ATTACHMENT 16.3- Scrum Master - QUALIFICATIONS FORM.pdf

PDF 80 KB Posted

Attached to
Cannabis Integration System (CSI) - DCC
Solicitation number
0000039409
Issued by
California

About this file

This is a Key Staff Qualifications Form for a Scrum Master position submitted in response to the State of California Department of Cannabis Control RFP 2026-001. The form requires bidders to document the qualifications and experience of proposed Scrum Master staff members on specified projects. Bidders may reference multiple projects to satisfy total experience requirements, with a separate form required for each project cited. The form collects standard identifying information including bidder name, key staff name, project name, company for whom the project was completed, staff reference contact information, employment dates, and work schedule classification (full-time or part-time). Bidders must provide a project description and contract amount, then document experience against specific qualification requirements by indicating whether experience requirements were fully met, partially met, or not met on the referenced project.

The form establishes four mandatory experience requirements for the Scrum Master position: a Bachelor's degree in Business Administration, Information Technology, Project Management, or Computer Science; four years of experience as a Scrum Master on large-scale complex IT projects facilitating Agile ceremonies and related functions; two years of experience maintaining sprint velocity and goals while ensuring a collaborative, self-organizing environment; and two years of experience partnering with Product Owners in managing backlogs, stakeholder expectations, and delivery of increments. Two desirable, scored qualifications are also included: one to three years of experience as a Scrum Master implementing or maintaining a Cannabis Licensing and Compliance system for a government agency (worth up to six points at two points per year), and possession of a Scrum Master Certificate (worth ten total points). Bidders must provide detailed descriptions demonstrating how proposed staff members meet each qualification requirement on the cited projects.

View the file

Other files

File Type Posted
Exhibit_C_Cost_Workbook.xlsx XLSX spreadsheet
ATTACHMENT 23- REQUEST FOR CHANGE FORM.pdf PDF
ATTACHMENT 22- KEY STAFF REPLACEMENT FORM.pdf PDF
ATTACHMENT 1- TEMPLATE FOR QUESTION SUBMITTAL.pdf PDF
Exhibit_A_Functional_Non-Functional_Requirements.xlsx XLSX spreadsheet
ATTACHMENT 19- CUS. REF. FOR PRODUCTIVE USE REQ. CERT..pdf PDF
EXHIBIT B- DELIVERABLES TABLE.pdf PDF
ATTACHMENT 17- NARRATIVE RESPONSE.pdf PDF
ATTACHMENT 10- DVBE DECLARATIONS.pdf PDF
EXHIBIT E- SECURITY AND DATA PROTECTION.pdf PDF
ATTACHMENT 8- WORKERS_ COMPENSATION CERTIFICATION.pdf PDF
ATTACHMENT 16.10- Technical Architect Lead - REFERENCE FORM.pdf PDF
ATTACHMENT 16.9- Technical Architect Lead - QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 6- CONFIDENTIALITY STATEMENT.pdf PDF
EXHIBIT D- IT - GP CLOUD - DGS PD 402-ITGP (Cloud).pdf PDF
ATTACHMENT 25- APPENDIX A - STATEMENT OF WORK.pdf PDF
ATTACHMENT 16.8- Configuration Lead - REFERENCE FORM.pdf PDF
ATTACHMENT 14- BIDDER QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 16.6- Business Analyst Lead - REFERENCE FORM.pdf PDF
ATTACHMENT 16.2- Project Manager - REFERENCE FORM.pdf PDF
ATTACHMENT 13- BIDDER QUALIFICATIONS FORM - INSTRUCTIONS.pdf PDF
ATTACHMENT 16- KEY STAFF QUALIFICATIONS FORM _ INSTRUCTIONS.pdf PDF
ATTACHMENT 16.4- Scrum Master - REFERENCE FORM.pdf PDF
ATTACHMENT 21- WORK ORDER AUTHORIZATION FORM.pdf PDF
ATTACHMENT 11- COMMERCIALLY USEFUL FUNCTION (CUF) CERTIFICATION.pdf PDF
ATTACHMENT 18- SOLUTION DEMONSTRATION.pdf PDF
ATTACHMENT 7- BIDDER DECLARATION GSPD 05-105.pdf PDF
ATTACHMENT 16.5- Business Analyst Lead - QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 5- RESPONSE TO ADMINISTRATIVE REQUIREMENTS.pdf PDF
ATTACHMENT 3- FOLLOW-ON CONTRACT DISCLOSURE FORM.pdf PDF
ATTACHMENT 2- INTENT TO BID.pdf PDF
ATTACHMENT 16.1- Project Manager - QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 9- BIDDING PREFERENCES AND INCENTIVES.pdf PDF
EXHIBIT A- FUNCTIONAL AND NON-FUNCTIONAL R.pdf PDF
ATTACHMENT 20- DELIVERABLE EXPECTATION DOCUMENT (DED).pdf PDF
ATTACHMENT 12- TACPA PREFERENCE REQUEST FORMS.pdf PDF
CDT_OSTP_Request_For_Proposal.pdf PDF
ATTACHMENT 4- COVER LETTER FORM.pdf PDF
EXHIBIT C- COST WORKSHEETS.pdf PDF
ATTACHMENT 15- BIDDER REFERENCE FORM.pdf PDF
ATTACHMENT 16.7- Configuration Lead - QUALIFICATIONS FORM.pdf PDF
ATTACHMENT 24- GLOSSARY OF TERMS.pdf PDF
DCC_-_Cannabis_Integration_System_CSI.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 16.3: Scrum Master - QUALIFICATIONS FORM

The Bidder may use multiple projects to meet the total experience required for each mandatory experience and, if applicable, desirable experience. A separate form must be completed for each project cited.

KEY STAFF QUALIFICATIONS FORM

1 Bidder:

2 Key Staff Name:

3 Project Name:

4 Name of Company for whom the Project was completed:

5 Contact Name and Information of Proposed Staff's Reference:

6 Staff Start Date (MM/DD/

YYYY):

7 Staff End Date (MM/DD/

YYYY):

8 Key Staff Work Schedule ☐ Full-time

☐ Part-time

9 Project Description:

10 Contract Amount: $

Documenting instructions when a minimum number of years of experience is required.

For each mandatory experience listed below,

• Check “Yes” if the total years of experience was met on this referenced project; or

• Check “Partial” if fewer than the total years of experience was met on this referenced

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

June 19, 2026

KEY STAFF QUALIFICATIONS FORM

project; or

• Check “No” if none of the experience was met on this referenced project.

If "Partial" or "Yes" is checked, enter the years and/or months of “Experience gained on this referenced project” and describe the Key Staff's role and responsibilities performed on the project in the “Description of services provided” field. The Bidder must ensure that each description clearly addresses how the work performed on the project meets each of the minimum qualification components of the Mandatory Experience Requirement, as defined in each of the requirements.

Require ment

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

12 Mandatory (M)

Bachelor degree in Business Administration, Information Technology, Project Management or Computer Science.

If the degree is not in English, it must be accompanied by an evaluation performed by a member of the National Association of Credential Evaluation Services

(NACES).

Attach Copy of Degree

N/A

Attach Copy of Degree

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

13 Mandatory (M)

Four (4) years of experience as a Scrum Master on a large-scale complex IT project facilitating Agile ceremonies, daily stand-ups, sprint planning, reviews, and retrospectives.

4 years ☐ Yes

Yr. ___ Mo.___

☐ Partial Yr. ___ Mo.___

☐ No

Provide a detailed description of the work performed on the cited project and how the key staff met this qualification, including each of the following. Please be as detailed as possible and cover each part of the requirement:

• Scrum Master on a large-scale complex IT

• Facilitating Agile ceremonies, daily stand-ups, sprint planning, reviews, and retrospectives.

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

14 Mandatory (M)

Two (2) years of experience maintaining sprint velocity, goals, and ensuring a collaborative, self-organizing environment.

Two (2) years ☐ Yes

Yr. ___ Mo.___

☐ Partial Yr. ___ Mo.___

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

☐ No

Provide a detailed description of the work performed on the cited project and how the key staff met this qualification, including each of the following. Please be as detailed as possible and cover each part of the requirement:

• Experience maintaining sprint velocity, goals, and ensuring a collaborative, self-organizing environment.

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

Mandatory (M)

Two (2) years of experience partnering with Product Owners and must have experience in managing all the following:

prioritize and refine backlogs, manage stakeholder expectations, and deliver increments.

Two (2) years ☐ Yes

Yr. ___ Mo.___

☐ Partial Yr. ___ Mo.___

☐ No

Provide a detailed description of the work performed on the cited project and how the key staff met this qualification, including each of the following. Please be as detailed as possible and cover each part of the requirement:

• Experience experience partnering with Product Owners

• Experience in managing all the following: prioritize and refine backlogs, manage stakeholder expectations, and deliver increments

State of California Department of Cannabis Control

RFP 2026-001

Bidder Response

Number Classification Qualifications

Total Experience Required

Experience gained on this cited Project

16 Desirable Scored

(DS)

One (1) to three (3) years of experience as the Scrum Master implementing or maintaining a Cannabis Licensing and Compliance system.

To receive DS points for this requirement, the following conditions must be met:

• The Cannabis Licensing and Compliance system must have been for a government agency (City, County, State or Federal).

Two (2) points per year up to three

(3) years of Scrum Master experience.

(2 pts. X 3 years = 6 maximum points possible.

1-3 Years ☐ Yes

Yr. ___ Mo.___

☐ Partial Yr. ___ Mo.___

☐ No

Provide a description of the work performed on the cited project and how it meets this requirement. Please be as detailed as possible and cover each part of the requirement:

RFP 2026-001

Bidder Response

Requirement Number

Classification Qualifications Total

Experience Required

Experience gained on this cited Project

17 Desirable Scored

(DS)

Scrum Master Certificate

Total Points: 10

Attach Certificate

Not Applicable

RFP 2026-001

Bidder Response

ATTACHMENT 16.3: Scrum Master - QUALIFICATIONS FORM