36C77623B0026_09JUN2023.docx
DOCX document 267 KB Posted
- Attached to
- EHRM Birmingham Infrastructure Upgrades Federal contract opportunity
- Solicitation number
- 36C77623B0026
About this file
This solicitation is for Electronic Health Records Modernization (EHRM) Infrastructure Upgrades to the Veterans Affairs Medical Center (VAMC) in Birmingham, Alabama. The contractor shall provide all labor, materials, supervision, quality control, project management and services to complete the upgrades. The work must be finished within 434 calendar days of receiving award. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and will be awarded on a firm-fixed-price basis. Bids are due by July 14, 2023 and award will be made based on evaluated price. The contractor must meet minimum insurance requirements and all work will be overseen by the Contracting Officer's Representative.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C77623B0026
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1of 73
36C77623B0026 X
6/9/2023
521-20-901 36C776 Department of Veterans Affairs Program Contracting Activity Central
6100 Oak Tree Blvd, Suite 490 Independence OH 44131 Department of Veterans Affairs Program Contract Activity Central 6100 Oak Tree Blvd, Suite 490
Independence OH 44131 Mary Harding, Contract Specialist 469-618-3465 ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM) INFRASTRUCTURE UPGRADES, VA MEDICAL CENTER (VAMC) BIRMINGHAM, ALABAMA
In accordance with 38 US Code, Section 8127 (Public Law 109-461), as implemented by Veterans Affairs Acquisition Regulation (VAAR)806.270, "contracting officers shall set aside solicitations...(with) the VA Rule of Two for Vendor Information Pages (VIP) verified service-disabled Veteran-owned small businesses (SDVOSBs) first, then Veteran-owned small businesses (VOSBs)." Accordingly, this acquisition action is being procured as a competitive Service-disabled Veteran-owned Small Business (SDVOSB) Set-Aside.
Pursuant to Federal Acquisition Regulation (FAR) Subpart 14.1, this solicitation is an Invitation for Bid (IFB), and sealed bidding procedures will be utilized to procure this construction project requirement.
The contractor awardee shall provide all labor, tools, equipment, materials, supervision, quality control, project management and services necessary to complete this construction project in accordance with the terms and conditions of the resultant contract and the specifications, drawings and other documents attached to this solicitation document.
Job worksite of this construction project is at the following location:
Birmingham VA Medical Center (VAMC), 700 South 19th Street, Birmingham, Alabama 35233-1927
VAAR Estimated Price Range Magnitude of Construction: Between $20,000,000 and $50,000,000
X X
52.211-10 X
2:00 PM
EDT
07-14-2023 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
00076 Department of Veterans Affairs Department of Veterans Affairs
6100 Oak Tree Blvd, Suite 490 Independence OH 44131
VAFSC
Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 6 |
| ITEM INFORMATION | 6 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 7 |
| 1.1 BID MATERIAL: | 7 |
| 1.2 BID GUARANTEE: | 7 |
| 1.3 PAYMENT & PERFORMANCE BONDS: | 7 |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS…………………...7
| 2.1 AVAILABILITY OF SOLICITATION DOCUMENTS……………………………………...7 |
| 2.2 INVITATION FOR BID………………………………………………………………………8 |
| 2.3 SDVOSB SET-ASIDE……………………………………………………………………….8 |
| 2.4 TECHNICAL QUESTIONS…………………………………………………………………8 |
| 2.5 AMENDMENTS……………………………………………………………………………...8 |
| 2.6 PRE-BID SITE VISIT………………………………………………………………………..8 |
| 2.7 PREPARATION OF BIDS…………………………………………………………………..8 |
| 2.8 BID SUBMISSION…………………………………………………………………………..9 |
| 2.9 DETERMINATION OF NON-RESPONSIVENESS…………………………………….11 |
| 2.10 DETERMINATION OF RESPONSIBILITY…………………………………………….11 |
| 2.11 VETS 4212………………………………………………………………………………..11 |
| 2.12 SYSTEM FOR AWARD MANAGEMENT (SAM)……………………………………..11 |
| 2.13 BASIS OF CONTRACT AWARD……………………………………………………….11 |
| 2.14 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE |
| ASSESSMENT SYSTEM (CPARS)………………………………………………………….12 |
| 2.15 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS……12 |
| 2.16 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT |
MANAGER……….……………………………………………………………………………..12
| 2.17 52.216-1 TYPE OF CONTRACT (APR 1984) | 13 |
| 2.18 52.228-11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021)(DEVIATION APR 2020) | 13 |
| 2.19 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (JUN 2020)(DEVIATION APR 2020) | 14 |
2.20 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED &
| VETERAN-OWNED SMALL BUSINESS IN OBTAINING BONDS (DEC 2009)………...15 | |
| 2.21 52.228-1 BID GUARANTEE (SEP 1996) | 15 |
| 2.22 52.228-17 INDIVIDUAL SURETY – PLEDGE OF ASSETS (BID GUARANTEE) | 16 |
| 2.23 52.233-2 SERVICE OF PROTEST | 16 |
| 2.24 52.236-27 SITE VISIT (CONSTRUCTION) | 17 |
| 2.25 52.252.1 SOLICITATION PROVISIONS | 17 |
2.26 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-CONSTRUCTION
| MATERIALS UNDER TRADE AGREEMENTS………………………………………17 | |
| 2.27 VAAR 852.233-71 ALTERNATE PROTEST | 19 |
| 2.28 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION | 19 |
2.29 VAAR 852.239-75 INFORMATION & COMMUNICATION TECHNOLOGY………20
2.30 52.211-6 BRAND NAME OR EQUAL 20
2.31 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITIES FOR CONSTRUCTION………...21
| REPRESENTATIONS AND CERTIFICATIONS | 23 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023) | 23 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 27 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 29 |
3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)………………………………………………………………..31
3.5 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020)……………………………………………………………33
GENERAL CONDITIONS……………………………………………………………………………..35
4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) …………………………………………………………………………………….35
| 4.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAR 2023) | 35 |
| 4.3 SUPPLEMENTAL INSURANCE REQUIREMENTS | 38 |
| 4.4 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 38 |
| 4.5 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (DEC 2022) | 39 |
| 4.6 52.223-20 AEROSOLS (JUN 2016) | 46 |
| 4.7 52.223-21 FOAMS (JUN 2016) | 47 |
| Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes: | 48 |
| 4.8 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 50 |
| 4.9 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023) | 49 |
| 4.10 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 57 |
| 4.11 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESSES (JAN 2023)(DEVIATION) | 58 |
| 4.12 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING--CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)(DEVIATION) | 61 |
4.13 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)………………………………………………………………..…………………
| 4.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 64 |
| 4.15 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 65 |
| 4.16 VAAR 852.236-80 SUBCONTRACTS & WORK COORDINATION (APR 2019) | 65 |
| 4.17 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY | 66 |
| 4.18 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES-SUPPLEMENT | 67 |
| 4.19 MANDATORY WRITTEN DISCLOSURES | 68 |
4.20 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)………………...…68
| 4.21 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 69 |
| 4.22 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT | 69 |
| 4.23 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS-CPM) (NOV 2018) | 69 |
4.24 LIST OF ATTACHMENTS…………….………………………………………………………...72
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
Line Item 0001 - Base Bid (General Construction): The contractor shall furnish all labor, materials, supervision, quality control, project management and services necessary to complete Electronic Health Records Modernization (EHRM) Infrastructure Upgrades to the Veterans Affairs Medical Center (VAMC) in Birmingham, Alabama. All work performed shall be completed in accordance with the specifications, drawings and other documents attached herein. The List of Attachments at the end of this solicitation identifies all specification and drawing attachments.
The contractor shall complete the entire construction project no later than 434 calendar days after the contractor receives the Notice To Proceed (NTP).
GRAND TOTAL
IMPORTANT INFORMATION FOR PROSPECTIVE BIDDERS
1. Line Item 0001 (the Base Bid) consists of all work required for this construction project.
2. Bidders must provide a lump sum price for Line Item 0001 (Base Bid). Failure to do so may render the bidder's bid as 'nonresponsive' pursuant to Federal acquisition Regulation (FAR) 14.301 Responsiveness of Bids, which states on (a) "To be considered for award, a bid must comply in all material respects with the invitation for bids." And, on 14.301(c), "Bids should be filled out, executed, and submitted in accordance with the instructions in the invitation."
3. Award will be made based on evaluation of each responsive bidder's Grand Total Price of Line Item 0001 (Base Bid).
4. Pricing shall be submitted in WHOLE DOLLAR VALUES. Please do NOT include pricing in cents.
5. The bidder is required to fill in the bidder's Unique Entity Identifier (UEI) number as registered with SAM.gov, in Block Number 14 on the Standard Form (SF) 1442.
6. PLEASE NOTE: The contractor agrees to attend any Post-Award Conference convened by the Contracting Activity or Contract Administration Team, in accordance with FAR Subpart 42.5. Per 42.501(a), "A postaward orientation aids both Government and Contractor personnel to (a) achieve a clear and mutual understanding of all contract requirements, and (2) identify and resolve potential problems.
7. Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:
Bidders are hereby notified that all state and local sales or use taxes for construction materials must be included in their bid price. It is solely the responsibility of the bidder to include all other applicable taxes in their bid price, as well. The Government has determined that, for this acquisition, it cannot take advantage of any sales or use tax exemptions that may be available to it under applicable state law. Under no circumstances will any Contractor be designated as an agent of the Government for purposes of any tax exemption, nor will the Government authorize any Contractor’s use of any tax exemption directly applicable to the Government under this procurement.
Page 1 of Page 1 of
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 BID MATERIAL:
Bid materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Invitation for Bid (IFB). The VA will not provide printed copies of drawings or specifications. It is the responsibility of the bidder to obtain the bid materials in a time and manner sufficient to respond to this solicitation by the specified due date.
1.2 BID GUARANTEE:
A bid guarantee is required in the form of a firm commitment in accordance with FAR 52.228-1. Failure to furnish the required bid guarantee by the time set for receipt of bids, may result in rejection of the bid. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
1.3 PAYMENT & PERFORMANCE BONDS:
The bidder to whom award is made will be required to furnish two (2) bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A), and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds shall be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds - Construction, which can be located under FAR 52.252-2 Clauses Incorporated by Reference. Copies of SFs 25A and 25 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:
All solicitation related documents will be published to Contract Opportunities https://Sam.gov.
2.2 INVITATION FOR BID:
This solicitation is being issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.
2.3 SDVOSB SET-ASIDE:
This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. Bids received from other than SDVOSB concerns will not be considered. All SDVOSBs must be listed as “verified” by the Small Business Administration (SBA) Veteran Small Business Certification (VetCert). Bidders must be verified and visible in the SBA VetCert database (Veteran Small Business Certification (sba.gov)) at TIME OF SUBMISSION OF BIDS AND TIME OF AWARD. Failure to be BOTH visible and verified at the time of bid submission and time of award will result in the bidder’s bid being deemed unacceptable and ineligible for award.
NOTE: As of January 1, 2023, all SDVOSBs that were previously verified by the VA Center for Verification and Evaluation (CVE) are automatically granted certification by the SBA for the remainder of the firm’s eligibility period. The SBA intends to grant a one-time, one-year extension of certification to current SDVOSBs verified by the VA as of the transfer date on January 1, 2023. This additional year will be added to the existing eligibility period of a current participant. New applicants certified by SBA after January 1, 2023, will receive the standard three-year certification period.
2.4 TECHNICAL QUESTIONS:
Questions of a technical nature must be provided in writing and shall be submitted by prospective bidders to Contract Specialist Mary Harding. Questions shall be submitted only via e-mail to mary.harding@va.gov. The subject line must read: EHRM Birmingham Infrastructure Upgrades - Technical Questions. Oral questions of a technical nature will not be accepted due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS June 28, 2023 at 2:00 p.m. (Eastern Time).
2.5 AMENDMENTS:
Amendments to this solicitation will be posted at https://Sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential bidders are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment may result in your bid being considered non-responsive.
2.6 PRE-BID SITE VISIT:
A formal site visit has been scheduled on June 21, 2023 for this project. This will be the only opportunity for potential bidders to visit the site. See FAR Clause 52.236-27 of this solicitation for further information.
All potential bidders, subcontractors and suppliers are strongly encouraged to attend this site visit.
2.7 PREPARATION OF BIDS:
The Government will not pay for any costs incurred in preparation and submission of bids.
2.8 BID SUBMISSION:
A. GENERAL:
(a) Bidders shall submit their bids via email to: mary.harding@va.gov.
(b) Only electronic bids will be accepted. No original or hard copies will be accepted.
(c) The bid opening will be conducted via teleconference. An in-person public bid opening will not be conducted.
(d) The bid bond shall be submitted as part of the electronic submission to mary.harding@va.gov.
(e) Failure to provide electronic bids and a copy of the bid bond electronically transmitted with your bid package, on the date and time set for bid opening, may deem the bid non-responsive.
B. BID PACKAGE CONTENTS:
(a) Standard Form (SF) 1442 Solicitation, Offer and Award:
The Bidder shall complete & sign the “OFFER” section of the SF 1442. Please include your company’s Unique Entity Identifier number associate with SAM.gov in Block 14.
(b) Acknowledgement of All Amendments:
The bidder shall acknowledge all amendments by either 1) Completing block 19 of the SF 1442, or 2) Returning the signed amendment form(s) with the submission.
(c) Pricing Schedule:
The Bidder shall complete the Price Schedule located on page 6 of the solicitation. The Bidder shall submit separate pricing for all items listed.
(d) Bid Guarantee:
The Bidder shall furnish a bid guarantee (see FAR 52.228-1). The bid guarantee shall be provided on Standard Form 24.
(e) Tax on Certain Foreign Procurements – Notice and Representation:
The Bidder shall provide their response to FAR 52.229-11 (d).
(f) Representations & Certifications:
The Bidder shall provide their Representations and Certifications or their response to FAR 52.204-8 (2) (i) or (ii) Annual Representations and Certifications.
(g) Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:
Offeror shall provide their response to FAR 52.204-24 (d) Representations.
(h) Information Regarding Responsibility Matters:
Bidder shall provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.
(i) Violation of Arms Controls Treaties or Agreements:
Bidder shall provide their response to FAR 52.209-13 (b) (1) or (2) Violation of Arms Controls Treaties or Agreements.
(j) Post-Award Small Business Program Representations:
Bidder shall provide their response to FAR 52.219-28 (h), if applicable.
(k) Limitations on Subcontracting:
In accordance with VAAR 852.219-75, the Bidder shall complete ATTACHMENT 9 - VA Notice of Limitations on Subcontracting-Certificate of Compliance for Construction and return it with their bid submission. Completed form will become part of the official award documentation.
(l) Experience Modification Rate:
The Bidder shall include the Safety of Environmental Violations and Experience Modification Rating (EMR) Information, including filling out ATTACHMENT 8 - Contractor Safety and Environmental Record Evaluation Form.
(1) Provide bidder’s information pertaining to their past Safety and Environmental record. The information must contain a certification that the bidder has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, the bidder shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
(2) Provide bidder’s information regarding their current EMR. This information shall be obtained from the Bidder’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder’s EMR is above 1.0, the Bidder must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
(3) Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
(4) If the NCCI cannot issue an EMR because the Bidder lacks insurance history, the Bidder shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead, and include a letter from the NCCI indicating that is has assigned Bidder a Unity Rating of 1.0.
(5) The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
(6) This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
(7) Failure to provide the above documentation, may result in a determination that the Bidder is non-responsive and therefore ineligible for award.
C. BID OPENING:
(a) Bids will be publicly read aloud via Microsoft Teams on the bid opening date at the specified time. A Microsoft Teams link and call-in number will be announced via an amendment to the solicitation approximately seven (7) calendar days prior to the due date for bids.
(b) In the event that there are any concerns with the bids, in accordance with FAR 14.402-1 (c), Microsoft Teams will be used to assist in the examination of the bid(s).
2.9 DETERMINATION OF NON-RESPONSIVENESS:
Bids received pertaining to this solicitation will be reviewed for responsiveness pursuant to FAR 14.301 Responsiveness of Bids. Failure to provide documentation as outlined in the Bid Submission section of the solicitation, at the date and time set for bid opening, may deem the bid non-responsive.
2.10 DETERMINATION OF RESPONSIBILITY:
A Determination of Responsibility in accordance with FAR Subpart 9.1 Responsible Prospective Contractors will be conducted for the apparent “low bidder/awardee” prior to award of the project. The above information, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility may make the Bidder ineligible for award.
2.11 VETS 4212:
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all bidders are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.
2.12 SYSTEM FOR AWARD MANAGEMENT (SAM):
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Bidders are required to be registered in SAM at the time an offer is submitted in order to comply with the annual representations and certifications requirements (see FAR 52.204-7).
2.13 BASIS OF CONTRACT AWARD:
Award may only be made with the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the government, considering only price (see FAR 52.214-19). The low price will be evaluated by the Contracting Officer prior to award to confirm that it is “a fair and reasonable price that is most advantageous to the Government.”
2.14 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR
PERFORMANCE ASSESSMENT SYSTEM (CPARS):
As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is available to all Federal agencies and is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.
Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMMERCIAL: 207- 438-1690. Registration should occur no later than thirty (30) days after contract award and must be kept current should there be any change to the contractor’s registered representative.
For contracts with a period of one (1) year or less, the Contracting Officer will perform a single evaluation when the contract is complete. For contracts exceeding one (1) year, the Contracting Officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA Contracting Officer within those thirty (30) days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
2.15 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform all work as identified in the solicitation documents. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements. If the site requires an investigation, the contractor shall follow VA Directive 0710.
2.16 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER:
Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations shall be replaced with “Contracting Officer’s Representative (COR).”
2.17 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price construction contract resulting from this solicitation.
(End of Provision)
2.18 52.228-11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021)(DEVIATION APR 2020)
(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety, except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12.
(b) The Contracting Officer may release a portion of the security interest on the individual surety’s assets based upon substantial performance of the Contractor’s obligations under its performance bond. The security interest in support of a performance bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102–1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.
(c) A surety’s assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety’s assets in support of a payment bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102–1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.
(d) The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.
(End of Clause)
2.19 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (JUN 2020)(DEVIATION APR 2020)
(a) Definitions. As used in this clause— "Original contract price" means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102–1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25, except that a seal is not required). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A, except that a seal is not required). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
| U.S. Department of Treasury |
| Financial Management Service |
| Surety Bond Branch |
| 3700 East West Highway, Room 6F01 |
| Hyattsville, MD 20782. |
Or, via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of Clause)
2.20 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.222-5 |
| CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK |
| MAY 2014 |
2.21 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
2.22 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)
(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
(End of Provision)
2.23 52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
MICHAEL.MULLEN@VA.GOV
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.24 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— June 21, 2023 - Meet at 10:00 a.m.
(c) Participants will meet at— VAMC Birmingham, Alabama Main Entrance (End of Provision)
2.25 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Provision)
2.26 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. "Bahrainian, Mexican, or Omani construction material," "commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than Bahrain, Mexico, or Oman that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material other than Bahrainian, Mexican, or Omani construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.204-7 |
| SYSTEM FOR AWARD MANAGEMENT |
| OCT 2018 |
| 52.204-16 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING |
| AUG 2020 |
| 52.204-22 |
| ALTERNATIVE LINE ITEM PROPOSAL |
| JAN 2017 |
| 52.214-3 |
| AMENDMENTS TO INVITATIONS FOR BIDS |
| DEC 2016 |
| 52.214-4 |
| FALSE STATEMENTS IN BIDS |
| APR 1984 |
| 52.214-5 |
| SUBMISSION OF BIDS |
| DEC 2016 |
| 52.214-6 |
| EXPLANATION TO PROSPECTIVE BIDDERS |
| APR 1984 |
| 52.214-7 |
| LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS |
| NOV 1999 |
| 52.214-18 |
| PREPARATION OF BIDS—CONSTRUCTION |
| APR 1984 |
| 52.214-19 |
| CONTRACT AWARD—SEALED BIDDING—CONSTRUCTION |
| AUG 1996 |
| 52.214-34 |
| SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE |
| APR 1991 |
| 52.214-35 |
| SUBMISSION OF OFFERS IN U.S. CURRENCY |
| APR 1991 |
2.27 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.
(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.
(End of Provision) PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:
| Deputy Assistant Secretary for Acquisition and Logistics, |
| Risk Management Team, Department of Veterans Affairs |
| 810 Vermont Avenue, N.W. |
| Washington, DC 20420 |
Or, for solicitations issued by the Office of Construction and Facilities Management:
| Director, Office of Construction and Facilities Management |
| 811 Vermont Avenue, N.W. |
| Washington, DC 20420 |
2.28 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)
(a) Any protest filed by an interested party shall—
(1) Include the name, address, fax number, email and telephone number of the protester;
(2) Identify the solicitation and/or contract number;
(3) Include an original signed by the protester or the protester’s representative and at least one copy;
(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;
(5) Specifically request a ruling of the individual upon whom the protest is served;
(6) State the form of relief requested; and
(7) Provide all information establishing the timeliness of the protest.
(b) Failure to comply with the above may result in dismissal of the protest without further consideration.
(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.
(End of Provision)
2.29 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (FEB 2023)
(a) Any offeror responding to this solicitation must comply with established VA Information and Communication Technology (ICT) (formerly Electronic and Information (EIT)) accessibility standards. Information about Section 508 is available at http://www.section508.va.gov/.
(b) The Section 508 accessibility standards applicable to this solicitation are stated in the clause at 852.239–75, Information and Communication Technology Accessibility. In order to facilitate the Government’s determination whether proposed ICT supplies meet applicable Section 508 accessibility standards, offerors must submit appropriate VA Section 508 Checklists, in accordance with the checklist completion instructions. The purpose of the checklists is to assist VA acquisition and program officials in determining whether proposed ICT supplies, or information, documentation and services conform to applicable Section 508 accessibility standards. The checklists allow offerors or developers to self-evaluate their supplies and document—in detail—whether they conform to a specific Section 508 accessibility standard, and any underway remediation efforts addressing conformance issues.
(c) Respondents to this solicitation must identify any exception to Section 508 requirements. If an offeror claims its supplies or services meet applicable Section 508 accessibility standards, and it is later determined by the Government, i.e., after award of a contract or order, that supplies or services delivered do not conform to the described accessibility standards, remediation of the supplies or services to the level of conformance specified in the contract will be the responsibility of the Contractor at its expense.
(End of Provision)
2.30 52.211-6 BRAND NAME OR EQUAL (AUG 1999)
(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.
(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must –
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by –
| (i) Brand name, if any; and, |
| (ii) Make or model number; |
(3) Include descriptive literature, such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and,
(4) Clearly describe any…