vulcan_worklist 15.pdf

PDF 7 KB Posted

Attached to
Forest Road Work
Solicitation number
AG-05G1-S-09-0010
Issued by

About this file

Work Summary 15

View the file

Other files

File Type Posted
Amend 8 Roads. SF 30.pdf PDF
Amend 8 Evaluation Factors.pdf PDF
Amend 7 Roads. SF 30.pdf PDF
map vulcan water source.pdf PDF
Amend 6 Roads. SF 30.pdf PDF
Amend 6 Project B Schedule.pdf PDF
Picture 2113250.pdf PDF
Past Performance Survey.pdf PDF
Picture 2113200 A.pdf PDF
Project C Section 881.pdf PDF
Pictures 2113250 2113200.pdf PDF
Picture 2113400.pdf PDF
Picture 2113015a..pdf PDF
Project C 813_pbsc.pdf PDF
Project C 836.pdf PDF
Earth Mound Typical Drawing.pdf PDF
Pictures 2113200.pdf PDF
WA1 03202009.pdf PDF
Amend 5 Roads.pdf PDF
Project C 833_pbsc.pdf PDF
PreBid Conference Amend 5.pdf PDF
Amend 4 Attachment.pdf PDF
EXAMPLE C.pdf PDF
Wage_ Deter_ 1977_0209_37 05292008.pdf PDF
Amend 4 Roads.pdf PDF
Amend 3 Roads.pdf PDF
Est Quantity 3.pdf PDF
typrd Model 6.pdf PDF
vulcan worklist 12.pdf PDF
Project B Vulcan.pdf PDF
Title Model 1.pdf PDF
Est Qty 5.pdf PDF
Vicinity Map Model 2.pdf PDF
EstQty 4.pdf PDF
vulcan_worklist 16.pdf PDF
Type II gate detail model 10.pdf PDF
culvert details model 7 pdf.pdf PDF
vulcan_worklist 13.pdf PDF
vulcan_worklist 11.pdf PDF
!Vulcan Specs Project B.pdf PDF
Drainage Details Model 8.pdf PDF
AT7&8.pdf PDF
cmplist Model 9.pdf PDF
vulcan_worklist 14.pdf PDF
Amend 2 Roads.pdf PDF
Project A Growden Energy Dissipater.pdf PDF
growden_energy_dis_plans.pdf PDF
Vicnity Map.pdf PDF
sf24_f.pdf PDF
Amend 1 Roads.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK SUMMARY SHEET TOTAL SHEETS

ROAD 2114400R ROAD 2114500R Seg 1

MP WORK ITEMS MP

0.00 Jct 2114000 0.00 Jct 2114000

Begin establishing clearing limits Begin establishing clearing limits Begin clearing and grubbing Begin clearing and grubbing Begin constructing 12' roadbed Begin constructing 12' roadbed Construct T-intersection 0.13 Begin 2' CWL Haul and place 16CY of unclassified borrow for T-intersection Construct OSD with 8' LOD Haul excess material from berm removal on the 2114000R segment 2 0.16 End 2' CWL Haul remainder of material from designated borrow source 0.20 Construct DD

0.04 Begin 4' CWL 0.50 Construct DD

0.07 End 4' CWL 0.57 Begin 2' CWR

0.13 Construct DD 0.60 End 2' CWR

0.47 Begin 2' CWR 0.69 Construct DD

0.50 End 2' CWR 0.78 Construct DD

0.54 Construct DD 0.81 Jct 2114510R Left

0.61 Construct OSD 1.01 Construct OSD with 15' LOD

0.72 Construct DD 1.11 Construct DD

0.82 Construct OSD 1.41 Construct DD

0.91 Construct TOL and TAR 1.47 Construct DD

0.92 End establishing clearing limits 1.50 Begin placing 6" of aggregate

End clearing and grubbing 1.52 Construct OSD End constructing 12' roadbed 1.54 End placing 6" of aggregate EOP 1.72 Construct DD

1.95 Construct OSD

2.09 Construct OSD

2.18 End establishing clearing limits

End clearing and grubbing End constructing 12' roadbed EOP Segment 1

15 16

File details come from the government source that posted it. Updated .