ATTACHMENT 16.9- Technical Architect Lead - QUALIFICATIONS FORM.pdf

PDF 79 KB Posted

Attached to
Cannabis Integration System (CSI) - DCC
Solicitation number
0000039409
Issued by
California

About this file

This is a Key Staff Qualifications Form for the Technical Architect Lead position associated with the State of California Department of Cannabis Control RFP 2026-001, with a bidder response due on June 19, 2026. The form serves as a template for bidders to document the qualifications and experience of proposed key staff members assigned to the contract. Bidders may use multiple projects to satisfy the total experience requirements and must complete a separate form for each project cited. The form requires bidders to provide project details including the project name, contracting company, staff reference information, employment dates, work schedule classification, project description, and contract amount. Bidders must verify whether each staff member's experience on the cited project meets, partially meets, or does not meet the mandatory and desirable experience requirements through checkbox selections and detailed narrative descriptions.

The position requires five mandatory qualifications: a bachelor's degree in Computer Science, Software Engineering, Information Systems Management, Computer Engineering, or Systems Engineering (with English translation if applicable); four years of experience as a Technical Architect Lead on large complex IT projects with systems integration and data exchange expertise; two years leading data conversion and migration efforts including data mapping, transformation logic, data quality validation, and secure data transfer; two years developing and maintaining technical architecture designs with traceability, auditability, and compliance with frameworks such as ITIL, ISO 20000, or NIST; and two years leading the design and implementation of application programming interfaces (APIs). A desirable, scored qualification offers up to six points for one to three years of experience as a Senior Technical Architect implementing or maintaining a Cannabis Licensing and Compliance system, with scoring at two points per year up to three years maximum.

View the file

Other files

File Type Posted
Exhibit_C_Cost_Workbook.xlsx XLSX spreadsheet
ATTACHMENT 23- REQUEST FOR CHANGE FORM.pdf PDF
ATTACHMENT 22- KEY STAFF REPLACEMENT FORM.pdf PDF
ATTACHMENT 1- TEMPLATE FOR QUESTION SUBMITTAL.pdf PDF
Exhibit_A_Functional_Non-Functional_Requirements.xlsx XLSX spreadsheet
ATTACHMENT 19- CUS. REF. FOR PRODUCTIVE USE REQ. CERT..pdf PDF
EXHIBIT B- DELIVERABLES TABLE.pdf PDF
ATTACHMENT 17- NARRATIVE RESPONSE.pdf PDF
ATTACHMENT 10- DVBE DECLARATIONS.pdf PDF
EXHIBIT E- SECURITY AND DATA PROTECTION.pdf PDF
ATTACHMENT 16.3- Scrum Master - QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 8- WORKERS_ COMPENSATION CERTIFICATION.pdf PDF
ATTACHMENT 16.10- Technical Architect Lead - REFERENCE FORM.pdf PDF
ATTACHMENT 21- WORK ORDER AUTHORIZATION FORM.pdf PDF
ATTACHMENT 11- COMMERCIALLY USEFUL FUNCTION (CUF) CERTIFICATION.pdf PDF
ATTACHMENT 18- SOLUTION DEMONSTRATION.pdf PDF
ATTACHMENT 7- BIDDER DECLARATION GSPD 05-105.pdf PDF
ATTACHMENT 16.5- Business Analyst Lead - QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 5- RESPONSE TO ADMINISTRATIVE REQUIREMENTS.pdf PDF
ATTACHMENT 3- FOLLOW-ON CONTRACT DISCLOSURE FORM.pdf PDF
ATTACHMENT 2- INTENT TO BID.pdf PDF
ATTACHMENT 16.1- Project Manager - QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 9- BIDDING PREFERENCES AND INCENTIVES.pdf PDF
EXHIBIT A- FUNCTIONAL AND NON-FUNCTIONAL R.pdf PDF
ATTACHMENT 20- DELIVERABLE EXPECTATION DOCUMENT (DED).pdf PDF
ATTACHMENT 12- TACPA PREFERENCE REQUEST FORMS.pdf PDF
CDT_OSTP_Request_For_Proposal.pdf PDF
ATTACHMENT 4- COVER LETTER FORM.pdf PDF
EXHIBIT C- COST WORKSHEETS.pdf PDF
ATTACHMENT 15- BIDDER REFERENCE FORM.pdf PDF
ATTACHMENT 16.7- Configuration Lead - QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 24- GLOSSARY OF TERMS.pdf PDF
DCC_-_Cannabis_Integration_System_CSI.pdf PDF
ATTACHMENT 6- CONFIDENTIALITY STATEMENT.pdf PDF
EXHIBIT D- IT - GP CLOUD - DGS PD 402-ITGP (Cloud).pdf PDF
ATTACHMENT 25- APPENDIX A - STATEMENT OF WORK.pdf PDF
ATTACHMENT 16.8- Configuration Lead - REFERENCE FORM.pdf PDF
ATTACHMENT 14- BIDDER QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 16.6- Business Analyst Lead - REFERENCE FORM.pdf PDF
ATTACHMENT 16.2- Project Manager - REFERENCE FORM.pdf PDF
ATTACHMENT 13- BIDDER QUALIFICATIONS FORM - INSTRUCTIONS.pdf PDF
ATTACHMENT 16- KEY STAFF QUALIFICATIONS FORM _ INSTRUCTIONS.pdf PDF
ATTACHMENT 16.4- Scrum Master - REFERENCE FORM.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 16.9: Technical Architect Lead - QUALIFICATIONS

FORM

The Bidder may use multiple projects to meet the total experience required for each mandatory experience and, if applicable, desirable experience. A separate form must be completed for each project cited.

KEY STAFF QUALIFICATIONS FORM

1 Bidder:

2 Key Staff Name:

3 Project Name:

4 Name of Company for whom the Project was completed:

5 Contact Name and Information of Proposed Staff's Reference:

6 Staff Start Date (MM/DD/

YYYY):

7 Staff End Date (MM/DD/

YYYY):

8 Key Staff Work Schedule ☐ Full-time

☐ Part-time

9 Project Description:

10 Contract Amount: $

11 Documenting instructions when a minimum number of years of experience is required.

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

June 19, 2026

KEY STAFF QUALIFICATIONS FORM

For each mandatory experience listed below,

• Check “Yes” if the total years of experience was met on this referenced project; or

• Check “Partial” if fewer than the total years of experience was met on this referenced project; or

• Check “No” if none of the experience was met on this referenced project.

If "Partial" or "Yes" is checked, enter the years and/or months of “Experience gained on this referenced project” and describe the Key Staff's role and responsibilities performed on the project in the “Description of services provided” field. The Bidder must ensure that each description clearly addresses how the work performed on the project meets each of the minimum qualification components of the Mandatory Experience Requirement, as defined in each of the requirements.

Require ment

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

12 Mandatory (M)

Bachelor degree in Computer Science, Software Engineering, Information Systems Management, Computer Engineering, or Systems Engineering.

If the degree is not in English, it must be accompanied by an evaluation performed by a member of the National Association of Credential Evaluation Services

(NACES).

Attach Copy of Degree

N/A

Attach Copy of Degree

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

13 Mandatory (M)

Four (4) years of experience as a Technical Architect Lead on a large complex IT project and must have experience in systems integration and data exchange between enterprise platforms and third-party applications.

Four (4) years ☐ Yes

Yr. ___ Mo.___

☐ Partial Yr. ___ Mo.___

☐ No

Provide a detailed description of the work performed on the cited project and how the key staff met this qualification, including each of the following. Please be as detailed as possible and cover each part of the requirement:

• Experience as a Technical Architect Lead on a large complex IT project

• Experience in systems integration and data exchange between enterprise platforms and third-party applications.

Require ment

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

14 Mandatory (M)

Two (2) years of experience in all of the following: leading data conversion and migration efforts, data mapping, transformation logic, data quality validation, and

Two (2) years ☐ Yes

Yr. ___ Mo.___

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response secure transfer of data between legacy systems and modern platforms.

☐ Partial Yr. ___ Mo.___

☐ No

Provide a detailed description of the work performed on the cited project and how the key staff met this qualification, including each of the following. Please be as detailed as possible and cover each part of the requirement:

• Experience leading data conversion and migration efforts

• Including data mapping, transformation logic, data quality validation, and secure transfer of data between legacy systems and modern platforms.

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

15 Mandatory (M)

Two (2) years of experience in developing and maintaining technical architecture designs and artifacts ensuring traceability, auditability, and compliance with frameworks such as ITIL, ISO 20000, or NIST.

Two (2) years ☐ Yes

Yr. ___ Mo.___

☐ Partial Yr. ___ as possible and cover each part of the requirement:

• Experience in developing and maintaining technical architecture designs and artifacts

• Ensuring traceability, auditability, and compliance with frameworks such as ITIL, ISO 20000, or NIST.

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

16 Mandatory (M)

Two (2) years of experience leading the design and implementation of application programming interfaces (APIs).

Two (2) years ☐ Yes

Yr. ___ Mo.___

☐ Partial Yr. ___ as possible and cover each part of the requirement:

• Experience leading the design and implementation of application programming interfaces (APIs).

Require ment

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

17 Desirable Scored

(DS)

One (1) to three (3) years of experience as the Senior Technical Architect implementing or maintaining a Cannabis Licensing and Compliance system.

Two (2) points per year up to three

(3) years of Senior Technical Architect experience.

1-3 Years ☐ Yes

Yr. ___ Mo.___

☐ Partial Yr. ___ Mo.___

☐ No

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

(2 pts. X 3 years = 6 maximum points possible.

Provide a description of the work performed on the cited project and how it meets this requirement. Please be as detailed as possible and cover each part of the requirement:

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

ATTACHMENT 16.9: Technical Architect Lead - QUALIFICATIONS FORM

File details come from the government source that posted it. Updated .