Attachment 2(a) Drawings Part_1_of_5 521-20-901 Birmingham EHRM 09-01-2022 Rev.pdf
PDF 14 MB Posted
- Attached to
- EHRM Birmingham Infrastructure Upgrades
- Solicitation number
- 36C77623B0026
About this file
This document provides details for a federal solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks a contractor to complete Electronic Health Records Modernization Infrastructure Upgrades to the Veterans Affairs Medical Center in Birmingham, Alabama. The solicitation number is 36C77623B0026 and the contractor shall furnish all labor, material, supervision, quality control, project management and services necessary to modernize infrastructure and support implementation of an upgraded electronic health records system.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
N
PROJECT LOCATION
REVISIONS
P L A N N I N G
A R C H I T E C T U R E
E N G I N E E R I N G
I N T E R I O R S
EST. 1915
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Program Contracting
Activity Central
(PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PRIME A/E CONTRACTOR
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
/3
/2
:2
:4
P M
700 19th St. S.
Birmingham, AL 35233
COVER SHEET
GI001
EHRM - INFRASTRUCTURE
UPGRADES
521-20-901
August 18, 2022 AN TWM
B
IM
/0
-1
-0
V
A B h a m
E
H R
M V
A B h a m
-E H
R M
-A rc h it e c tu re .r v t
100% CONSTRUCTION
DOCUMENTSGDM ARCHITECTS/ENGINEERS
Dallas, TX 75204-8589
3232 McKinney Avenue, Suite 800
1401 W 34th Ave, Suite 200 Anchorage, AK 99503
(907) 562-0422
(214) 526-1144
BIRMINGHAM VA MEDICAL CENTER
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES - BIRMINGHAM, AL
PROJECT NO. 521-20-901
CONTRACT NO. 36C77621C0111
100% CONSTRUCTION DOCUMENTS
PROJECT DESCRIPTION:
PROJECT BUILDING:
VA BIRMINGHAM HEALTHCARE SYSTEM (VABHCS)
700 19th Street
Birmingham, AL 35233
BASIC DEFINITIONS
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT DEPT. OF VETERANS AFFAIRS AND
IS REFERRED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER.
THE TERM "OWNER" MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S
AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE
RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BEWTEEN THE GENERAL CONTRACTOR
AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE
CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF THEIR AUTHORITY AS DELEGATED BY
THE CONTRACTING OFFICER.
"CONTRACTING OFFICER'S REPRESENTATIVE", COR: MEANS THE CONTRACTING OFFICER'S
AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE
CONTRACTOR'S (PLURAL) PERFORMANCE.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE
CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES
ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR
TO FULFILL THE CONTRACTOR'S OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR
A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE
CONTRACT DOCUMENTS.
"DRAWINGS", "SHOP DRAWINGS" OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF
CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN,
LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS,
SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION
REPRESENTATIVE OF THE PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER
DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED
THROUGHOUT THE DRAWINGS AS IF SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT
AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND
OF SPECIALTY WORK IN CONNECTION WITH THIS PROJECT.
"FURNISH" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS,
TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING,
PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY
OTHER ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH
UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS, SLEEVES,
SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL,
DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP,
INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL ACCESSORIES,
SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT
LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND
OTHER ITEMS REQUIRED TO COMPLETE THE REFERENCED TASK.
"BY OWNER"; "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED
TO THE JOB SITE AND INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT,
BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS
SPECIFIED OR SHOWN.
OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS
CAN BE FOUND IN THE LEGEND AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN
DIVISION 0 AND 1 OF THE PROJECT MANUAL.
THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO, UPGRADING FACILITY FIBER THROUGHOUT THE BUILDINGS TO EACH TELECOMMUNICATION ROOM, PROVIDE A REDUNDANT FIBER RUN THROUGHOUT THE FACILITY TO EACH TELECOMMUNICATION ROOM, PROVIDE REDUNDANT FIBER MAINS TO THE DEMARCATION ROOM FROM THE PROVIDER POINT, INSTALL ADDITIONAL TELECOMMUNICATION ROOM OUTLETS, INSTALL NEW ELECTRICAL OUTLETS THROUGHOUT THE FACILITY, PROVIDE ADDITIONAL OUTLETS IN EACH TELECOMMUNICATIONS ROOM, UPGRADE FACILITY POWER DISTRIBUTION AS REQUIRED, UPGRADE FACILITY HVAC DISTRIBUTION AS REQUIRED, HHAZARDOUS MATERIAL ABATEMENT.
GENERAL PROJECT NOTES
1. CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO BIDDING TO BECOME FAMILIAR
WITH THE EXISTING SITE CONDITIONS, SECURITY PROVISIONS, LAYDOWN AREA AND
OTHER SITE SPECIFIC GENERAL CONDITIONS WHICH MAY AFFECT THE BID VALUE FOR
THIS PROJECT.
2. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL
SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL
WHICH FORM A PART OFTHE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL
INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT
OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR
CLARIFICATION SEVEN DAYS BEFORE BEGINING WORK ON THE AFFECTED ACTIVITIES.
3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO
THE START OF WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN DIMENSIONS
OR CONDITIONS.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND
NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY
DESCRIPTION AS MAY BE NECESSARY TO COMPLETE THE SCOPE OF WORK DEFINED ON
THE DRAWINGS AND SPECIFICATIONS.
5. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS
(HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC.), CERTIFICATIONS,
INSPECTIONS, DEPARTMENT APPROVALS, ETC. FOR WORK PERFORMED UNDER THIS
CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATIONS,
INSPECTIONS AND AGENCY APPROVALS TO THE COR.
6. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS,
ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND SUPPLEMENTARY
CONDITIONS OF THE CONTRACT.
7. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE RESPONSIBLE FOR THE PROPER
PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND
METHODS OF CONTRUCTION, SAFETY AND SECURITY ON SITE.
8. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR
THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL
BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS
FOR FINISHES AND SUBSTRATES AFFECTED.
9. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN
SECURITY DURING ALL CONSTRUCTION WORK.
10 PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, WITHOUT
ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE
COURSE OF CONSTRUCTION.
11. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL
GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINING EACH CONSTRUCTION
ACTIVITY.
12. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE
PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS
CONTRACT.
13. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND
PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS.
14. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN
PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY
WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT
WHICH DEVELOPS DEFECTS, EXCEPT FROM ORDINARY WEAR AND TEAR, WITHIN ONE (1)
YEAR FROM THE DATE OF THE FINAL ACCEPTANCE BY THE OWNER.
15. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER OUTAGES
AND SHUTDOWNS. POWER OUTAGES AND SHUTDOWNS MUST BE SCHEDULED WITH THE
COR, TWO WEEKS PRIOR TO OUTAGE.
16. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED
MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING,
EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO
MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF
DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS AND
ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR PORTIONS THEREOF TO BE REMOVED,
RELOCATED, REVISED OR ABANDONDED.
17. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL
BE CORRECTED AT NO EXPENSE TO THE OWNER OR ARCHITECT/ENGINEER OR RECORD
(EOR).
18. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE
MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF
CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE
BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK CLEAN.
19. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF
WASTE FROM THE SITE, CHECK WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND
TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE
BE USED WITHOUT PRIOR APPROVAL FROM THE COR. ALL BUILDING INTERIOR STAGING
AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL
TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS
SHALL NOT BE STORED IN CORRIDORS AT ANY TIME.
20. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR
TO START OF WORK.
21. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING,
AND TEMPORARY SUPPORTS AND RESTRAINS IN THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
22. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL BE EXCESSIVE.
RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.
23. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE
CORRECTIVE ACTION.
24. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL
FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR
SOILED DURING THE COURSE OF CONSTRUCTION.
25. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND
STORED IN A SAFE PLACE TO PREVENT DAMAGE; WHEN DAMAGED, REPLACED AT NO
EXPENSE TO THE OWNER.
26. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH
PROVISIONS OF THE TECHNICAL SPECIFICATIONS.
27. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT
SCALE THE DRAWINGS. ITEMS WRONGLY LOCATED BY DRAWING SCALING SHALL BE
CORRECTED AT THE CONTRACTORS EXPENSE AND AT NO ADDITIONAL COST TO THE
GOVERNMENT OR AE.
28. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S
EXISTING SIGNAGE SYSTEMS.
29. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL
CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO
MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE
THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR HOLIDAYS AT NO
ADDITIONAL COST TO THE GOVERNMENT.
30. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE
EXISTING REINFORCEMENT, STRUCTURAL MEMBER, AND UTILITIES TO MAINTAIN
ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT,
STRUCTURE, AND UTILITIES. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING
(NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASABLE, CONSTRACTOR SHALL USE
GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS
REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3)
WEEKS PRIOR TO EVENT; WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE
NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON THE THREE (3) WEEK LOOK
AHEAD SCHEDULE.
31. PROTECT EXISTING FIRE SUPRESSION SYSTEMS DURING CONSTRUCTION.
32. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT
AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE
CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE
CONDITION ACKNOWLEDGEMENT. REMIDIATION WOULD BE COMPENSATED BY
ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.
NO. DESCRIPTION DATE
08/18/2022
REVISIONS
P L A N N I N G
A R C H I T E C T U R E
E N G I N E E R I N G
I N T E R I O R S
EST. 1915
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Program Contracting
Activity Central
(PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PRIME A/E CONTRACTOR
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
/3
/2
:3
:4
P M
700 19th St. S.
Birmingham, AL 35233
SHEET INDEX
GI002
EHRM - INFRASTRUCTURE
UPGRADES
521-20-901
August 18, 2022 Checker Author
B
IM
/0
-1
-0
V
A B h a m
E
H R
M V
A B h a m
-E H
R M
-A rc h it e c tu re .r v t
100% CONSTRUCTION
DOCUMENTSGDM ARCHITECTS/ENGINEERS
Dallas, TX 75204-8589
3232 McKinney Avenue, Suite 800
1401 W 34th Ave, Suite 200 Anchorage, AK 99503
(907) 562-0422
(214) 526-1144
SHEET INDEX
SHEET
NUMBER SHEET NAME 1
C O
N S
T R
U C
T
IO
N I S
S U
E
/1
/2
TK-436 NEW PATCH PANEL SCHEDULES - FIFTH FLOOR
TK-437 NEW PATCH PANEL SCHEDULES - SIXTH FLOOR
TK-438 NEW PATCH PANEL SCHEDULES - SIXTH FLOOR
TK-439 NEW PATCH PANEL SCHEDULES - SIXTH FLOOR
TK-440 NEW PATCH PANEL SCHEDULES - SEVENTH FLOOR
TK-441 NEW PATCH PANEL SCHEDULES - SEVENTH FLOOR
TK-442 NEW PATCH PANEL SCHEDULES - EIGHTH FLOOR
TK-443 NEW PATCH PANEL SCHEDULES - NINTH FLOOR
TK-444 TELECOM BONDING DETAIL - BASEMENT, GROUND AND FIRST FLOORS
TK-445 TELECOM BONDING DETAIL - SECOND, THIRD, FOURTH AND FIFTH FLOORS
TK-446 TELECOM BONDING DETAILS - SIXTH, SEVENTH, EIGHTH AND NINTH FLOORS
TK-501 NEW RACK ELEVATIONS
TK-502 NEW RACK ELEVATIONS
TK-503 NEW RACK ELEVATIONS
TK-504 NEW RACK ELEVATIONS
TK-505 NEW RACK ELEVATIONS
TK-506 NEW MCR RACK ELEVATIONS
TK-507 NEW MCR RACK ELEVATIONS
SHEET INDEX
SHEET
NUMBER SHEET NAME 1
C O
N S
T R
U C
T
IO
N I S
S U
E
/1
/2
TN-108.1 TELECOM REMODEL PLAN - EIGHTH FLOOR - AREA 1 & 2
TN-108.2 TELECOM REMODEL PLAN - EIGHTH FLOOR - AREA 3
TN-108.3 ENLARGED TELECOM REMODEL PLANS - EIGHT FLOOR
TN-108.4 TELECOM DISTANCE ASSESSMENT - 8TH FLOOR
TN-109 TELECOM REMODEL PLAN - NINTH FLOOR
TN-109.1 TELECOM REMODEL PLAN - NINTH FLOOR - AREA 1 & 2
TN-109.2 TELECOM REMODEL PLAN - NINTH FLOOR - AREA 3
TN-109.3 ENLARGED TELECOM REMODEL PLANS - NINTH FLOOR
TN-109.4 TELECOM DISTANCE ASSESSMENT - 9TH FLOOR
TN-110 TELECOM REMODEL PLAN - TENTH FLOOR
TN-111 TELECOM REMODEL PLAN - ELEVENTH FLOOR
TK-001 TELECOM DETAILS
TK-002 MCR TELECOM GRID
TK-201 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR
TK-202 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR
TK-203 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR
TK-204 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR
TK-205 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR
TK-206 EXISTING PATCH PANEL SCHEDULES - GROUND FLOOR
TK-207 EXISTING PATCH PANEL SCHEDULES - GROUND & FIRST FLOOR
TK-208 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-209 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-210 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-211 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-212 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-213 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-214 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-215 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-216 EXISTING PATCH PANEL SCHEDULES - FIRST FLOOR
TK-217 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR
TK-218 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR
TK-219 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR
TK-220 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR
TK-221 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR
TK-222 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR
TK-223 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR
TK-224 EXISTING PATCH PANEL SCHEDULES - SECOND FLOOR
TK-225 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR
TK-226 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR
TK-227 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR
TK-228 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR
TK-229 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR
TK-230 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR
TK-231 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR
TK-232 EXISTING PATCH PANEL SCHEDULES - THIRD FLOOR
TK-233 EXISTING PATCH PANEL SCHEDULES - THIRD & FOURTH FLOOR
TK-234 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-235 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-236 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-237 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-238 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-239 EXISTING PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-240 EXISTING PATCH PANEL SCHEDULES - FOURTH & FIFTH FLOOR
TK-241 EXISTING PATCH PANEL SCHEDULES - FIFTH FLOOR
TK-242 EXISTING PATCH PANEL SCHEDULES - FIFTH FLOOR
TK-243 EXISTING PATCH PANEL SCHEDULES - FIFTH & SIXTH FLOOR
TK-244 EXISTING PATCH PANEL SCHEDULES - FIFTH & SIXTH FLOOR
TK-245 EXISTING PATCH PANEL SCHEDULES - SIXTH FLOOR
TK-246 EXISTING PATCH PANEL SCHEDULES - SIXTH FLOOR
TK-247 EXISTING PATCH PANEL SCHEDULES - SIXTH FLOOR
TK-248 EXISTING PATCH PANEL SCHEDULES - SIXTH FLOOR
TK-249 EXISTING PATCH PANEL SCHEDULES - SIXTH & SEVENTH FLOOR
TK-250 EXISTING PATCH PANEL SCHEDULES - SEVENTH FLOOR
TK-251 EXISTING PATCH PANEL SCHEDULES - SEVENTH FLOOR
TK-252 EXISTING PATCH PANEL SCHEDULES - SEVENTH FLOOR
TK-253 EXISTING PATCH PANEL SCHEDULES - SEVENTH & EIGHTH FLOOR
TK-254 EXISTING PATCH PANEL SCHEDULES - EIGHTH FLOOR
TK-255 EXISTING PATCH PANEL SCHEDULES - EIGHTH FLOOR
TK-256 EXISTING PATCH PANEL SCHEDULES - EIGHTH FLOOR
TK-257 EXISTING PATCH PANEL SCHEDULES - EIGHT & NINTH FLOOR
TK-258 EXISTING PATCH PANEL SCHEDULES - NINTH FLOOR
TK-259 EXISTING PATCH PANEL SCHEDULES - NINTH FLOOR
TK-301 EXISTING RACK ELEVATIONS
TK-302 EXISTING RACK ELEVATIONS
TK-303 EXISITNG RACK ELEVATIONS
TK-304 EXISITNG RACK ELEVATIONS
TK-305 EXISITNG RACK ELEVATIONS
TK-306 EXISITNG RACK ELEVATIONS
TK-307 EXISITNG RACK ELEVATIONS
TK-308 EXISITNG RACK ELEVATIONS
TK-401 FIBER RISER DIAGRAM
TK-402 TELECOM ROOM DETAILS
TK-403 CABLE SCHEDULES
TK-404 MCR TELECOM EQUIPMENT SCHEDULE
TK-405 NEW PATCH PANEL SCHEDULES - BASEMENT AND GROUND FLOOR
TK-406 NEW PATCH PANEL SCHEDULES - GROUND FLOOR
TK-407 NEW PATCH PANEL SCHEDULES FIRST FLOOR
TK-408 NEW PATCH PANEL SCHEDULES - FIRST FLOOR
TK-409 NEW PATCH PANEL SCHEDULES - FIRST FLOOR
TK-410 NEW PATCH PANEL SCHEDULES - FIRST FLOOR
TK-411 NEW PATCH PANEL SCHEDULES - SECOND FLOOR
TK-412 NEW PATCH PANEL SCHEDULES - SECOND FLOOR
TK-413 NEW PATCH PANEL SCHEDULES - SECOND FLOOR
TK-414 NEW PATCH PANEL SCHEDULES - THIRD FLOOR
TK-415 NEW PATCH PANEL SCHEDULES - THIRD FLOOR
TK-416 NEW PATCH PANEL SCHEDULES - THIRD FLOOR
TK-417 NEW PATCH PANEL SCHEDULES - MCR
TK-418 NEW PATCH PANEL SCHEDULES - MCR
TK-419 NEW PATCH PANEL SCHEDULES - MCR
TK-420 NEW PATCH PANEL SCHEDULES - MCR
TK-421 NEW PATCH PANEL SCHEDULES - MCR
TK-422 NEW PATCH PANEL SCHEDULES - MCR
TK-423 NEW PATCH PANEL SCHEDULES - MCR
TK-424 NEW PATCH PANEL SCHEDULES - MCR
TK-425 NEW PATCH PANEL SCHEDULES - MCR
TK-426 NEW PATCH PANEL SCHEDULES - MCR
TK-427 NEW PATCH PANEL SCHEDULES - MCR
TK-428 NEW PATCH PANEL SCHEDULES - MCR
TK-429 NEW PATCH PANEL SCHEDULES - MCR
TK-430 NEW PATCH PANEL SCHEDULES - MCR
TK-431 NEW PATCH PANEL SCHEDULES - MCR
TK-432 NEW PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-433 NEW PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-434 NEW PATCH PANEL SCHEDULES - FOURTH FLOOR
TK-435 NEW PATCH PANEL SCHEDULES - FIFTH FLOOR
SHEET INDEX
SHEET
NUMBER SHEET NAME 1
C O
N S
T R
U C
T
IO
N I S
S U
E
/1
/2
TD-102.3 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 3
TD-102.4 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 4
TD-102.5 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 5
TD-102.6 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 6 & 7
TD-102.7 ENLARGED TELECOM DEMOLITION PLANS - SECOND FLOOR
TD-103 TELECOM DEMOLITION PLAN - THIRD FLOOR
TD-103.1 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 1
TD-103.2 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 2
TD-103.3 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 3
TD-103.4 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 4
TD-103.5 TELECOM DEMOLITION PLAN - THIRD FLOOR - AREA 5 & 6
TD-103.6 ENLARGED TELECOM DEMOLITION PLANS - THIRD FLOOR
TD-103.7 TELECOM DEMOLITION PLANS - MCR & PBX PHASE 1 & 2
TD-103.8 TELECOM DEMOLITION PLANS - MCR & PBX PHASE 3 & 4
TD-104 TELECOM DEMOLITION PLAN - FOURTH FLOOR
TD-104.1 TELECOM DEMOLITION PLAN - FOURTH FLOOR - AREA 1
TD-104.2 TELECOM DEMOLITION PLAN - FOURTH FLOOR - AREA 2 & 3
TD-104.3 TELECOM DEMOLITION PLAN - FOURTH FLOOR - AREA 4
TD-104.4 TELECOM DEMOLITION PLAN - FOURTH FLOOR - AREA 5 & 6
TD-104.5 ENLARGED TELECOM DEMOLITION PLANS - FOURTH FLOOR
TD-105 TELECOM DEMOLITION PLAN - FIFTH FLOOR
TD-105.1 TELECOM DEMOLITION PLAN - FIFTH FLOOR - AREA 1 & 2
TD-105.2 TELECOM DEMOLITION PLAN - FIFTH FLOOR - AREA 3
TD-105.3 TELECOM DEMOLITION PLAN - FIFTH FLOOR - AREA 4
TD-105.4 TELECOM DEMOLITION PLAN - FIFTH FLOOR - AREA 5 & 6
TD-105.5 ENLARGED TELECOM DEMOLITION PLANS - FIFTH FLOOR
TD-106 TELECOM DEMOLITION PLAN - SIXTH FLOOR
TD-106.1 TELECOM DEMOLITION PLAN - SIXTH FLOOR - AREA 1 & 2
TD-106.2 TELECOM DEMOLITION PLAN - SIXTH FLOOR - AREA 3
TD-106.3 TELECOM DEMOLITION PLAN - SIXTH FLOOR - AREA 4
TD-106.4 TELECOM DEMOLITION PLAN - SIXTH FLOOR - AREA 5
TD-106.5 ENLARGED TELECOM DEMOLITION PLANS - SIXTH FLOOR
TD-107 TELECOM DEMOLITION PLAN - SEVENTH FLOOR
TD-107.1 TELECOM DEMOLITION PLAN - SEVENTH FLOOR - AREA 1 & 2
TD-107.2 TELECOM DEMOLITION PLAN - SEVENTH FLOOR - AREA 3
TD-107.3 TELECOM DEMOLITION PLAN - SEVENTH FLOOR - AREA 4
TD-107.4 ENLARGED TELECOM DEMOLITION PLANS - SEVENTH FLOOR
TD-108 TELECOM DEMOLITION PLAN - EIGHTH FLOOR
TD-108.1 TELECOM DEMOLITION PLAN - EIGHTH FLOOR - AREA 1 & 2
TD-108.2 TELECOM DEMOLITION PLAN - EIGHTH FLOOR - AREA 3
TD-108.3 ENLARGED TELECOM DEMOLITION PLANS - EIGHTH FLOOR
TD-109 TELECOM DEMOLITION PLAN - NINTH FLOOR
TD-109.1 TELECOM DEMOLITION PLAN - NINTH FLOOR - AREA 1 & 2
TD-109.2 TELECOM DEMOLITION PLAN - NINTH FLOOR - AREA 3
TD-109.3 ENLARGED TELECOM DEMOLITION PLANS - NINTH FLOOR
TD-110 TELECOM DEMOLITION PLAN - TENTH FLOOR
TD-111 TELECOM DEMOLITION PLAN - ELEVENTH FLOOR
TN-100B TELECOM REMODEL PLAN - BASEMENT
TN-100B0 TELECOM REMODEL PLAN - SUB-BASEMENT
TN-100B.11 ENLARGED TELECOM REMODEL PLANS - BASEMENT FLOOR
TN-100B.21 TELECOM DISTANCE ASSESSMENT - BASEMENT
TN-100G TELECOM REMODEL PLAN - GROUND FLOOR
TN-100G.1 TELECOM REMODEL - GROUND FLOOR - AREA 1
TN-100G.2 TELECOM REMODEL - GROUND FLOOR - AREA 2
TN-100G.3 TELECOM REMODEL - GROUND FLOOR - AREA 3
TN-100G.4 TELECOM REMODEL - GROUND FLOOR - AREA 4
TN-100G.5 TELECOM REMODEL - GROUND FLOOR - AREA 5
TN-100G.6 TELECOM REMODEL - GROUND FLOOR - AREA 6
TN-100G.7 ENLARGED TELECOM REMODEL PLANS - GROUND FLOOR
TN-100G.8 TELECOM DISTANCE ASSESSMENT - GROUND FLOOR
TN-101 TELECOM REMODEL PLAN - FIRST FLOOR
TN-101.1 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 1
TN-101.2 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 2
TN-101.3 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 3
TN-101.4 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 4
TN-101.5 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 5
TN-101.6 TELECOM REMODEL PLAN - FIRST FLOOR - AREA 6
TN-101.7 ENLARGED TELECOM REMODEL PLANS - FIRST FLOOR
TN-101.8 TELECOM DISTANCE ASSESSMENT - 1ST FLOOR
TN-102 TELECOM REMODEL PLAN - SECOND FLOOR
TN-102.1 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 1
TN-102.2 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 2
TN-102.3 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 3
TN-102.4 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 4
TN-102.5 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 5
TN-102.6 TELECOM REMODEL PLAN - SECOND FLOOR - AREA 6 & 7
TN-102.7 ENLARGED TELECOM REMODEL PLANS - SECOND FLOOR
TN-102.8 TELECOM DISTANCE ASSESSMENT - 2ND FLOOR
TN-103 TELECOM REMODEL PLAN - THIRD FLOOR
TN-103.1 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 1
TN-103.2 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 2
TN-103.3 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 3
TN-103.4 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 4
TN-103.5 TELECOM REMODEL PLAN - THIRD FLOOR - AREA 5 & 6
TN-103.6 ENLARGED TELECOM REMODEL PLANS - THIRD FLOOR
TN-103.7 TELECOM REMODEL PLANS - MCR & PBX PHASE 1 & 2
TN-103.8 TELECOM REMODEL PLANS - MCR & PBX PHASE 3 & 4
TN-103.9 TELECOM DISTANCE ASSESSMENT - 3RD FLOOR
TN-104 TELECOM REMODEL PLAN - FOURTH FLOOR
TN-104.1 TELECOM REMODEL PLAN - FOURTH FLOOR - AREA 1
TN-104.2 TELECOM REMODEL PLAN - FOURTH FLOOR - AREA 2 & 3
TN-104.3 TELECOM REMODEL PLAN - FOURTH FLOOR - AREA 4
TN-104.4 TELECOM REMODEL PLAN - FOURTH FLOOR - AREA 5 & 6
TN-104.5 ENLARGED TELECOM REMODEL PLANS - FOURTH FLOOR
TN-104.6 TELECOM DISTANCE ASSESSMENT - 4TH FLOOR
TN-105 TELECOM REMODEL PLAN - FIFTH FLOOR
TN-105.1 TELECOM REMODEL PLAN - FIFTH FLOOR - AREA 1 & 2
TN-105.2 TELECOM REMODEL PLAN - FIFTH FLOOR - AREA 3
TN-105.3 TELECOM REMODEL PLAN - FIFTH FLOOR - AREA 4
TN-105.4 TELECOM REMODEL PLAN - FIFTH FLOOR - AREA 5 & 6
TN-105.5 ENLARGED TELECOM REMODEL PLANS - FIFTH FLOOR
TN-105.6 TELECOM DISTANCE ASSESSMENT - 5TH FLOOR
TN-106 TELECOM REMODEL PLAN - SIXTH FLOOR
TN-106.1 TELECOM REMODEL PLAN - SIXTH FLOOR - AREA 1 & 2
TN-106.2 TELECOM REMODEL PLAN - SIXTH FLOOR - AREA 3
TN-106.3 TELECOM REMODEL PLAN - SIXTH FLOOR - AREA 4
TN-106.4 TELECOM REMODEL PLAN - SIXTH FLOOR - AREA 5
TN-106.5 ENLARGED TELECOM REMODEL PLANS - SIXTH FLOOR
TN-106.6 TELECOM DISTANCE ASSESSMENT - 6TH FLOOR
TN-107 TELECOM REMODEL PLAN - SEVENTH FLOOR
TN-107.1 TELECOM REMODEL PLAN - SEVENTH FLOOR - AREA 1 & 2
TN-107.2 TELECOM REMODEL PLAN - SEVENTH FLOOR - AREA 3
TN-107.3 TELECOM REMODEL PLAN - SEVENTH FLOOR - AREA 4
TN-107.4 ENLARGED TELECOM REMODEL PLANS - SEVENTH FLOOR
TN-107.5 TELECOM DISTANCE ASSESSMENT - 7TH FLOOR
TN-108 TELECOM REMODEL PLAN - EIGHTH FLOOR
SHEET INDEX
SHEET
NUMBER SHEET NAME 1
C O
N S
T R
U C
T
IO
N I S
S U
E
/1
/2
MJ106 SIXTH FLOOR - MECHANICAL ENLARGED
MJ107 SEVENTH FLOOR - MECHANICAL ENLARGED
MJ108 EIGHTH FLOOR - MECHANICAL ENLARGED
MJ109 NINTH FLOOR - MECHANICAL ENLARGED
MK001 MECHANICAL SCHEDULES
MK002 MECHANICAL SCHEDULES
15-E-ELECTRICAL
EG-001 ELECTRICAL LEGEND AND FIXTURE SCHEDULE
ED-100B ELECTRICAL DEMOLITION PLAN - BASEMENT
ED-100B0 ELECTRICAL DEMOLITION PLAN - SUB-BASEMENT
ED-100B.1 ENLARGED ELECTRICAL DEMOLITION PLANS - BASEMENT FLOOR
ED-100G ELECTRICAL DEMOLITION PLAN - GROUND FLOOR
ED-100G.1 ENLARGED ELECTRICAL DEMOLITION PLANS - GROUND FLOOR
ED-100G.2 ENLARGED ELECTRICAL DEMOLITION PLANS - GROUND FLOOR
ED-101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
ED-101.1 ENLARGED ELECTRICAL DEMOLITION PLANS - FIRST FLOOR
ED-101.2 ENLARGED ELECTRICAL DEMOLITION PLANS - FIRST FLOOR
ED-102 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR
ED-102.1 ENLARGED ELECTRICAL DEMOLITION PLANS - SECOND FLOOR
ED-103 ELECTRICAL DEMOLITION PLAN - THIRD FLOOR
ED-103.1 ENLARGED ELECTRICAL DEMOLITION PLANS - THIRD FLOOR
ED-103.2 ELECTRICAL DEMOLITION PLANS - MCR & PBX PHASE 1 & 2
ED-103.3 ELECTRICAL DEMOLITION PLANS - MCR & PBX PHASE 3 & 4
ED-103.4 LIGHTING DEMOLITION PLAN - MCR & PBX PHASE 4
ED-104 ELECTRICAL DEMOLITION PLAN - FOURTH FLOOR
ED-104.1 ENLARGED ELECTRICAL DEMOLITION PLANS - FOURTH FLOOR
ED-105 ELECTRICAL DEMOLITION PLAN - FIFTH FLOOR
ED-105.1 ENLARGED ELECTRICAL DEMOLITION PLANS - FIFTH FLOOR
ED-106 ELECTRICAL DEMOLITION PLAN - SIXTH FLOOR
ED-106.1 ENLARGED ELECTRICAL DEMOLITION PLANS - SIXTH FLOOR
ED-107 ELECTRICAL DEMOLITION PLAN - SEVENTH FLOOR
ED-107.1 ENLARGED ELECTRICAL DEMOLITION PLANS - SEVENTH FLOOR
ED-108 ELECTRICAL DEMOLITION PLAN - EIGHTH FLOOR
ED-108.1 ENLARGED ELECTRICAL DEMOLITION PLANS - EIGHTH FLOOR
ED-109 ELECTRICAL DEMOLITION PLAN - NINTH FLOOR
ED-109.1 ENLARGED ELECTRICAL DEMOLITION PLANS - NINTH FLOOR
ED-110 ELECTRICAL DEMOLITION PLAN - TENTH FLOOR
ED-111 ELECTRICAL DEMOLITION PLAN - ELEVENTH FLOOR
EP-100B ELECTRICAL REMODEL PLAN - BASEMENT
EP-100B0 ELECTRICAL REMODEL PLAN - SUB-BASEMENT
EP-100B.1 ENLARGED ELECTRICAL REMODEL PLANS - BASEMENT FLOOR
EP-100G ELECTRICAL REMODEL PLAN - GROUND FLOOR
EP-100G.1 ENLARGED ELECTRICAL REMODEL PLANS - GROUND FLOOR
EP-100G.2 ENLARGED ELECTRICAL REMODEL PLANS - GROUND FLOOR
EP-101 ELECTRICAL REMODEL PLAN - FIRST FLOOR
EP-101.1 ENLARGED ELECTRICAL REMODEL PLANS - FIRST FLOOR
EP-102 ELECTRICAL REMODEL PLAN - SECOND FLOOR
EP-102.1 ENLARGED ELECTRICAL REMODEL PLANS - SECOND FLOOR
EP-103 ELECTRICAL REMODEL PLAN - THIRD FLOOR
EP-103.1 ENLARGED ELECTRICAL REMODEL PLANS - THIRD FLOOR
EP-103.2 ELECTRICAL REMODEL PLANS - MCR & PBX PHASE 1 & 2
EP-103.3 ELECTRICAL REMODEL PLANS - MCR & PBX PHASE 3 & 4
EP-103.4 LIGHTING REMODEL PLANS - MCR & PBX PHASE 4
EP-103.5 MCR EQUIPMENT SCHEDULE
EP-104 ELECTRICAL REMODEL PLAN - FOURTH FLOOR
EP-104.1 ENLARGED ELECTRICAL REMODEL PLANS - FOURTH FLOOR
EP-105 ELECTRICAL REMODEL PLAN - FIFTH FLOOR
EP-105.1 ENLARGED ELECTRICAL REMODEL PLANS - FIFTH FLOOR
EP-106 ELECTRICAL REMODEL PLAN - SIXTH FLOOR
EP-106.1 ENLARGED ELECTRICAL REMODEL PLANS - SIXTH FLOOR
EP-107 ELECTRICAL REMODEL PLAN - SEVENTH FLOOR
EP-107.1 ENLARGED ELECTRICAL REMODEL PLANS SEVENTH FLOOR
EP-108 ELECTRICAL REMODEL PLAN - EIGHTH FLOOR
EP-108.1 ENLARGED ELECTRICAL PLANS - EIGHTH FLOOR
EP-109 ELECTRICAL REMODEL PLAN - NINTH FLOOR
EP-109.1 ENLARGED ELECTRICAL PLANS - NINTH FLOOR
EP-110 ELECTRICAL REMODEL PLAN - TENTH FLOOR
EP-111 ELECTRICAL REMODEL PLAN - ELEVENTH FLOOR
EK-001 POWER AND ELEVATION SCHEMATIC FOR TR RACK
EK-002 POWER ONE-LINE DIAGRAMS
EK-003 ELECTRICAL DETAILS
EK-100 PANEL SCHEDULES
EK-101 PANEL SCHEDULES
EK-102 PANEL SCHEDULES
EK-103 PANEL SCHEDULES
EK-104 PANEL SCHEDULES
EK-105 PANEL SCHEDULES
EK-106 PANEL SCHEDULES
EK-107 PANEL SCHEDULES
EK-108 PANEL SCHEDULES
EK-109 PANEL SCHEDULES
EK-110 PANEL SCHEDULES
EK-111 PANEL SCHEDULES
EK-112 PANEL SCHEDULES
EK-113 PANEL SCHEDULES
EK-114 PANEL SCHEDULES
EK-115 PANEL SCHEDULES
EK-116 PANEL SCHEDULES
EK-117 PANEL SCHEDULES
EK-118 PANEL SCHEDULES
16-T-TELECOM
TG-001 GENERAL TELECOM NOTES
TD-100B TELECOM DEMOLITION PLAN - BASEMENT
TD-100B0 TELECOM DEMOLITION PLAN - SUB-BASEMENT
TD-100B.1 ENLARGED TELECOM DEMOLITION PLANS - BASEMENT
TD-100G TELECOM DEMOLITION PLAN - GROUND FLOOR
TD-100G.1 TELECOM DEMOLITION - GROUND FLOOR - AREA 1
TD-100G.2 TELECOM DEMOLITION - GROUND FLOOR - AREA 2
TD-100G.3 TELECOM DEMOLITION - GROUND FLOOR - AREA 3
TD-100G.4 TELECOM DEMOLITION - GROUND FLOOR - AREA 4
TD-100G.5 TELECOM DEMOLITION - GROUND FLOOR - AREA 5
TD-100G.6 TELECOM DEMOLITION - GROUND FLOOR - AREA 6
TD-100G.7 ENLARGED TELECOM DEMOLITION PLANS - GROUND FLOOR
TD-101 TELECOM DEMOLITION PLAN - FIRST FLOOR
TD-101.1 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 1
TD-101.2 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 2
TD-101.3 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 3
TD-101.4 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 4
TD-101.5 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 5
TD-101.6 TELECOM DEMOLITION PLAN - FIRST FLOOR - AREA 6
TD-101.7 ENLARGED TELECOM DEMOLITION PLANS - FIRST FLOOR
TD-102 TELECOM DEMOLITION PLAN - SECOND FLOOR
TD-102.1 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 1
TD-102.2 TELECOM DEMOLITION PLAN - SECOND FLOOR - AREA 2
SHEET INDEX
SHEET
NUMBER SHEET NAME 1
C O
N S
T R
U C
T
IO
N I S
S U
E
/1
/2
01-G-GENERAL
GI001 COVER SHEET X
GI002 SHEET INDEX X
GI003 CODE INFORMATION, SYMBOLS AND ABBREVIATIONS X
GI004 ICRA CLASSIFICATION PROCESS X
07-STRUCTURAL
SF-101 FIRST FLOOR PLANS X
SF-103 THIRD FLOOR PLANS X
SF-104 FOURTH FLOOR PLANS X
SF-105 FIFTH FLOOR PLANS X
08-A-ARCHITECTURAL
AE100SB OVERALL FLOOR PLAN LEVEL SUB-BASEMENT X
AE100B OVERALL FLOOR PLAN LEVEL BASEMENT X
AE100 OVERALL GROUND FLOOR PLAN X
AE101 OVERALL FLOOR PLAN LEVEL 1 X
AE102 OVERALL FLOOR PLAN LEVEL 2 X
AE103 OVERALL FLOOR PLAN LEVEL 3 X
AE104 OVERALL FLOOR PLAN LEVEL 4 X
AE105 OVERALL FLOOR PLAN LEVEL 5 X
AE106 OVERALL FLOOR PLAN LEVEL 6 X
AE107 OVERALL FLOOR PLAN LEVEL 7 X
AE108 OVERALL FLOOR PLAN LEVEL 8 X
AE109 OVERALL FLOOR PLAN LEVEL 9 X
AE110 OVERALL FLOOR PLAN LEVELS 10 & 11 X
AE400 ENLARGED BASEMENT PLANS X
AE400G ENLARGED GROUND FLOOR PLANS X
AE401 ENLARGED PLANS LEVEL 1 X
AE401.1 ENLARGED PLANS LEVEL 1 - PHARMACY X
AE401.2 ENLARGED PLANS LEVEL 1 - PHARMACY X
AE402 ENLARGED PLANS LEVEL 2 X
AE403 ENLARGED PLANS LEVEL 3 X
AE403.2 ENLARGED PLAN LEVEL 3 X
AE403.3 ENLARGED PLAN LEVEL 3 X
AE404 ENLARGED PLANS LEVEL 4 X
AE405 ENLARGED PLANS LEVEL 5 X
AE406 ENLARGED PLANS LEVEL 6 X
AE407 ENLARGED PLANS LEVEL 7 X
AE408 ENLARGED PLANS LEVEL 8 X
AE409 ENLARGED PLANS LEVEL 9 X
AE450 INTERIOR ELEVATIONS X
AE450G INTERIOR ELEVATIONS X
AE451.1 INTERIOR ELEVATIONS X
AE451.2 INTERIOR ELEVATIONS X
AE452 INTERIOR ELEVATIONS X
AE453.1 INTERIOR ELEVATIONS X
AE453.2 INTERIOR ELEVATIONS X
AE453.3 INTERIOR ELEVATIONS X
AE454.1 INTERIOR ELEVATIONS X
AE454.2 INTERIOR ELEVATIONS X
AE455 INTERIOR ELEVATIONS X
AE456 INTERIOR ELEVATIONS X
AE457 INTERIOR ELEVATIONS X
AE458 INTERIOR ELEVATIONS X
AE459 INTERIOR ELEVATIONS X
AE500 INTERIOR SECTION DETAILS X
AE560 MILLWORK SECTION DETAILS X
AE600 ARCHITECTURAL DETAILS X
11-F-FIRE PROTECTION
FP001 FIRE ALARM GENERAL NOTES, DIAGRAMS, & LEGEND
FP101 FIRE PROTECTION - OVERALL PLANS
FP102 FIRE PROTECTION - OVERALL PLANS
FP103 FIRE PROTECTION - OVERALL PLANS
FP110 FIRE PROTECTION ENLARGED PLANS
FP120 FIRE PROTECTION ENLARGED PLANS
FP130 FIRE PROTECTION ENLARGED PLANS
FP140 FIRE PROTECTION ENLARGED PLANS
FP150 FIRE PROTECTION ENLARGED PLANS
FX001 CLEAN AGENT NOTES, DETAILS & PLAN
14-M-MECHANICAL
MG001 MECHANICAL LEGEND AND ABBREVIATIONS
MG002 MECHANICAL SEQUENCE OF OPERATION
MG003 MECHANICAL POINTS LIST AND MCR SECTION
MG004 MECHANICAL DETAILS AND SECTION
MG005 MECHANICAL CHILLED WATER SECTIONS
MG006 MECHANICAL CHILLED WATER SECTIONS
MG007 MECHANICAL CHILLED WATER SECTIONS
MD100B BASEMENT - MECHANICAL OVERALL DEMOLITION PLAN
MD100G GROUND FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD101 FIRST FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD102 SECOND FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD103 THIRD FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD104 FOURTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD105 FIFTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD106 SIXTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD107 SEVENTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD108 EIGHTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MD109 NINTH FLOOR - MECHANICAL OVERALL DEMOLITION PLAN
MH100B BASEMENT - MECHANICAL OVERALL RENOVATION PLAN
MH100G GROUND FLOOR - MECHANICAL OVERALL RENOVATION PLAN
MH101 FIRST FLOOR - MECHANICAL OVERALL RENOVATION PLAN
MH102 SECOND FLOOR - MECHANICAL OVERALL PLAN
MH103 THIRD FLOOR - MECHANICAL OVERALL PLAN
MH104 FOURTH FLOOR - MECHANICAL OVERALL PLAN
MH105 FIFTH FLOOR - MECHANICAL OVERALL PLAN
MH106 SIXTH FLOOR - MECHANICAL OVERALL PLAN
MH107 SEVENTH FLOOR - MECHANICAL OVERALL PLAN
MH108 EIGHTH FLOOR - MECHANICAL OVERALL PLAN
MH109 NINTH FLOOR - MECHANICAL OVERALL PLAN
MJ100B BASEMENT - MECHANICAL ENLARGED
MJ100G GROUND FLOOR - MECHANICAL ENLARGED
MJ100G.1 GROUND FLOOR - MECHANICAL ENLARGED
MJ101 FIRST FLOOR - MECHANICAL ENLARGED
MJ101.1 FIRST FLOOR - MECHANICAL ENLARGED
MJ101.2 FIRST FLOOR - MECHANICAL ENLARGED
MJ102 SECOND FLOOR - MECHANICAL ENLARGED
MJ103 THIRD FLOOR - MECHANICAL ENLARGED
MJ103.1 THIRD FLOOR MCR - PIPING ENLARGED
MJ103.2 THIRD FLOOR MCR - VENTILATION ENLARGED
MJ104 FOURTH FLOOR - MECHANICAL ENLARGED
MJ104.1 FOURTH FLOOR - MECHANICAL ENLARGED
MJ105 FIFTH FLOOR - MECHANICAL ENLARGED
NO. DESCRIPTION DATE
CLEAN AGENT NOTES, DETAILS & PLANFIRE PROTECTION SYSTEMS NOTES, DETAILS, & PLAN
TYPE 1 ( NO CHANGE )
FIRE SUPPRESSION SYSTEM
EXISTING BUILDING HEIGHT / AREA:
PROJECT AREA:
BUILDING OCCUPANCY CLASSIFICATION
TYPE OF CONSTRUCTION:
NO CHANGE
EXISTING HEALTH CARE - HOSPITAL
(NO CHANGE):
FULLY SPRINKLERED (EXISTING, NO CHANGE)
SEISMIC / WIND REQUIREMENTS EXISTING - NO CHANGE
BASEMENT, GROUND LEVEL, AND LEVELS 1 THROUGH 11
AREA AND HEIGHT: EXISTING - NO CHANGE
OCCUPANT LOAD:
EXITING AND EXIT REQUIREMENTS:
EXISTING - NO CHANGES
EXISTING - NO CHANGES
SCOPE AND CODE SUMMARY
CODE TABULATION
APPLICABLE CODES AND ORDINANCES
2001 NFPA
2021 NFPA 101, LIFE SAFETY CODE
2022 NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
2020 NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF
WATER-BASED FIRE PROTECTION SYSTEMS
2020 NFPA 70, NATIONAL ELECTRICAL CODE
2022 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE
2020 NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY
EQUIPMENT
2020 NFPA 855, STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE
SYSTEMS
2021 INTERNATIONAL BUILDING CODE (IBC) WHERE NFPA 101 AND ASSOCIATED
DOCUMENTS ARE SILENT
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE (IFC), WHERE NFPA STANDARDS AND CODES ARE
SILENT
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL FUEL GAS CODE (IFGC)
2021 UNIFORM PLUMBING CODE
2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (ICC/ANSI 117.1)
FIRE AND SMOKE PROTECTION FEATURES
TEMPORARY PROTECTION: IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE
FIRESTOPPED AT THE END OF THE WORK SHIFT
DUE TO ANY INCOMPLETE WORK, PROVIDE TEMPORARY FIRESTOPPING COMPOSED OF
MINERAL WOOL SATISFYING FIRE RATING REQUIREMENTS AT PENETRATIONS
ACCESSIBILITY
VA BARRIER FREE DESIGN STANDARD, PAGE 18-13
ARCHITECTURAL BARRIERS ACT ACCESSIBIILITY STANDARDS (ABAAS)
SECTION 1103 SCOPING REQUIREMENTS - 1103.1 WHERE REQUIRED.
SITES, BUILDINGS, STRUCTURES, FACILITIES, ELEMENTS AND SPACES, TEMPORARY OR
PERMANENT, SHALL BE ACCESSIBLE TO PERSONS WITH PHYSICAL DISABILITIES.
EXCEPTIONS:
1103.2.3 EMPLOYEE WORK AREAS. SPACES AND ELEMENTS WITHIN EMPLOYEE WORK
AREAS SHALL ONLY BE REQUIRED TO COMPLY WITH SECTION 907.5.2.3.2, 1007, AND
1104.3.1 AND SHALL BE DESIGNED AND CONSTRUCTION SO THAT
INDIVIDUALS WITH DISABILITIES CAN APPROACH, ENTER, AND EXIT THE WORK AREAS.
1103.2.8 LIMITED ACCESS SPACES. NONOCCUPIABLE SPACES ACCESSED ONLY BY
LADDERS, CATWALKS, CRAWLSPACES, FREIGHT ELEVATORS OR VERY NARROW
PASSAGEWAYS ARE NOT REQUIRED TO BE ACCESSIBLE.
1103.2.9 EQUIPMENT SPACES. SPACES FREQUENTED ONLY BY PERSONNEL FOR
MAINTENANCE, REPAIR OR MONITORING OF EQUIPMENT ARE NOT REQUIRED TO BE
ACCESSIBLE.
SECTION 1104 ACCESSIBLE ROUTES - 1104.5 LOCATION.
ACCESSIBLE ROUTES SHALL COINCIDE WITH OR BE LOCATED IN THE SAME AREA AS A
GENERAL CIRCULATION PATH.
WHERE THE CIRCULATION PATH IS INTERIOR, THE ACCESSIBLE ROUTE SHALL ALSO BE
INTERIOR. WHERE ONLY ONE ACCESSIBLE ROUTE IS PROVIDED, THE ACCESSIBLE
ROUTE SHALL NOT PASS THROUGH KITCHENS, STORAGE ROOMS, RESTROOMS,
CLOSETS, OR SIMILAR SPACES.
SECTION 1110 SIGNAGE - 1110.1 SIGNS.
REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL
SYMBOL OF ACCESSIBILITY AT THE FOLLOWING LOCATIONS: ACCESSIBLE PARKING
SPACES, PASSENGER LOADING ZONES, ROOMS, ENTRANCES, CHECK-OUT AISLES,
FAMILY OR ASSISTED-USE TOILET AND BATHING ROOMS, AREAS OF REFUGE, AND
EXTERIOR AREAS. IN ADDITIONAL 1110.2 DIRECTIONAL SIGNAGE. DIRECTIONAL
SIGNAGE INDICATING THE ROUTE TO THE NEAREST LIKE ACCESSIBLE ELEMENT SHALL
BE PROVIDED AT THE FOLLOWING LOCATIONS STATED IN 1110.2 AND INCLUDE THE
INTERNATIONAL SYMBOL OF ACCESSIBILITY.
APPLICABLE CODES AND ORDINANCES
FLOOR PLAN NOTES
1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS
BASED UPON OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT
FIELD CONDITIONS.
2. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL
MOUNTED EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.
3. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS
OTHERWISE NOTED.
4. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL
INCONSISTENCIES IN FLOOR ELEVATIONS. PATCHING SHALL BE COMPATIBLE WITH
STATIC DISSIPATIVE FLOOR ADHESIVE
5. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE
SUBSTRATE FOR FINISHES.
6. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING ACCESS
CONTROL.
7. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND
PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE
PARTITION CONTAINS ACOUSTICAL INSULATION. PROVIDE FIRESTOPPING PER
REQUIREMENTS OF SPECIFICATION SECTION 07 84 00 FOR ALL RATED WALL
PENETRATIONS AND INTERSECTIONS.
8. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED STRUCTURE UNLESS
NOTED OTHERWISE, NO CEILINGS SPECIFIED.
INFECTION CONTROL NOTES
1. PRESSURE INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE PRESSURE (VERIFY
TWICE A DAY IN WRITING AND SUBMIT TO COR) - IF NOT, VERIFY ALL OPENINGS
(SUCH AS DOORS) ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER.
METER MUST READ CONTINUOUSLY.
2. CONTRACTOR SHALL DEVELOP A DAILY CHECK LIST FOR CONSTRUCTION
OVERSIGHT TUNED TO THE QUALITY ASSURANCE PLAN WHICH CAPTURED MOST
ERRORS. THIS MAY EVOLVE TO A LIVING DOCUMENT PENDING ISSUES
ENCOUNTERED.
3. REFER TO SPEC SECTION 01 35 26, DRAWING GI004 AND DEMOLITION DRAWINGS FOR
ICRA
REQUIREMENTS BASED ON DURATION / EXTENT OF WORK AND RISK FACTOR
HAZARDOUS MATERIALS NOTES
1. REMOVAL OF HAZARDOUS MATERIALS FROM THE BUILDING MUST FOLLOW STATE
AND FEDERAL REGULATIONS, AS WELL AS LOCAL LAWS WHEN APPLICABLE.
2. REFER TO THE DRAWINGS PREPARED BY THE HAZARDOUS MATERIAL CONSULTANT
DIAGRAM THE KNOWN ACM MATERIALS AFFECTED BY THE “WORK”.
REFLECTED CEILING PLAN NOTES
1. REFER TO ELECTRICAL SHEETS FOR FIXTURE TYPES, SWITCHING, AND SPECIAL
SYSTEMS.
2. REFER TO MECHANICAL SHEETS FOR DIFFUSER AND DUCTING LAYOUTS.
FLOOR PLAN GENERAL NOTES
DEMOLITION NOTES
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH
THE SCOPE OF WORK.
2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND
AREAS REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL
QUANTITIES AND LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE
THE SCOPE OF WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS
SPECIFICALLY SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE
POSSESSION OF THE CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE
SITE.
4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL AND ENVIRONMENT
FRIENDLY MANNER PER VA GUIDELINES AT NO ADDITIONAL EXPENSE TO OWNER
5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN
THE BUILDING OR ON THE SITE. ALL DEBRIS IS TO BE REMOVED, AT MINIMUM ONCE
PER SHIFT DURING THE DESIGNATED TIMES.
6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS
MATERIALS ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO
ENDANGER HEALTH OF WORKERS AND PUBLIC.
7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES AND STANDARDS.
9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH
THEIR REQUIREMENTS.
10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE
BRACING AND SHORING.
11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY
ADJACENT OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM
INTERFERENCE TO PUBLIC OR PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS
AND ACCESS AT ALL TIMES.
12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION
SEPARATION WALLS AS REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST,
WEATHER, AND OTHER HAZARDS THAT MAY BE EXPOSED AS A RESULT OF THE
DEMOLITION WORK.
SEE SPECIFICATION SECTION 01 35 26 FOR REQUIREMENTS AND DEMOLITION
DRAWINGS FOR LOCATIONS AND DETAILS.
13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE
DRILLS. DO NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED AND APPROVED BY
COR.
14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY
DIMENSION.
15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING
STRUCTURAL ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION,
UNLESS SPECIFICALLY NOTED ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY
OF THE CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING, BRACING, OR
TEMPORARY STRUCTURE, AND TO COORDINATE WITH STRUCTURAL ENGINEER AS
REQUIRED.
16. ALL PUBLIC UTILITIES ARE TO REMAIN IN OPERATION THROUGHOUT
CONSTRUCTION. CONTRACTOR TO COORDINATE ANY TEMPORARY SERVICES
REQUIRED TO MAINTAIN BUSINESS OPERATIONS WITH THE COR.
17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC.
DEMOLITION AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.
18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR.
ALL FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND
OPERABLE AT ALL TIMES. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO
PROTECT THIS EQUIPMENT. IMMEDIATELY NOTIFY COR, BUILDING SECURITY AND
BUILDING MANAGER OF DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE
DAMAGED SYSTEMS IMMEDIATELY AS DIRECTED AND TO THE SATISFACTION OF THE
COR. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE
ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE
ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS.
19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE
POINT IN QUESTION WITH THE COR BEFORE PROCEEDING. IMMEDIATELY STOP WORK
IF HAZARDOUS MATERIALS ARE FOUND AND CONTACT THE COR.
20. SEE TELECOMMUNICATION DRAWINGS FOR REMOVAL OF ANY EQUIPMENT,
CABLING SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND
TELEPHONE. VERIFY WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT
DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW
CONSTRUCTION DELAYS.
21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED, TO THE ORIGINAL RATING
WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY
DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL
LISTING REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS
ORIGINALLY DESIGNED.
22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE
LEFT IN CLEAN, ORDERLY CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL
SHALL BE REMOVED.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY
AND ALL DAMAGE CAUSED BY OR IN CONJUCTION WITH THE "WORK". REFINISH TO
MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.
24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL
SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR
CONSTRUCTION.
25. PRIOR TO DEMOLITION, INVESTIGATE WALLS AND CEILINGS FOR CONCEALED
PIPING AND/OR OTHER UTILITIES OR SERVICES AND INFORM COR OF ANY CONDITION
NOT DOCUMENTED IN CONTRACT DRAWINGS. DEMO DESIGNATED WALL BASES, WALL
FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO CONDUITS AND
RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN FOR ADDITIONAL INFORMATION.
26. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING
ADHESIVES, TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS
NOTED OTHERWISE. PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.
27. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A CONSTRUCTION
CONTAINMENT CUBE WITH HEPA VACUUM TO MAINTAIN NEGATIVE PRESSURE AS A
MEANS TO ACCESS AREAS ABOVE CEILING TILES, THIS INCLUDES ALL PATIENT
CORRIDORS AND ALL ACUTE CARE PATIENT AREAS. THIS IS IN CONJUNCTION WITH
THE HOSPITALS INFECTION PREVENTION MEASURES AND ICRA PROTOCOLS.
DEMOLITION GENERAL NOTES
GENERAL SYMBOLS
SCALE:
B2
VIEW NAME
1/8" = 1'-0"
A4
CONCRETE
METALS
BRICK
CMU
TILE
STONE
WOOD
GYPSUM
GLASS
INSULATION
REGULAR
STEEL ALUMINUM
FACE COMMON
CMU
CERAMIC
MARBLE LIMESTONE
FINISH BLOCKING
PLASTER OR GWB
LARGE SCALE SMALL SCALE
BATT OR
LOOSE
RIGID
SURFACE
DETAIL TITLE
BUILDING SECTION
WALL SECTION
EXTERIOR / INTERIOR
ELEVATION
INTERIOR MULTI-VIEW
ELEVATION
MATERIALS REFERENCE
DETAIL SECTION
AE402
C4
AE201
A1
AE305
SIM
A1
AE305
SIM
A1
AE305
SIM
AE505
C3
A3
ELEVATION NUMBER
SHEET ON WHICH
ELEVATION IS DRAWN
ELEVATION NUMBER
SHEET ON WHICH
ELEVATION IS DRAWN
ACTUAL SQ. FT.
PROGRAMMED SQ. FT.
ROOM NUMBER
DOOR NUMBER
KEYNOTE
WALL TYPE
REVISION NUMBER
ELEVATION INDICATION
COLUMN GRID
IDENTIFICATION
NORTH ARROW
WINDOW NUMBER
A1
EQUIPMENT TAG
D
N
MATCHLINE
FINISH , FINISH MATERIAL FINISH EXTENTS
SPRAY FOAM
B
5E
1t
S
W1
ROOM NAME
A505B
200 SF / 150 SF
A1
REVISIONS
P L A N N I N G
A R C H I T E C T U R E
E N G I N E E R I N G
I N T E R I O R S
EST. 1915
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Program Contracting
Activity Central
(PCAC)
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
PRIME A/E CONTRACTOR
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
/1
/2
:3
:2
P M
700 19th St. S.
Birmingham, AL 35233
CODE INFORMATION,
SYMBOLS AND
ABBREVIATIONS
GI003
EHRM - INFRASTRUCTURE
UPGRADES
521-20-901
August 18, 2022 Checker Author
B
IM
/0
-1
-0
V
A B h a m
E
H R
M V
A B h a m
-E H
R M
-A rc h it e c tu re .r v t
100% CONSTRUCTION
DOCUMENTSGDM ARCHITECTS/ENGINEERS
Dallas, TX 75204-8589
3232 McKinney Avenue, Suite 800
1401 W 34th Ave, Suite 200 Anchorage, AK 99503
(907) 562-0422
(214) 526-1144
TLT TOILET
TOPO TOPOGRAPHY
TOS TOP OF STEEL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TRANS TRANSVERSE
TS TRANSITION STRIP
TYP TYPICAL
U
UC UNDERCUT
UG UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UR URINAL
UV UNIT VENTILATOR
V
V VOLT
VAV VARIABLE AIR VOLUME
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W
W WATT / WATER
W/ WITH
W/O WITHOUT
WAGD WASTE ANESTHESIA GAS DISPOSAL
WC WATER CLOSET / WALL COVERING
WD WOOD
WDB WOOD BASE
WDF WOOD FLOOR
WDP WOOD PANEL
WDW WINDOW
WDWF WINDOW FILM
WGD WALL GUARD
WH WATER HEATER / WALL HYDRANT
WP WEATHERPROOF
WPFG WATERPROOFING
WS WATER STOP
WT WEIGHT / WINDOW TREATMENT
WWF WELDED WIRE FABRIC
X
XFMR TRANSFORMER
Y
YD YARD
YH YARD HYDRANT
MFR MANUFACTURER
MG MOTOR GENERATOR / MEDICAL GAS
MH MANHOLE
MIN MINIMUM
MLO MAIN LUGS ONLY
MM MILLIMETER
MO MASONRY OPENING
MP METAL PANEL
MT METAL TRANSITION
MTD MOUNTED
MTG MOUNTING
MULL MULLION
MV MEDICAL VACUUM
N
N NITROGEN
N2O NITROUS OXIDE
NEC NATIONAL ELECTRICAL CODE
NFPA NATIONAL FIRE PROTECTION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
O/S OFFSET
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
OX OXYGEN
OZ OUNCE
P
P PAINT / PUMP / PENDANT
PA PASCAL
PART PARTITION
PAVT PAVEMENT
PC POINT OF CURVATURE / PRIVACY CURTAIN
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERP PERPENDICULAR
PHC PREHEAT COIL
PHVAC PLUMBING, HEATING, VENTILATING AND AIR CONDITIONING
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PKG PARKING
PL PLASTIC LAMINATE / PROPERTY LINE / PLATE
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
POL CONC POLISHED CONCRETE
PR PAIR
PRF POURED RESINOUS FLOORING
PROJ PROJECTION
PRV PRESSURE REGULATING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PTB PORCELAIN TILE BASE
PTF PORCELAIN TILE FLOOR
PTVC POINT OF VERTICAL CURVATURE
PTW PORCELAIN TILE WALL
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
Q
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QZP QUARTZ POLYMER
R
R RADIUS / REGISTER
RA RETURN AIR
RAF RAISED ACCESS FLOORING
RB RESILIENT BASE
RCP REINFORCED…
This is the start of the file's text. The full file is on GovTribe.