This is a Work Order Authorization (WOA) Form template for the California Department of Cannabis Control (DCC) Contract. The document establishes the framework for authorizing contractors to perform work associated with phases of the CSI Project, including defined deliverables, milestones, and activities executed according to an approved project schedule and Deliverable Expectation Documents (DEDs). The contractor is responsible for providing all labor, materials, tools, and resources necessary to complete the defined scope of work. Weekly written status updates are required, including work completed, risks and issues encountered, planned future work, and any potential schedule or scope variances. The WOA includes an Attachment 1 - WOA Schedule for Contractor Work that outlines deliverable IDs, milestones, start and completion dates, and dependencies. Approvals are required from both the DCC Project Director (or designee) and the Contractor Project Manager (or designee).
Compensation is provided on a fixed-price basis with payment made only after formal written State acceptance of each deliverable or milestone in accordance with the corresponding DED. A deliverable payment schedule identifies each deliverable/milestone ID, SOW reference, deliverable/milestone name, acceptance criteria reference, fixed price, target completion date, and the total not-to-exceed amount. The standard contract includes a 20 percent holdback with release in accordance with the main contract terms. Any modifications to deliverables, schedule, or cost must be approved by both parties through a formal written amendment to the WOA. Entrance criteria require satisfaction of all prerequisites before work initiation, such as completion of prior phase deliverables, availability of environments, and data readiness. Acceptance criteria are confirmed through written State approval that all requirements defined in the corresponding DED have been satisfied.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 21: WORK ORDER AUTHORIZATION FORM
Work Order Authorization (WOA)
Work Order Authorization (WOA) Contract #: XXXX
WOA #:
Title:
Date:
Expected Term of WOA: ___ through ___
Not-to-Exceed Cost: $__________
1. Introduction
This Work Order Authorization (“WOA”) is issued pursuant to the terms of California Department of Cannabis Control (DCC) Contract #XXXX (the “Contract”). Upon approval of this WOA, the Contractor shall be authorized to perform the work described herein, including all attachments or exhibits attached hereto or incorporated herein by reference.
2. WOA Scope / Description
This WOA authorizes the Contractor to perform work associated with Phase ___ of the CSI Project, including the deliverables, milestones, and activities defined herein. The work will be executed in accordance with the approved project schedule and Deliverable Expectation Documents (DEDs). The Contractor shall provide all labor, materials, tools, and resources necessary to complete and deliver the defined scope of work.
3. Payment Provisions
3.1 Payment Basis
The Contractor shall be compensated on a fixed-price basis for the successful completion and State acceptance of each deliverable or milestone identified in Table 3.2 – Deliverable Payment Schedule.
Each deliverable payment represents full compensation for all work necessary to achieve the specified acceptance criteria.
3.2 Deliverable Payment Schedule
Deliverable / Milestone
ID
SOW
Reference
Deliverable / Milestone Name
Acceptance Criteria Reference
Fixed Price Target Completion Date
Total Fixed-Price Not-to-Exceed Amount: $XXX,XXX
3.3 Payment Terms
Payment shall be made only after the State’s formal written acceptance of each deliverable or milestone in accordance with the DED. Each DED shall have a version history and approval table. Signature in the approval table, on the most recent version, indicates the State's formal written acceptance of each deliverable.
3.4 Withhold
☐ 20% Holdback Release in accordance with Contract
☐ Other: _______________________
4. Approved Contractor Staff
Staff ID Name of Personnel
Role SOW ID Assigned Deliverables
5. WOA Reporting Requirements
The Contractor shall provide weekly written status updates including: work completed to date, risks and issues encountered, planned future work, and any potential schedule or scope variances. If the Contractor anticipates that a deliverable cannot be completed within the WOA schedule, the Contractor shall immediately notify the DCC Project Director or designee for resolution.
6. WOA Entrance and Acceptance Criteria
6.1 Entrance Criteria
All prerequisites necessary to begin work under this WOA must be satisfied prior to initiation (e.g., completion of prior phase deliverables, availability of environments, and data readiness).
6.2 Acceptance Criteria
Each deliverable or milestone shall be deemed accepted upon written approval by the State confirming that all acceptance criteria defined in the corresponding DED have been met.
7. WOA Amendment
Any modification to deliverables, schedule, or cost must be approved by both parties in writing through a formal amendment to this WOA.
8. Attachment Listing
Attachment 1 – WOA Schedule for Contractor Work
9. Approvals
DCC Project Director or Designee Date Contractor Project Manager or Designee Date
By signing below, the parties certify that they have the authority to obligate their respective organizations to this WOA and agree to its terms and all incorporated documents.
Attachment 1 – WOA Schedule for Contractor Work
Deliverable
ID
Milestone Start Date Completion Date
Dependencies
| ATTACHMENT 21: WORK ORDER AUTHORIZATION FORM |
| Work Order Authorization (WOA) |
| Work Order Authorization (WOA) |
| 1. Introduction |
| 2. WOA Scope / Description |
| 3. Payment Provisions |
| 3.1 Payment Basis |
| 3.2 Deliverable Payment Schedule |
| 3.3 Payment Terms |
| 3.4 Withhold |
| 4. Approved Contractor Staff |
| 5. WOA Reporting Requirements |
| 6. WOA Entrance and Acceptance Criteria |
| 6.1 Entrance Criteria |
| 6.2 Acceptance Criteria |
| 7. WOA Amendment |
| 8. Attachment Listing |
| 9. Approvals |
| Attachment 1 – WOA Schedule for Contractor Work |
File details come from the government source that posted it. Updated .