This document is an Air Force Base Civil Engineering Work Clearance Request (AF IMT 103) form designed to coordinate and authorize work that may potentially disrupt base operations. The form requires detailed information about a specific work project, including the type of facility/work involved (such as pavements, drainage systems, utility distribution, fire protection systems), duration of work, location, equipment and materials to be used, and any excavation details. Multiple base organizations must review and approve the request, including Civil Engineering, Communications, Security, Environmental, and other relevant departments, to ensure safety and minimize disruption to base activities. The form is meant to be processed just prior to work commencement and must be resubmitted if job site conditions change during the project timeline.

View the file

Other files

File Type Posted
Questions Consolidated.docx DOCX document
Questions Consolidated.docx DOCX document
Amendment 1.pdf PDF
FA521525R0016 - Solicitation.pdf PDF
Attachment 1 - SOW B1601 _ B1407 Final.pdf PDF
Attachment 5 - B1601 Pictures.pdf PDF
Attachment 6 - B1407 Pictures.pdf PDF
Attachment 15 - 1354 Form.pdf PDF
Attachment 17 - PRSC LUCMP_2023_April.pdf PDF
Attachment 26 - Wage Determination.pdf PDF
Attachment 4 - B1407 Drawings.pdf PDF
Attachment 7 - B1601_HTRW_Final.pdf PDF
Attachment 8 - B1407_HTRW_Final.pdf PDF
Attachment 10 - FY20_Eareckson_SAR Form v20200508.pdf PDF
Attachment 11 - Cargo Processing Worksheet.pdf PDF
Attachment 13 - 611CES_DigPermitProcess(Draft201112).pdf PDF
Attachment 20 - 11 AF Satellite and Ground Terminal Request (Fillable).pdf PDF
Attachment 22 SoW Contacts.pdf PDF
Attachment 23 611 CES GIS Deliverable Specifications_final.pdf PDF
Attachment 2 - Island Layout B1601_1407 Utilites and Yards.pdf PDF
Attachment 12 - WIA Base Support Letter.pdf PDF
Attachment 16 - AF3000-3064-3065.pdf PDF
Attachment 18 - Wake_Island_FG_2023.pdf PDF
Attachment 21 Notice of Demo and Reno.pdf PDF
Attachment 3 - B1601 Drawings.pdf PDF
Attachment 9 - Wake Island Cargo Processing Guide.pdf PDF
Attachment 19 - eSSS PRSC Commercial Satellite Terminal Policy Memorandum.pdf PDF
Attachment 24 611 CES CAD Deliverable Specifications.pdf PDF
Attachment 25 EA Final WIA PEA_PRSC_CC_Signed _ final.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE PREPAREDBASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITYB. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND

I. OTHERC. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND

3. DURATION CLEARANCE REQUIRED

(DD MMM YY - DD MMM YY)

4. DATE OF CLEARANCE

5. SIGNATURE OF REQUESTING OFFICIAL 6. TELEPHONE NO. 7. ORGANIZATION

ORGANIZATION REMARKS (Use Reverse for additional REVIEWER'S NAME AND INITIALS

A. 611 CES/CEIE

B. AFCEC/CZOP

C. ACOMS

D. ASUS

A. ELECTRICAL DISTRIBUTION

B. STEAM DISTRIBUTION

C. WATER DISTRIBUTION

D. POL DISTRIBUTION

E. SEWER DISTRIBUTION

F. PAVEMENTS/ GROUNDS

G. FIRE PROTECTION

L. SAFETY

H. ENVIRONMENTAL

I. COMMS

10. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

11. OTHER (Specify)

13. REQUESTED CLEARANCE APPROVED DISAPPROVED

14. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 14a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.AF IMT 103, 19940801, V3

EMERGENCY

8.

K. SECURITY POLICE

J. BASE OPERATIONS

9.

12. SITE LEAD

(Manager or CE)

12a. DATE SIGNED

B O S

A F

Submit to: 611CES.CEOER.CustomerService@us.af.mil Attachment 14

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

AF IMT 103, 19940801, V3 (REVERSE)

B. Location where work will take place (include maps)

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

A. Reason for request

C. How will work be accomplished (equipment, materials)

D. If digging, depth of excavation

E. If digging, will soil be returned to original location or placed elsewhere

F. Other comments (extended duration request, emergency work justification,etc)

AF IMT 103, 19940801, V3

19. Organization Comments Continued.

Waterline Dig Permit
WL Excavations
WL Excavations 1
Blank Page
has: Off
has not been staked or clearly marked: Off
2 TYPE OF FACILITYWORK INVOLVED: Excavation Permit.
A PAVEMENTS: Off
D FIRE DETECTION PROTECTION SYSTEMS: Off
G AIRCRAFT OR VEHICULAR TRAFFIC FLOW: Off
B DRAINAGE SYSTEMS: Off
E UTILITY: Off
OVERHEAD: Off
UNDERGROUND: Off
H SECURITY: Off
C RAILROAD TRACKS: Off
F COMM: Off
OVERHEAD_2: Off
UNDERGROUND_2: Off
I OTHER: Off
4 DATE OF CLEARANCE:
17a DATE SIGNED:
Text4:
Emergency: Off
Date:
Contract No:
WO No:
Clerance Date:
Requester:
Text11:
Organization:
Remarks/ Signature:
Date Signed:
Other:
E: Off
G: Off
T: Off
Remarks:
Commercial:
Location:
Reason:
Accomplishement:
Depth:
Materials:
Soil:
Electrical:
Steam:
Water:
POL:
Sewer:
Pavements Grounds:
Fire Protection:
Environmental:
Comms:
Base Ops:
Security Police:
Safety:
Text1:
Location 2:
Text3:
Text5:
Text6:
Text7:
Text8:
Text9:
Text10:
Text12:
Text13:
Text14:
Text15:
Text16:
Text17:
Text18:
Text19:
Text20:
Check Box23: Off
Check Box24: Off

File details come from the government source that posted it. Updated .