This file is a sample water quality and operational data report for the Yuma Desalting Plant (YDP) for fiscal year 2026, documenting potable water and service water treatment performance metrics. The report contains detailed daily operational data for June 10, 2026, including three main treatment train sections: Pilot System 1 (PS1) Pretreatment, PS1 Reverse Osmosis (RO) systems, and potable/service water quality parameters. Key operational metrics tracked include turbidity (measured in NTU), pH levels, free and total chlorine residuals, conductivity, flow rates, and pressure differentials across cartridge filters and RO membrane stages. The document specifies water quality compliance standards, such as maintaining turbidity under 0.30 NTU for 95% of monthly readings, minimum free chlorine residuals of 0.2 mg/L, and pH ranges appropriate for each treatment stage.

The report also includes calendar year 2025 summary data showing cumulative water diversions, production volumes, and consumptive use tracked in acre-feet across multiple water source feeds including the Colorado River, WQIC well, and MODE (Main Outlet Drain Extension). Daily product discharge records indicate YDP produced approximately 247,116 cubic meters (approximately 200 acre-feet) of product water distributed through service water systems, potable water systems, and discharge to the Colorado River, with documented operational events including temporary flow interruptions for maintenance, equipment cleaning, and system outages. The facility tracks water conservation metrics, cooling tower operations, irrigation usage, and maintains detailed records of chemical dosing rates for sodium bicarbonate, ferric sulfate, lime slurry, and antiscalant (VITEC 5100) to optimize treatment efficiency and water quality compliance.

View the file

Other files

File Type Posted
140R3026R0012-Solicitation_Rev_-1_0002.pdf PDF
Attachment_1_Statement_of_Work_pg_98_0002.pdf PDF
Attachment_-_Questions_and_Responses_0002.pdf PDF
Sol_140R3026R0012_Amd_0002.pdf PDF
Attachment_01C_Price_Breakdown-OFFEROR_COMPLETE_0002.xlsx XLSX spreadsheet
Attachment_01CC_Schedule_of_Fixed_Hourly_Labor_Rates-OFFEROR_COMPLETE_0002.xlsx XLSX spreadsheet
140R3026R0012-Solicitation_0001.pdf PDF
Sol_140R3026R0012_Amd_0001.pdf PDF
Attachment_01D_Personnel_Resource_Matrix__OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_01A_Basis_for_Contract_Cost__1_page.pdf PDF
Attachment_1_Statement_of_Work_.pdf PDF
Attachment_04_Safety_and_Health_Standards_Glossary__11_pages.pdf PDF
Attachment_11_Emergency_Response_Services__8_pages.pdf PDF
Attachment_15_STORES_Inventory_340_Catalog__1_of_2.xlsx XLSX spreadsheet
Sol_140R3026R0012.pdf PDF
Attachment_01C_Price_Breakdown-OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_21_Sample_FCU_Temperature_Status_Report.xlsx XLSX spreadsheet
Attachment_01E_Service_Contracts_-_Pricing_Summary__OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_16_Contractor_On-boarding_Off-boarding_Process__23_pages.pdf PDF
Attachment_18_Permits__234_pages.pdf PDF
Attachment_12_Sample_Invoice__6_pages.pdf PDF
Attachment_14_Preventive_and_Predictive_Maintenance_Summary.xlsx XLSX spreadsheet
Attachment_08_Wage_Determination_2015-5475__Rev__30__10_pages.pdf PDF
Attachment_01B_Levels_of_Performance_OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_19_Current_AL_Small_Service_Contracts.xlsx XLSX spreadsheet
Attachment_20_Sample_ADEQ_Potable_Water_Inspection_Report__16_pages.pdf PDF
Attachment_17_Sample_CRADA__10_pages.pdf PDF
Attachment_02_Government_Furnished_Equipment__10_pages.pdf PDF
Attachment_01_Performance_Requirements_Summary_(PRS).pdf PDF
Attachment_06_Reporting__10_pages.pdf PDF
Attachment_07_Drawings__6_pages.pdf PDF
Attachment_15_STORES_Inventory_345_Catalog__2_of_2.xlsx XLSX spreadsheet
Attachment_23_-_PPQ.pdf PDF
Attachment_01CC_Schedule_of_Fixed_Hourly_Labor_Rates-OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_01B_Levels_of_Performance_EXPLANATION__1_page.pdf PDF
Attachment_03_PPICR.xlsx XLSX spreadsheet
Attachment_05_CARMA_Business_Standards__76_pages.pdf PDF
Attachment_10_Forms__12_pages.pdf PDF
Attachment_13_Modification_and_Repair_Backlog.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PW

Yuma Desalting Plant
FY 2026
Potable Water and Service Water
Date:6/10/26
North UV Light
Manual DataInstrument DataUV Light InstrumentSample Probe Selected (1 or 2)
Potable WaterPotable WaterDataDoseFlow
TimeTurbiditypHChlorineTimeTurbiditypHChlorineTimemJ/cm2GPMTimeTurbiditypHChlorine
00000.138.060.9400000.028.060.91000041.611.20000111
03000.118.070.9603000.028.080.94030042.213.10300111
06000.138.121.0406000.028.101.01060042.413.80600111
09000.108.070.8409000.028.070.85090041.616.80900111
12000.118.081.0612000.028.041.02120041.115.11200111
15000.097.970.9815000.028.020.99150040.715.41500111
18000.098.041.0018000.028.021.00180040.417.51800122
21000.098.071.0021000.028.040.98210040.215.02100122
PWNTUpHChlorinePWNTUpHChlorineUVmJ/cm2GPMGAC in Service (S or N)
average0.118.060.98average0.028.050.96average41.314.7South 21:00Influent pHSecured
Effluent pHSecured
*Minumum manual free chlorine residual for the previous 24 hour periodNorth 21:00Influent pH9.41
mg/L0.84Effluent pH7.21
* Record time and turbidity value for any readings exceeding 1 NTU
Service Water Influent* Turbidity values must reamin under .30 NTUs for 95% of the monthly readings
ManualInstr.* Record time and chlorine residual for any readings less than .2 mg/L
DataData
TimepHpHTurbidityFree ChlorineCartridge Filter Differential Pressure
00009.289.04TimeNTUTimemg/LTimeNorth BankSouth Bank
03009.268.940000Secured#1 kPa8.9#3 kPa
06009.519.240000Secured#2 kPa1.8#4 kPa
09009.419.321200Secured#1 kPa11.2#3 kPa
12009.599.351200Secured#2 kPa2.5#4 kPa
15009.309.11
18009.289.20
21009.369.18Sodium BicarbonateService WaterPotable Water
DrawdownOrtho Polyphosphate DrawdownTI-2906 Drawdown
SWpHpH0000100mL/minS.G.0000200mL/hr0000SecuredmL/hr
average9.379.171200100mL/min1.0401200200mL/hr1200SecuredmL/hr

Comments: 18:00 found PW pH & CL2 #2 probes selected

PS 1

Yuma Desalting Plant
FY 2026
Pilot System 1 Pretreatment
Date:6/10/26
2400 - 06000600 - 18001800 - 2400
OperatorMendozaHerreraWeber
Actual Time3:1510:0018:30
MODE 1manualpH7.89
Intake ConductivitymanualuS/cm378336123702
Intake TurbiditymanualNTU5.86.711.0
Chlorine Dosage Ratemanuallbs/day354040
1 Ton Scale Readingmanualkg140
Intake TemperatureInstrumentOC27.827.628.5
Intake Free Chlorinemanualmg/L4.74.54.5
Intake Total Chlorinemanualmg/L5.95.65.3
SCR Influent FlowUCOSL/s373737
SCR Influent Flow TotalizerFrom Flow Meterm33809022
SCR Mixer SpeedUCOS%565656
SCR Rake SpeedUCOS%202020
SCR Rake TorqueUCOSN m296099
SCR RZ pHmanualpH10.1010.0210.15
SCR RZ pHInstrumentpH10.079.9010.10
SCR Effluent pHmanualpH10.1110.0710.15
SCR Effluent pHInstrumentpH10.149.9610.07
SCR Eff TurbiditymanualNTU4.8614.4016.50
SCR Eff TurbidityInstrumentNTU64.8019.4528.05
Sludge Levelmanualinches8106
Blowdown Solidsmanual%16.119.924.7
Blowdown IntervalUCOSminutes202020
SCR RZ V/V'smanual% / %5/68/107/10
Ferric Sulfate DrawdownmanualmL/minute898989
Ferric Sulfate specific gravitymanualS.G.1.2441.2441.244
Lime slurry specific gravitymanualS.G.1.0601.0601.060
Lime slurry pump speedmanual%23.0025.0023.50
DMGF Influent pHmanualpH7.787.907.90
Clearwell ConductivitymanualuS/cm338735353448
Clearwell TurbiditymanualNTU0.140.120.11
Clearwell TurbidityUCOSNTU0.040.040.04
Clearwell pHmanualpH3.864.094.03
Clearwell pHInstrumentpH4.154.004.14
Clearwell Free Chlorinemanualmg/L0.891.190.81
Clearwell Free ChlorineInstrumentmg/L0.811.240.86
Clearwell Total Chlorinemanualmg/L1.321.551.38
Clearwell Plugging FactorInstrument%141412
Filter Cell 1 Plugging FactorInstrument%N/AN/AN/A
Filter Cell 2 Plugging FactorInstrument%N/AN/AN/A
Filter Cell 3 Plugging FactorInstrument%N/AN/AN/A
Filter Cell 4 Plugging FactorInstrument%N/AN/AN/A
Filter Cell 1 TurbiditymanualNTU0.080.120.28
Filter Cell 2 TurbiditymanualNTU0.140.210.28
Filter Cell 3 TurbiditymanualNTU0.120.150.12
Filter Cell 4 TurbiditymanualNTU0.110.130.12
Filter Cell 1 pHmanualpH7.798.508.62
Filter Cell 2 pHmanualpH8.568.398.35
Filter Cell 3 pHmanualpH8.468.498.68
Filter Cell 4 pHmanualpH8.188.478.61
Yuma Desalting Plant
FY 2026
Pilot System 1 RO
Date:6/10/26North BankSouth BankNorth BankSouth BankSouth BankSouth Bank
0001 - 06000600 - 18000600 - 18001800 - 2400
OperatorMendozaHerreraWeber
Actual Time3:3010:3019:00
RO #1 Feed pHmanualpH5.260.006.005.72
RO #1 Feed TemperatureinstrumentoC27.10.026.028.0
RO #1 Feed Chlorinemanualmg/L0.100.000.110.18
RO #1 Feed TurbiditymanualNTU0.180.000.140.11
RO #1 Ammonia Feed Raterotometerkg/hr0.1100.110.11
RO #1 Feed Pressureinstrumentmpa1.430.001.501.52
RO #1 Feed Plugging Factormanual (Chemetek)%1401311
RO #1 Feed ConductivitymanualuS/cm3342034853401
RO #1 Product FlowinstrumentL/s8.20.08.28.3
RO #1 Product ConductivitymanualuS/cm6720686683
RO #1 VITEC 5100 DrawdownmanualmL/hour74.4074.474.4
RO #1 Reject FlowinstrumentL/s1.501.501.501.501.501.50
RO #1 Reject ConductivitymanualuS/cm915092889393946693979472
RO #1 1ST Stage DifferentialUCOSkPa241249238248244255
RO #1 2nd Stage DifferentialUCOSkPa139109130109130111
RO #1 Intersatge ConductivityManualuS/cm543354595669567655675562
RO #1 Intestage TemperatureManualoC282826.326.328.328.1
RO #1 Reject Free ChlorineManualmg/L0.100.090.090.110.100.10
RO #1 Interstage Free ChlorineManualmg/L0.090.090.090.100.090.10
RO #2 Feed pHmanualpH5.836.026.15
RO #2 Feed TemperatureinstrumentoC26.425.927.9
RO #2 Feed Chlorinemanualmg/L0.110.120.12
RO #2 Feed TurbiditymanualNTU0.150.120.12
RO #2 Ammonia Feed Raterotometerkg/hr0.170.170.17
RO #2 Feed Pressureinstrumentmpa1.211.261.23
RO #2 Feed Plugging Factormanual (Chemetek)%131210
RO #2 Feed ConductivitymanualuS/cm337334903412
RO #2 Product FlowinstrumentL/s12.912.912.9
RO #2 Product ConductivitymanualuS/cm663654668
RO #2 Reject FlowinstrumentL/s4.294.294.29
RO #2 Reject ConductivitymanualuS/cm897993429135
RO #2 VITEC 5100 DrawdownmanualmL/hour114114114
RO #2 1ST Stage Differential NorthinstrumentkPa99.098.0103.0
RO #2 1ST Stage Conductivity NorthmanualuS/cm576058395735
RO #2 2nd Stage Differential NorthinstrumentkPa96.0101.0102.0
RO #2 1ST Stage Differential SouthinstrumentkPa145.0148.0145.0
RO #2 1ST Stage Conductivity SouthmanualuS/cm600961345984
RO #2 2nd Stage Differential SouthinstrumentkPa58.056.062.0
RO #2 Product Pressure Vessel 1instrumentkPa140
RO #2 Product Pressure Vessel 2instrumentkPa160
RO #2 Product Pressure Vessel 3instrumentkPa150
RO #2 Product Pressure Vessel 4instrumentkPa140
RO #2 Product Pressure Vessel 5instrumentkPa40
RO #2 Product Pressure Vessel 6instrumentkPa50
RO #2 Product Pressure Vessel 7instrumentkPa160
RO #2 Product Pressure Vessel 8instrumentkPa140
RO #2 Product Pressure Vessel 9instrumentkPa120
RO #2 Product Pressure Vessel 10instrumentkPa60
RO #2 Product Pressure Vessel 11instrumentkPa60
RO #2 Product Pressure Vessel 12instrumentkPa50
Product AirbreakmanualpH5.31
Product AirbreakmanualoC26.4
MODE 2 InfluentmanualpH4.37
MODE 2 InfluentmanualoC27.2
MODE 2 Discharge to RivermanualpH6.39
MODE 2 Discharge to RivermanualoC28.9

Data

Yuma Desalting Plant
FY 2026
Date:06/10/26Name:MendozaTime: 0500
PS1 Daily Data
PS 1 PretreatmentPS 1 Dual Media Gravity Filters
Intake TurbidityNTU5.79DMGF Influent pHpH7.78
Intake ConductivityuS/cm3783Cell 1 & 3 Plugging Factors%N/AN/A
Chlorine Dosage Ratelbs/day35.0Cell 2 & 4 Plugging Factors%N/AN/A
Intake TemperatureOC27.8Clearwell TurbidityNTU0.14
Intake Free Chlorinemg/L4.7Clearwell Free Chlorinemg/L0.89
SCR Influent FlowL/s37Clearwell Plugging Factor%14.0
SCR pH setpointpHManualClearwell pHpH3.86
SCR Reaction Zone pHpH10.10Clearwell ConductivityuS/cm3387
SCR Effluent pHpH10.11Cell Backwashed (previous day)1
SCR Effluent Chlorinemg/L2.50Sewage Treatment Facility
SCR Mixer Speed%56Blower In Service1
SCR Rake Speed%20Lift Station Vault Inspection
SCR Effluent TurbidityNTU4.9Lift Station 1Dry
SCR Blowdown Solids%16.1Lift Station 2Dry
SCR V/V Solids%5/6Lift Station 3Dry
SCR Blowdown Intervalminutes20Lift Station 4Dry
SCR Sludge Levelinches8PS1 Air Break ORP (manual mV)258
Ferric Sulfate DrawdownmL/min89Sodium Bisulfite Drawdown (mL/min)10
Ferric Sulfate Specific Gravitys.g.1.244Cold Storage FacilityEastWest
Lime Slurry Specific Gravitys.g.1.060Maximum TemperatureOC99
Lime Slurry Pump Speed%23Minimum TemperatureOC66
RO #1 UnitRO #2 Unit
Feed Conductivity (bench)uS/cm3342Feed Conductivity (bench)uS/cm3373
Feed Free Chlorine (bench)mg/L0.10Feed Free Chlorine (bench)mg/L0.11
Feed pH (bench)pH5.26Feed pH (bench)pH5.83
Feed TemperatureOC27.1Feed TemperatureOC26.4
Feed Turbidity (bench)NTU0.18Feed Turbidity (bench)NTU0.15
Ammonia Feed Ratekg/hr0.11Ammonia Feed Ratekg/hr0.17
Feed PressuremPa1.43Feed PressuremPa1.21
Feed Plugging Factor%14.0Feed Plugging Factor%13.0
Total Product FlowL/s8.22Product FlowL/s12.88
Product Conductivity (bench)uS/cm672Product Conductivity (bench)uS/cm663
Total Reject FlowL/s3.00Reject FlowL/s4.29
Reject Conductivity NB (bench)uS/cm9150Reject Conductivity (bench)uS/cm8979
Reject Conductivity SB (bench)uS/cm92881ST Stage Differential NorthkPa99.0
Reject Free Chlorine SBmg/L0.101ST Stage Differential SouthkPa145.0
Interstage Free Chlorine SBmg/L0.09VITEC 5100 Drawdown RatemL/hour114.0
1ST Stage Differential NorthkPa241.0Cartridge Filter PressureInlet / PSI30
1ST Stage Differential SouthkPa249.0Outlet / PSI24
VITEC 5100 Drawdown RatemL/hour74.4Comments:
Cartridge Filter PressureInlet / PSI32
Outlet / PSI24

Calcs

RO Calculations
HWS
Result
CalculationMethod(%)
RecoveryFlow73.2620320856
RecoveryTDS70.8965458521
Salt PassageTDS9.8057398282
Salt RejectionTDS90.1942601718
FS
RecoveryFlow75.0145602796
RecoveryTDS69.8244428922
Salt PassageTDS9.7016238317
Salt RejectionTDS90.2983761683

TDS

TDS Calculations
MODE
Streamacbcbp
0.51750.003510.503
HWS
Cond.TDS
(μS/cm)(mg/l)
Feed33422080.4203675184
Reject91506324.9492301967
Product672338.016
Concentrate (TDS)3447.1238878653
FS
Feed33732101.3570262255
Reject89796192.0984033419
Product663333.489
Concentrate (TDS)3437.4554794815

Summary Yuma Desalting Plant

Calendar Year 2025 - In Acre Feet
DIVERSIONS
MODEDW8WQIC WellColorado RiverCooper LateralYuma Mesa Conduit
MonthFromTotalDischargeSepticFromDischargeSepticConsumptive UseFromDischargeSepticConsumptive UseFromDischargeSepticConsumptive UseFromDischargeSepticConsumptive UseFromDischargeSepticConsumptive Use
Rejectto RiverDischargeto RiverDischargeto RiverDischargeto RiverDischargeto RiverDischargeto RiverDischarge
(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)(acre-feet)
January58.014.713.10.20.00.00.00.016.13.60.112.48.88.80.00.00.00.00.00.00.00.0
February24.98.96.20.10.00.00.00.035.08.70.226.12.92.90.00.00.00.00.00.00.00.0
March80.315.922.30.30.00.00.00.00.00.00.00.01.01.00.00.00.00.00.00.00.00.0
April77.715.421.40.40.00.00.00.00.00.00.00.06.96.90.00.00.00.00.00.00.00.0
May79.515.621.90.40.00.00.00.00.00.00.00.02.62.60.00.00.00.00.00.00.00.0
June77.715.421.80.50.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
July75.713.718.70.50.00.00.00.03.91.00.02.90.00.00.00.00.00.00.00.00.00.0
August80.015.722.50.60.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
September67.714.418.50.50.00.00.00.010.12.70.17.20.00.00.00.00.00.00.00.00.00.0
October80.315.923.00.60.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
November77.115.121.80.40.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
December38.611.99.60.20.00.00.00.041.810.40.231.30.00.00.00.00.00.00.00.00.00.0
PS 1 Total817.5172.5220.74.70.00.00.00.0106.926.40.580.022.20.00.022.20.00.00.00.00.00.00.00.0
Returned to MODE via Service Water Overflow151.0
Returned from Potable Water Sampling System6.0
Returned via WQIC Drains0.43
Returned to MODE via PS 1 Clearwell Overflow253.7
Returned to MODE via Cooling Tower Blowdown2.7
Total to MODE - Measured586.3AF
Used by cooling tower3.0Evaporation
Used by irrigation0.5Consumption
On-Site Usage3.6AF

Water Conserved 225.4 AF MODE water (non-Colorado River water) discharged to River/River aquifer. This goes into USBR Conservation Table.

Unaccounted for (air compressors, etc.) 104.4 AF Plant Drain to MODE

Total Returned to MODE 690.7 AF

Consumptive Use 102.2 AF Offset for water returned to River

Flows

Pilot System 1 - cubic meters/acre feetCY 2025
WQIC Feed (total)Return To MODEDischarge To Colorado RiverTotal Product Produced
RejectProductProduct
Jan9141474.1

Olaiz, Antonio M: Olaiz, Antonio M:

16.1 ac.ft. of the 74.1

ac.ft. that was reported came from WQIC wellJan1809714.7Jan2063816.731Jan5212242.3
Feb7384359.9

Olaiz, Antonio M: Olaiz, Antonio M:

1,135.9 ac.ft. of the 59.9

ac.ft. that was reported came from WQIC wellFeb109708.9Feb1836914.892Feb3215426.1
Mar9904980.3Mar1960715.9Mar2748022.278Mar5646845.8
Apr9585477.7Apr1897415.4Apr2637321.381Apr5464644.3Delivered to Service Water System251.1
May9807379.5May1924315.6May2698721.879May5542044.9Delivered from Service Water System100.1
Jun9585477.7Jun1897415.4Jun2695221.850Jun5464644.3Returned to MODE via Service Water Overflow151.0
Jul9822479.6

Olaiz, Antonio M: Olaiz, Antonio M:

3.9 ac.ft. of the 79.6

ac.ft. that was reported came from WQIC wellJul1684113.7Jul2420819.626Jul4866639.5Returned to MODE via PS 1 Clearwell Overflow253.7
Aug9868080.0Aug1940715.7Aug2776422.509Aug5589245.3Returned from Potable Water Sampling System6.0
Sep9591177.8

Olaiz, Antonio M: Olaiz, Antonio M:

10.1 ac.ft. of the 77.8

ac.ft. that was reported came from WQIC wellSep1774314.4Sep2619221.234Sep5131241.6Returned via WQIC Drains0.43
Oct9910880.3Oct1960715.9Oct2833122.969Oct5646845.8Used for potable water5.2
Nov9511377.1Nov1864615.1Nov2694121.842Nov5370143.5Used by cooling tower3.0
Dec9910880.3

Olaiz, Antonio M: Olaiz, Antonio M:

41.8 ac.ft. of the 80.3 ac.ft. that was reported came from WQIC well Olaiz, Antonio M: Olaiz, Antonio M:

16.1 ac.ft. of the 74.1 ac.ft. that was reported came from WQIC well Olaiz, Antonio M: Olaiz, Antonio M:

1,135.9 ac.ft. of the 59.9 ac.ft. that was reported came from WQIC well Olaiz, Antonio M: Olaiz, Antonio M:

3.9 ac.ft. of the 79.6 ac.ft. that was reported came from WQIC well Olaiz, Antonio M: Olaiz, Antonio M:

10.1 ac.ft. of the 77.8

ac.ft. that was reported came from WQIC wellDec1464811.9Dec2457819.926Dec4303134.9Used by irrigation0.5
924.4172.5247.116498.2
PS 1 Clearwell Overflow
Feedwater
Jan2119517.2
Feb3071924.9
Mar2297418.6
Apr2223318.0
May2341019.0
Jun2223318.0
Jul3271726.5
Aug2338119.0
Sep2685621.8
Oct2303318.7
Nov2276618.5
Dec4142933.6
253.7

Product to River

avg flow
datehrsfrom PIcubic meterstotal cubic meters
12410.515908
22410.497907
32410.502907
42410.507908
52410.494907
62410.498907
72410.491906
82410.503907
92410.506908
102410.491906
112410.493907
122410.497907
132410.495907
142410.495907
152410.499907
162410.247885
172410.110873
182410.001864
19249.987863
202410.050868
212410.071870
222410.491906
23248.877767
2412.333.010134Product to the river was secured at 1140 due to scheduled MODE outage to repair concrete upstream.
2500.1890Product to the river remained secured due to schedule MODE outage to repair concrete upstream.
2600.1830
2700.1910
2800.1870
2900.1870
3000.1940January
3100.181020638
100.1880Product to the river remained secured due to scheduled MODE outage to repair concrete upstream in canal.
200.1790
300.1780
400.1780
500.1770
600.1800
7114.616183Product to the river was resumed on 2/7/25 at 13:00.
82410.180880
92410.195881
10249.841850
11249.550825
12249.150791
13249.176793
14249.379810
15249.597829
16249.780845
17249.851851
18249.793846
192410.380897
202410.381897
212410.384897
222410.368896
232410.383897
242410.411900
252410.438902
262410.470905
272410.418900February
282410.36689618369
12410.373896
22410.372896
32410.358895
42410.354895
52410.387897
62410.370896
72410.345894
82410.354895
92410.348894
102410.370896
112410.369896
122410.383897
132410.325892
142410.288889
152410.307891
162410.332893
172410.330893
182410.279888
192410.092872
202410.031867
212410.062869
222410.086871
232410.103873
242410.218883
252410.213882
262410.216883
272410.207882
282410.159878
292410.120874
302410.140876March
312410.16287827480
12410.098872
2248.687751
32410.085871
42410.142876
52410.138876
62410.163878
72410.215883
82410.217883
92410.263887
102410.273888
112410.295889
122410.271887
132410.250886
142410.235884
152410.228884
162410.242885
172410.189880
182410.168878
192410.197881
202410.191880
212410.249886
222410.281888
232410.284889
242410.251886
252410.240885
262410.185880
272410.175879
282410.304890
292410.365896April
302410.36489526373
12410.399899
22410.375896
32410.376897
42410.358895
5249.839850
62410.266887
72410.336893
82410.373896
92410.440902
102410.499907
112410.464904
1222.759.895810Product to the river flow was temporary secured at 0840 to clean algae in product air break. Product to the river flow was resumed at 0955.
13249.915857
142410.157878
1522.1679.580764Product to the river flow was temporary secured at 1630 due to RO 1 & 2 down. Product to the river flow was resumed at 18:20.
162410.507908
172410.505908
182410.465904
192410.311891
202410.196881
212410.240885
222410.346894
232410.323892
242410.275888
252410.246885
262410.285889
272410.319892
282410.318892
2917.387.479468Product to the river flow was temporary secured at 0538 to clean PS 1 intake basin. Product to the river flow was resumed at 1215.
302410.282888May
312410.28988926987
12410.200881
22410.271887
32410.327892
42410.363895
52410.367896
62410.366896
72410.345894
82410.355895
922.6679.856804Product to the river flow was temporary secured at 0750 to clean algae in product air break. Product to the river flow was resumed at 0910.
102410.360895
112410.180880
122410.502907
132410.477905
142410.494907
152410.512908
162410.511908
172410.499907
182410.498907
192410.496907
202410.498907
212410.507908
222410.539911
232410.494907
242410.488906
252410.500907
262410.503907
272410.499907
282410.495907
292410.488906June
302410.50090726952
12410.498907
22410.491906
32410.513908
42410.501907
522.339.263745Product flow to the river was temporarily secured at 15:20 due to PS 1 intake influent line plugged. Flow was resumed at 17:00
6245.497475Product flow to the river was decreased to fill service water tank.
7245.489474Product flow to the river was decreased to fill service water tank.
80.600.2581Product flow to the river was secured at 00:36 due to the installation of PS 1 RO 2 cartridge filter housings.
900.1310Product flow to the river remained secured.
104.502.08534Product flow to the river was resumed at 19:30
112410.495907
122410.496907
132410.454903
142410.510908
152410.463904
162410.506908
172410.502907
182410.508908
192410.499907
202410.505908
212410.147877
222410.059869
232410.495907
242410.502907
252410.497907
262410.500907
272410.468904
282410.498907
2922.339.753784Product flow to the river was temporarily secured at 07:30 to clean algae in product break piping. Flow was resumed at 09:10
302410.509908July
312410.491632295890624208
1208.773632Product flow to the river was temporarily secured at 11:15 due to PS 1 intake pumps tripped due to power control board failure. Flow was resumed at 15:15.
22410.492907
32410.506908
42410.501907
52410.657921
62410.333893
72410.251886
82410.333893
92410.473905
102410.475905
112410.464904
122410.475905
132410.411899
142410.500907
152410.493907
162410.501907
172410.504908
182410.479905
192410.477905
202410.505908
212410.498907
222410.491906
232410.516909
242410.486906
252410.502907
262410.491906
272410.498907
282410.506908
292410.501907
302410.404899August
312410.31089127764
12410.107873
22410.120874
3249.900855
42410.474905
5249.666835Product flow to the river was decreased to 8.5 l/s due to RO 1 secured.
6248.511735
7248.481733
8248.503735
9248.619745
102410.474905Product flow to the river was increased to 10.5 l/s.
1122.8310.130833Product flow to the river was temporary secured at 07:20 to clean product air break pipe. Product to the river flow was resumed at 08:30.
122410.789932
132410.532910
142410.339893
152410.364895
162410.420900
172410.465904
182410.466904
192410.517909
202410.582914
212410.564913
222410.520909
232410.469905
242410.332893
252410.423901
262410.351894
272410.351894
282410.338893
292410.410899September
302410.43190126192
12410.410899
22410.461904
32410.468904
42410.381897
52410.342894
62410.362895
72410.343894
82410.341893
92410.416900
102410.617917
112410.619917
122410.692924
132410.689924
142410.555912
152410.610917
162410.631919
172410.632919
182410.664921
192410.678923
202410.702925
212410.689924
222410.678923
232410.674922
242410.673922
252410.710925
262410.759930
272410.765930
282410.643920
292410.609917
302410.552912October
312410.54291128331
12410.597916
22410.747929
32410.676922
42410.390898
52410.647920
62410.723926
72410.712926
82410.741928
92410.764930
102410.757929
112410.787932
122410.728927
132410.729927
142410.793933
152410.807934
16185.950386Product water flow to the river with sodium bisulfite injection was secured from 09:40 to 15:40 due to unscheduled power outage.
17249.912856
182410.512908
1922.8310.111831Product water flow to the river with sodium bisulfite injection was secured from 08:50 to 10:00 due to unscheduled power outage.
202410.623918
212410.651920
222410.672922
232410.695924
242410.592915
2522.5010.123820Product water flow to the river was temporary secured at 08:00 to clean algae build up in the product air break. Product water flow to the river was resumed at 09:30.
262410.797933
272410.801933
282410.795933
292410.790932November
302410.81293426941
12410.846937
22410.829936
32410.828936
4249.625832Product water flow was decreased to 8.5 L/s due to only one RO online.
522.427.803630Product water flow was temporarily secured at 06:55 due to scheduled outage of RO's to perform PM. Flow was resumed at 08:30.
6248.276715
7248.402726
8248.624745
923.228.457707Product water flow was temporarily secured at 08:30 due to FCU update. Flow was resumed at 09:17.
10248.542738
11248.578741
12248.584742
13248.691751
14248.744755
15248.716753
16248.659748
17248.682750
18248.709752
19248.733755
20248.736755
21248.578741
22248.622745Product water flow was increased to 10.5 L/s, both RO's are online.
23249.710839
24249.705838
252410.033867
262410.026866
27249.882854
28249.908856
29249.889854
30249.909856December
31249.93285824578
18369

Other Usage-Returns

LiterslitersliterslitersliterslitersliterslitersLiters
PotablePotableServiceServiceServiceServicePotableLiters
producedreturnFeedBlowdown/OverflowEvaporationusedusedreturnDW-8WQIC Well
Service WaterDry ChemPotable SampleCooling TowerCooling TowerCooling TowerIrrigationpersonnel/process areasWQIC-C100usedused
Jan17,981,62014.58959,6260.8620,3000.5735,8040.6677,8800.557,9240.043,2970.0352,0050.2912,8420.0100.019,886,390.016.12.19786909905463
Feb4,287,5483.48985,1440.8572,4340.5641,1790.5545,5860.495,5930.146,1620.0374,7150.309,4240.0100.043,186,850.035.02.12377173319360
Mar8,167,9876.621,118,8670.9606,2730.5225,5860.254,7100.0170,8760.152,2560.0401,2100.3383,4220.0700.00.00.01.94910993969073
Apr7,922,7176.421,314,2031.1621,8760.5260,0300.276,6520.1183,3770.152,9750.0469,3400.38201,9550.1600.00.00.02.20386168425124
May9,129,8667.401,336,5721.1645,9350.5423,1630.3173,7110.1249,4520.251,3510.0526,1150.43151,4710.1200.00.00.02.41846779107922
Jun8,107,5336.571,201,3821.0619,4730.5695,6830.6246,2760.2449,4070.446,2380.0586,6750.4812,3180.0100.03,785.00.02.55330112217238
Jul9,734,0527.891,199,2921.0635,0200.51,086,2950.957,7780.01,028,5170.833,2250.0605,6000.4913,0020.0100.04,803,165.03.92.88567826589567
Aug18,813,64415.251,253,4661.0619,6780.5950,4140.8496,8850.4453,5280.410,0610.0753,2150.6115,2790.0100.00.00.02.90789286133259
Sep10,488,0498.501,345,5661.1628,4290.5795,2290.6377,3260.3417,9030.381,2220.1730,5050.5915,2790.0100.012,399,660.010.12.90312407202340
Oct11,066,9448.971,391,5331.1641,6160.5589,7030.5294,2700.2295,4330.279,0270.1749,4300.614,0350.0000.00.00.02.79802175429709
Nov10,416,6398.441,086,5850.9613,2270.5370,1730.3195,2840.2174,8890.186,8470.1529,9000.435,8630.0000.00.00.02.17816893869537
Dec7,378,5875.98872,3470.7609,6570.5241861.500.2101,0370.1140,8240.189,6700.1386,0700.317,2940.0100.051,547,915.041.81.78324955263705
liters123,495,18614,064,5837,433,9187,015,1193,297,3963,717,723672,3306,464,780532,1840131,827,765
acre feet100.111.46.05.72.73.00.55.20.430106.9
Description:Total amount of service water produced.Total amount of potable water produced. Subset of service water.Continuously running sample lines. Flow to plant drain which discharges to MODE. Subset of potable water.Feed to cooling tower. Subset of service water.Blowdown/overflow from cooling tower. Flows to plant drain. Subset of cooling tower feed.Evaporation of cooling water. Difference between feed and blowdown values. Subset of cooling tower feed.Total amount of water used for irrigation of grounds. Subset of service water.Potable water supplied to plant facilities. Includes bathrooms, drinking fountains, kitchens and showers. Flows to plant sewers which discharge to septic fields. Subset of potable water.Potable water supplied to WQIC and Contractor Maintenance Bldg. Flow to plant drain. Subset of potable water.Total pumped from on-site salinity management well DW-8.Total pumped from dedicated, on-site test train well.

Flow Diagram

MODE
YumaFeedRejectPS1 Clearwell
Mesa818172Overflow
ConduitAFAF254Service Water
AFOverflow
151
AF
0107AF
AF
0AF5.76.0
AFAF
11.45.24
AFAF
0
AFRiver
FeedReturnedConserved
Cooper22.23626221Irrigation
LateralAFAFAF1ReturnedConserved
AF15
AFAF

Colorado River

WQIC

WQIC Well Service Water System

Potable Water System Septic Fields Drainage Well 8 Samples Cooling Tower

WQIC

WQIC Well Service Water System

Potable Water System Septic Fields Drainage Well 8 Samples Cooling Tower

File details come from the government source that posted it. Updated .