Attachment_1_Statement_of_Work_pg_98_0002.pdf

PDF 86 KB Posted

Attached to
OPERATION AND MAINTENANCE OF YDP, IDIQ
Solicitation number
140R3026R0012
Issued by
Not on record

About this file

This is a Statement of Work attachment for an Indefinite Delivery Indefinite Quantity (IDIQ) federal contract solicitation for operation and maintenance support services at the Yuma Desalting Plant (YDP) and Water Quality Improvement Center (WQIC).

The contractor is required to provide operations personnel, equipment, tools, materials, and parts for continuous 24/7 operation of YDP and WQIC systems, including staffing for 100 percent of current and future operations at all times. Minimum operational requirements include developing and maintaining Standard Operating Procedures (SOPs), operational guidelines, checklists, production records, daily logs, repair orders, technical documentation, housekeeping, sample collection for laboratory analysis, and data logging for the Distributed Control System (DCS) and SCADA systems. The contractor must ensure all operations personnel hold current Arizona-Certified Water Treatment Plant Operator licenses. Minimum staffing certifications include all plant operators with at least Grade 1 ADEQ Water Treatment licenses (with two holding Grade 1 Wastewater licenses), shift lead staff with minimum Grade 2 licenses, and management personnel with Grade 2 and Grade 4 licenses as specified. The Operator of Record must hold a Grade 4 ADEQ Water Treatment License and Grade 3 Water Distribution License. All SOPs must be developed, reviewed, signature-approved, and controlled for adequacy prior to implementation for operations, maintenance support, equipment testing, and facility cleanout activities.

View the file

Other files

File Type Posted
Attachment_01C_Price_Breakdown-OFFEROR_COMPLETE_0002.xlsx XLSX spreadsheet
140R3026R0012-Solicitation_Rev_-1_0002.pdf PDF
Sol_140R3026R0012_Amd_0002.pdf PDF
Attachment_01CC_Schedule_of_Fixed_Hourly_Labor_Rates-OFFEROR_COMPLETE_0002.xlsx XLSX spreadsheet
Attachment_-_Questions_and_Responses_0002.pdf PDF
140R3026R0012-Solicitation_0001.pdf PDF
Sol_140R3026R0012_Amd_0001.pdf PDF
Attachment_11_Emergency_Response_Services__8_pages.pdf PDF
Attachment_1_Statement_of_Work_.pdf PDF
Attachment_10_Forms__12_pages.pdf PDF
Attachment_04_Safety_and_Health_Standards_Glossary__11_pages.pdf PDF
Attachment_13_Modification_and_Repair_Backlog.xlsx XLSX spreadsheet
Attachment_15_STORES_Inventory_345_Catalog__2_of_2.xlsx XLSX spreadsheet
Attachment_20_Sample_ADEQ_Potable_Water_Inspection_Report__16_pages.pdf PDF
Attachment_02_Government_Furnished_Equipment__10_pages.pdf PDF
Attachment_17_Sample_CRADA__10_pages.pdf PDF
Attachment_23_-_PPQ.pdf PDF
Attachment_03_PPICR.xlsx XLSX spreadsheet
Attachment_01B_Levels_of_Performance_EXPLANATION__1_page.pdf PDF
Attachment_06_Reporting__10_pages.pdf PDF
Attachment_01_Performance_Requirements_Summary_(PRS).pdf PDF
Attachment_22_Sample_YDP_and_PS1_Water_Quality_Reports.xlsx XLSX spreadsheet
Attachment_01D_Personnel_Resource_Matrix__OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_01A_Basis_for_Contract_Cost__1_page.pdf PDF
Attachment_01CC_Schedule_of_Fixed_Hourly_Labor_Rates-OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_15_STORES_Inventory_340_Catalog__1_of_2.xlsx XLSX spreadsheet
Attachment_19_Current_AL_Small_Service_Contracts.xlsx XLSX spreadsheet
Attachment_08_Wage_Determination_2015-5475__Rev__30__10_pages.pdf PDF
Attachment_07_Drawings__6_pages.pdf PDF
Attachment_01B_Levels_of_Performance_OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_05_CARMA_Business_Standards__76_pages.pdf PDF
Attachment_01E_Service_Contracts_-_Pricing_Summary__OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_12_Sample_Invoice__6_pages.pdf PDF
Attachment_18_Permits__234_pages.pdf PDF
Attachment_21_Sample_FCU_Temperature_Status_Report.xlsx XLSX spreadsheet
Attachment_16_Contractor_On-boarding_Off-boarding_Process__23_pages.pdf PDF
Attachment_01C_Price_Breakdown-OFFEROR_COMPLETE.xlsx XLSX spreadsheet
Attachment_14_Preventive_and_Predictive_Maintenance_Summary.xlsx XLSX spreadsheet
Sol_140R3026R0012.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 140R3026R0012 Title: Yuma Desalting Plant (YDP) Operation and Maintenance (O&M) Support Services; IDIQ

Attachment (1): Statement of Work

(a) The Contractor shall provide:

(1) Operations personnel, equipment, tools, materials and parts to provide operations on all YDP and WQIC equipment and systems; and

(2) The necessary number of operations shifts and shift assignments to perform all the work as specified in Section C.1.1 (Scope), Section C.1.2.2 (Water Quality Improvement Center), and Section 1.3 (General Description); and

(3) The capability of providing staffing for 100 percent of all current and future operations of the YDP and WQIC systems and equipment at all times.

(b) As a minimum, Contractor operations shall include developing, maintaining and performing:

procedural guidelines; SOPs; operational guidelines and instructions; operational checklists and data sheet types; operational production records (E-file process test data); daily logs; repair orders (Trouble Logs); documentation (YDP Technical Library and E-file); house-keeping and grounds-keeping to keep the YDP and WQIC operating areas and facilities clean and orderly; take samples for backup laboratory analysis; log operating data at specified intervals for analysis and backup to the DCS and WQIC SCADA;

and all other operational matters related to contract performance. Additionally, Contractor operations personnel shall perform inspections, maintain responsibility for chemicals as stated in Section C.4.11 (Chemicals), and comply with all regulatory requirements as stated in Section C.4.10 (Regulatory Requirements). The Contractor shall provide support for the development of the DCS Control Strategies and SCADA Control Strategies.

(c) The Contractor shall continuously operate facilities, equipment and system(s) as described in Section C.1.1 (Scope). The Contractor shall support portions of the YDP, WQIC, and ALS facility undergoing cleanout, equipment layup, equipment and process testing, as well as operation for maintenance purposes. The Contractor shall operate the operational systems within the operating envelopes, criteria and production schedules, as specified in the SOPs or as directed by the COR.

C.4.5 Certified Operators

The Contractor shall ensure, at all times, that Operations personnel hold a current and valid Arizona-Certified Water Treatment Plant Operator License(s) as stated in Section C.2.4.3.1 (Operations Personnel). As a minimum, the Contractor shall provide, at all times, personnel with the following certifications:

All plant operators holding at least a Grade 1, ADEQ Water Treatment License and two holding at least a Grade 1, ADEQ Wastewater Treatment or Wastewater Collection License;

Shift Lead Staff, minimum of six five holding at least a Grade 2, ADEQ Water Treatment License;

Operations Foreman, Senior Plant Operator, Plant Superintendent & Lead and Contract Managerment Staff, minimum of two,all must hold holding at least a Grade 2 ADEQ Water Treatment License and Water Distribution License and two must holding at least a Grade 4 ADEQ Water Treatment License;

The ADEQ Operator of Record for the YDP must hold a Grade 4 ADEQ Water Treatment License and a Grade 3 ADEQ Water Distribution License. This requirement is based on the YDP being classified as a Grade 4 Water Treatment and Grade 3 Water Distribution facility by ADEQ.

C.4.6 Standard Operating Procedures (SOPs)

The Contractor shall ensure that the YDP and WQIC SOPs follow prescribed, controlled methods, and are routinely prepared, reviewed and signature-approved for adequacy prior to being utilized for the performance of designated work (operations, situations, tasks, etc.). The SOPs shall be developed, revised, approved, re-approved, issued and controlled as necessary for each operating system, and shall

File details come from the government source that posted it. Updated .