About this file

This document is a pre-award survey of a prospective contractor's accounting system. The survey evaluates whether the contractor's accounting system meets generally accepted accounting principles and can properly segregate direct and indirect costs, accumulate costs by contract, allocate indirect costs, and provide financial information as required. It finds that the system properly segregates costs, identifies direct costs by contract, accumulates costs under general ledger control, excludes unallowable costs from government contracts, and provides information for progress payments. While the system does not currently identify labor by cost objective or have a timekeeping system, it does distribute labor costs appropriately. The accounting system is currently in full operation and designed to provide reliable data for follow-on acquisitions. The survey recommends the accounting system is acceptable for award of the prospective contract.

The related federal contract opportunity is for the Army's Cyber TRIDENT program. Cyber TRIDENT will provide an integrated, streamlined approach for developing, releasing, and maintaining cyber training capabilities in support of Army, Navy, Marine Corps, Air Force, National Guard, and Reserve organizations, as well as the Department of Defense and state and local governments. The contract will optimize the acquisition lifecycle for the Program of Record for Cyber Experimentation and continue to evolve its platform, architectures, and development environment while efficiently providing cyber training integration and technologies.

View the file

Other files for this federal contract opportunity

Other files attached to Cyber TRIDENT, newest first.
File Type Posted
DO 0003-Order-SOW-CDRLs.pdf PDF
TO 0001-Order-SOW-CDRLs.pdf PDF
TO 0002-Order-SOW-CDRLs.pdf PDF
Slides - Industry Day - Pre-Solicitation Briefing Slides Contracts - 4-30-20.pptx PPTX presentation
Attach 18 - Past Perf Questionnaire - Cyber TRIDENT - 4-15-20 Updated.docx DOCX document
Attach 1 - SOW - Base CYBER TRIDENT Base SOW - 29 Apr 2020 Updated.pdf PDF
Attach 4 - RCS Price List - 4-24-20 Updated.docx DOCX document
CDRL_Base_SOW.pdf PDF
RFP - W900KK-20-R-0001 DRAFT 30 Apr 2020 Updated.pdf PDF
SOW - DO 3 CYBER TRIDENT DO 3 SOW - 29 Apr 2020 Updated.pdf PDF
SOW - TO 1 CYBER TRIDENT TO 1 SOW - 29 Apr 2020 Updated.pdf PDF
Attach 17 - Proposal Cost Price Workbook 4-30-20 Updated.xls XLS spreadsheet
SOW - TO 2 CYBER TRIDENT TO 2 SOW - 29 Apr 2020 Updated.pdf PDF
Consolidated Industry Questions 1-200 4-30-2020 Posted (2).pdf PDF
Consolidated Industry Questions 1-200 4-30-2020 Posted.pdf PDF
Consolidated Industry Questions-Answer 1-74.pdf PDF
Q_A from Draft RFP.pdf PDF
Q-As -Cyber TRIDENT W900KK-20-R-0001 27 Mar 2020.pdf PDF
Distribution Agreement - Cyber TRIDENT Solicitation -Final 13 Mar 2020.pdf PDF
List of Attachments - 13 Mar 2020.pdf PDF
Attach 19 - Q-A Spreadsheet-12 Mar 2020.xlsx XLSX spreadsheet
Instructions for Obtaining Distribution D Document - 13 Mar 2020.pdf PDF
Attach 2 -Contract Labor Rates.docx DOCX document
Attach 15 - Pre-Award Survey of Prospective Contractor Acctg System Checklist.pdf PDF
RFP - W900KK-20-R-0001 DRAFT 10 Mar 2020.pdf PDF
Statement of Work - DO 2 - Integraton Factory.pdf PDF
Statement of Work -DO 3 - Platform Capability Production.pdf PDF
Statement of Work - DO 1 - Infrastructure and Maintenance.pdf PDF
Attach 14 - PCTE DD254.pdf PDF
Instructions to Obtain Distribution D Documents.docx DOCX document
Attach 5 Small Business Participation Proposal Form.DOCX DOCX document
Attach 1 - Statement of Work - Basic Contract - Cyber TRIDENT.pdf PDF
00 Solicitation Attachment List.pdf PDF
Attach 18 - Past Perf Questionaire - Cyber TRIDENT.docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE)

NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF PROSPECTIVE

CONTRACTOR

ACCOUNTING SYSTEM

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 6/30/2020

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions.

Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S.

General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY

MADE BY

4. SURVEY

REVIEWING

OFFICIAL

a. SIGNATURE AND OFFICE (Include, typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE) YES NO

NOT

APPLIC-

CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED

ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?

(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE) NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF PROSPECTIVE CONTRACTOR

ACCOUNTING SYSTEM

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 6/30/2020 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY MADE BY

4. SURVEY REVIEWING OFFICIAL

a. SIGNATURE AND OFFICE (Include, typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE)

YES

NO

NOT APPLIC-CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

8.2.1.3144.1.471865.466429

IF CONTINUATION SHEETS ATTACHED - MARK HERE: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE): 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. NO (Explain in 2. NARRATIVE): 0
SERIAL NUMBER (For surveying activity use):
PROSPECTIVE CONTRACTOR:
2. NARRATIVE (Clarification of deficiencies, and other pertinent comments,. If additional space is required, continue on plain sheets of paper.):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
3. SURVEY MADE BY. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name):
3. SURVEY MADE BY. a. SIGNATURE AND OFFICE (include, typed or printed name):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name):
c. DATE REVIEWED. Enter 2 digit month, 2 digit day and 4 digit year.:
c. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
b. TELEPHONE NUMBER (include area code):
b. TELEPHONE NUMBER (include area code):
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? YES.: 0
a. Proper segregation of direct costs from indirect costs. YES.: 0
b. Identification and accumulation of direct costs by contract. YES.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) YES.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NO.: 0
a. Proper segregation of direct costs from indirect costs. NO.: 0
b. Identification and accumulation of direct costs by contract. NO.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NO.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NOT APPLICABLE.: 0
a. Proper segregation of direct costs from indirect costs. NOT APPLICABLE.: 0
b. Identification and accumulation of direct costs by contract. NOT APPLICABLE. : 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NOT APPLICABLE. : 0
d. Accumulation of costs under general ledger control. YES.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NOT APPLICABLE.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. YES.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NOT APPLICABLE.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. YES.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NOT APPLICABLE.: 0
j. Segregation of preproduction costs from production costs. YES.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NOT APPLICABLE.: 0
b. Required to support request for progress payments. YES : 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NOT APPLICABLE.:
5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? YES

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.): 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NO

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NOT APPLICABLE

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NO.: 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? YES: 0
b. Required to support request for progress payments. NO.: 0
b. Required to support request for progress payments. NOT APPLICABLE.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NO.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). YES.: 0
j. Segregation of preproduction costs from production costs. NO.: 0
j. Segregation of preproduction costs from production costs. NOT APPLICABLE.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NO.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. YES.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NO.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NOT APPLICABLE.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NO. : 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. YES.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NO.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NOT APPLICABLE.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NO.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. YES.: 0
d. Accumulation of costs under general ledger control. NO.: 0