Attachment 3(a) HazMaterials Survey Birmingham EHRM Part_1_of_2.pdf

PDF 17 MB Posted

Attached to
EHRM Birmingham Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77623B0026
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document outlines a federal contract opportunity for infrastructure upgrades at the Veterans Affairs Medical Center in Birmingham, Alabama. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0026 to provide all labor, materials, project management and services necessary to complete Electronic Health Records Modernization infrastructure upgrades at the Birmingham VAMC. Specifically, the selected contractor will be responsible for furnishing and installing all infrastructure upgrades needed to support the implementation of a new electronic health records system, including any necessary demolition, construction, wiring, equipment installation and configuration. The opportunity is open to all qualified vendors, with proposals due by the date specified in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Birmingham Infrastructure Upgrades, newest first.
File Type Posted
Attachment to Amendment 0008_Specification 01 33 00 Submittal Procedures 7-28-2023.pdf PDF
Amendment 0008_36C77623B0026_QAs and Revised Specs_28JUL2023.pdf PDF
Attachment to Amendment 0008_Specification Section 27 10 00 - Control and Signal Wiring_27JUL2023.pdf PDF
Amendment 0007_36C77623B0026_Spec 096519 Flooring_26JUL2023.pdf PDF
Attachment to Amendment 0007_Specification Section 096519 Resilient Tile Flooring_26JUL2023.pdf PDF
Site Visit Attendance Sheet_21JULY2023.pdf PDF
Amendment 0006_36C77623B0026_25JUL2023.pdf PDF
Amendment 0005_36C77623B0026_24JUL2023.pdf PDF
Amendment 0004_36C77623B0026_20JUL2023.pdf PDF
Amendment 0003_36C77623B0026_18JUL2023.pdf PDF
Amendment 0002 Attachment_Ethernet Jacket Color Table 3-2_Feb2016.pdf PDF
36C77623B0026_Amendment 0002_11JUL2023.pdf PDF
Amendment 0001_36C77623B0026 0001_1_30JUN2023.pdf PDF
Site Visit Attendance Sheet_21JUNE2023.pdf PDF
Signed Site Visit Attendance Sheet_21JUNE2023.pdf PDF
36C77623B0026_09JUN2023.docx DOCX document
Attachment 9 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
Attachment 5 Design Narrative Birmingham EHRM 08-18-2022.pdf PDF
Attachment 1(b) Specifications Birmingham EHRM 08-31-2022_Part_2_of_2.pdf PDF
Attachment 10(b) Wage Determination AL20230096_ShelbyCounty_27JAN2023.pdf PDF
Attachment 10(a) Wage Determination AL20230087_JeffersonCounty_27JAN2023.pdf PDF
Attachment 7(b) OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
Attachment 7(a) OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
Attachment 2(d) Drawings Part_4_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 2(b) Drawings Part_2_of_5 Birmingham EHRM_09-01-2022.pdf PDF
Attachment 3(b) HazMaterial Survey Birmingham EHRM 09-01-2022_Part_2_of_2.pdf PDF
Attachment 7(c) OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
Attachment 8 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 4 Scope of Work Birmingham EHRM 05-19-2023.pdf PDF
Attachment 2(c) Drawings Part_3_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 6 Submittal Register Birmingham EHRM 08-18-2022.xlsx XLSX spreadsheet
Attachment 2(a) Drawings Part_1_of_5 521-20-901 Birmingham EHRM 09-01-2022 Rev.pdf PDF
Attachment 2(e) Drawings Part_5_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 1(a) Specifications Part_1_of_2 Birmingham EHRM 08-31-2022.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

American Engineering Testing 550 Cleveland Avenue North St. Paul, MN 55114-1804 teamAET.com • 800.972.6364

Geotechnical ● Materials Forensic ● Environmental

Building Technology Petrography/Chemistry

LIMITED ASBESTOS

AND LEAD INSPECTION REPORT

VA Medical Center 7010 19th Steet South Birmingham, AL 35233

AET Project No. P-0013087

Report Date:

July 20, 2022

Prepared for:

GDM

1401 W. 34th Ave., Ste. 200 Anchorage, AK 99503

550 Cleveland Avenue North | Saint Paul, MN 55114 Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | teamAET.com | AA/EEO

This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc.

GDM

1401 W. 34th Ave., Ste. 200 Anchorage, AK 99503

Attn: Mr. Conrad Chandler, Project Manager

RE: Limited Asbestos and Lead Inspection Report

VA Medical Center 7010 19th Street South Birmingham, AL 35233

Dear Mr. Chandler:

American Engineering Testing, Inc. has completed the enclosed report of Limited Asbestos and Lead Inspection services for the VA Medical Center located in Birmingham, Alabama. This service was performed in accordance with our proposal agreement no. P-0013087.

We appreciate the opportunity to have been of service to you on this project. If you have any questions regarding the information presented in this Limited Asbestos and Lead Inspection Report or if we can be of additional assistance, please contact me.

Sincerely, American Engineering Testing, Inc.

Bruce A. Boehm Carlson Sr. Environmental Project Manager E-mail: bboehmcarlson@teamAET.com Phone: (651) 999-1387

Enclosure

Limited Asbestos and Lead Inspection Report VA Medical Center, Birmingham, AL

Page ii

TABLE OF CONTENTS

Page

TRANSMITTAL LETTER………………………………………………………………………………i TABLE OF CONTENTS........................................................................................................... ii EXECUTIVE SUMMARY .........................................................................................................iii

1.0 INTRODUCTION

1.1 Purpose

1.2 Scope of Inspection

1.3 Limitations

2.0 ASBESTOS AND LEAD INSPECTION PROCEDURES

2.1 General Information

2.2 Function of Inspection

3.0 ASBESTOS AND LEAD INSPECTION RESULTS

3.1 Asbestos-Containing Materials

3.2 Lead Paints/Coatings

4.0 RECOMMENDATIONS

5.0 GENERAL REMARKS

5.1 Standard of Care

5.2 Certifications

TABLES

1. Summary of Asbestos Containing Building Materials

2. Summary of Non-Asbestos-Containing Building Materials

3. Summary of Lead Containing Paints/Coatings

4. Summary of Non-Lead Containing Paints/Coatings

FIGURES

1. Cover Page/Notes

2. Basement Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

3. Ground Floor Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test

Locations

4. Floor 01 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

5. Floor 02 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

6. Floor 03 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

7. Floor 04 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

8. Floor 05 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

9. Floor 06 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

10. Floor 07 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

11. Floor 08 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

12. Floor 09 Asbestos Containing Building Materials Sample and Lead Containing Paints/Coatings Test Locations

Page iii

APPENDICES

A. Explanation of Tables B. Material Identification and Inventory C. Asbestos Laboratory Analytical Results D. Lead Testing Results E. Pre-Demolition Environmental Checklist and Guide F. Photographic Log G. Laboratory Credentials H. AET Certifications

Page iv

EXECUTIVE SUMMARY

American Engineering Testing, Inc. (AET) was authorized by GDM (Client) to conduct a limited asbestos and lead inspection at the VA Medical Center, 7010 19th Street South, Birmingham, Alabama (Site). The purpose for the limited asbestos and lead inspection was to identify, sample and quantify suspect asbestos-containing building materials (ACBMs) and to test and quantify lead containing paints/coatings as required by The University of Alabama Safe State Program and by the U.S.

Environmental Protection Agency (EPA). Services performed by AET were conducted in accordance with our Proposal No. P-0013087.

Bruce Boehm Carlson, a University of Alabama Safe State Program certified Asbestos Building Inspector and Inspector Assessor, completed the inspection on May 24-26, 2022. AET collected 86 samples of suspect ACBM and tested 110 suspect painted/coated lead surfaces at the Site.

The inspection was limited to select IT equipment rooms and select rooms that may be converted to IT equipment rooms.

The following materials were sampled and found to contain greater than 1% asbestos:

• 315-2G-A – Photo 2 – 2” gray ceramic floor tile with black mastic was found to contain 3% asbestos in the black mastic only, the ceramic tile DOES NOT contain asbestos. Approximately 24 total square feet (SF) of the floor tile was identified in Floor 09 Room 9208.

• 430-BAC-A, B – Photos 3 and 4 – Black tar above the ceiling was found to contain 4% asbestos. Approximately 120 total SF was identified in Ground Floor Room G516 (48 SF), Floor 03 Room 3314 (12 SF), Room 3435 (30 SF), and Room 3436 (30 SF).

These asbestos-containing materials must be removed by a licensed asbestos abatement company using certified supervisors and workers prior to commencing renovation activities.

may not accept the waste as general C&D waste but rather may require disposal as asbestos waste.

The rest of the materials that were sampled and tested were found to not contain asbestos.

The following painted/coated surfaces were found to contain greater than 1 milligram per square centimeter (mg/cm2) lead:

• Shot 30 - Photo 5 – Light tan painted terra cotta block walls were found to contain 1.40 mg/cm2 lead. Approximately 805 total square feet (SF) of the terra cotta tile was identified in Floor 02 Room 2348.

• Shots 106 and 107 - Photo 6 – Tan painted 4” green ceramic wall tiles were found to contain between 6.40 and 6.70 mg/cm2 lead. Approximately 120 total SF of the ceramic tile was identified in Floor 08 Room 8216.

Page v

The lead containing materials must be removed and properly disposed of by Environmental Protection Agency (EPA) Lead Renovation, Repair and Painting (RRP) trained and certified personnel OR a University of Alabama Safe State Program certified lead abatement contractor utilized certified supervisors and workers.

Salvage, reuse, recycle or properly dispose of the numerous regulated waste materials identified at the Site prior to commencing with renovation activities.

Complete and submit the State of Alabama Department of Environmental Management Notice of Abatement/Demolition Form at least ten working prior to commencing the demolition activities.

If untested suspect asbestos-containing materials or potential lead containing paints/coatings are identified during renovation, do not disturb the materials and contact AET for consultation or follow-up testing. Notify the general contractor of the location and quantity of asbestos and regulated waste items at the Site.

1.0 INTRODUCTION

1.1 Purpose

This report presents the results of the limited asbestos and lead Inspection performed at the VA Medical Center, 7010 19th Street South, Birmingham, Alabama (Site). American Engineering Testing, Inc. (AET) completed the inspection at the request of GDM (Client). The inspection was performed to facilitate moving and installation of IT cabling at the Site.

The purpose for the limited asbestos and lead inspection was to identify, sample and quantify suspect asbestos-containing building materials (ACBMs) and to test and quantify lead containing paints/coatings as required by The University of Alabama Safe State Program and by the U.S.

Environmental Protection Agency (EPA).

1.2 Scope of Inspection

AET’s scope of services included the following tasks:

• Conduct a visual inspection for the presence of ACBM.

• Collect representative bulk samples of suspect ACBMs for analysis.

• Submit the bulk samples of suspect materials to an accredited National Voluntary Laboratory Accreditation Program (NVLAP) laboratory for analysis of asbestos content. Laboratory certifications can be found in Appendix G.

• Identify, test, and quantify the various painted/coated materials for lead content utilizing a portable x-ray fluorescence (XRF) analyzer.

• Prepare a final report summarizing the results of the assessment.

1.3 Limitations

Sampling and testing were limited to select IT equipment rooms and select rooms that may be converted to IT equipment rooms.

2.0 ASBESTOS AND LEAD INSPECTION PROCEDURES

2.1 General Information

The inspection was conducted on May 24-26, 2022 by Bruce Boehm Carlson, a University of Alabama Safe State Program certified Asbestos Building Inspector and Lead Inspector. AET collected 86 samples of suspect asbestos-containing building materials (ACBM) and tested 110 suspect painted/coated lead surfaces at the Site.

Suspect asbestos inspection, sampling and analytical procedures were performed in accordance with EPA Asbestos Hazard Emergency Response Act (AHERA) 40 CFR Part 763, Subpart E; EPA National

Emission Standard for Hazardous Air Pollutants (NESHAP), 40 CFR Part 61; and the Occupational Safety and Health Administration (OSHA) rules and regulations, Asbestos Standards for General Industry 29 CFR 1910.1001 and Asbestos Standards for the Construction Industry 29 CFR 1926.1101.

Asbestos samples were analyzed utilizing polarized light microscopy (PLM) by Eurofins EMLab P&K, a NVLAP accredited laboratory (NVLAP Lab No. 200844-0). Other potential regulated wastes were inventoried according to the Pre-Demolition Environmental Checklist and Guide.

Potential lead-containing paint sampling and analytical procedures were performed in accordance with the University of Alabama Safe State Program, the U.S. Department of Housing and Urban Development (HUD), the EPA and the OSHA. Testing was conducted utilizing a Niton portable XRF analyzer.

2.2 Function of Inspection

The EPA NESHAP requires building owners to inspect for ACBM in areas of a building where renovation or demolition will take place. Some States regulate the removal and disposal of regulated waste as outlined in the Pre-Demolition Environmental Checklist and Guide.

All manufactured and some natural products are considered suspect ACBM. Materials that are considered to be non-suspect are wood, metal, glass, and fiberglass. Prior to renovation or demolition of a building, all regulated friable ACBM must be removed from the affected area. In addition, non-friable materials, which are in a damaged condition or are likely to become friable during the process of renovation or demolition also require removal. Non-friable materials, which are in good condition at the time of inspection and most likely will not become friable during demolition may, under certain circumstances, remain in place prior to demolition. EPA and OSHA define any building material which contains greater than one percent asbestos to be asbestos-containing material. It is also required to point-count by PLM the percent asbestos in friable asbestos-containing material (ACM) estimated to contain less than one percent asbestos.

The State of Alabama Department of Environmental Management regulates the removal and disposal of regulated waste. This also includes delaminating lead-based paint.

HUD and the EPA identify lead-based paint as any paint, varnish, shellac, or other coating that contains lead concentrations equal or greater than one milligram per square centimeter (1.0 mg/cm2), 0.5 % by weight or 5,000 parts per million (ppm). OSHA recognizes lead-based paint as paint that contains any detectable amount of lead. Although the use of lead in paint was banned in 1978 by the Consumer Product Safety Commission (CPSC), consumer paints can still contain up to 0.06 % lead by weight or 600 ppm. Lead-based paints are still commonly used in many commercial applications.

3.0 ASBESTOS AND LEAD INSPECTION RESULTS

3.1 Asbestos-Containing Materials

See Figures 1 through 12 for the locations of the asbestos containing building material samples. See Table 1 for the materials that contain asbestos and Table 2 for the materials that do not contain asbestos. Please see Appendix B for all material locations. The asbestos analytical laboratory report is included in Appendix C. Photographs are included in Appendix F. Laboratory credentials are included in Appendix G.

The following materials were sampled and found to contain greater than 1% asbestos:

• 315-2G-A – Photo 2 – 2” gray ceramic floor tile with black mastic was found to contain 3% asbestos in the black mastic only, the ceramic tile DOES NOT contain asbestos. Approximately 24 total square feet (SF) of the floor tile was identified in Floor 09 Room 9208.

• 430-BAC-A, B – Photos 3 and 4 – Black tar above the ceiling was found to contain 4% asbestos. Approximately 120 total SF was identified in Ground Floor Room G516 (48 SF), Floor 03 Room 3314 (12 SF), Room 3435 (30 SF), and Room 3436 (30 SF).

These asbestos-containing materials must be removed by a licensed asbestos abatement company using certified supervisors and workers prior to commencing renovation activities.

The rest of the materials that were sampled and tested were found to not contain asbestos.

Complete and submit the State of Alabama Department of Environmental Management Notice of Abatement/Demolition Form at least ten working prior to commencing the demolition activities.

3.2 Lead Paints/Coatings

AET tested the various paints/coatings in the various IT equipment rooms at the Site. A summary of the lead containing paints/coatings can be found in Table 3 and a summary of the non-lead containing paints/coatings can be found in Table 4. Please see Appendix D for the locations and results of all the tested paints/coatings. A copy of the XRF Performance Characteristics Sheets can be found in Appendix G.

The following painted/coated surfaces were found to contain greater than 1 milligram per square centimeter (mg/cm2) lead:

• Shot 30 - Photo 5 – Light tan painted terra cotta block walls were found to contain 1.40 mg/cm2 lead. Approximately 805 total square feet (SF) of the terra cotta tile was identified in Floor 02 Room 2348.

• Shots 106 and 107 - Photo 6 – Tan painted 4” green ceramic wall tiles were found to contain between 6.40 and 6.70 mg/cm2 lead. Approximately 120 total SF of the ceramic tile was identified in Floor 08 Room 8216.

The lead containing materials must be removed and properly disposed of by Environmental Protection Agency (EPA) Lead Renovation, Repair and Painting (RRP) trained and certified personnel OR a University of Alabama Safe State Program certified lead abatement contractor utilized certified supervisors and workers.

Salvage, reuse, recycle or properly dispose of the numerous regulated waste materials identified at the Site prior to commencing with demolition activities. A copy of the Pre-Demolition Environmental Checklist and Guide is in Appendix E.

4.0 RECOMMENDATIONS

Based on the results of this investigation, AET recommends the following:

• The facility owners must notify employees, tenants, contractors, and vendors working in the building of the presence, quantity, and location of identified or assumed ACBM and lead containing paints/coatings.

• Prior to commencing renovation/demolition activities conduct the following:

o Sample and test the presumed ACBM listed in Section 3, OR assume they contain asbestos and utilize a licensed asbestos abatement company with certified supervisors and workers to remove the presumed ACBM listed in Section 3.1.

o Utilize EPA Lead RRP or University of Alabama Safe State Program trained and certified contractors to manage the painted/coated surfaces throughout and on the building in accordance with the EPA Lead RRP Rules and/or State of Alabama regulations.

• Salvage, reuse, recycle or properly dispose of the numerous regulated objects identified at the Site prior to commencing with renovation activities.

• Complete and submit the State of Alabama Department of Environmental Management Notice of Abatement/Demolition Form at least ten working prior to commencing the demolition activities. The form is available at: http://adem.alabama.gov/DeptForms/Form496.pdf

• Obtain all required local permits.

• Prepare a general environmental contingency management plan for addressing potential situations that may arise during the renovation project. Example contingencies might include management of petroleum, management of spilled fluids or other unknown regulated items encountered during the demolition and Site excavation.

• During the renovation/demolition activities, if additional suspect asbestos containing materials or potential lead containing paints/coatings are discovered, do not disturb the materials and contact AET for consultation or follow-up testing.

5.0 GENERAL REMARKS

5.1 Standard of Care

Bulk asbestos and lead testing, collection and analysis was conducted in accordance with EPA and the State of Alabama required methodology. Other potential regulated wastes were inventoried.

This report summarizes the results of the inspection completed by AET. This inspection and review of the subject property has been limited in scope in that it was undertaken with the knowledge that visual observations and random sampling methods alone might not reveal the presence, full nature, and extent of all ACBM, lead paint, and other regulated wastes in the building. AET makes no representations as to the asbestos or lead content of materials not sampled or that were not accessible to our inspector(s) (i.e., between walls, beneath floors, in sealed pipe chases, etc).

The ACBM, lead paint, and other regulated wastes sample locations and building dimensions were visually estimated. Therefore, the sample locations, building dimensions and approximate square footages of ACBM and lead paint should be considered accurate only to the degree implied by the methods used.

This asbestos and regulated wastes inspection is not intended to be the sole basis for asbestos, lead paint, and regulated waste removal bids. Confirmation of the presence, condition, and quantity of the ACBM’s, lead paints, and other regulated waste should be conducted by prospective removal contractors prior to accepting removal bids. This report is provided for the exclusive use of the client noted on the cover page and is subject to the terms and conditions in the applicable contract between the Client and AET. The Client is the only party to whom AET has explained the limitations of this inspection and has been involved in the shaping of the scope of services. Any third-party review of this report will be subject to the terms and conditions governing contractual work between the Client and AET. The unauthorized use of, reliance on, or release of information contained in this report, without the expressed written consent of the Client is strictly prohibited and will be without risk or liability.

The services performed by AET on this project have been conducted with a level of care and skill that meets or exceeds industry standards set by reputable members of the profession, practicing in the same locality under similar budget and time constraints. This inspection does not guarantee all ACBM, lead paint, or other regulated waste were found.

5.2 Certifications

I, the undersigned, do hereby certify that I am an accredited Asbestos Building Inspector and Lead Inspector in the State of Alabama, certified by the University of Alabama Safe State Program, Nos.

AIN052291E0820 and LIN052291E0820. A photocopy of my current certification is included in Appendix H.

Report Authored By:

Bruce A. Boehm Carlson Senior Environmental Project Manager

Tables

Table 1 - Summary of Asbestos Containing Building Materials

Area Location Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 09

315 Ceramic Tile

2G 2" Gray

M YES 24 SF

Notes: Located in various areas thoughout the building. There is black floor tile mastic beneath the ceramic tile that was found to contain asbestos.

Non-Friable

Floor 03

430 Tar

BAC Black Above Ceiling

M YES 12 SF

Notes: Located in various areas thoughout the building. Located specifically in Ground Floor Room G516 (48 SF), Floor 03 Room 3314 (12 SF), Room 3435 (30 SF), and Room 3436 (30 SF) for an approximate total of 120 SF.

Non-Friable

Floor 03

430 Tar

BAC Black Above Ceiling

M YES 30 SF

Notes: Located in various areas thoughout the building. Located specifically in Ground Floor Room G516 (48 SF), Floor 03 Room 3314 (12 SF), Room 3435 (30 SF), and Room 3436 (30 SF) for an approximate total of 120 SF.

Non-Friable

Floor 03

430 Tar

BAC Black Above Ceiling

M YES 30 SF

Notes: Located in various areas thoughout the building. Located specifically in Ground Floor Room G516 (48 SF), Floor 03 Room 3314 (12 SF), Room 3435 (30 SF), and Room 3436 (30 SF) for an approximate total of 120 SF.

Non-Friable

Ground Floor

G516

430 Tar

BAC Black Above Ceiling

M YES 48 SF

Notes: Located in various areas thoughout the building. Located specifically in Ground Floor Room G516 (48 SF), Floor 03 Room 3314 (12 SF), Room 3435 (30 SF), and Room 3436 (30 SF) for an approximate total of 120 SF.

Non-Friable

Page 1 of 1Wednesday, July 20, 2022

2:56:26 PM

American Engineering Testing, Inc.

St. Paul, MN 55114

Table 2 - Summary of Non-Asbestos Containing Building Materials

Location Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 01

104 Spray Applied Fireproofing

G Gray

S ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 03

104 Spray Applied Fireproofing

G Gray

S ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 03

104 Spray Applied Fireproofing

G Gray

S ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 01

107 Decorative Wall Texture

SMT Smooth

S ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 01

107 Decorative Wall Texture

SMT Smooth

S ND 7 7

Notes: Located in select areas throughout the building.

Friable

Page 1 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Location Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 09

107 Decorative Wall Texture

SMT Smooth

S ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 01

201 0-4 Fiberglass Pipe Insulation

BR Brown

T ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 01

234 Duct Insulation

WFG White Fiberglass

T ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 01

251 Blown-in Insulation

W White

T ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 03

302 2x2 Ceiling Tile

MHLF Medium Hole Linear Fissure

M ND 7 7

Notes: Located in select areas throughout the building.

Friable

Page 2 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Ground Floor

G114B

302 2x2 Ceiling Tile

MHWF Medium Hole Wide Fissure

M ND 7 7

Notes: Located in various areas thoughout the building.

Friable

Floor 02

2510/2127

302 2x2 Ceiling Tile

PHBW Pinhole Birdwing

M ND 7 7

Notes: Located in select areas throughout the building.

Friable

Floor 03

302 2x2 Ceiling Tile

PHF Pinhole Fissure

M ND 7 7

Notes: Located in various areas thoughout the building.

Friable

Floor 03

302 2x2 Ceiling Tile

PHSS Pinhole Small Hole

M ND 7 7

Notes: Located in select areas throughout the building.

Friable

Ground Floor

G516

302 2x2 Ceiling Tile

SSR Smooth Sheetrock

M ND 7 7

Notes: Located in various areas thoughout the building.

Friable

Floor 04

303 2x4 Ceiling Tile

PHF Pinhole Fissure

M ND 7 7

Notes: Located in various areas thoughout the building.

Friable

Page 3 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 03

305 Sheetrock & Taping Compound

WC Walls and Ceilings

M ND 7 7

Notes: Located thoughout the building.

Friable

Floor 03

308 Base Cove & Mastic

4AG 4" Army Green

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Floor 03

308 Base Cove & Mastic

4B 4" Black

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 09

308 Base Cove & Mastic

4BG 4" Beige

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 04

308 Base Cove & Mastic

4BR 4" Brown

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 04

308 Base Cove & Mastic

4BRD 4" Brown Decorative

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Page 4 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 03

308 Base Cove & Mastic

4G 4" Gray

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Ground Floor

G114B

308 Base Cove & Mastic

4LGR 4" Light Green

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Basement

B103J

308 Base Cove & Mastic

4M 4" Maroon

M ND

Notes: Located in select areas of the building.

Non-Friable

Floor 03

308 Base Cove & Mastic

4T 4" Tan

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Floor 04

308 Base Cove & Mastic

4THB 4" Thick Black

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 03

308 Base Cove & Mastic

6B 6" Black

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Page 5 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Ground Floor

G111G

308 Base Cove & Mastic

6BR 6" Brown

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 04

308 Base Cove & Mastic

6G 6" Gray

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 06

308 Base Cove & Mastic

6GR 6" Green

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 03

308 Base Cove & Mastic

6T 6" Tan

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Ground Floor

G111G

309 Mastic - Carpet

C Clear

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 02

2510/2127

309 Mastic - Carpet

GR Green

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Page 6 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 09

310 12x12 Floor Tile & Mastic

TSM Tan Small Mottled

M ND 0 NA

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 01

310 12x12 Floor Tile & Mastic

CBRS Cream w/ Brown Streaks

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Floor 04

310 12x12 Floor Tile & Mastic

CRGS Cream w/ Gray Streaks

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 02

310 12x12 Floor Tile & Mastic

T Tan

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Floor 02

2714A

310 12x12 Floor Tile & Mastic

TBRS Tan w/ Brown Streaks

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Floor 03

310 12x12 Floor Tile & Mastic

TM Tan Mottled

M ND 0 NA

Notes: Located in various areas thoughout the building.

Non-Friable

Page 7 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 03

3711A

310 12x12 Floor Tile & Mastic

WBGS White w/ Beige Streaks

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 03

310 12x12 Floor Tile & Mastic

WBRS White w/ Blue & Red Streaks

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 04

310 12x12 Floor Tile & Mastic

WBS White w/ Black Specks

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 03

310 12x12 Floor Tile & Mastic

WCF White Confetti

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 02

310 12x12 Floor Tile & Mastic

WGRS White w/ Green Streaks

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Ground Floor

G114B

310 12x12 Floor Tile & Mastic

WLC White Large Confetti

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Page 8 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Basement

B103C

312 Mastic - Floor Tile

TB Tan/Black

M ND

Notes: Located in various areas throuhout the building.

Non-Friable

Floor 04

313 Sheet Floor & Mastic

Y Yellow

M ND 7 7

Notes: Located in various areas thoughout the building.

Friable

Floor 01

315 Ceramic Tile

12T 12" Tan

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Floor 04

315 Ceramic Tile

2T 2" Tan

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 08

315 Ceramic Tile

4GR 4" Green

M ND 120 SF

Notes: Located in various areas thoughout the building. The glazing on the tile was found to contain lead above the regulated limit of 1.0 milligram per square centimeter (mg/cm2).

Non-Friable

Floor 08

315 Ceramic Tile

4LBL 4" Light Blue

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Page 9 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Ground Floor

G516

315 Ceramic Tile

MBRB Multi-Brown Brick

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 06

6332A

321 Caulk

B Black

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 03

321 Caulk

BRFC Brown Fire Caulk

M ND

Notes: Located throughout the building.

Non-Friable

Floor 01

321 Caulk

C Clear

M ND

Notes: Located throughout the building.

Non-Friable

Floor 02

321 Caulk

DBRFC Dark Brown Fire Caulk

M ND

Notes: Located throughout the building.

Non-Friable

Floor 03

321 Caulk

GD Gray Duct

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Page 10 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 01

321 Caulk

PF Pink Fire

M ND

Notes: Located throughout the building.

Non-Friable

Floor 03

321 Caulk

RF Red Fire

M ND

Notes: Located throughout the building.

Non-Friable

Floor 04

321 Caulk

TD Tan Duct

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 03

321 Caulk

W White

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 02

2510/2127

321 Caulk

WD White Duct

M ND

Notes: Located throughout the building.

Non-Friable

Floor 01

321 Caulk

YF Yellow Fire

M ND

Notes: Located throughout the building.

Non-Friable

Page 11 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Basement

B103J

363 Epoxy Flooring

BL Blue

M ND

Notes: Located in select areas of the basement.

Non-Friable

Floor 03

502 Sink Undercoating

B Black

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 03

509 Adhesive

BRF Black Raised Floor

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Floor 06

525 Laboratory Counters

B Black

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 04

530 Odd Sized Vinyl Floor Tile

16T 16" Tan

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Floor 04

530 Odd Sized Vinyl Floor Tile

4BRB 4" Brown Board

M ND

Notes: Located in various areas thoughout the building.

Non-Friable

Page 12 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Room Number

Material

ID

Subcat ID

Material ID Description Subcategory Description

Material Code

Asbestos Content

Quantity Physical Assessment:

Friability Condition

Damage Potential:

Water Air Vib Acc

Cond Rating

AHERA

Rating

Client Name: GDM Project Number: P-0013087 Project Manager: Bruce A. Boehm Carlson

Building Number: 7010 Building Name VA Medical Center Building Address 1: 7010 19th St. S.

Sample Set Name: 1 Building Address 2:

City, State Zip: Birmingham, AL 35233

Lead Paint

Floor 02

530 Odd Sized Vinyl Floor Tile

BRB Brown Board

M ND

Notes: Located in select areas throughout the building.

Non-Friable

Page 13 of 13Wednesday, July 20, 2022

2:56:50 PM

American Engineering Testing, Inc.

Table 3

Birmingham VA Medical Center Birmingham, VA

AET Project No. P-0013087

Shot Fl. Rm. Side/Location Component Substrate Color Reading (mg/cm2) Quantity Result

30 2 2348 North Wall Terra Cotta Block Light Tan 1.40 80 SF Positive 106 8 8216 West Wall 4" Ceramic Tile Green 6.70 120 SF Positive 107 8 8216 West Wall 4" Ceramic Tile Green 6.40 See above Positive

Project: GDM - Birmingham VA Medical Center By: Bruce A. Boehm Carlson Project No.: P-0013087 Date: May 24-26, 2022

Summary of Lead Containing Paints/Coatings

Table 4

Birmingham, VA

AET Project No. P-0013087

Shot Fl. Rm. Side/Location Component Substrate Color Reading (mg/cm2) Quantity Result

C1 Calibration Range <0.01 SRM 2570 0.00 NA Pass C2 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C3 Calibration 3.58 ± 0.39 SRM 2571 3.40 NA Pass 1 3 3436 North Door Wood Blonde 0.00 NA Negative 2 3 3436 North Door Frame Metal Beige 0.01 NA Negative 3 3 3436 North Walls Sheetrock Tan 0.00 NA Negative 4 3 3436 North Window Frame Metal Dark Gray 0.00 NA Negative 5 3 3436 Hall Door Frame Metal White 0.00 NA Negative 6 3 3435 Hall Door Frame Metal White 0.00 NA Negative 7 3 3435 North Door Wood Blonde 0.00 NA Negative 8 3 3435 North Door Frame Metal White 0.01 NA Negative 9 3 3435 North Walls Sheetrock White 0.00 NA Negative 10 3 3904 Hall Door Frame Metal Tan 0.00 NA Negative 11 3 3904 North Door Wood Blonde 0.00 NA Negative 12 3 3904 North Walls Sheetrock Light Blue 0.00 NA Negative 13 3 3904 North Panel Wood White 0.00 NA Negative C4 Calibration Range <0.01 SRM 2570 0.00 NA Pass C5 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C6 Calibration 3.58 ± 0.39 SRM 2571 3.50 NA Pass C7 Calibration Range <0.01 SRM 2570 0.00 NA Pass C8 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C9 Calibration 3.58 ± 0.39 SRM 2571 3.50 NA Pass 14 3 3302 Hall Door Frame Metal White 0.00 NA Negative

Project: GDM - Birmingham VA Medical Center By: Bruce A. Boehm Carlson Project No.: P-0013087 Date: May 24-26, 2022

Summary of Non-Lead Containing Paints/Coatings

Birmingham, VA

AET Project No. P-0013087

Shot Fl. Rm. Side/Location Component Substrate Color Reading (mg/cm2) Quantity Result

Project: GDM - Birmingham VA Medical Center By: Bruce A. Boehm Carlson Project No.: P-0013087 Date: May 24-26, 2022

Summary of Non-Lead Containing Paints/Coatings

15 3 3302 South Door Frame Metal Beige 0.00 NA Negative 16 3 3302 West Walls Sheetrock Tan 0.00 NA Negative 17 3 3217 North Wall Terra Cotta Block Tan 0.00 NA Negative 18 3 3111 North Door Frame Metal Light Yellow 0.00 NA Negative 19 3 3111 North Wall Terra Cotta Block Tan 0.00 NA Negative 20 3 3111 West Wall Concrete Light Yellow 0.00 NA Negative 21 3 3314 Hall Door Frame Metal Tan 0.03 NA Negative 22 3 3314 West Door Frame Metal Dark Beige 0.02 NA Negative 23 3 3314 West Wall Sheetrock Tan 0.00 NA Negative 24 3 3605 Floor Floor Concrete Gray 0.00 NA Negative 25 3 3605 West Panel Wood Blue 0.00 NA Negative 26 3 3605 South Pipe Steel Red 0.00 NA Negative 27 2 2348 North Door Frame Metal White 0.01 NA Negative 28 2 2348 North Door Wood Blonde 0.00 NA Negative 29 2 2348 North Wall Sheetrock Light Tan 0.00 NA Negative 31 2 2348 Ceiling Timbers Wood Beige 0.00 NA Negative 32 2 2348 South Panel Wood Beige 0.00 NA Negative 33 2 2714A South Door Wood Medium Stain 0.00 NA Negative 34 2 2714A North Wall Concrete Yellow 0.00 NA Negative 35 2 2714A East Wall Sheetrock Yellow 0.00 NA Negative 36 2 2714A West Panel Wood Yellow 0.00 NA Negative 37 2 2714A West Panel Wood Gray 0.00 NA Negative 38 2 2904 North Door Frame Metal Tan 0.00 NA Negative

Birmingham, VA

AET Project No. P-0013087

Shot Fl. Rm. Side/Location Component Substrate Color Reading (mg/cm2) Quantity Result

Project: GDM - Birmingham VA Medical Center By: Bruce A. Boehm Carlson Project No.: P-0013087 Date: May 24-26, 2022

Summary of Non-Lead Containing Paints/Coatings

39 2 2904 North Door Wood Blonde 0.00 NA Negative 40 2 2904 East Wall Sheetrock Light Green 0.00 NA Negative 41 2 2904 North Panel Wood White 0.00 NA Negative 42 2 2602 Floor Floor Concrete Gray 0.00 NA Negative 43 2 2602 West Door Frame Metal Light Brown 0.00 NA Negative

C10 Calibration Range <0.01 SRM 2570 0.00 NA Pass C11 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C12 Calibration 3.58 ± 0.39 SRM 2571 3.40 NA Pass 44 2 2510/2127 South Wall Sheetrock Tan 0.00 NA Negative 45 2 2510/2127 West Door Wood Dark Stained 0.00 NA Negative 46 2 2713 South Wall Sheetrock Tan 0.00 NA Negative 47 2 2713 South Wall Sheetrock White 0.00 NA Negative 48 2 2713 South Pipe Metal White 0.05 NA Negative 49 2 2713 South Wall Concrete Gray 0.02 NA Negative 50 1 1510 East Door Frame Metal White 0.00 NA Negative 51 1 1510 East Wall Sheetrock Dark Tan 0.00 NA Negative 52 1 1510 East Door Frame Metal Beige 0.00 NA Negative 53 1 1508 East Door Frame Metal Beige 0.05 NA Negative 54 1 1508 South Wall Concrete Tan 0.00 NA Negative

C13 Calibration Range <0.01 SRM 2570 0.00 NA Pass C14 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C15 Calibration 3.58 ± 0.39 SRM 2571 3.50 NA Pass C16 Calibration Range <0.01 SRM 2570 0.00 NA Pass

Birmingham, VA

AET Project No. P-0013087

Shot Fl. Rm. Side/Location Component Substrate Color Reading (mg/cm2) Quantity Result

Project: GDM - Birmingham VA Medical Center By: Bruce A. Boehm Carlson Project No.: P-0013087 Date: May 24-26, 2022

Summary of Non-Lead Containing Paints/Coatings

C17 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C18 Calibration 3.58 ± 0.39 SRM 2571 3.30 NA Pass 55 1 1403 Floor Floor Concrete Gray 0.00 NA Negative 56 1 1403 East Wall Sheetrock Tan 0.01 NA Negative 57 1 1403 North Door Frame Metal White 0.00 NA Negative 58 1 1403 North Door Wood Blonde 0.00 NA Negative 59 1 1403 West Pipe Steel Red 0.00 NA Negative 60 1 1517 South Door Frame Metal Gray 0.01 NA Negative 61 1 1365 West Wall Sheetrock White 0.01 NA Negative 62 1 1365 Ceiling Ceiling Concrete White 0.01 NA Negative 63 1 1365 Duct Duct Fiberglass White 0.00 NA Negative 64 1 1365 West Paneling Wood Blonde 0.00 NA Negative 65 Ground G114B South Door Frame Metal Gray 0.00 NA Negative 66 Ground G111G East Door Frame Metal Brown 0.00 NA Negative 67 Ground G111G East Wall Sheetrock Tan 0.00 NA Negative 68 Ground G511 West Door Metal Beige 0.04 NA Negative 69 Ground G511 West Door Frame Metal White 0.00 NA Negative 70 Ground G511 West Door Wood Blonde 0.00 NA Negative 71 Ground G511 East Wall Sheetrock White 0.00 NA Negative 72 Ground G511 East Panel Wood White 0.00 NA Negative 73 Ground G511 Floor Floor Concrete Gray 0.00 NA Negative 74 BSMT B103C West Wall Sheetrock White 0.00 NA Negative 75 BSMT B103C Above Ceiling Pipe Metal Red 0.00 NA Negative

Birmingham, VA

AET Project No. P-0013087

Shot Fl. Rm. Side/Location Component Substrate Color Reading (mg/cm2) Quantity Result

Project: GDM - Birmingham VA Medical Center By: Bruce A. Boehm Carlson Project No.: P-0013087 Date: May 24-26, 2022

Summary of Non-Lead Containing Paints/Coatings

76 BSMT B103J Floor Floor Concrete Blue 0.00 NA Negative 77 BSMT B103J Above Ceiling Pipe Metal Red 0.00 NA Negative 78 BSMT B103J Above Ceiling Ceiling Concrete White 0.00 NA Negative 79 9 9115 North Wall Terra Cotta Block Tan 0.00 NA Negative 80 9 9302 East Wall Wood Tan 0.00 NA Negative 81 9 9208 West Floor 2" Ceramic Tile Gray 0.00 NA Negative

C19 Calibration Range <0.01 SRM 2570 0.00 NA Pass C20 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C21 Calibration 3.58 ± 0.39 SRM 2571 3.50 NA Pass C22 Calibration Range <0.01 SRM 2570 0.00 NA Pass C23 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C24 Calibration 3.58 ± 0.39 SRM 2571 3.90 NA Pass 82 3 3711A Ceiling Ceiling Concrete White 0.00 NA Negative 83 3 3711A Above Ceiling Pipe Metal White 0.00 NA Negative 84 3 3711A Above Ceiling Pipe Metal Red 0.50 NA Negative 85 3 3711 East Wall Concrete Yellow 0.00 NA Negative 86 3 3711 East Wall Sheetrock Yellow 0.00 NA Negative 87 Ground G516 Floor Floor Ceramic Tile Multi-Brown 0.00 NA Negative 88 Ground G516 South Wall Terra Cotta Block Tan 0.01 NA Negative 89 Ground G516 South Wall Concrete Tan 0.00 NA Negative 90 4 4302 South Door Wood Medium Stain 0.00 NA Negative 91 4 4214 North Wall Terra Cotta Block Tan 0.00 NA Negative 92 4 4214 Floor Floor 2" Ceramic Tile Tan 0.00 NA Negative

Birmingham, VA

AET Project No. P-0013087

Shot Fl. Rm. Side/Location Component Substrate Color Reading (mg/cm2) Quantity Result

Project: GDM - Birmingham VA Medical Center By: Bruce A. Boehm Carlson Project No.: P-0013087 Date: May 24-26, 2022

Summary of Non-Lead Containing Paints/Coatings

93 4 4202 North Wall Concrete White 0.25 NA Negative 94 4 4202 East Wall Sheetrock White 0.20 NA Negative 95 4 4602 East Panel Wood Blue 0.00 NA Negative 96 4 4625 West Door Frame Metal Beige 0.00 NA Negative 97 4 4625 West Door Metal Beige 0.04 NA Negative

C25 Calibration Range <0.01 SRM 2570 0.00 NA Pass C26 Calibration 0.71 ± 0.08 SRM 2574 0.70 NA Pass C27 Calibration 3.58 ± 0.39 SRM 2571 3.70 NA Pass 98 6 6604 East Panel Wood Blue 0.00 NA Negative 99 7 7614 East Door Frame Metal Beige 0.00 NA Negative

100 7 7614 East Door Wood Blonde 0.00 NA Negative 101 7 7614 West Wall Sheetrock Tan 0.00 NA Negative 102 7 7614 West Panel Wood Blue 0.00 NA Negative 103 5 5201 East Window Frame Metal Black 0.00 NA Negative 104 5 5214 South Wall Terra Cotta Block Tan 0.00 NA Negative 105 6 6313 East Cabinets Metal Tan 0.00 NA Negative 108 8 8213/8123 South Wall 4" Ceramic Tile Light Blue 0.12 NA Negative 109 7 7217 South Wall Terra Cotta Block Tan 0.02 NA Negative 110 7 7217 South Pipe Metal Red 0.02 NA Negative C28 Calibration Range <0.01 SRM 2570 0.00 NA Pass C29 Calibration 0.71 ± 0.08 SRM 2574 0.60 NA Pass C30 Calibration 3.58 ± 0.39 SRM 2571 3.50 NA Pass

Figures

VA Medical Center 7010 19th St. S.

Birmingham, Alabama AET Project No. P-0013087Date: 7/19/2022

General Notes

Figure

File: X:\AMERICAN\ALABAMA\Birmingham_AL\VA_MedicalCenter\Drawings\AE_CoverPage.dwg PO 17938-1640

GENERAL NOTES

ALL ACM ABATEMENT OR ENCLOSURE WORK SHALL BE PERFORMED BY TRAINED/LICENSED ASBESTOS ABATEMENT CONTRACTOR WITHIN A FULL CONTAINMENT UNDER NEGATIVE PRESSURE (NPE).

ALL HVAC AIR INTAKES WITHIN NPE SHALL BE SHUT DOWN AND ISOLATED WITH CRITICAL BARRIERS DURING ACTIVE ACM REMOVAL OR ENCLOSURE WORK. WORK TO BE SCHEDULED WITH GENERAL CONTRACTOR AND OWNER TO

ACCOMMODATE CONSTRUCTION AND FACILITY REQUIREMENTS.

WHERE NEGATIVE PRESSURE ENCLOSURES ARE WITHIN OPERATIONAL TR ROOMS, CONTRACTOR TO MAINTAIN COOLING AIR FLOW TO ELECTRONICS BY TUNNELING METHODS OR SIMILAR.

WORKERS PERFORMING ACM REMOVAL OR ENCLOSURE SHALL DON, AT MINIMUM, HALF FACE AIR PURIFYING RESPIRATORS WITH P100 FILTERS, DISPOSABLE DUST SUITS (WITH BOOT COVERS) AND GLOVES DURING ACTIVE TASKS, WHICH SHALL

BE SUPPLEMENTED WITH USE OF POWERED AIR PURIFYING RESPIRATORS.

ACM REMOVAL WORK AREAS SHALL BE PREPARED IN ACCORDANCE WITH THE FOLLOWING: A) ALL FLOORS, CEILINGS AND WALLS SHALL BE ISOLATED USING 2-LAYERS OF 6-MIL POLY SHEETING; B) OSHA ASBESTOS SIGNAGE AT ENTRANCE TO REGULATED AREAS; C)SINGLE-POINT OF ENTRY WITH 3-STAGE WET DECONTAMINATION STATION TO ALLOW WORKERS TO REMOVE PPE, WASH AND VACUUM THEMSELVES OFF PRIOR TO EXITING THE REGULATED WORK AREA; D) MAINTAINED UNDER NEGATIVE PRESSURE (-0.02 IN WG OR BETTER) USING HEPA FILTERED AIR MACHINES WITH EXHAUST ROUTED TO OUTDOORS; E) MINIMUM OF 4 AIR CHANGES PER HOUR; F) CLEAN/CHANGE ROOM SUFFICIENT FOR WORKERS TO CHANGE INTO STREET CLOTHES (OPAQUE POLY REQUIRED AS NEEDED FOR PRIVACY); G) RENEWABLE ADHESIVE MATS IMMEDIATELY OUTSIDE OF REGULATED WORK AREA TO ENSURE FOOT TRAFFIC DOES NOT SPREAD DUST/DEBRIS TO OTHER AREAS

OF FACILITY.

ACM WORK TO BE PERFORMED USING THE FOLLOWING CONTROLS: A) HEPA FILTERED VACUUM FOR CONTINUOUS AND FINAL CLEANUP; B) ONLY MANUAL REMOVAL MEANS/TOOLS ARE ALLOWED TO DISTURB ACM (MECHANICAL TOOLS

PROHIBITED FOR ACM REMOVAL).

REGULATED WORK AREA IS TO BE CLEANED BY CONTRACTOR FOLLOWING COMPONENT REMOVAL USING STANDARD HEPA VACUUM & WET WIPING METHODS AND VISUALLY INSPECTED AND CLEARANCE SAMPLED BY VA REPRESENTATIVE TO

VERIFY COMPLETION OF SCOPE.

AN INDEPENDENT THIRD PARTY CONSULTANT IS TO BE RESPONSIBLE FOR PERIMETER AIR MONITORING AND FINAL CLEARANCE AIR SAMPLING/VISUAL INSPECTION REQUIREMENTS.

CONTRACTOR TO BE RESPONSIBLE FOR OSHA EMPLOYEE EXPOSURE MONITORING REQUIREMENTS.

ALL WASTE PRODUCED DURING REMEDIATION PHASE SHALL BE COLLECTED, CONTAINERIZED, LABELED, CHARACTERIZED AND DISPOSED IN ACCORDANCE WITH SPECIFICATION 02.82.11

ALL WASTE CONTAINERS, EQUIPMENT, ETC. SHALL BE WET WIPED PRIOR TO LEAVING REGULATED WORK AREA.

NIGHTS WORK IS TO BE PERFORMED…

This is the start of the file's text. The full file is on GovTribe.