ATTACHMENT 16- SAMPLE SOW TEMPLATE.pdf
PDF 43 KB Posted
- Solicitation number
- 0000039071
- Issued by
- Sacramento County, San Francisco City, California
About this file
This is a Sample Scope of Work (SOW) Template document provided by the California 9-1-1 Branch to guide contractors in developing SOWs for Customer Premises Equipment (CPE) projects supporting Public Safety Answering Points (PSAPs). The template establishes a standardized structure for CPE procurement projects and requires contractors to provide comprehensive documentation including equipment lists with quantities and individual pricing, system design specifications, network configuration details, integration requirements with CAD and radio systems, change order procedures, acceptance testing protocols, responsible party contact information, and installation schedules with key milestone dates. The SOW must also document contractor, PSAP, and CA 9-1-1 Branch responsibilities, service level agreements with response times for critical, major, and minor outages, 24/7 contact information for trouble reporting, and detailed training plans for PSAP personnel including user manuals and technical service documentation.
The template requires appendices containing site certification documents describing necessary building modifications, floor plans showing workstation deployment and NG9-1-1 trunk ingress points, detailed pricing and terms from the contractor including quantities and monthly maintenance costs, and sample project forms such as change request and issue communication templates. The SOW must include a maintenance plan addressing remote maintenance and update processes, acknowledge service provision terms, and provide sign-off approval by authorized PSAP representatives. While the document does not specify fixed contract terms, amounts, or award dates, it establishes a comprehensive framework ensuring clear project scope definition, cost transparency, and coordinated implementation between contractors, PSAPs, and state oversight entities.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 16: SAMPLE SOW TEMPLATE
This document is a template that will serve as a starting point to develop the SOW that will be submitted to the PSAP to support ordering CPE.
A. Cover Page (should include the following)
a. Contractor Name
b. PSAP Name
c. Project name
d. Table of Contents
e. Including all the major categories and subcategories
B. Body
a. Overview
a. An overall statement about the purpose of the SOW and scope of the project
b. A list of all equipment, including quantities, individual prices for hardware, and monthly maintenance costs
c. A description of the equipment that is to be provided by the PSAP
d. Specific equipment that will not be provided by the Contractor to ensure that the
PSAP and the State understand what has been specifically excluded from the project
e. Any other general issues.
b. Design
a. System overview including a description of the equipment and services provided.
This includes but is not limited to network configuration and interfaces, gateways, UPS, logging recorders, interfaces to other equipment and any other pertinent system elements.
b. Description of the network elements to be connected to the system including NG9-1-1 circuits, administration lines, ring-down lines, direct connects, remote maintenance lines, contact closures, and any other network connections that will be configured in the system
c. Integration Requirements to other equipment such as CAD, radio, and time syncing equipment;
c. Change Requests
a. Change orders will be allowed upon approval from both the PSAP and the CA
9-1-1 Branch. Include a copy of the vendor change order form.
d. Acceptance Testing
a. A copy of the System Acceptance Checklist (TD284) (Checklist form will be made available in the Chapter III Funding Manual)
b. A description of how MACs are handled once Acceptance has been signed off by the authorized PSAP representative.
e. Names of Responsible Parties and Contact Information
a. Names and contact information of all the responsible parties from the Contractor, PSAP, and the CA 9-1-1 Branch.
f. Responsibilities
a. Contractor responsibilities
b. PSAP responsibilities
c. CA 9-1-1 Branch responsibilities.
g. PSAP admin/business line profile that will be integrated into the CPE, as well as 9-1-1 bandwidth to be provided with Cloud/Data Center CPE.
h. Installation Schedule
a. List of key dates beginning with the estimated funding approval date from the CA
9-1-1 Branch. A revised schedule from the Contractor will be required once TD-288 is issued.
b. These include site readiness date, installation date, system in-service date, anticipated PSAP acceptance date and any other dates pertinent to the success of the project.
i. Service Provisions
a. Acknowledgment of the terms of the service provisions of the Contract.
j. Maintenance Plan
a. Remote maintenance/update processes
b. Response times for critical, major, and minor outages
c. 24/7 contact numbers to report trouble
k. Training Plan:
a. A description of the training that will be provided to the PSAP personnel
b. List of the user manuals/websites that will be provided by the Contractor;
c. List of the technical service manuals/websites that will be provided by the
Contractor.
l. SOW Approval
a. A sign-off page for the authorized PSAP representative to approve the content of the SOW.
m. Appendices
a. Site Certification Document: The document that describes the building and environmental changes that the PSAP must make to accommodate the new or updated system
b. Floor Plan: Diagrams of the room where the workstations will be deployed, and the NG9-1-1 trunk (if applicable) point of ingress at the PSAP
c. Pricing and Terms: A copy of the detailed quote from the Contractor for the project that includes quantities, and monthly maintenance costs
d. Forms: Samples of the forms that will be used for the project, such as change request forms, issue communications forms and any other applicable forms
ATTACHMENT 16: SAMPLE SOW TEMPLATE