EstQty 4.pdf

PDF 10 KB Posted

Attached to
Forest Road Work
Solicitation number
AG-05G1-S-09-0010
Issued by

About this file

Estimate Quantities 4

View the file

Other files

File Type Posted
Amend 8 Roads. SF 30.pdf PDF
Amend 8 Evaluation Factors.pdf PDF
Amend 7 Roads. SF 30.pdf PDF
map vulcan water source.pdf PDF
Amend 6 Roads. SF 30.pdf PDF
Amend 6 Project B Schedule.pdf PDF
Picture 2113250.pdf PDF
Past Performance Survey.pdf PDF
Picture 2113200 A.pdf PDF
Project C Section 881.pdf PDF
Pictures 2113250 2113200.pdf PDF
Picture 2113400.pdf PDF
Picture 2113015a..pdf PDF
Project C 813_pbsc.pdf PDF
Project C 836.pdf PDF
Earth Mound Typical Drawing.pdf PDF
Pictures 2113200.pdf PDF
WA1 03202009.pdf PDF
Amend 5 Roads.pdf PDF
Project C 833_pbsc.pdf PDF
PreBid Conference Amend 5.pdf PDF
Amend 4 Attachment.pdf PDF
EXAMPLE C.pdf PDF
Wage_ Deter_ 1977_0209_37 05292008.pdf PDF
Amend 4 Roads.pdf PDF
Amend 3 Roads.pdf PDF
Est Quantity 3.pdf PDF
typrd Model 6.pdf PDF
vulcan worklist 12.pdf PDF
Project B Vulcan.pdf PDF
Title Model 1.pdf PDF
Est Qty 5.pdf PDF
Vicinity Map Model 2.pdf PDF
vulcan_worklist 16.pdf PDF
Type II gate detail model 10.pdf PDF
culvert details model 7 pdf.pdf PDF
vulcan_worklist 13.pdf PDF
vulcan_worklist 11.pdf PDF
!Vulcan Specs Project B.pdf PDF
Drainage Details Model 8.pdf PDF
AT7&8.pdf PDF
cmplist Model 9.pdf PDF
vulcan_worklist 14.pdf PDF
vulcan_worklist 15.pdf PDF
Amend 2 Roads.pdf PDF
Project A Growden Energy Dissipater.pdf PDF
growden_energy_dis_plans.pdf PDF
Vicnity Map.pdf PDF
sf24_f.pdf PDF
Amend 1 Roads.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET TOTAL SHEETS

Project Road Number and Length

Item Number

Description Unit 2113400R

SEG 1

3.68 mi

2113400R

SEG 2

0.68 mi

2114000R

SEG 2

0.26 mi

2114025R

0.37 mi

2114033R

0.66 mi

2114080R

0.22 mi

2114400R

0.92 mi

2114500R

SEG 1

2.18 mi

2114500R

SEG 3

0.35 mi

Sheet Totals Remarks

15101 Mobilization ls All All All All All All All All All All 15219 Establishing clearing limits mile 0.68 0.23 0.37 0.66 0.22 0.92 2.18 0.35 5.61

20103 Clearing and grubbing, disposal of tops and limbs f,l, logs f, and stumps f. mile 0.68 0.37 0.66 0.22 0.92 2.18 0.35 5.38

20301 Removal of Culvert each 0 Disposal Method A

20402 Roadway excavation, compaction method C, finishing method C. mile 0.52 0.68 0.03 0.37 0.66 0.22 0.92 2.18 0.35 5.93

20404 Unclassified borrow, compaction method B, finishing method C cy* 16 16

20420A Drainage excavation, type Drain Dip each 4 4 3 2.00 3 6 2 24 20420B Drainage excavation, type Outslope Drain each 2 1 2 2 2 7 3 19 23050 Roadside Brushing mile 0.23 0.23 25102 Placed riprap, class 2 cy* 0 Commercial source

25103 Keyed riprap, class 4. cy* 0 Commercial source

32222 Pit run maximum size 4" compaction method H cy* 266 40 24 32 16 40 155 40 613 Commercial source

60250A 18 inch corrugated metal pipe, 0.064 inch thickness for steel or 0.060 inch thickness for aluminum, method A ft 26 30 56

60250B 24 inch corrugated metal pipe, 0.064 inch thickness for steel or 0.060 inch thickness for aluminum, method B ft 0

62501 Seeding dry method acre* 0.86 2.14 0.05 1.17 2.08 0.68 2.90 6.87 1.10 17.85

65001 Furnish and Install road closure device, type II gate, size 16' each 1 1 1 1 4

* Denotes Contract Quantities

Borrow source on 2114040

ESTIMATE OF QUANTITES

Quantities

4 16

File details come from the government source that posted it. Updated .