Attachment to Amendment 0007_Specification Section 096519 Resilient Tile Flooring_26JUL2023.pdf

PDF 140 KB Posted

Attached to
EHRM Birmingham Infrastructure Upgrades Federal contract opportunity
Solicitation number
36C77623B0026
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This specification document outlines the requirements for resilient tile flooring installation as part of the Electronic Health Records Modernization (EHRM) Infrastructure Upgrades project at the Veterans Affairs Medical Center in Birmingham, Alabama. The project requires installation of luxury vinyl tile that meets standards for critical radiant flux, smoke density, slip resistance, and other performance measures. The specification defines submittal requirements, material standards, subfloor testing and preparation procedures, and installation and protection methods in accordance with the manufacturer's instructions.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Birmingham Infrastructure Upgrades, newest first.
File Type Posted
Attachment to Amendment 0008_Specification Section 27 10 00 - Control and Signal Wiring_27JUL2023.pdf PDF
Amendment 0008_36C77623B0026_QAs and Revised Specs_28JUL2023.pdf PDF
Attachment to Amendment 0008_Specification 01 33 00 Submittal Procedures 7-28-2023.pdf PDF
Amendment 0007_36C77623B0026_Spec 096519 Flooring_26JUL2023.pdf PDF
Site Visit Attendance Sheet_21JULY2023.pdf PDF
Amendment 0006_36C77623B0026_25JUL2023.pdf PDF
Amendment 0005_36C77623B0026_24JUL2023.pdf PDF
Amendment 0004_36C77623B0026_20JUL2023.pdf PDF
Amendment 0003_36C77623B0026_18JUL2023.pdf PDF
Amendment 0002 Attachment_Ethernet Jacket Color Table 3-2_Feb2016.pdf PDF
36C77623B0026_Amendment 0002_11JUL2023.pdf PDF
Amendment 0001_36C77623B0026 0001_1_30JUN2023.pdf PDF
Signed Site Visit Attendance Sheet_21JUNE2023.pdf PDF
Site Visit Attendance Sheet_21JUNE2023.pdf PDF
36C77623B0026_09JUN2023.docx DOCX document
Attachment 7(c) OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
Attachment 8 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 4 Scope of Work Birmingham EHRM 05-19-2023.pdf PDF
Attachment 2(c) Drawings Part_3_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 6 Submittal Register Birmingham EHRM 08-18-2022.xlsx XLSX spreadsheet
Attachment 2(a) Drawings Part_1_of_5 521-20-901 Birmingham EHRM 09-01-2022 Rev.pdf PDF
Attachment 2(e) Drawings Part_5_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 1(a) Specifications Part_1_of_2 Birmingham EHRM 08-31-2022.pdf PDF
Attachment 10(b) Wage Determination AL20230096_ShelbyCounty_27JAN2023.pdf PDF
Attachment 10(a) Wage Determination AL20230087_JeffersonCounty_27JAN2023.pdf PDF
Attachment 7(b) OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
Attachment 7(a) OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
Attachment 2(d) Drawings Part_4_of_5 Birmingham EHRM 09-01-2022.pdf PDF
Attachment 2(b) Drawings Part_2_of_5 Birmingham EHRM_09-01-2022.pdf PDF
Attachment 3(b) HazMaterial Survey Birmingham EHRM 09-01-2022_Part_2_of_2.pdf PDF
Attachment 9 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
Attachment 5 Design Narrative Birmingham EHRM 08-18-2022.pdf PDF
Attachment 3(a) HazMaterials Survey Birmingham EHRM Part_1_of_2.pdf PDF
Attachment 1(b) Specifications Birmingham EHRM 08-31-2022_Part_2_of_2.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Birmingham Healthcare System (VABHCS) 100% Construction Documents

Birmingham, AL 07/26/2023

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Birmingham, AL VA Project No. 521-20-901

09 65 19 - 1 of 7

RESILIENT TILE FLOORING

SECTION 09 65 19

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section specifies the installation of luxury vinyl tile/ and accessories required for a complete installation.

1.2 RELATED WORK:

A. Resilient Base: Section 09 65 13, RESILIENT BASE AND ACCESSORIES.

B. Subfloor Testing and Preparation: Section 09 05 16, SUBSURFACE

PREPARATION FOR FLOOR FINISHES.

E. Color, Pattern and Texture for Resilient Tile Flooring and Accessories:

Section 09 06 00, SCHEDULE FOR FINISHES.

1.3 SUBMITTALS:

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Resilient material manufacturer’s recommendations for adhesives, underlayment, primers, and polish.

3. Application, installation and maintenance instructions.

D. Samples:

1. Tile: Each type, color, thickness and finish.

2. Edge Strips: Each type, color, thickness and finish.

3. Feature Strips: Each type, color, thickness and finish.

E. Shop Drawings:

1. Layout of patterns as shown on the construction documents.

2. Edge strip locations showing types and detail cross sections.

F. Test Reports:

1. Abrasion resistance: Depth of wear for each tile type and color and volume loss of tile, certified by independent laboratory. Tested per

ASTM F510/F510M.

2. Moisture and pH test results as per Section 09 05 16, SUBSURFACE

PREPARATION FOR FLOOR FINISHES.

Birmingham, AL VA Project No. 521-20-901

09 65 19 - 2 of 7

1.4 DELIVERY:

A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.

B. Materials from containers which have been distorted, damaged or opened prior to installation are not acceptable.

1.5 STORAGE:

A. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives, and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.

1.6 QUALITY ASSURANCE:

A. Installer Qualifications: A company specializing in installation with minimum three (3) years’ experience and employs experienced flooring installers who have retained, and currently hold, an INSTALL

Certification, or a certification from a comparable certification program.

1. Installers to be certified by INSTALL or a comparable certification program with the following minimum criteria:

a. US Department of Labor approved four (4) year apprenticeship program, 160 hours a year.

b. Career long training.

c. Manufacturer endorsed training.

d. Fundamental journeyman skills certification.

B. Furnish product type materials from the same production run.

1.7 WARRANTY:

A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of

Construction”.

1.8 APPLICABLE PUBLICATIONS:

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. ASTM International (ASTM):

Birmingham, AL VA Project No. 521-20-901

09 65 19 - 3 of 7

D2047-11................Test Method for Static Coefficient of Friction of Polish-Coated Flooring Surfaces as Measured by the James Machine

D2240-05(R2010).........Test Method for Rubber Property—Durometer

Hardness

D4078-02(R2008).........Water Emulsion Floor Finish

E648-14c................Critical Radiant Flux of Floor Covering Systems

Using a Radiant Energy Source

E662-14.................Specific Optical Density of Smoke Generated by

Solid Materials

E1155/E1155M-14.........Determining Floor Flatness and Floor Levelness

Numbers

F510/F510M-14...........Resistance to Abrasion of Resilient Floor

Coverings Using an Abrader with a Grit Feed

Method

F710-11.................Preparing Concrete Floors to Receive Resilient

Flooring

F925-13.................Test Method for Resistance to Chemicals of

Resilient Flooring

F1344-12(R2013).........Rubber Floor Tile

F1700-13a...............Solid Vinyl Floor Tile

F1869-11................Test Method for Measuring Moisture Vapor

Emission Rate of Concrete Subfloor Using

Anhydrous Calcium Chloride

F2170-11................Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in Situ Probes

F2195-13................Linoleum Floor Tile

C. Code of Federal Regulation (CFR):

40 CFR 59...............Determination of Volatile Matter Content, Water

Content, Density Volume Solids, and Weight

Solids of Surface Coating

D. International Standards and Training Alliance (INSTALL):

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS:

A. Provide adhesives, underlayment, primers, and polish recommended by resilient floor material manufacturer.

Birmingham, AL VA Project No. 521-20-901

09 65 19 - 4 of 7

B. Critical Radiant Flux: 0.45 watts per sq. cm or more, Class I, per

ASTM E648.

C. Smoke Density: Less than 450 per ASTM E662.

D. Slip Resistance – Not less than 0.55 when tested with ASTM D2047.

2.2 LUXURY VINYL TILE:

A. Basis of Design: Interface Collection Level Set, Style A003001, Color Polished Cement

B. Colors and Patterns: To be selected by C.O.R. from manufacturer’s standard colors prior to final acceptance of work.

C. Product Size:

D. ASTM F1700, Class III, Printed Film Vinyl Tile E. Thickness: Total Thickness 4.5 mm, Wear Layer Thickness 22 mil

F. Size: 50 cm x 50 cm (19.69 x 19.69)

G. Chemical Resistance: ASTM F925; pass.

H. IIC Sound Rating (ASTM E492-09) 64 IIC

I. Slip Resistance (ASTM D2047) >0.55 wet/dry, ADA Compliant J. Static Load Limit (ASTM F970) 1500 psi

K. Flexibility (ASTMF137) Passes

L. Resistance to Heat (ASTM F1514) Passes M. Resistance to Light (ASTM F1515) Passes

N. Radiant Flux (ASTM E648) Class I O. Smoke Density (ASTM E-662) ≤ 450

P. Thickness (ASTM F386) Passes

Q. Residual Indentation (ASTM F1914) Passes

2.3 ADHESIVES:

A. Provide water resistant type adhesive for flooring, base and accessories as recommended by the manufacturer to suit substrate conditions. VOC content to be less than the 50 grams/L when calculated according to 40 CFR 59 (EPA Method 24). Submit manufacturer’s descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.

2.7 PRIMER FOR CONCRETE SUBFLOORS:

A. Provide in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR

FLOOR FINISHES.

Birmingham, AL VA Project No. 521-20-901

09 65 19 - 5 of 7

2.8 LEVELING COMPOUND FOR CONCRETE FLOORS:

A. Provide cementitious products with latex or polyvinyl acetate resins in the mix in accordance with Section 09 05 16, SUBSURFACE PREPARATION FOR

FLOOR FINISHES.

2.9 POLISH AND CLEANERS:

A. Cleaners: As recommended in writing by floor tile manufacturer.

B. Polish: ASTM D4078.

2.10 MOULDING:

A. Provide tapered mouldings of vinyl for both edges and transitions of flooring materials specified. Provide vertical lip on moulding of maximum 6 mm (1/4 inch). Provide bevel change in level between 6 and

13 mm (1/4 and 1/2 inch) with a slope no greater than 1:2.

PART 3 - EXECUTION

3.1 ENVIRONMENTAL REQUIREMENTS:

A. Maintain flooring materials and areas to receive resilient flooring at a temperature above 20 degrees C (68 degrees F) for three (3) days before application, during application and two (2) days after application, unless otherwise directly by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 13 degrees C (55 degrees F) thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.

B. Do not install flooring until building is permanently enclosed and wet construction in or near areas to receive tile materials is complete, dry and cured.

3.2 SUBFLOOR TESTING AND PREPARATION:

A. Prepare and test surfaces to receive resilient tile and adhesive as per

Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

1. Remove existing resilient floor and existing adhesive.

B. Prepare concrete substrates in accordance with ASTM F710.

3.3 INSTALLATION:

A. Install in accordance with manufacturer's instructions for application and installation unless specified otherwise.

Birmingham, AL VA Project No. 521-20-901

09 65 19 - 6 of 7

B. Mix tile from at least two containers. An apparent line either of shades or pattern variance is not acceptable.

C. Tile Layout:

1. If layout is not shown on construction documents, lay tile symmetrically about center of room or space with joints aligned.

2. Vary edge width as necessary to maintain full size tiles in the field, no edge tile to be less than 1/2 the field tile size, except where irregular shaped rooms make it impossible.

3. Place tile pattern in the same direction; do not alternate tiles unless specifically indicated in the construction documents to the contrary.

D. Application:

1. Adhere floor tile to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.

2. Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.

3. Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.

4. Roll tile floor with a minimum 45 kg (100 pound) roller.

E. Seal joints at pipes with sealants in accordance with Section 07 92 00, JOINT SEALANTS.

F. Installation of Edge Strips:

1. Locate edge strips under center line of doors unless otherwise shown on construction documents.

2. Set resilient edge strips in adhesive. Anchor metal edge strips with anchors and screws.

3. Where tile edge is exposed, butt edge strip to touch along tile edge.

4. Where thin set ceramic tile abuts resilient tile, set edge strip against floor file and against the ceramic tile edge.

Birmingham, AL VA Project No. 521-20-901

09 65 19 - 7 of 7

3.4 CLEANING AND PROTECTION:

A. Clean adhesive marks on exposed surfaces during the application of resilient materials before the adhesive sets. Exposed adhesive is not acceptable.

B. Keep traffic off resilient material for a minimum 72 hours after installation.

C. Clean flooring as recommended in accordance with manufacturer’s printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and/or finish in accordance with manufacturer’s written instructions.

D. When construction traffic occurs over tile, cover resilient materials with reinforced kraft paper properly secured and maintained until removal is directed by COR. At entrances and where wheeled vehicles or carts are used, cover tile with plywood, hardboard, or particle board over paper, secured and maintained until removal is directed by COR.

E. When protective materials are removed and immediately prior to acceptance, replace damaged tile and mouldings, re-clean resilient materials.

3.5 LOCATION:

A. Unless otherwise indicated in construction documents, install tile flooring, under areas where casework, laboratory and pharmacy furniture and other equipment occur.

B. Extend tile flooring for room into adjacent closets and alcoves.

- - - E N D - - -