sf330 questions.docx

Standard Form DOCX document 18 KB Posted

Attached to
IDIQ Architect-Engineer Services for USDA, Departmental Management with work primarily in Washington, DC
Solicitation number
AG-3142-S-10-0016
Issued by

About this file

Responses to Potential Offeror Questions on the submission of SF330s.

View the file

Other versions and copies of SF 330

File Revision Posted Attached to
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
SF330-21b.pdf Revision not stated HUD Emerg. Grant: Water Line Design-Build RFQ A&E
1-Standard Form 330 Part II.pdf.pdf Revision not stated Waters Avenue Force Main Replacement CEI Services
Standard_Form_330-21b_-_Architect-Engineering_Qualifications.pdf Revision not stated Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
SF330-21b.pdf Revision not stated PARAMARIBO: A&E Services, MSGR
15. Exhibit M - SF330 - Architect-Engineer Qualifications_VA-GP.pdf Revision not stated Request for Lease Proposals (RLP) for Olympia, WA CBOC
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Subsurface Investigation & Testing
1-Standard Form 330 Part II.pdf.pdf Revision not stated Miscellaneous Construction Engineering and Inspection (CEI) Services - CDBG-DR
1-Standard Form 330 Part II.pdf.pdf Revision not stated Misc. Professional Stormwater Services
SF-330 AE Qualifications.pdf Revision not stated IDIQ For Architect Engineer (A/E) Services for Central Office
Appendix-4-AE-Qualifications-SF-330-Forms.pdf Revision not stated Construction Management for the 30th Street WestCatenary Replacement Project – Phase 1A
HR001126RE008 Public Announcement Attachment 2 - SF 330.pdf Revision not stated DARPA Modernization Project: Request for Qualifications for A&E Services
SF 330 Instructions.pdf Revision not stated DARPA Modernization Project: Request for Qualifications for A&E Services
SF330 21AE FILLABLE.pdf Revision not stated DOC Architect and Engineering IDIQ
Attachment 1b - ArchitectEngineerQualifications (SF330-FAA 4400-37).docx Revision not stated Architecture and Engineering Services - MMAC
EXHIBIT M_SF330 - Architect-Engineer Qualifications.pdf Revision not stated Request for Lease Proposal (RLP): Las Vegas, NV Medical Facility
Attachment 5 - Standard Form 330 (SF330) - Architect-Engineer Qualifications.pdf Revision not stated FY 27 A-E IDIQ Solicitation
SF330-21a.pdf Revision not stated Architect & Engineering Services CFAC FY26 QA1
SF330-21a.pdf Revision not stated CC-623-250-001 BCCC Nursing Building Renovation and Addition
12-EXHIBIT L SF 330 Architect Engineer Qualifications.pdf Revision not stated Oklahoma City OK Fiscal Building Superseding Lease
Show all 20

Who attaches SF 330

State Files
Florida 97
Maryland 41
Pennsylvania 23
Washington 21
Texas 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Please can you give us clarification on the Criteria 2 Specialized Team Experience. When reading the requirements in this RFP it sounds as if you are looking for a team that has completed within the past 5 years, 10 large scale projects five being historic and five new constructions with the minimum size of 1M Square feet of space. Is this the correct understanding? If so, the extreme requirement of having projects with that size and scope would eliminate every firm within the RFP 60 mile limit requirement since there aren’t that many historic buildings in the Washington DC area of those sizes. Response: The requirement is that the firm be within a 60 mile radius of Washington DC not that all the work experience be within that 60 mile radius. Offerors should select projects that best demonstrate their ability to meet the requirements of the solicitation, to include experience of the size indicated and projects in the Washington DC area.

2. Demonstrate specialized experience, within the past five years, of the firm and its consultants in the design of five (5) completed renovation projects of similar size and complexity and five (5) completed new construction projects. Similar size is defined as meeting the following two (2) conditions:

a. Building shall be a minimum of one million (1,000,000) gross square feet area and multi-storied. Each construction/renovation phase shall be a minimum of one hundred thousand (100,000) gross square feet.

b. Each renovation project shall be a minimum of $15 million.

Response: These statements are correct.

3. Can you please confirm the 12 point font requirement? Format of the required information within the required page limits may not be feasible with this size. Request consideration of a minimum 10 point font for legibility. Response: Font is to be 12 pitch.

4. Can you please confirm the one page limit for Section F projects, particularly given the detailed data to be provided under Criteria 2 (including performance evaluations) and minimum font size noted above. Response: The requirement is for only page per project.

5. Can you please verify the overall 50-page limit (exclusive of cover letter, resumes of key personnel, and organization chart): does this limit refer to the SF 330 Part I only, or does it include Part II? Response: The 50-page limit is for all parts of the responses except those specifically excluded. The Prime and Subs are each required to submit Part II of the SF 330; therefore, Part II of the SF 330 is not subject to the 50 page limit.

6. Can you please verify the 15 page limit on Section H. Instructions in the first paragraph of Selection Criteria indicate that additional sheets may be used to address Criterion 1 through 7 up to the maximum of 50 total sheets, if required. Response: As indicated in the solicitation “Section H shall not exceed fifteen (15) sheets.”

7. Under required services, it states that Key Personnel shall be licensed or accredited to practice their profession in Washington, DC, Virginia and Maryland. What is considered Key Personnel? Response: Key Personnel are defined in page 1 of the SF-330 instructions as, “Individuals who will have major contract responsibilities and/or provide unusual or unique expertise.”

8. According to the RFQ the Section F is to be one page. When listing an IDIQ/IDC with multiple task orders, it will be difficult to best illustrate our services in one page, especially if multiple members of our team participated in the project. Is it possible to change the requirement to 2 pages? Response: One page.

9. Where could we look to find the copy of the approved 1997 master plan referred to in this proposal? Response: The master plan referred to will be provided the successful contractor(s) in order to provide specific design under the contract. This information should not be necessary in order to provide the required SF330 and attachments.

10. Could we also have access to the following changes and modifications for reference to the anticipated scope of work?

0. Final site and building plans for Phases I and II approved by NCPC on October 2, 1997 and July 31, 1998, respectively.

0. Final site and building plans for Phase III approved by NCPC on October 3, 2002.

Response: A review of previous phases of work on the USDA South Building is not pertinent to providing qualification as request.

11. Please define Construction Management services, as listed under “Required Services” of this contract. Response: See answer to #12 below.

12. Under “Required Services” there is a request for the AE to include Construction Management Services. Is the intent that this include work for the AE as a CMA or is the intent that the AE have the capability to provide construction administration services relative to technical and design issues from the contract documents developed by the same AE? Or do you expect we will add this capability to our team via a subcontractor? Response: The Construction Management Services referred to the requirement that Contractor provide post-design construction management services of a technical and design nature, including daily inspection services to USDA, during construction by a third party.

13. When the RFP refers to page limits (50 pages overall, and 15 for Section H), does that mean 50 single sides, or may we use 50 double-sided pages? Response: The page limits listed in the solicitation are to be interpreted as sheets of paper. If both sides of a single page are utilized that would be one sheet towards the 50 sheet total and towards the 15 for Section H, as applicable. All offerors are encouraged to provide double sided responses.

1. Regarding Criterion 2, Specialized/Recent Team Experience:

Could you please confirm or clarify if the required building size of (a minimum of) 1M gsf refers to one building, under one roof; or, can it also be defined as the total gsf of several buildings on one campus, for the same client? This clarification can also apply to Criterion 3, Management and Resources, allowing a firm to establish the ability to work concurrently on multiple large projects on the same campus. Response: The required building size does not have to be under one roof but could be composed of several buildings in a campus.

1. “This ID/IQ contract will include the design of future phases of the South Building Modernization consistent with the approved 1997 Master Plan and other projects primarily in the Washington, DC metropolitan area.”

We thought it could mean that some projects weren’t in the DC metropolitan area. And pairing it with the following sentence:

“A/E firm's main office responsible for performing contractual obligations, sub-consultants' offices, joint venture partnership's offices and mentor/protégée's offices must be within a 60 mile commute to USDA Headquarters, 1400 Independence Ave. SW, Washington, DC 20250 by Personally Owned Vehicle (POV) or Washington Metropolitan Area Transit Authority (WMATA).” Response: USDA Headquarters does have responsible for several locations not in the Washington DC metropolitan area which the contractor(s) could be called upon to provided design services for. These projects would be managed with most meetings still taking place in Washington, DC.

1. Is it required that our fire engineers are licensed in Maryland, Virginia and DC? Response: Fire Engineers would be required to be licensed in Maryland, Virginia, and DC.