Attachment 6 Submittal Register Birmingham EHRM 08-18-2022.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- EHRM Birmingham Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77623B0026
About this file
This document is a submittal register for a federal construction project to complete Electronic Health Records Modernization infrastructure upgrades to the Veterans Affairs Medical Center in Birmingham, Alabama. The project requires submittals on a variety of construction requirements before and after mobilization. Critical submittals due prior to mobilization include phasing plans, utility interruption schedules, OSHA certifications, and letters of superintendence. Additional required submittals cover general construction requirements as well as mechanical, electrical, and specialty construction items. The document lists over 250 specified sections with corresponding submittal items, critical submittals, response due dates from the contractor, dates of VA response, and status notes. The construction project aims to upgrade infrastructure at the Birmingham VAMC to support Electronic Health Records Modernization.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| SPECIFICATION SECTION | SECTION TITLE | SUBMITTAL ITEM | CRITICAL SUBMITTAL THAT MUST BE SUBMITTED PRIOR TO MOBILIZATION | DATE SENT | RESPONSE DUE DATE | DATE OF VA RESPONSE | STATUS | NOTES |
| DIVISION 01 GENERAL REQUIREMENTS | ||||||||
| - | - | Phasing Plan | Yes | |||||
| - | - | Utility Interruption Schedule | Yes | |||||
| - | - | OSHA Certifications | Yes | |||||
| - | - | Letter of Superintendence | Yes | |||||
| 01 00 00 | General Requirements | Environmental Protection Plan | Yes | |||||
| 01 00 00 | General Requirements | Electronic Security Memorandum | Yes | |||||
| 01 00 00 | General Requirements | Warranty Management Plan | No | |||||
| 01 00 00 | General Requirements | Warranty Tags | No | |||||
| 01 00 00 | General Requirements | Training Course Outline | No | |||||
| 01 00 00 | General Requirements | Security Plan | No | |||||
| 01 00 00 | General Requirements | Duplicate Keys | No | |||||
| 01 00 00 | General Requirements | Document Control Security Memorandum | Yes | |||||
| 01 00 00 | General Requirements | Vehicle Authorization Request | No | |||||
| 01 00 00 | General Requirements | Survey | No | |||||
| 01 00 00 | General Requirements | Re - Survey | No | |||||
| 01 00 00 | General Requirements | As Built Drawings - With Each Completed Phase | No | |||||
| 01 00 00 | General Requirements | Testing and Commissioning Plan | Yes | |||||
| 01 00 00 | General Requirements | O & M Manuals 2 wks. prior to Final Inspections | No | |||||
| 01 00 00 | General Requirements | Photo Documentation - With the Work | Yes | |||||
| 01 31 16.15 | Project Schedule | Critical Path Method (CPM) Schedule | Yes | |||||
| 01 32 16.15 | Project Schedule | Cost Loaded Project Schedule | Yes | |||||
| 01 33 23 | Shop Drawings, Product Data, and Samples | Submittal Register | Yes | |||||
| 01 33 23 | Shop Drawings, Product Data, and Samples | Submittal Schedule | No | |||||
| 01 35 26 | Safety Requirements | Critical Lift Plan | Yes | |||||
| 01 35 26 | Safety Requirements | Accident Prevention Plan | No | |||||
| 01 35 26 | Safety Requirements | Activity Hazard Analysis | Yes | |||||
| 01 35 26 | Safety Requirements | Training Records for 10 and 30 hr. OSHA training. | No | |||||
| 01 35 26 | Safety Requirements | Accident and OSHA Logs | Yes | |||||
| 01 35 26 | Safety Requirements | Infection Control Plan (ICRA) | Yes | |||||
| 01 35 26 | Safety Requirements | Fire Safety Plan | No | |||||
| 01 35 26 | Safety Requirements | Excavation Permit Data | Yes | |||||
| 01 35 26 | Safety Requirements | Detailed Lift Plan | Yes | |||||
| 01 35 26 | Safety Requirements | Confined Space Plan | Yes | |||||
| 01 35 26 | Safety Requirements | Hot Work Permit Plan | Yes | |||||
| 01 45 00 | Quality Control | CQC Plan | No | |||||
| 01 45 00 | Quality Control | CQC Plan, Meetings, Submittal Compliance Statement, Phasing, Tests | No | |||||
| 01 45 00 | Quality Control | CQC Plan, Inspection, Documentation, Verification Statement | Yes | |||||
| 01 45 29 | Testing Lab Services | Test Laboratory Requirements | Yes | |||||
| 01 57 19 | Temporary Environmental Controls | Environmental Protection Plan | Yes | |||||
| 01 74 19 | Construction Waste Management | Construction Waste Management Plan | Yes | |||||
| 01 81 11 | Sustainable Construction Requirements | Sustainable Design Submittals | Yes | |||||
| 01 91 00 | General Commissioning Requirements | Commissioning Team | Yes | |||||
| 01 91 00 | General Commissioning Requirements | List of Systems to be commissioned | Yes | |||||
| 01 91 00 | General Commissioning Requirements | Commissioning Team Roles and Responsibilities | Yes | |||||
| 01 91 00 | General Commissioning Requirements | Commissioning Documents | Yes | |||||
| 01 91 00 | General Commissioning Requirements | Commissioning Activities Schedule | Yes | |||||
| 01 91 00 | General Commissioning Requirements | Pre-Functional Checklists | No | |||||
| 01 91 00 | General Commissioning Requirements | Systems Functional Performance Test Procedures | No | |||||
| 01 91 00 | General Commissioning Requirements | Final Commissioning Plan Submittal | No | |||||
| 01 91 00 | General Commissioning Requirements | Systems Functional Performance Test Procedure | No | |||||
| 01 91 00 | General Commissioning Requirements | Pre-Functional Checklists | No | |||||
| 01 91 00 | General Commissioning Requirements | Test and Inspection Reports | No | |||||
| 01 91 00 | General Commissioning Requirements | Corrective Action Documents | No | |||||
| 01 91 00 | General Commissioning Requirements | Preliminary Commissioning Report Submittal | No | |||||
| 01 91 00 | General Commissioning Requirements | Final Commissioning Report Submittal | No | |||||
| 01 91 00 | General Commissioning Requirements | Data for Commissioning | No | |||||
| DIVISION 02 EXISTING CONDITIONS | ||||||||
| 02 41 00 | Selective Demolition | Demolition Plans Including Shoring, Bracing | No | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Asbestos Abatement Plan, prepared in accordance with the requirements of Alabama Department of Environmental Management (ADEM) | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Lead Based Paint Abatement Plan, prepared in accordance with the requirements of Alabama Department of Environmental Management (ADEM) | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Packaging Notifications | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Hazardous Waste Management Plan | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Onsite Hazardous Waste Management | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Notices of Non-Compliance and Notices of Violation | No | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Transportation and Disposal Coordinator | No | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Organization Chart, Qualifications, Training, Licenses Certification | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Security Plan | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Spill Response Plan | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Waste Minimization Plan | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Recordkeeping | No | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Exception Report | No | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Shipping Documents and Packaging Certification | Yes | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Certificates of Disposal | No | |||||
| 02 82 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | Closeout submittals shall include all updates to previously submitted information as necessary to ensure the documentation requirements of this section are fulfilled. | No | |||||
| 02 82 00 | Asbestos Remediation | Asbestos Abatement Plan, prepared in accordance with the requirements of Alabama Department of Environmental Management (ADEM) | Yes | |||||
| 02 82 00 | Asbestos Remediation | Emergency Action Plan and Arrangements | Yes | |||||
| 02 82 00 | Asbestos Remediation | Affidavit Of Medical Surveillance, Respiratory Protection, And Training Accreditation | Yes | |||||
| 02 82 00 | Asbestos Remediation | Certificate Of Worker's Acknowledgement | Yes | |||||
| 02 82 00 | Asbestos Remediation | Contractor/Competent Person(S) Review and Acceptance of The VA's Asbestos Specifications | Yes | |||||
| 02 82 00 | Asbestos Remediation | Employee Training | Yes | |||||
| 02 82 00 | Asbestos Remediation | Notifications | Yes | |||||
| 02 82 00 | Asbestos Remediation | Permits | No | |||||
| 02 82 00 | Asbestos Remediation | Respiratory Protection Program | Yes | |||||
| 02 82 00 | Asbestos Remediation | Respirator Program Records | Yes | |||||
| 02 82 00 | Asbestos Remediation | Testing Laboratory | Yes | |||||
| 02 82 00 | Asbestos Remediation | Landfill Approval | Yes | |||||
| 02 82 00 | Asbestos Remediation | Medical Certification | Yes | |||||
| 02 82 00 | Asbestos Remediation | Contractor's Professional Industrial Hygienist (CPIH/CIH) | Yes | |||||
| 02 82 00 | Asbestos Remediation | Designated Competent Person | Yes | |||||
| 02 82 00 | Asbestos Remediation | Worker's License | Yes | |||||
| 02 82 00 | Asbestos Remediation | Contractor's License | Yes | |||||
| 02 82 00 | Asbestos Remediation | Federal, State or Local Citations on Previous Projects | Yes | |||||
| 02 82 00 | Asbestos Remediation | Certificate Of Compliance | Yes | |||||
| 02 82 00 | Asbestos Remediation | Product Data | Yes | |||||
| 02 82 00 | Asbestos Remediation | Amended Water | Yes | |||||
| 02 82 00 | Asbestos Remediation | Safety Data Sheets (SDS) for All Materials | Yes | |||||
| 02 82 00 | Asbestos Remediation | Encapsulants | Yes | |||||
| 02 82 00 | Asbestos Remediation | Respirators | Yes | |||||
| 02 82 00 | Asbestos Remediation | Local Exhaust Equipment | Yes | |||||
| 02 82 00 | Asbestos Remediation | Pressure Differential Automatic Recording Instrument | Yes | |||||
| 02 82 00 | Asbestos Remediation | Vacuums | Yes | |||||
| 02 82 00 | Asbestos Remediation | Glove bags | Yes | |||||
| 02 82 00 | Asbestos Remediation | Equipment Used to Contain Airborne Asbestos Fibers | Yes | |||||
| 02 82 00 | Asbestos Remediation | Water Filtration Equipment | Yes | |||||
| 02 82 00 | Asbestos Remediation | Ventilation Systems | Yes | |||||
| 02 82 00 | Asbestos Remediation | Periodic Submittals | No | |||||
| 02 82 00 | Asbestos Remediation | Air Sampling Results | No | |||||
| 02 82 00 | Asbestos Remediation | Pressure Differential Recordings for Local Exhaust System | No | |||||
| 02 82 00 | Asbestos Remediation | Clearance Sampling | No | |||||
| 02 82 00 | Asbestos Remediation | Updates to any of the preconstruction submittals | No | |||||
| 02 82 00 | Asbestos Remediation | Closeout Submittals | No | |||||
| 02 82 00 | Asbestos Remediation | Asbestos Disposal Quantity Report | No | |||||
| 02 82 00 | Asbestos Remediation | Delivery Tickets | No | |||||
| 02 82 00 | Asbestos Remediation | Waste Shipment Records | No | |||||
| 02 82 00 | Asbestos Remediation | Transporter Certification | Yes | |||||
| 02 82 00 | Asbestos Remediation | Certificate Of Completion | No | |||||
| 02 82 00 | Asbestos Remediation | Rental Equipment | No | |||||
| 02 82 00 | Asbestos Remediation | Closeout submittals to include all updates to previously submitted information as necessary to ensure the documentation requirements of this section are fulfilled. | No | |||||
| 02 83 00 | Lead Remediation | Lead Abatement Plan, prepared in accordance with the requirements of Montana Department of Environmental Quality (DEQ | Yes | |||||
| 02 83 00 | Lead Remediation | Competent Person Qualifications | Yes | |||||
| 02 83 00 | Lead Remediation | Training Certification | Yes | |||||
| 02 83 00 | Lead Remediation | Occupational and Environmental Assessment Data Report | Yes | |||||
| 02 83 00 | Lead Remediation | Medical Examinations | Yes | |||||
| 02 83 00 | Lead Remediation | Lead Waste Management Plan | Yes | |||||
| 02 83 00 | Lead Remediation | Licenses, Permits and Notifications | Yes | |||||
| 02 83 00 | Lead Remediation | Occupant Protection Plan | Yes | |||||
| 02 83 00 | Lead Remediation | Lead Compliance Plan | Yes | |||||
| 02 83 00 | Lead Remediation | Contractor Experience and Qualifications | Yes | |||||
| 02 83 00 | Lead Remediation | Affidavit of Medical Surveillance, Respiratory Protection, and Training Accreditation | Yes | |||||
| 02 83 00 | Lead Remediation | Contractor/Competent Person(s) Review and Acceptance of the VA's Lead Specifications | Yes | |||||
| 02 83 00 | Lead Remediation | Written Evidence of TSD Approval | Yes | |||||
| 02 83 00 | Lead Remediation | Testing Laboratory | Yes | |||||
| 02 83 00 | Lead Remediation | Contractor's Professional Industrial Hygienist (CPIH/CIH) Qualifications | Yes | |||||
| 02 83 00 | Lead Remediation | Certificate Of Worker's Acknowledgement | Yes | |||||
| 02 83 00 | Lead Remediation | Respirators | Yes | |||||
| 02 83 00 | Lead Remediation | Vacuum Filters | Yes | |||||
| 02 83 00 | Lead Remediation | Negative Air Pressure System | Yes | |||||
| 02 83 00 | Lead Remediation | Materials and Equipment | Yes | |||||
| 02 83 00 | Lead Remediation | Expendable Supplies | Yes | |||||
| 02 83 00 | Lead Remediation | Local Exhaust Equipment | Yes | |||||
| 02 83 00 | Lead Remediation | Pressure Differential Automatic Recording Instrument | Yes | |||||
| 02 83 00 | Lead Remediation | Safety Data Sheets (SDS) For All Materials | Yes | |||||
| 02 83 00 | Lead Remediation | Initial Sample Results | Yes | |||||
| 02 83 00 | Lead Remediation | Pressure Differential Log | Yes | |||||
| 02 83 00 | Lead Remediation | Occupational and Environmental Assessment Data Report | No | |||||
| 02 83 00 | Lead Remediation | Sampling Results | No | |||||
| 02 83 00 | Lead Remediation | Pressure Differential Recordings for Local Exhaust System | No | |||||
| 02 83 00 | Lead Remediation | Clearance Certification | No | |||||
| 02 83 00 | Lead Remediation | Certificate Of Completion | No | |||||
| 02 83 00 | Lead Remediation | Closeout Submittals | No | |||||
| 02 83 00 | Lead Remediation | Hazardous Waste Manifest | No | |||||
| 02 83 00 | Lead Remediation | In addition to these submittals, the closeout submittals shall include all updates to previously submitted information as necessary to ensure the documentation requirements of this section are fulfilled. | No | |||||
| DIVISION 03 CONCRETE | ||||||||
| 03 30 00 | Cast-In-Place Concrete | Shop Drawings: Reinforcing steel: Complete shop drawings | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Mill Test Reports - Reinforcing Steel | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Mill Test Reports - Cement | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Manufacturer's Certificates: Abrasive aggregate | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Manufacturer's Certificates: Lightweight aggregate for structural concrete. | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Manufacturer's Certificates: Air-entraining admixture. | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Manufacturer's Certificates: Chemical admixtures, including chloride ion content | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Manufacturer's Certificates: Waterproof paper for curing concrete | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Manufacturer's Certificates: Liquid membrane-forming compounds for curing concrete | No | |||||
| 03 30 00 | Cast-In-Place Concrete | Testing Agency for Concrete Mix Design | Yes | |||||
| 03 30 00 | Cast-In-Place Concrete | Test Report for Concrete Mix Designs | No | |||||
| DIVISION 04 MASONRY | ||||||||
| DIVISION 05 METALS | ||||||||
| 05 50 00 | Metal Fabrications | Shop Drawings, Product Data , Samples | Yes | |||||
| DIVISION 06 WOOD, PLASTICS, AND COMPOSITES | ||||||||
| 06 10 00 | Rough Carpentry | Shop Drawings, Product Data , Samples | Yes | |||||
| 06 10 00 | Rough Carpentry | Sustainable Design Submittals | No | |||||
| 06 10 00 | Rough Carpentry | Manufacturers Certificate for Unmarked lumber | No | |||||
| 06 20 00 | Finish Carpentry | Shop Drawings, Product Data , Samples | Yes | |||||
| 06 20 00 | Finish Carpentry | Certificates | No | |||||
| 07 27 26 | Fluid Applied Membrane Air and Moisture Barrier | Shop Drawings, Product Data , Samples | Yes | |||||
| 07 50 05 | Roof Systems | Warranty | No | |||||
| 07 50 05 | Roof Systems | Shop Drawings, Product Data , Samples | Yes | |||||
| 07 84 00 | Firestopping | Installer Qualifications, Inspector Qualifications | No | |||||
| 07 84 00 | Firestopping | Manufacturers Literature, Data, and Installation | No | |||||
| 07 84 00 | Firestopping | List of FM, UL, or WH classification number of systems installed | No | |||||
| 07 84 00 | Firestopping | Lab test reports for ASTM E814 | No | |||||
| 07 84 00 | Firestopping | Manufacturers Certifications | No | |||||
| 07 92 00 | Joint Sealants | Shop Drawings, Product data, Samples | Yes | |||||
| 07 92 00 | Joint Sealants | MFG Certifications and Installation Instructions | No | |||||
| 07 92 00 | Joint Sealants | Cured samples of exposed sealants for each color. | No | |||||
| 07 92 00 | Joint Sealants | Primers and Sealing Compounds | No | |||||
| 07 92 00 | Joint Sealants | 10 Year Warranty | No | |||||
| DIVISION 07 OPENINGS | ||||||||
| 08 11 13 | Hollow Metal Doors and Frames | Shop Drawings, Product Data, Samples | Yes | |||||
| 08 11 13 | Hollow Metal Doors and Frames | Submittal Drawings | Yes | |||||
| 08 11 13 | Hollow Metal Doors and Frames | Mfg. Literature and Data | Yes | |||||
| 08 11 13 | Hollow Metal Doors and Frames | Sustainable Construction Submittals | Yes | |||||
| 08 11 13 | Hollow Metal Doors and Frames | Test Reports | Yes | |||||
| 08 11 13 | Hollow Metal Doors and Frames | MFG Qualifications | Yes | |||||
| 08 14 16 | Flush Wood Veneer Doors | Product Data, Shop Drawings, Samples | Yes | |||||
| 08 14 16 | Flush Wood Veneer Doors | Door Schedules | Yes | |||||
| 08 14 16 | Flush Wood Veneer Doors | Samples | Yes | |||||
| 08 14 16 | Flush Wood Veneer Doors | Test Reports | Yes | |||||
| 08 14 16 | Flush Wood Veneer Doors | MFG certification | Yes | |||||
| 08 14 16 | Flush Wood Veneer Doors | Environmental Documentation, MFG Documentation | No | |||||
| 08 14 16 | Flush Wood Veneer Doors | Cleaning Instructions | No | |||||
| 08 14 16 | Flush Wood Veneer Doors | Warranty documents | No | |||||
| 08 31 13 | Access Doors and Frames | Shop Drawings, Product Data, Samples | Yes | |||||
| 08 31 13 | Access Doors and Frames | Submittal Drawings | Yes | |||||
| 08 31 13 | Access Doors and Frames | MFG Data and Literature | Yes | |||||
| 08 31 13 | Access Doors and Frames | Sustainable Construction Submittals | Yes | |||||
| 08 31 13 | Access Doors and Frames | Warranty | No | |||||
| 08 71 00 | Door Hardware | Shop Drawings, Product Data, Samples | Yes | |||||
| 08 71 00 | Door Hardware | Hardware Schedule | Yes | |||||
| 08 71 00 | Door Hardware | Certificate Of Compliance | No | |||||
| DIVISION 09 FINISHES | ||||||||
| 09 06 00 | Schedule for Finishes | Shop Drawings, Product Data, Samples | Yes | |||||
| 09 22 16 | Non Structural Metal Framing | Shop Drawings, Product Data, Samples | Yes | |||||
| 09 29 00 | Gypsum Board | Shop Drawings, Product Data, Samples | Yes | |||||
| 09 29 00 | Gypsum Board | Gypsum Board, Finish Materials, Cornerbead and trim | Yes | |||||
| 09 51 00 | Acoustical Ceiling Tiles | Product Data | Yes | |||||
| 09 51 00 | Acoustical Ceiling Tiles | Shop Drawings | Yes | |||||
| 09 51 00 | Acoustical Ceiling Tiles | Closeout Submittals | No | |||||
| 09 65 13 | Resilient Base | Shop Drawings, Product Data, Samples | Yes | |||||
| 09 65 36 | Static Dissipative Resilient Flooring | Shop Drawings, Product Data, Samples, Sustainable Design Submittals | Yes | |||||
| 09 65 36 | Static Dissipative Resilient Flooring | Test Reports | Yes | |||||
| 09 65 36 | Static Dissipative Resilient Flooring | Warranty | No | |||||
| 09 69 00 | Access Flooring | Product Data, Shop Drawings, Samples | Yes | |||||
| 09 69 00 | Access Flooring | Sustainable Design Submittals | No | |||||
| 09 69 00 | Access Flooring | Manufacturer’s Certificate | No | |||||
| 09 69 00 | Access Flooring | Floor System Test Reports | No | |||||
| 09 69 00 | Access Flooring | MFG and Installers Qualifications | Yes | |||||
| 09 69 00 | Access Flooring | Coordinated Bracing Drawings and Seismic Calculations | No | |||||
| 09 69 00 | Access Flooring | O&M Information | No | |||||
| 09 91 00 | Painting | Shop Drawings, Product Data, Samples | Yes | |||||
| 09 91 00 | Painting | Sustainable Design Submittals, Painter Qualifications | Yes | |||||
| DIVISION 10 SPECIALTIES | ||||||||
| 10 14 00 | Signage | Shop Drawings, Product Data, Samples | Yes | |||||
| 10 14 00 | Signage | Sustainable Design Submittals | No | |||||
| 10 14 00 | Signage | Interior Sign Samples | No | |||||
| 10 14 00 | Signage | MFG Data | No | |||||
| 10 14 00 | Signage | Shop Drawings | No | |||||
| 10 14 00 | Signage | Full Size Layout | No | |||||
| 10 14 00 | Signage | MFG Qualifications | No | |||||
| 10 14 00 | Signage | Installer Qualifications | No | |||||
| 10 15 10 | Miscellaneous Accessories | Shop Drawings, Product Data, and Samples | Yes | |||||
| 10 15 00 | Miscellaneous Accessories | Manufacturer's Literature and Data | No | |||||
| 10 15 00 | Miscellaneous Accessories | Samples | No | |||||
| 10 44 13 | Fire Extinguisher Cabinets & Clean Agent Portable Extinguishers | Product Data, Shop Drawings, Samples | Yes | |||||
| DIVISION 13 SPECIAL CONSTRUCTION | ||||||||
| 13 05 41 | Seismic Restraint Requirements for Nonstructural Components | Coordination Drawings for Equipment Anchorage | Yes | |||||
| 13 05 41 | Seismic Restraint Requirements for Nonstructural Components | Coordination Drawing for Bracing | Yes | |||||
| 13 05 41 | Seismic Restraint Requirements for Nonstructural Components | Coordination Drawings for Ductwork | Yes | |||||
| 13 05 41 | Seismic Restraint Requirements for Nonstructural Components | Design Calculations | Yes | |||||
| 13 05 41 | Seismic Restraint Requirements for Nonstructural Components | Submittal Data For Concrete Anchors | Yes | |||||
| 13 21 33 | Hot/Cold Isle Containment Systems-Hard Partition | Shop Drawings, Product Data, Samples | Yes | |||||
| 13 21 33 | Hot/Cold Isle Containment Systems-Hard Partition | Samples | No | |||||
| 13 21 33 | Hot/Cold Isle Containment Systems-Hard Partition | Shop Drawings | Yes | |||||
| 13 21 33 | Hot/Cold Isle Containment Systems-Hard Partition | Manufacturer Literature | Yes | |||||
| DIVISION 21 FIRE SUPPRESSION | ||||||||
| 21 08 00 | Commissioning of Fire Suppression Systems | Commissioning Process | Yes | |||||
| 21 08 00 | Commissioning of Fire Suppression Systems | Submittal Review | No | |||||
| 21 13 13 | Wet Pipe Sprinkler System Modifications | Shop Drawings, Product Data, Samples | Yes | |||||
| 21 13 13 | Wet Pipe Sprinkler System Modifications | Qualifications, Design with Calcs, O&M Manuals | Yes | |||||
| 21 13 45 | Sprinkler Guards | Product Data, Shop Drawings, Samples | Yes | |||||
| 21 22 00 | Clean Agent Fire Suppression System | Shop Drawings, Product Data, Samples | Yes | |||||
| DIVISION 22 PLUMBING | ||||||||
| 22 05 11 | Common Work Results for Plumbing | Shop Drawings, Product Data, Samples, Phasing Plan | Yes | |||||
| 22 05 11 | Common Work Results for Plumbing | Certification, Shop Drawings, Coordination Drawings, Mfg. Literature | Yes | |||||
| 22 05 11 | Common Work Results for Plumbing | Rigging Plan, O&M Manuals, System Readiness Checklist, Training Plans | No | |||||
| 22 05 23 | General Duty Valves for Plumbing Piping | Product Data, Shop Drawings, Submittals | Yes | |||||
| 22 05 23 | General Duty Valves for Plumbing Piping | O&M Manuals | No | |||||
| 22 05 23 | General Duty Valves for Plumbing Piping | System Readiness Checklist | No | |||||
| 22 05 23 | General Duty Valves for Plumbing Piping | Training Plans and Instructor Qualifications | Yes | |||||
| 22 07 11 | Plumbing Insulation | Shop Drawings, Product Data, Samples, Mfg. instructions | Yes | |||||
| 22 08 00 | Commissioning of Plumbing Systems | Shop Drawings, Product Data, Samples, MFG. Instructions | No | |||||
| 22 11 00 | Facility Water Distribution | Shop Drawings, Product Data, Samples | Yes | |||||
| 22 11 00 | Facility Water Distribution | O & M Manuals | No | |||||
| 22 11 00 | Facility Water Distribution | System Readiness Checklist, Training Plans | No | |||||
| 22 13 00 | Facility Sanitary and Vent Piping | Shop Drawings, Products Data, Submittals | Yes | |||||
| 22 13 00 | Facility Sanitary and Vent Piping | O&M Manuals | No | |||||
| DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING | ||||||||
| 23 05 11 | Common Work Results for HVAC | Shop Drawings, Product Data, Samples | Yes | |||||
| 23 05 11 | Common Work Results for HVAC | Certification, Shop Drawings, Coordination Drawings, Mfg. Literature | Yes | |||||
| 23 05 11 | Common Work Results for HVAC | Rigging Plan, O&M Manuals, System Readiness Checklist, Training Plans | No | |||||
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | Product Data, Shop Drawings, Submittals of Motors, Enclosures, Starters, MCC, VFDs | Yes | |||||
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | O&M Manuals | No | |||||
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | Two Week Certification, Systems Readiness Checklist | No | |||||
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | Training Plans and Instructor Qualifications | No | |||||
| 23 05 41 | Noise and Vibration Control for HVAC Piping Equipment | Product Data, Shop Drawings, Samples, | Yes | |||||
| 23 05 41 | Noise and Vibration Control for HVAC Piping Equipment | Seismic Requirements | Yes | |||||
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | Shop Drawings, Product Data, Samples, TAB Format, TAB Qualifications | Yes | |||||
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | Design Review, System Inspection, System Readiness, Completed TAB | No | |||||
| 23 07 11 | HVAC and Boiler Plant Insulation | Product Data, Shop drawings, Samples, | Yes | |||||
| 23 08 00 | Commissioning of HVAC Systems | Shop Drawings, Product Data, Samples, MFG. Instructions | No | |||||
| 23 09 23 | Direct Digital Control System for HVAC | Shop Drawings, Product Data, Samples | Yes | |||||
| 23 09 23 | Direct Digital Control System for HVAC | Wiring Diagram, Terminal Strip, Control Damper and Valves | Yes | |||||
| 23 09 23 | Direct Digital Control System for HVAC | Cut Sheets, Sequence of Operations, Proposed Graphics | Yes | |||||
| 23 09 23 | Direct Digital Control System for HVAC | Schematic Wiring Diagrams, Instrumentation List, Riser Diagrams | Yes | |||||
| 23 09 23 | Direct Digital Control System for HVAC | Scaled Plans, Construction details, | Yes | |||||
| 23 09 23 | Direct Digital Control System for HVAC | Product Certs, Licenses for Software, Software Tools, As Built Drawings | Yes | |||||
| 23 09 23 | Direct Digital Control System for HVAC | Training Manuals, O&M Manual, Performance Report | Yes | |||||
| 23 21 13 | Hydronic Piping | Shop Drawings, Product Data, Samples, Welders Certs | Yes | |||||
| 23 21 13 | Hydronic Piping | Coordination Drawings, As Built Drawings, O&M Manuals | Yes | |||||
| 23 21 13 | Hydronic Piping | Readiness Checklist, Training Plans | No | |||||
| 23 21 23 | Hydronic Pumps | Shop Drawings, Product Data, Samples | Yes | |||||
| 23 21 23 | Hydronic Pumps | Characteristic Curves, O&M Manual, Readiness Checklist, Training plans | Yes | |||||
| 23 22 13 | Steam and Condensate Heating Piping | Shop Drawings, Product Data, Samples | Yes | |||||
| 23 22 13 | Steam and Condensate Heating Piping | Manufacturer's Literature and Data | No | |||||
| 23 22 13 | Steam and Condensate Heating Piping | Coordination Drawings | Yes | |||||
| 23 22 13 | Steam and Condensate Heating Piping | Record Documents | No | |||||
| 23 31 00 | HVAC Ducts and Casings | Shop Drawings, Product Data, Samples | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Rectangular Duct systems, Liners, Sealants, Gaskets, Access doors | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Round and Flat Oval Duct, Liner, Sealants, Gaskets, Access Sections, Install Instructions | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Volume and Backdraft Dampers | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Upper Hanging Attachments | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Fire Dampers, Fire Doors, Smoke Dampers | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Flex Duct and Clamps | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Flexible Connections | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Test Fittings | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Design Analysis of Optional systems | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Coordination Drawings | Yes | |||||
| 23 31 00 | HVAC Ducts and Casings | Test Results | No | |||||
| 23 37 00 | Air Outlets and Inlets | Shop Drawings, Product Data, Samples | Yes | |||||
| 23 37 00 | Air Outlets and Inlets | Coordination Drawings | Yes | |||||
| 23 64 00 | Packaged Water Chillers | Shop Drawings, Product Data, Samples | Yes | |||||
| 23 64 00 | Packaged Water Chillers | O&M Manuals, Run Test | No | |||||
| 23 64 00 | Packaged Water Chillers | Product Certificate, Seismic | No | |||||
| 23 81 23 | Computer Room Air Conditioners | Shop Drawings, Product Data, Samples, Certifications, Wiring Diagrams | Yes | |||||
| 23 81 23 | Computer Room Air Conditioners | Shop Drawings, Product Data, Samples, Certifications | Yes | |||||
| 23 81 23 | Computer Room Air Conditioners | Certifications, System Readiness Checklist | No | |||||
| 23 81 23 | Computer Room Air Conditioners | 4 Year Guarantee, Service Guarantee | No | |||||
| DIVISION 26 ELECTRICAL | ||||||||
| 26 05 19 | Low Voltage Electrical Power Conductors and Cables | Shop Drawings, Product Data, Samples | Yes | |||||
| 26 05 19 | Low Voltage Electrical Power Conductors and Cables | MFG/Installer Certification and Test Records | No | |||||
| 26 05 26 | Grounding and Bonding of Electrical Systems | Shop Drawings, Product Data | Yes | |||||
| 26 05 26 | Grounding and Bonding of Electrical Systems | MFG/Installer Certification and Test Records | No | |||||
| 26 05 33 | Raceways and Boxes for Electrical Systems | Product Data | Yes | |||||
| 26 05 33 | Raceways and Boxes for Electrical Systems | Shop Drawings | No | |||||
| 26 05 33 | Raceways and Boxes for Electrical Systems | MFG and Installation Certification | No | |||||
| 26 05 73 | Overcurrent Protective Device Coordination Study | Product Data | Yes | |||||
| 26 05 73 | Overcurrent Protective Device Coordination Study | Coordination Study, Drawings, Calcs, Arc-Flash Labels per Part 1.6 | Yes | |||||
| 26 05 73 | Overcurrent Protective Device Coordination Study | Contractor Certification | No | |||||
| 26 09 23 | Lighting Controls | Shop Drawings, Product Data | Yes | |||||
| 26 09 23 | Lighting Controls | O&M Manuals | No | |||||
| 26 09 23 | Lighting Controls | MFG/Installer Certification and Test Records | No | |||||
| 26 22 00 | Low-Voltage Transformers | Shop Drawings, Product Data | Yes | |||||
| 26 22 00 | Low-Voltage Transformers | O&M Manuals | No | |||||
| 26 22 00 | Low-Voltage Transformers | MFG/Installer Certification and Test Records | No | |||||
| 26 24 13 | Distribution Switchboards | Shop Drawings, Product Data | Yes | |||||
| 26 24 13 | Distribution Switchboards | O&M Manuals | No | |||||
| 26 24 13 | Distribution Switchboards | MFG/Installer Certification and Test Records | No | |||||
| 26 24 16 | Panelboards | Shop Drawings, Product Data | Yes | |||||
| 26 24 16 | Panelboards | O&M Manuals | No | |||||
| 26 24 16 | Panelboards | MFG/Installer Certification and Test Records | No | |||||
| 26 25 11 | Busways | Shop Drawings, Product Data | Yes | |||||
| 26 25 11 | Busways | O&M Manuals | No | |||||
| 26 25 11 | Busways | MFG/Installer Certification and Test Records | No | |||||
| 26 27 26 | Wiring Devices | Shop Drawings, Product Data | Yes | |||||
| 26 29 21 | Enclosed Switches and Circuit Breakers | Shop Drawings, Product Data | Yes | |||||
| 26 29 21 | Enclosed Switches and Circuit Breakers | O&M Manuals | No | |||||
| 26 29 21 | Enclosed Switches and Circuit Breakers | MFG/Installer Certification and Test Records | No | |||||
| 26 33 53 | Static Uninterruptible Power Supply | Shop Drawings, Product Data | Yes | |||||
| 26 33 53 | Static Uninterruptible Power Supply | MFG Test Reports | Yes | |||||
| 26 33 53 | Static Uninterruptible Power Supply | O&M Manuals | No | |||||
| 26 33 53 | Static Uninterruptible Power Supply | MFG/Installer Certification and Test Records | No | |||||
| 26 43 13 | Surge Protective Devices | Shop Drawings, Product Data | Yes | |||||
| 26 43 13 | Surge Protective Devices | O&M Manuals | No | |||||
| 26 43 13 | Surge Protective Devices | MFG/Installer Certification | No | |||||
| 26 51 00 | Interior Lighting | Shop Drawings, Product Data | Yes | |||||
| 26 51 00 | Interior Lighting | O&M Manuals | No | |||||
| 26 51 00 | Interior Lighting | Installer Certification and Test Records | No | |||||
| DIVISION 27 COMMUNICATIONS | ||||||||
| 27 05 26 | Grounding and Bonding for Communication Systems | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 05 26 | Grounding and Bonding for Communication Systems | Riser Diagram with System Routing | Yes | |||||
| 27 05 26 | Grounding and Bonding for Communication Systems | Test Reports | No | |||||
| 27 05 33 | Raceways and Boxes for Communication Systems | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 05 33 | Raceways and Boxes for Communication Systems | Manuals, Certifications | No | |||||
| 27 05 36 | Cable Trays for Communications Systems | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 05 53 | Identification for Communications Systems | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 10 00 | Structured Cabling | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 11 16 | Communications Cabinets Racks Frames and Enclosures | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 11 19 | Communications Termination Blocks and Patch Panels | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 11 26 | Communications Rack Mounted Power Protection and Power Strips | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 13 13 | Communications Copper Backbone Cabling | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 13 13.13 | Communications Copper Cable Slicing and Terminations | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 13 23 | Communications Optical Fiber Backbone Cabling | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 13 23 | Communications Optical Fiber Backbone Cabling | Test Reports | Yes | |||||
| 27 15 13 | Communications Copper Horizontal Cabling | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 15 13 | Communications Copper Horizontal Cabling | Test Reports | No | |||||
| 27 15 13.13 | Communications Optical Fiber Splicing and Terminations | Shop Drawings, Product Data, Samples | Yes | |||||
| 27 16 19 | Communications Patch Cords Station Cords and Cross Connect Wire | Shop Drawings, Product Data, Samples | Yes | |||||
| DIVISION 28 ELECTRONIC SAFETY AND SECURITY | ||||||||
| 28 13 00 | Physical Access Control System | Certificate Of Compliance | Yes | |||||
| 28 13 00 | Physical Access Control System | Shop Drawings, Product Data | Yes | |||||
| 28 13 00 | Physical Access Control System | O&M Manuals, MFG and Contractor Certification | Yes | |||||
| 28 23 00 | Video Surveillance System | Shop Drawings, Product Data | Yes | |||||
| 28 23 00 | Video Surveillance System | O&M Manuals, MFG and Contractor Certification | Yes | |||||
| 28 31 00 | Fire Detection and Alarm | Shop Drawings, Product Data | Yes | |||||
| 28 31 00 | Fire Detection and Alarm | O&M Manuals, MFG and Contractor Certification | Yes | |||||
| DIVISION 31 EARTHWORK | ||||||||
| DIVISION 32 EXTERIOR IMPROVEMENTS | ||||||||
| DIVISION 33 UTILITIES |