEVENTH FLOOR

TK-253 EXISTING PATCH PANEL SCHEDULES - SEVENTH & EIGHTH FLOOR

TK-254 EXISTING PATCH PANEL SCHEDULES - EIGHTH FLOOR

TK-255 EXISTING PATCH PANEL SCHEDULES - EIGHTH FLOOR

TK-256 EXISTING PATCH PANEL SCHEDULES - EIGHTH FLOOR

TK-257 EXISTING PATCH PANEL SCHEDULES - EIGHT & NINTH FLOOR

TK-258 EXISTING PATCH PANEL SCHEDULES - NINTH FLOOR

TK-259 EXISTING PATCH PANEL SCHEDULES - NINTH FLOOR

TK-301 EXISTING RACK ELEVATIONS

TK-302 EXISTING RACK ELEVATIONS

TK-303 EXISITNG RACK ELEVATIONS

TK-304 EXISITNG RACK ELEVATIONS

TK-305 EXISITNG RACK ELEVATIONS

TK-306 EXISITNG RACK ELEVATIONS

TK-307 EXISITNG RACK ELEVATIONS

TK-308 EXISITNG RACK ELEVATIONS

TK-401 FIBER RISER DIAGRAM

TK-402 TELECOM ROOM DETAILS

TK-403 CABLE SCHEDULES

TK-404 MCR TELECOM EQUIPMENT SCHEDULE

TK-405 NEW PATCH PANEL SCHEDULES - BASEMENT AND GROUND FLOOR

TK-406 NEW PATCH PANEL SCHEDULES - GROUND FLOOR

TK-407 NEW PATCH PANEL SCHEDULES FIRST FLOOR

TK-408 NEW PATCH PANEL SCHEDULES - FIRST FLOOR

TK-409 NEW PATCH PANEL SCHEDULES - FIRST FLOOR

TK-410 NEW PATCH PANEL SCHEDULES - FIRST FLOOR

TK-411 NEW PATCH PANEL SCHEDULES - SECOND FLOOR

TK-412 NEW PATCH PANEL SCHEDULES - SECOND FLOOR

TK-413 NEW PATCH PANEL SCHEDULES - SECOND FLOOR

TK-414 NEW PATCH PANEL SCHEDULES - THIRD FLOOR

TK-415 NEW PATCH PANEL SCHEDULES - THIRD FLOOR

TK-416 NEW PATCH PANEL SCHEDULES - THIRD FLOOR

TK-417 NEW PATCH PANEL SCHEDULES - MCR

TK-418 NEW PATCH PANEL SCHEDULES - MCR

TK-419 NEW PATCH PANEL SCHEDULES - MCR

TK-420 NEW PATCH PANEL SCHEDULES - MCR

TK-421 NEW PATCH PANEL SCHEDULES - MCR

TK-422 NEW PATCH PANEL SCHEDULES - MCR

TK-423 NEW PATCH PANEL SCHEDULES - MCR

TK-424 NEW PATCH PANEL SCHEDULES - MCR

TK-425 NEW PATCH PANEL SCHEDULES - MCR

TK-426 NEW PATCH PANEL SCHEDULES - MCR

TK-427 NEW PATCH PANEL SCHEDULES - MCR

TK-428 NEW PATCH PANEL SCHEDULES - MCR

TK-429 NEW PATCH PANEL SCHEDULES - MCR

TK-430 NEW PATCH PANEL SCHEDULES - MCR

TK-431 NEW PATCH PANEL SCHEDULES - MCR

TK-432 NEW PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-433 NEW PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-434 NEW PATCH PANEL SCHEDULES - FOURTH FLOOR

TK-435 NEW PATCH PANEL SCHEDULES - FIFTH FLOOR

SHEET INDEX

SHEET

NUMBER SHEET NAME 1

C O

N S

T R

U C

T

IO

N I S

S U

E

/1

/2

TD-102.3 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 3

TD-102.4 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 4

TD-102.5 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 5

TD-102.6 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 6 & 7

TD-102.7 ENLARGED TELECOM DEMOLITION PLANS - SECOND FLOOR

TD-103 TELECOM DEMOLITION PLAN - THIRD FLOOR

TD-103.1 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 1

TD-103.2 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 2

TD-103.3 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 3

TD-103.4 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 4

TD-103.5 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 5 & 6

TD-103.6 ENLARGED TELECOM DEMOLITION PLANS - THIRD FLOOR

TD-103.7 TELECOM DEMOLITION PLANS - MCR & PBX PHASE 1 & 2

TD-103.8 TELECOM DEMOLITION PLANS - MCR & PBX PHASE 3 & 4

TD-104 TELECOM DEMOLITION PLAN - FOURTH FLOOR

TD-104.1 TELECOM DEMOLITION PLAN - FOURTH FLOOR - AREA 1

TD-104.2 TELECOM DEMOLITION PLAN - FOURTH FLOOR - AREA 2 & 3

TD-104.3 TELECOM DEMOLITION PLAN - FOURTH FLOOR - AREA 4

TD-104.4 TELECOM DEMOLITION PLAN - FOURTH FLOOR - AREA 5 & 6

TD-104.5 ENLARGED TELECOM DEMOLITION PLANS - FOURTH FLOOR

TD-105 TELECOM DEMOLITION PLAN - FIFTH FLOOR

TD-105.1 TELECOM DEMOLITION PLAN - FIFTH FLOOR - AREA 1 & 2

TD-105.2 TELECOM DEMOLITION PLAN - FIFTH FLOOR - AREA 3

TD-105.3 TELECOM DEMOLITION PLAN - FIFTH FLOOR - AREA 4

TD-105.4 TELECOM DEMOLITION PLAN - FIFTH FLOOR - AREA 5 & 6

TD-105.5 ENLARGED TELECOM DEMOLITION PLANS - FIFTH FLOOR

TD-106 TELECOM DEMOLITION PLAN - SIXTH FLOOR

TD-106.1 TELECOM DEMOLITION PLAN - SIXTH FLOOR - AREA 1 & 2

TD-106.2 TELECOM DEMOLITION PLAN - SIXTH FLOOR - AREA 3

TD-106.3 TELECOM DEMOLITION PLAN - SIXTH FLOOR - AREA 4

TD-106.4 TELECOM DEMOLITION PLAN - SIXTH FLOOR - AREA 5

TD-106.5 ENLARGED TELECOM DEMOLITION PLANS - SIXTH FLOOR

TD-107 TELECOM DEMOLITION PLAN - SEVENTH FLOOR

TD-107.1 TELECOM DEMOLITION PLAN - SEVENTH FLOOR - AREA 1 & 2

TD-107.2 TELECOM DEMOLITION PLAN - SEVENTH FLOOR - AREA 3

TD-107.3 TELECOM DEMOLITION PLAN - SEVENTH FLOOR - AREA 4

TD-107.4 ENLARGED TELECOM DEMOLITION PLANS - SEVENTH FLOOR

TD-108 TELECOM DEMOLITION PLAN - EIGHTH FLOOR

TD-108.1 TELECOM DEMOLITION PLAN - EIGHTH FLOOR - AREA 1 & 2

TD-108.2 TELECOM DEMOLITION PLAN - EIGHTH FLOOR - AREA 3

TD-108.3 ENLARGED TELECOM DEMOLITION PLANS - EIGHTH FLOOR

TD-109 TELECOM DEMOLITION PLAN - NINTH FLOOR

TD-109.1 TELECOM DEMOLITION PLAN - NINTH FLOOR - AREA 1 & 2

TD-109.2 TELECOM DEMOLITION PLAN - NINTH FLOOR - AREA 3

TD-109.3 ENLARGED TELECOM DEMOLITION PLANS - NINTH FLOOR

TD-110 TELECOM DEMOLITION PLAN - TENTH FLOOR

TD-111 TELECOM DEMOLITION PLAN - ELEVENTH FLOOR

TN-100B TELECOM REMODEL PLAN - BASEMENT

TN-100B0 TELECOM REMODEL PLAN - SUB-BASEMENT

TN-100B.11 ENLARGED TELECOM REMODEL PLANS - BASEMENT FLOOR

TN-100B.21 TELECOM DISTANCE ASSESSMENT - BASEMENT

TN-100G TELECOM REMODEL PLAN - GROUND FLOOR

TN-100G.1 TELECOM REMODEL - GROUND FLOOR - AREA 1

TN-100G.2 TELECOM REMODEL - GROUND FLOOR - AREA 2

TN-100G.3 TELECOM REMODEL - GROUND FLOOR - AREA 3

TN-100G.4 TELECOM REMODEL - GROUND FLOOR - AREA 4

TN-100G.5 TELECOM REMODEL - GROUND FLOOR - AREA 5

TN-100G.6 TELECOM REMODEL - GROUND FLOOR - AREA 6

TN-100G.7 ENLARGED TELECOM REMODEL PLANS - GROUND FLOOR

TN-100G.8 TELECOM DISTANCE ASSESSMENT - GROUND FLOOR

TN-101 TELECOM REMODEL PLAN - FIRST FLOOR

TN-101.1 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 1

TN-101.2 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 2

TN-101.3 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 3

TN-101.4 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 4

TN-101.5 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 5

TN-101.6 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 6

TN-101.7 ENLARGED TELECOM REMODEL PLANS - FIRST FLOOR

TN-101.8 TELECOM DISTANCE ASSESSMENT - 1ST FLOOR

TN-102 TELECOM REMODEL PLAN - SECOND FLOOR

TN-102.1 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 1

TN-102.2 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 2

TN-102.3 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 3

TN-102.4 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 4

TN-102.5 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 5

TN-102.6 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 6 & 7

TN-102.7 ENLARGED TELECOM REMODEL PLANS - SECOND FLOOR

TN-102.8 TELECOM DISTANCE ASSESSMENT - 2ND FLOOR

TN-103 TELECOM REMODEL PLAN - THIRD FLOOR

TN-103.1 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 1

TN-103.2 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 2

TN-103.3 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 3

TN-103.4 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 4

TN-103.5 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 5 & 6

TN-103.6 ENLARGED TELECOM REMODEL PLANS - THIRD FLOOR

TN-103.7 TELECOM REMODEL PLANS - MCR & PBX PHASE 1 & 2

TN-103.8 TELECOM REMODEL PLANS - MCR & PBX PHASE 3 & 4

TN-103.9 TELECOM DISTANCE ASSESSMENT - 3RD FLOOR

TN-104 TELECOM REMODEL PLAN - FOURTH FLOOR

TN-104.1 TELECOM REMODEL PLAN - FOURTH FLOOR - AREA 1

TN-104.2 TELECOM REMODEL PLAN - FOURTH FLOOR - AREA 2 & 3

TN-104.3 TELECOM REMODEL PLAN - FOURTH FLOOR - AREA 4

TN-104.4 TELECOM REMODEL PLAN - FOURTH FLOOR - AREA 5 & 6

TN-104.5 ENLARGED TELECOM REMODEL PLANS - FOURTH FLOOR

TN-104.6 TELECOM DISTANCE ASSESSMENT - 4TH FLOOR

TN-105 TELECOM REMODEL PLAN - FIFTH FLOOR

TN-105.1 TELECOM REMODEL PLAN - FIFTH FLOOR - AREA 1 & 2

TN-105.2 TELECOM REMODEL PLAN - FIFTH FLOOR - AREA 3

TN-105.3 TELECOM REMODEL PLAN - FIFTH FLOOR - AREA 4

TN-105.4 TELECOM REMODEL PLAN - FIFTH FLOOR - AREA 5 & 6

TN-105.5 ENLARGED TELECOM REMODEL PLANS - FIFTH FLOOR

TN-105.6 TELECOM DISTANCE ASSESSMENT - 5TH FLOOR

TN-106 TELECOM REMODEL PLAN - SIXTH FLOOR

TN-106.1 TELECOM REMODEL PLAN - SIXTH FLOOR - AREA 1 & 2

TN-106.2 TELECOM REMODEL PLAN - SIXTH FLOOR - AREA 3

TN-106.3 TELECOM REMODEL PLAN - SIXTH FLOOR - AREA 4

TN-106.4 TELECOM REMODEL PLAN - SIXTH FLOOR - AREA 5

TN-106.5 ENLARGED TELECOM REMODEL PLANS - SIXTH FLOOR

TN-106.6 TELECOM DISTANCE ASSESSMENT - 6TH FLOOR

TN-107 TELECOM REMODEL PLAN - SEVENTH FLOOR

TN-107.1 TELECOM REMODEL PLAN - SEVENTH FLOOR - AREA 1 & 2

TN-107.2 TELECOM REMODEL PLAN - SEVENTH FLOOR - AREA 3

TN-107.3 TELECOM REMODEL PLAN - SEVENTH FLOOR - AREA 4

TN-107.4 ENLARGED TELECOM REMODEL PLANS - SEVENTH FLOOR

TN-107.5 TELECOM DISTANCE ASSESSMENT - 7TH FLOOR

TN-108 TELECOM REMODEL PLAN - EIGHTH FLOOR

SHEET INDEX

SHEET

NUMBER SHEET NAME 1

C O

N S

T R

U C

T

IO

N I S

S U

E

/1

/2

MJ106 SIXTH FLOOR - MECHANICAL ENLARGED

MJ107 SEVENTH FLOOR - MECHANICAL ENLARGED

MJ108 EIGHTH FLOOR - MECHANICAL ENLARGED

MJ109 NINTH FLOOR - MECHANICAL ENLARGED

MK001 MECHANICAL SCHEDULES

MK002 MECHANICAL SCHEDULES

15-E-ELECTRICAL

EG-001 ELECTRICAL LEGEND AND FIXTURE SCHEDULE

ED-100B ELECTRICAL DEMOLITION PLAN - BASEMENT

ED-100B0 ELECTRICAL DEMOLITION PLAN - SUB-BASEMENT

ED-100B.1 ENLARGED ELECTRICAL DEMOLITION PLANS - BASEMENT FLOOR

ED-100G ELECTRICAL DEMOLITION PLAN - GROUND FLOOR

ED-100G.1 ENLARGED ELECTRICAL DEMOLITION PLANS - GROUND FLOOR

ED-100G.2 ENLARGED ELECTRICAL DEMOLITION PLANS - GROUND FLOOR

ED-101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR

ED-101.1 ENLARGED ELECTRICAL DEMOLITION PLANS - FIRST FLOOR

ED-101.2 ENLARGED ELECTRICAL DEMOLITION PLANS - FIRST FLOOR

ED-102 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR

ED-102.1 ENLARGED ELECTRICAL DEMOLITION PLANS - SECOND FLOOR

ED-103 ELECTRICAL DEMOLITION PLAN - THIRD FLOOR

ED-103.1 ENLARGED ELECTRICAL DEMOLITION PLANS - THIRD FLOOR

ED-103.2 ELECTRICAL DEMOLITION PLANS - MCR & PBX PHASE 1 & 2

ED-103.3 ELECTRICAL DEMOLITION PLANS - MCR & PBX PHASE 3 & 4

ED-103.4 LIGHTING DEMOLITION PLAN - MCR & PBX PHASE 4

ED-104 ELECTRICAL DEMOLITION PLAN - FOURTH FLOOR

ED-104.1 ENLARGED ELECTRICAL DEMOLITION PLANS - FOURTH FLOOR

ED-105 ELECTRICAL DEMOLITION PLAN - FIFTH FLOOR

ED-105.1 ENLARGED ELECTRICAL DEMOLITION PLANS - FIFTH FLOOR

ED-106 ELECTRICAL DEMOLITION PLAN - SIXTH FLOOR

ED-106.1 ENLARGED ELECTRICAL DEMOLITION PLANS - SIXTH FLOOR

ED-107 ELECTRICAL DEMOLITION PLAN - SEVENTH FLOOR

ED-107.1 ENLARGED ELECTRICAL DEMOLITION PLANS - SEVENTH FLOOR

ED-108 ELECTRICAL DEMOLITION PLAN - EIGHTH FLOOR

ED-108.1 ENLARGED ELECTRICAL DEMOLITION PLANS - EIGHTH FLOOR

ED-109 ELECTRICAL DEMOLITION PLAN - NINTH FLOOR

ED-109.1 ENLARGED ELECTRICAL DEMOLITION PLANS - NINTH FLOOR

ED-110 ELECTRICAL DEMOLITION PLAN - TENTH FLOOR

ED-111 ELECTRICAL DEMOLITION PLAN - ELEVENTH FLOOR

EP-100B ELECTRICAL REMODEL PLAN - BASEMENT

EP-100B0 ELECTRICAL REMODEL PLAN - SUB-BASEMENT

EP-100B.1 ENLARGED ELECTRICAL REMODEL PLANS - BASEMENT FLOOR

EP-100G ELECTRICAL REMODEL PLAN - GROUND FLOOR

EP-100G.1 ENLARGED ELECTRICAL REMODEL PLANS - GROUND FLOOR

EP-100G.2 ENLARGED ELECTRICAL REMODEL PLANS - GROUND FLOOR

EP-101 ELECTRICAL REMODEL PLAN - FIRST FLOOR

EP-101.1 ENLARGED ELECTRICAL REMODEL PLANS - FIRST FLOOR

EP-102 ELECTRICAL REMODEL PLAN - SECOND FLOOR

EP-102.1 ENLARGED ELECTRICAL REMODEL PLANS - SECOND FLOOR

EP-103 ELECTRICAL REMODEL PLAN - THIRD FLOOR

EP-103.1 ENLARGED ELECTRICAL REMODEL PLANS - THIRD FLOOR

EP-103.2 ELECTRICAL REMODEL PLANS - MCR & PBX PHASE 1 & 2

EP-103.3 ELECTRICAL REMODEL PLANS - MCR & PBX PHASE 3 & 4

EP-103.4 LIGHTING REMODEL PLANS - MCR & PBX PHASE 4

EP-103.5 MCR EQUIPMENT SCHEDULE

EP-104 ELECTRICAL REMODEL PLAN - FOURTH FLOOR

EP-104.1 ENLARGED ELECTRICAL REMODEL PLANS - FOURTH FLOOR

EP-105 ELECTRICAL REMODEL PLAN - FIFTH FLOOR

EP-105.1 ENLARGED ELECTRICAL REMODEL PLANS - FIFTH FLOOR

EP-106 ELECTRICAL REMODEL PLAN - SIXTH FLOOR

EP-106.1 ENLARGED ELECTRICAL REMODEL PLANS - SIXTH FLOOR

EP-107 ELECTRICAL REMODEL PLAN - SEVENTH FLOOR

EP-107.1 ENLARGED ELECTRICAL REMODEL PLANS SEVENTH FLOOR

EP-108 ELECTRICAL REMODEL PLAN - EIGHTH FLOOR

EP-108.1 ENLARGED ELECTRICAL PLANS - EIGHTH FLOOR

EP-109 ELECTRICAL REMODEL PLAN - NINTH FLOOR

EP-109.1 ENLARGED ELECTRICAL PLANS - NINTH FLOOR

EP-110 ELECTRICAL REMODEL PLAN - TENTH FLOOR

EP-111 ELECTRICAL REMODEL PLAN - ELEVENTH FLOOR

EK-001 POWER AND ELEVATION SCHEMATIC FOR TR RACK

EK-002 POWER ONE-LINE DIAGRAMS

EK-003 ELECTRICAL DETAILS

EK-100 PANEL SCHEDULES

EK-101 PANEL SCHEDULES

EK-102 PANEL SCHEDULES

EK-103 PANEL SCHEDULES

EK-104 PANEL SCHEDULES

EK-105 PANEL SCHEDULES

EK-106 PANEL SCHEDULES

EK-107 PANEL SCHEDULES

EK-108 PANEL SCHEDULES

EK-109 PANEL SCHEDULES

EK-110 PANEL SCHEDULES

EK-111 PANEL SCHEDULES

EK-112 PANEL SCHEDULES

EK-113 PANEL SCHEDULES

EK-114 PANEL SCHEDULES

EK-115 PANEL SCHEDULES

EK-116 PANEL SCHEDULES

EK-117 PANEL SCHEDULES

EK-118 PANEL SCHEDULES

16-T-TELECOM

TG-001 GENERAL TELECOM NOTES

TD-100B TELECOM DEMOLITION PLAN - BASEMENT

TD-100B0 TELECOM DEMOLITION PLAN - SUB-BASEMENT

TD-100B.1 ENLARGED TELECOM DEMOLITION PLANS - BASEMENT

TD-100G TELECOM DEMOLITION PLAN - GROUND FLOOR

TD-100G.1 TELECOM DEMOLITION - GROUND FLOOR - AREA 1

TD-100G.2 TELECOM DEMOLITION - GROUND FLOOR - AREA 2

TD-100G.3 TELECOM DEMOLITION - GROUND FLOOR - AREA 3

TD-100G.4 TELECOM DEMOLITION - GROUND FLOOR - AREA 4

TD-100G.5 TELECOM DEMOLITION - GROUND FLOOR - AREA 5

TD-100G.6 TELECOM DEMOLITION - GROUND FLOOR - AREA 6

TD-100G.7 ENLARGED TELECOM DEMOLITION PLANS - GROUND FLOOR

TD-101 TELECOM DEMOLITION PLAN - FIRST FLOOR

TD-101.1 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 1

TD-101.2 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 2

TD-101.3 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 3

TD-101.4 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 4

TD-101.5 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 5

TD-101.6 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 6

TD-101.7 ENLARGED TELECOM DEMOLITION PLANS - FIRST FLOOR

TD-102 TELECOM DEMOLITION PLAN - SECOND FLOOR

TD-102.1 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 1

TD-102.2 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 2

SHEET INDEX

SHEET

NUMBER SHEET NAME 1

C O

N S

T R

U C

T

IO

N I S

S U

E

/1

/2

01-G-GENERAL

GI001 COVER SHEET X

GI002 SHEET INDEX X

GI003 CODE INFORMATION, SYMBOLS AND ABBREVIATIONS X

GI004 ICRA CLASSIFICATION PROCESS X

07-STRUCTURAL

SF-101 FIRST FLOOR PLANS X

SF-103 THIRD FLOOR PLANS X

SF-104 FOURTH FLOOR PLANS X

SF-105 FIFTH FLOOR PLANS X

08-A-ARCHITECTURAL

AE100SB OVERALL FLOOR PLAN LEVEL SUB-BASEMENT X

AE100B OVERALL FLOOR PLAN LEVEL BASEMENT X

AE100 OVERALL GROUND FLOOR PLAN X

AE101 OVERALL FLOOR PLAN LEVEL 1 X

AE102 OVERALL FLOOR PLAN LEVEL 2 X

AE103 OVERALL FLOOR PLAN LEVEL 3 X

AE104 OVERALL FLOOR PLAN LEVEL 4 X

AE105 OVERALL FLOOR PLAN LEVEL 5 X

AE106 OVERALL FLOOR PLAN LEVEL 6 X

AE107 OVERALL FLOOR PLAN LEVEL 7 X

AE108 OVERALL FLOOR PLAN LEVEL 8 X

AE109 OVERALL FLOOR PLAN LEVEL 9 X

AE110 OVERALL FLOOR PLAN LEVELS 10 & 11 X

AE400 ENLARGED BASEMENT PLANS X

AE400G ENLARGED GROUND FLOOR PLANS X

AE401 ENLARGED PLANS LEVEL 1 X

AE401.1 ENLARGED PLANS LEVEL 1 - PHARMACY X

AE401.2 ENLARGED PLANS LEVEL 1 - PHARMACY X

AE402 ENLARGED PLANS LEVEL 2 X

AE403 ENLARGED PLANS LEVEL 3 X

AE403.2 ENLARGED PLAN LEVEL 3 X

AE403.3 ENLARGED PLAN LEVEL 3 X

AE404 ENLARGED PLANS LEVEL 4 X

AE405 ENLARGED PLANS LEVEL 5 X

AE406 ENLARGED PLANS LEVEL 6 X

AE407 ENLARGED PLANS LEVEL 7 X

AE408 ENLARGED PLANS LEVEL 8 X

AE409 ENLARGED PLANS LEVEL 9 X

AE450 INTERIOR ELEVATIONS X

AE450G INTERIOR ELEVATIONS X

AE451.1 INTERIOR ELEVATIONS X

AE451.2 INTERIOR ELEVATIONS X

AE452 INTERIOR ELEVATIONS X

AE453.1 INTERIOR ELEVATIONS X

AE453.2 INTERIOR ELEVATIONS X

AE453.3 INTERIOR ELEVATIONS X

AE454.1 INTERIOR ELEVATIONS X

AE454.2 INTERIOR ELEVATIONS X

AE455 INTERIOR ELEVATIONS X

AE456 INTERIOR ELEVATIONS X

AE457 INTERIOR ELEVATIONS X

AE458 INTERIOR ELEVATIONS X

AE459 INTERIOR ELEVATIONS X

AE500 INTERIOR SECTION DETAILS X

AE560 MILLWORK SECTION DETAILS X

AE600 ARCHITECTURAL DETAILS X

11-F-FIRE PROTECTION

FP001 FIRE ALARM GENERAL NOTES, DIAGRAMS, & LEGEND

FP101 FIRE PROTECTION - OVERALL PLANS

FP102 FIRE PROTECTION - OVERALL PLANS

FP103 FIRE PROTECTION - OVERALL PLANS

FP110 FIRE PROTECTION ENLARGED PLANS

FP120 FIRE PROTECTION ENLARGED PLANS

FP130 FIRE PROTECTION ENLARGED PLANS

FP140 FIRE PROTECTION ENLARGED PLANS

FP150 FIRE PROTECTION ENLARGED PLANS

FX001 CLEAN AGENT NOTES, DETAILS & PLAN

14-M-MECHANICAL

MG001 MECHANICAL LEGEND AND ABBREVIATIONS

MG002 MECHANICAL SEQUENCE OF OPERATION

MG003 MECHANICAL POINTS LIST AND MCR SECTION

MG004 MECHANICAL DETAILS AND SECTION

MG005 MECHANICAL CHILLED WATER SECTIONS

MG006 MECHANICAL CHILLED WATER SECTIONS

MG007 MECHANICAL CHILLED WATER SECTIONS

MD100B BASEMENT - MECHANICAL OVERALL DEMOLITION PLAN

MD100G GROUND FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD101 FIRST FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD102 SECOND FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD103 THIRD FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD104 FOURTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD105 FIFTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD106 SIXTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD107 SEVENTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD108 EIGHTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MD109 NINTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN

MH100B BASEMENT - MECHANICAL OVERALL RENOVATION PLAN

MH100G GROUND FLOOR - MECHANICAL OVERALL RENOVATION PLAN

MH101 FIRST FLOOR - MECHANICAL OVERALL RENOVATION PLAN

MH102 SECOND FLOOR - MECHANICAL OVERALL PLAN

MH103 THIRD FLOOR - MECHANICAL OVERALL PLAN

MH104 FOURTH FLOOR - MECHANICAL OVERALL PLAN

MH105 FIFTH FLOOR - MECHANICAL OVERALL PLAN

MH106 SIXTH FLOOR - MECHANICAL OVERALL PLAN

MH107 SEVENTH FLOOR - MECHANICAL OVERALL PLAN

MH108 EIGHTH FLOOR - MECHANICAL OVERALL PLAN

MH109 NINTH FLOOR - MECHANICAL OVERALL PLAN

MJ100B BASEMENT - MECHANICAL ENLARGED

MJ100G GROUND FLOOR - MECHANICAL ENLARGED

MJ100G.1 GROUND FLOOR - MECHANICAL ENLARGED

MJ101 FIRST FLOOR - MECHANICAL ENLARGED

MJ101.1 FIRST FLOOR - MECHANICAL ENLARGED

MJ101.2 FIRST FLOOR - MECHANICAL ENLARGED

MJ102 SECOND FLOOR - MECHANICAL ENLARGED

MJ103 THIRD FLOOR - MECHANICAL ENLARGED

MJ103.1 THIRD FLOOR MCR - PIPING ENLARGED

MJ103.2 THIRD FLOOR MCR - VENTILATION ENLARGED

MJ104 FOURTH FLOOR - MECHANICAL ENLARGED

MJ104.1 FOURTH FLOOR - MECHANICAL ENLARGED

MJ105 FIFTH FLOOR - MECHANICAL ENLARGED

NO. DESCRIPTION DATE

CLEAN AGENT NOTES, DETAILS & PLANFIRE PROTECTION SYSTEMS NOTES, DETAILS, & PLAN

TYPE 1 ( NO CHANGE )

FIRE SUPPRESSION SYSTEM

EXISTING BUILDING HEIGHT / AREA:

PROJECT AREA:

BUILDING OCCUPANCY CLASSIFICATION

TYPE OF CONSTRUCTION:

NO CHANGE

EXISTING HEALTH CARE - HOSPITAL

(NO CHANGE):

FULLY SPRINKLERED (EXISTING, NO CHANGE)

SEISMIC / WIND REQUIREMENTS EXISTING - NO CHANGE

BASEMENT, GROUND LEVEL, AND LEVELS 1 THROUGH 11

AREA AND HEIGHT: EXISTING - NO CHANGE

OCCUPANT LOAD:

EXITING AND EXIT REQUIREMENTS:

EXISTING - NO CHANGES

EXISTING - NO CHANGES

SCOPE AND CODE SUMMARY

CODE TABULATION

APPLICABLE CODES AND ORDINANCES

2001 NFPA

2021 NFPA 101, LIFE SAFETY CODE

2022 NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

2020 NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF

WATER-BASED FIRE PROTECTION SYSTEMS

2020 NFPA 70, NATIONAL ELECTRICAL CODE

2022 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE

2020 NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY

EQUIPMENT

2020 NFPA 855, STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE

SYSTEMS

2021 INTERNATIONAL BUILDING CODE (IBC) WHERE NFPA 101 AND ASSOCIATED

DOCUMENTS ARE SILENT

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL FIRE CODE (IFC), WHERE NFPA STANDARDS AND CODES ARE

SILENT

2021 INTERNATIONAL MECHANICAL CODE (IMC)

2021 INTERNATIONAL FUEL GAS CODE (IFGC)

2021 UNIFORM PLUMBING CODE

2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (ICC/ANSI 117.1)

FIRE AND SMOKE PROTECTION FEATURES

TEMPORARY PROTECTION: IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE

FIRESTOPPED AT THE END OF THE WORK SHIFT

DUE TO ANY INCOMPLETE WORK, PROVIDE TEMPORARY FIRESTOPPING COMPOSED OF

MINERAL WOOL SATISFYING FIRE RATING REQUIREMENTS AT PENETRATIONS

ACCESSIBILITY

VA BARRIER FREE DESIGN STANDARD, PAGE 18-13

ARCHITECTURAL BARRIERS ACT ACCESSIBIILITY STANDARDS (ABAAS)

SECTION 1103 SCOPING REQUIREMENTS - 1103.1 WHERE REQUIRED.

SITES, BUILDINGS, STRUCTURES, FACILITIES, ELEMENTS AND SPACES, TEMPORARY OR

PERMANENT, SHALL BE ACCESSIBLE TO PERSONS WITH PHYSICAL DISABILITIES.

EXCEPTIONS:

1103.2.3 EMPLOYEE WORK AREAS. SPACES AND ELEMENTS WITHIN EMPLOYEE WORK

AREAS SHALL ONLY BE REQUIRED TO COMPLY WITH SECTION 907.5.2.3.2, 1007, AND

1104.3.1 AND SHALL BE DESIGNED AND CONSTRUCTION SO THAT

INDIVIDUALS WITH DISABILITIES CAN APPROACH, ENTER, AND EXIT THE WORK AREAS.

1103.2.8 LIMITED ACCESS SPACES. NONOCCUPIABLE SPACES ACCESSED ONLY BY

LADDERS, CATWALKS, CRAWLSPACES, FREIGHT ELEVATORS OR VERY NARROW

PASSAGEWAYS ARE NOT REQUIRED TO BE ACCESSIBLE.

1103.2.9 EQUIPMENT SPACES. SPACES FREQUENTED ONLY BY PERSONNEL FOR

MAINTENANCE, REPAIR OR MONITORING OF EQUIPMENT ARE NOT REQUIRED TO BE

ACCESSIBLE.

SECTION 1104 ACCESSIBLE ROUTES - 1104.5 LOCATION.

ACCESSIBLE ROUTES SHALL COINCIDE WITH OR BE LOCATED IN THE SAME AREA AS A

GENERAL CIRCULATION PATH.

WHERE THE CIRCULATION PATH IS INTERIOR, THE ACCESSIBLE ROUTE SHALL ALSO BE

INTERIOR. WHERE ONLY ONE ACCESSIBLE ROUTE IS PROVIDED, THE ACCESSIBLE

ROUTE SHALL NOT PASS THROUGH KITCHENS, STORAGE ROOMS, RESTROOMS,

CLOSETS, OR SIMILAR SPACES.

SECTION 1110 SIGNAGE - 1110.1 SIGNS.

REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL

SYMBOL OF ACCESSIBILITY AT THE FOLLOWING LOCATIONS: ACCESSIBLE PARKING

SPACES, PASSENGER LOADING ZONES, ROOMS, ENTRANCES, CHECK-OUT AISLES,

FAMILY OR ASSISTED-USE TOILET AND BATHING ROOMS, AREAS OF REFUGE, AND

EXTERIOR AREAS. IN ADDITIONAL 1110.2 DIRECTIONAL SIGNAGE. DIRECTIONAL

SIGNAGE INDICATING THE ROUTE TO THE NEAREST LIKE ACCESSIBLE ELEMENT SHALL

BE PROVIDED AT THE FOLLOWING LOCATIONS STATED IN 1110.2 AND INCLUDE THE

INTERNATIONAL SYMBOL OF ACCESSIBILITY.

APPLICABLE CODES AND ORDINANCES

FLOOR PLAN NOTES

1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS

BASED UPON OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT

FIELD CONDITIONS.

2. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL

MOUNTED EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.

3. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS

OTHERWISE NOTED.

4. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL

INCONSISTENCIES IN FLOOR ELEVATIONS. PATCHING SHALL BE COMPATIBLE WITH

STATIC DISSIPATIVE FLOOR ADHESIVE

5. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE

SUBSTRATE FOR FINISHES.

6. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING ACCESS

CONTROL.

7. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND

PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE

PARTITION CONTAINS ACOUSTICAL INSULATION. PROVIDE FIRESTOPPING PER

REQUIREMENTS OF SPECIFICATION SECTION 07 84 00 FOR ALL RATED WALL

PENETRATIONS AND INTERSECTIONS.

8. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED STRUCTURE UNLESS

NOTED OTHERWISE, NO CEILINGS SPECIFIED.

INFECTION CONTROL NOTES

1. PRESSURE INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE PRESSURE (VERIFY

TWICE A DAY IN WRITING AND SUBMIT TO COR) - IF NOT, VERIFY ALL OPENINGS

(SUCH AS DOORS) ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER.

METER MUST READ CONTINUOUSLY.

2. CONTRACTOR SHALL DEVELOP A DAILY CHECK LIST FOR CONSTRUCTION

OVERSIGHT TUNED TO THE QUALITY ASSURANCE PLAN WHICH CAPTURED MOST

ERRORS. THIS MAY EVOLVE TO A LIVING DOCUMENT PENDING ISSUES

ENCOUNTERED.

3. REFER TO SPEC SECTION 01 35 26, DRAWING GI004 AND DEMOLITION DRAWINGS FOR

ICRA

REQUIREMENTS BASED ON DURATION / EXTENT OF WORK AND RISK FACTOR

HAZARDOUS MATERIALS NOTES

1. REMOVAL OF HAZARDOUS MATERIALS FROM THE BUILDING MUST FOLLOW STATE

AND FEDERAL REGULATIONS, AS WELL AS LOCAL LAWS WHEN APPLICABLE.

2. REFER TO THE DRAWINGS PREPARED BY THE HAZARDOUS MATERIAL CONSULTANT

DIAGRAM THE KNOWN ACM MATERIALS AFFECTED BY THE “WORK”.

REFLECTED CEILING PLAN NOTES

1. REFER TO ELECTRICAL SHEETS FOR FIXTURE TYPES, SWITCHING, AND SPECIAL

SYSTEMS.

2. REFER TO MECHANICAL SHEETS FOR DIFFUSER AND DUCTING LAYOUTS.

FLOOR PLAN GENERAL NOTES

DEMOLITION NOTES

1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH

THE SCOPE OF WORK.

2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND

AREAS REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL

QUANTITIES AND LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE

THE SCOPE OF WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.

3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS

SPECIFICALLY SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE

POSSESSION OF THE CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE

SITE.

4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL AND ENVIRONMENT

FRIENDLY MANNER PER VA GUIDELINES AT NO ADDITIONAL EXPENSE TO OWNER

5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN

THE BUILDING OR ON THE SITE. ALL DEBRIS IS TO BE REMOVED, AT MINIMUM ONCE

PER SHIFT DURING THE DESIGNATED TIMES.

6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS

MATERIALS ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO

ENDANGER HEALTH OF WORKERS AND PUBLIC.

7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.

8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES AND STANDARDS.

9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH

THEIR REQUIREMENTS.

10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE

BRACING AND SHORING.

11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY

ADJACENT OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM

INTERFERENCE TO PUBLIC OR PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS

AND ACCESS AT ALL TIMES.

12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION

SEPARATION WALLS AS REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST,

WEATHER, AND OTHER HAZARDS THAT MAY BE EXPOSED AS A RESULT OF THE

DEMOLITION WORK.

SEE SPECIFICATION SECTION 01 35 26 FOR REQUIREMENTS AND DEMOLITION

DRAWINGS FOR LOCATIONS AND DETAILS.

13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE

DRILLS. DO NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED AND APPROVED BY

COR.

14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY

DIMENSION.

15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING

STRUCTURAL ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION,

UNLESS SPECIFICALLY NOTED ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY

OF THE CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING, BRACING, OR

TEMPORARY STRUCTURE, AND TO COORDINATE WITH STRUCTURAL ENGINEER AS

REQUIRED.

16. ALL PUBLIC UTILITIES ARE TO REMAIN IN OPERATION THROUGHOUT

CONSTRUCTION. CONTRACTOR TO COORDINATE ANY TEMPORARY SERVICES

REQUIRED TO MAINTAIN BUSINESS OPERATIONS WITH THE COR.

17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC.

DEMOLITION AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.

18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR.

ALL FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND

OPERABLE AT ALL TIMES. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO

PROTECT THIS EQUIPMENT. IMMEDIATELY NOTIFY COR, BUILDING SECURITY AND

BUILDING MANAGER OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE

DAMAGED SYSTEMS IMMEDIATELY AS DIRECTED AND TO THE SATISFACTION OF THE

COR. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE

ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE

ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS.

19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE

POINT IN QUESTION WITH THE COR BEFORE PROCEEDING. IMMEDIATELY STOP WORK

IF HAZARDOUS MATERIALS ARE FOUND AND CONTACT THE COR.

20. SEE TELECOMMUNICATION DRAWINGS FOR REMOVAL OF ANY EQUIPMENT,

CABLING SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND

TELEPHONE. VERIFY WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT

DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW

CONSTRUCTION DELAYS.

21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED, TO THE ORIGINAL RATING

WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY

DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL

LISTING REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS

ORIGINALLY DESIGNED.

22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE

LEFT IN CLEAN, ORDERLY CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL

SHALL BE REMOVED.

23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY

AND ALL DAMAGE CAUSED BY OR IN CONJUCTION WITH THE "WORK". REFINISH TO

MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.

24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL

SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR

CONSTRUCTION.

25. PRIOR TO DEMOLITION, INVESTIGATE WALLS AND CEILINGS FOR CONCEALED

PIPING AND/OR OTHER UTILITIES OR SERVICES AND INFORM COR OF ANY CONDITION

NOT DOCUMENTED IN CONTRACT DRAWINGS. DEMO DESIGNATED WALL BASES, WALL

FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO CONDUITS AND

RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN FOR ADDITIONAL INFORMATION.

26. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING

ADHESIVES, TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS

NOTED OTHERWISE. PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.

27. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A CONSTRUCTION

CONTAINMENT CUBE WITH HEPA VACUUM TO MAINTAIN NEGATIVE PRESSURE AS A

MEANS TO ACCESS AREAS ABOVE CEILING TILES, THIS INCLUDES ALL PATIENT

CORRIDORS AND ALL ACUTE CARE PATIENT AREAS. THIS IS IN CONJUNCTION WITH

THE HOSPITALS INFECTION PREVENTION MEASURES AND ICRA PROTOCOLS.

DEMOLITION GENERAL NOTES

GENERAL SYMBOLS

SCALE:

B2

VIEW NAME

1/8" = 1'-0"

A4

CONCRETE

METALS

BRICK

CMU

TILE

STONE

WOOD

GYPSUM

GLASS

INSULATION

REGULAR

STEEL ALUMINUM

FACE COMMON

CMU

CERAMIC

MARBLE LIMESTONE

FINISH BLOCKING

PLASTER OR GWB

LARGE SCALE SMALL SCALE

BATT OR

LOOSE

RIGID

SURFACE

DETAIL TITLE

BUILDING SECTION

WALL SECTION

EXTERIOR / INTERIOR

ELEVATION

INTERIOR MULTI-VIEW

ELEVATION

MATERIALS REFERENCE

DETAIL SECTION

AE402

C4

AE201

A1

AE305

SIM

A1

AE305

SIM

A1

AE305

SIM

AE505

C3

A3

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS DRAWN

ELEVATION NUMBER

SHEET ON WHICH

ELEVATION IS DRAWN

ACTUAL SQ. FT.

PROGRAMMED SQ. FT.

ROOM NUMBER

DOOR NUMBER

KEYNOTE

WALL TYPE

REVISION NUMBER

ELEVATION INDICATION

COLUMN GRID

IDENTIFICATION

NORTH ARROW

WINDOW NUMBER

A1

EQUIPMENT TAG

D

N

MATCHLINE

FINISH , FINISH MATERIAL FINISH EXTENTS

SPRAY FOAM

B

5E

1t

S

W1

ROOM NAME

A505B

200 SF / 150 SF

A1

REVISIONS

P L A N N I N G

A R C H I T E C T U R E

E N G I N E E R I N G

I N T E R I O R S

EST. 1915

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Program Contracting

Activity Central

(PCAC)

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

PRIME A/E CONTRACTOR

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

/1

/2

:3

:2

P M

700 19th St. S.

Birmingham, AL 35233

CODE INFORMATION,

SYMBOLS AND

ABBREVIATIONS

GI003

EHRM - INFRASTRUCTURE

UPGRADES

521-20-901

August 18, 2022 Checker Author

B

IM

/0

-1

-0

V

A B h a m

E

H R

M V

A B h a m

-E H

R M

-A rc h it e c tu re .r v t

100% CONSTRUCTION

DOCUMENTSGDM ARCHITECTS/ENGINEERS

Dallas, TX 75204-8589

3232 McKinney Avenue, Suite 800

1401 W 34th Ave, Suite 200 Anchorage, AK 99503

(907) 562-0422

(214) 526-1144

TLT TOILET

TOPO TOPOGRAPHY

TOS TOP OF STEEL

TOW TOP OF WALL

TP TOP OF PAVEMENT

TRANS TRANSVERSE

TS TRANSITION STRIP

TYP TYPICAL

U

UC UNDERCUT

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UR URINAL

UV UNIT VENTILATOR

V

V VOLT

VAV VARIABLE AIR VOLUME

VC VERTICAL CURVE

VCP VITRIFIED CLAY PIPE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W

W WATT / WATER

W/ WITH

W/O WITHOUT

WAGD WASTE ANESTHESIA GAS DISPOSAL

WC WATER CLOSET / WALL COVERING

WD WOOD

WDB WOOD BASE

WDF WOOD FLOOR

WDP WOOD PANEL

WDW WINDOW

WDWF WINDOW FILM

WGD WALL GUARD

WH WATER HEATER / WALL HYDRANT

WP WEATHERPROOF

WPFG WATERPROOFING

WS WATER STOP

WT WEIGHT / WINDOW TREATMENT

WWF WELDED WIRE FABRIC

X

XFMR TRANSFORMER

Y

YD YARD

YH YARD HYDRANT

MFR MANUFACTURER

MG MOTOR GENERATOR / MEDICAL GAS

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MM MILLIMETER

MO MASONRY OPENING

MP METAL PANEL

MT METAL TRANSITION

MTD MOUNTED

MTG MOUNTING

MULL MULLION

MV MEDICAL VACUUM

N

N NITROGEN

N2O NITROUS OXIDE

NEC NATIONAL ELECTRICAL CODE

NFPA NATIONAL FIRE PROTECTION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O/S OFFSET

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OPNG OPENING

OPP OPPOSITE

OX OXYGEN

OZ OUNCE

P

P PAINT / PUMP / PENDANT

PA PASCAL

PART PARTITION

PAVT PAVEMENT

PC POINT OF CURVATURE / PRIVACY CURTAIN

PCF POUNDS PER CUBIC FOOT

PED PEDESTAL

PERP PERPENDICULAR

PHC PREHEAT COIL

PHVAC PLUMBING, HEATING, VENTILATING AND AIR CONDITIONING

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

PKG PARKING

PL PLASTIC LAMINATE / PROPERTY LINE / PLATE

PLAS PLASTER

PLBG PLUMBING

PLF POUNDS PER LINEAR FOOT

PLYWD PLYWOOD

PNL PANEL

POL CONC POLISHED CONCRETE

PR PAIR

PRF POURED RESINOUS FLOORING

PROJ PROJECTION

PRV PRESSURE REGULATING VALVE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT OF TANGENCY

PTB PORCELAIN TILE BASE

PTF PORCELAIN TILE FLOOR

PTVC POINT OF VERTICAL CURVATURE

PTW PORCELAIN TILE WALL

PVC POLYVINYL CHLORIDE

PVI POINT OF VERTICAL INTERSECTION

PVT POINT OF VERTICAL TANGENCY

Q

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QZP QUARTZ POLYMER

R

R RADIUS / REGISTER

RA RETURN AIR

RAF RAISED ACCESS FLOORING

RB RESILIENT BASE

RCP REINFORCED…

This is the start of the file's text. The full file is on GovTribe.