Text version
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 1
TASK ORDER REQUEST
Contract Number Individual Task Order Number
This Individual Task Order is issued under contract number:
AG-5G1-C-09-00__
Solicitation No.: AG-05G1-S-09-0010 Project B
AG-05G1-D-09-________
ISSUING OFFICE: (Forest Service Unit Name) Task Order Date
Colville National Forest Acquisition Management 765 South Main Colville WA. 99114
Financial obligations and payments shall be processed via the Issuing Office.
PROJECT NAME
Vulcan Road Reconstruction, Project B Republic Ranger District, Colville National Forest
Itemized payment items, quantities, prices and detailed project requirements are attached
Proposal Request Date:
April 4, 2009 Amendment 3
AG-05G1-S-09-0010
Proposal Response Date/Time (close of business unless otherwise shown):
See AG-05G1-S-09-0010
A BID GUARANTEE is required for all offers exceeding $100,000.00.
OFFER:
Offeror Name (same as on contract) Offered by (Name, Title, Phone):
Offered Amounts attached in Section B. Authorized Signature:
Date:
This is a firm offer for 60 calendar days from the Response Date/Time. The offer agrees to furnish any required bonds and to perform the work at the prices offered.
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 2
PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
AG-05G1-S-09-0010
Project B
Task Order
Vulcan Road Reconstruction Republic Ranger District, Colville National Forest
Ferry County, Washington
ITEM
NO.
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Road 2113010R
15101 Mobilization LSQ Job
1 $______
15219 Establish Clearing Limits
AQ Mile 1.80 $______
20402 Roadway Excavation, Compaction Method C, Finishing Method C
AQ Mile
0.62 $______
20420A Drainage Excavation, Type Drain Dip
AQ Each 4 $______
23050 Roadside Brushing AQ Mile 1.8 $______
32222 Pit Run Maximum Size 4 inches, Compaction Method H
CQ Cubic Yards
32 $______
62501 Seeding, Dry Method
CQ Acre 0.98 $______
65001 Furnish and Install Road Closure Device Type II Gate, Size 16 feet
AQ Each 1 $______
Total for Road 2113010R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 3
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113015R
15101 Mobilization
LSQ Job
AQ Mile 0.24 $______
20103 Clearing and Grubbing, Disposal of Tops and Limbs f, l, logs f and stumps f.
0.24 $______
Excavation, Compaction Method C, Finishing Method
AQ Mile 0.28 $______
Excavation, Type
Size 4 inches, 34 $______
CQ Acre 0.82 $______
Total for Road 2113015R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 4
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113040R
AQ Mile 0.39 $______
Grubbing, Disposal of Tops and Limbs, f, l, logs f, and stumps f
Excavation, Compaction Method
0.39 $______
AQ Each 2 $______
20420B Drainage
Outslope Dip
Size 4 inches, 105 $______
CQ Acre 1.23 $______
Total for Road 2113040R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 5
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113045R
AQ Mile 0.22 $______
Excavation, Compaction Method
0.22 $______
23050 Roadside Brushing
Size 4 inches, 8 $______
CQ Acre 0.35 $______
Total for Road 2113045R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 6
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113200R
AQ Mile 0.75 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.75 $______
20301 Removal of Culvert
LSQ Each 1 $______
Excavation, Compaction Method
0.91 $______
20404 Unclassified Borrow, Compaction Method
8 $______
AQ Each 7 $______
Outslope Drain
AQ Each 11 $______
25104 Keyed Riprap, Class
70 $______
Size 4 inches, Compaction Method H
CQ Cubic
433 $______
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 7
60250A 18 inch Corrugated Metal Pipe, .064 inch thickness for steel or .060 inch thickness for aluminum, Method A
AQ Feet 26 $______
CQ Acre 3.53 $______
Total for Road 2113200R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 8
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113250R
AQ Mile 0.40 $______
Grubbing, Disposal of Tops and Limbs, f, l, logs f, and
AQ Mile 0.40 $______
Excavation, Compaction Method
0.40 $______
Excavation, Type
AQ Each 6 $______
Size 4 inches, 264 $______
CQ Acre 1.26 $______
Road Closure Device Type II Gate, Size 16
Total for Road 2113250R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 9
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113253R
Excavation, Compaction Method
0.03 $______
Compaction Method
54 $______
25101 Place Riprap, Class 2 CQ Cubic
2 $______
Size 4 inches, 37 $______
60250B 24 inch Corrugated Metal Pipe, .064 inch thickness for steel or .060 inch thickness
Method C
AQ Feet 32 $______
CQ Acre 0.05 $______
Total for Road 2113253R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 10
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113300R
Excavation, Compaction Method
0.34 $______
AQ Each 9 $______
AQ Each 5 $______
Size 4 inches, 188 $______
CQ Acre 1.01 $______
Total for Road 2113300R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 11
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113360R
15101 Mobilization LSQ Job 1 $______
AQ Mile 0.18 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.18 $______
Excavation, Compaction Method
0.18 $______
AQ Each 3 $______
Size 4 inches, CQ Acre 0.57 $______
Road Closure Device Type II Gate, Size 16
Total for Road 2113360R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 12
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113400R S.1
Excavation, Compaction Method
0.52 $______
Size 4 inches, 266 $______
Metal Pipe, .064 inch thickness for steel or .060 inch thickness
AQ Feet 26 $______
CQ Acre 0.86 $______
Total for Road 2113400R S.1 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 13
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2113400R S.2
AQ Mile 0.68 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.68 $______
Excavation, Compaction Method
0.68 $______
Size 4 inches, 40 $______
Metal Pipe, .064 inch thickness for steel or .060 inch thickness
AQ Feet 30 $______
CQ Acre 2.14 $______
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 14
Road Closure Device
Total for Road 2113400R S.2 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 15
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 21134000R S.2
AQ Mile 0.23 $______
Excavation, Compaction Method
0.03 $______
23050 Roadside Brushing
CQ Mile 0.23 $______
CQ Acre 0.05 $______
Road Closure Device
Total for Road 21134000R S.2 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 16
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114025R
AQ Mile 0.37 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.37 $______
Excavation, Compaction Method
0.37 $______
Size 4 inches, 24 $______
CQ Acre 1.17 $______
Road Closure Device
Total for Road 2114025R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 17
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114033R
AQ Mile 0.66 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.66 $______
Excavation, Compaction Method C, Finishing Method
0.66 $______
Size 4 inches, CQ Acre 2.08 $______
Road Closure Device Type II Gate, Size 16
Total for Road 2114033R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 18
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114080R
Grubbing, Disposal of Tops and Limbs, Excavation, Compaction Method
0.22 $______
32222 Pit run maximum size 4 inches, 16 $______
CQ Acre 0.68 $______
Total for Road 2114080R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 19
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114400R
AQ Mile 0.92 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.92 $______
Excavation, Compaction Method
0.92 $______
Compaction Method
Size 4 inches, CQ Acre 2.90 $______
Total for Road 2114400R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 20
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114500R S.1
AQ Mile 2.18 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 2.18 $______
Excavation, Compaction Method
2.18 $______
AQ Each 6 $______
AQ Each 7 $______
Size 4 inches, 155 $______
CQ Acre 6.87 $______
Total for Road 2114500R S.1 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 21
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2144500R S.3
AQ Mile 0.35 $______
Grubbing, Disposal of Tops and Limbs, AQ Mile 0.35 $______
Excavation, Compaction Method
0.35 $______
Size 4 inches, CQ Acre 1.10 $______
Total for Road 2144500R S.3 $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 22
DESCRIPTION METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
Road 2114510R
Grubbing, Disposal of Tops and Limbs, Excavation, Compaction Method
0.39 $______
Size 4 inches, CQ Acre 1.22 $______
Road Closure Device
Total for Road 2114510R $_____
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 23
SUMMARY OF OFFER
Road Number Total Price
2113010R $_______________
2113015R $_______________
2113040R $_______________
2113045R $_______________
2113200R $_______________
2113250R $_______________
2113253R $_______________
2113300R $_______________
2113360R $_______________
2113400R Segment 1 $_______________
2113400R Segment 2 $_______________
2114000R Segment 2 $_______________
2114025R $_______________
2114080R $_______________
2114400R $_______________
2114500R Segment 1 $_______________
2114500R Segment 3 $_______________
2114510R $_______________
Total Offer for All Roads $_______________
The offeror must provide a price on all items.
Award of this requirement will result in a task order off one of the contracts for Road Work on the Colville National Forest. The pricing for this project along with the technical factors will be evaluated when the Government evaluates the basic solicitation AG-05G1-S-09-0010. All terms and conditions of the IDIQ contract are incorporated into this project.
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 24
* Designated Method of Measurement
CQ - Contract Quantities. These quantities are based upon the original design data available prior to advertising the project.
AQ - Actual Quantities. These quantities are determined from measurement of completed work.
LSQ - Lump Sum Quantities. These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
Construction Project
This is a construction project.
Price Range
The Government’s estimate is between $100,000 and $250,000.
Bonding
A Bid Guarantee of 20% is required (reference FAR 52.228-1, Bid Guarantee).
Performance and Payment Bonds are also required (reference FAR 52.228-15, Performance and Payment Bonds – Construction).
All referenced clauses are in the basic solicitation/contract.
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 25
SECTION C - DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
Description of Work or Scope of Contract
This project consists of reconstruction of approximately 18 miles of existing roads. The work required to complete the reconstruction includes establishing clearing/construction limits, clearing and disposal of slash, decking of timber, excavation and placement of excavated and borrow material, hauling and placing aggregate, gate fabrication and installation, culvert installation and seeding all disturbed areas. The Contractor shall furnish all materials according to the specifications and drawings. This is a construction project.
Project Location
Project is located on the Republic Ranger District. See attached maps for exact location.
From Republic, Washington travel east on SR20 approx. 3 miles to junction of SR21. Go north on SR21 to Curlew – approximately 21 miles. Continue on SR 21 for about 0.5 miles to County Road 615, Vulcan Mtn road. Turn left (northwest) onto C.615, in about 3 miles the county road turns into National Forest System Road (NFSR) 2113; the junction of NFSR 2113 and 2114 is 0.5 miles beyond that. The Vulcan Road Reconstruction project is located on several tributary roads to NFS Roads 2113 and 2114, as shown on the project vicinity map in the drawings.
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
Special Project Specifications
The Special Project Specifications shown in the specification listing are applicable to this contract. All specifications not included in the specification listing, but referenced by listed specifications, are applicable. The Special Project Specifications shown on the specification list are physically attached to this contract.
Project Drawings
The attached listed drawings located in Section J (16 pages) are part of this solicitation and any resultant contract.
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 26
ADDITIONAL CLAUSES
The Government will issue a task order against one of the contracts for Road Work, Colville National Forest. All terms and conditions listed in the main contract are also part of this solicitation and resulting task order.
In addition, the following clauses apply to this task order:
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than ****. The time stated for completion shall include final cleanup of the premises.
*This date is negotiable. Offerors shall submit their proposed completion date with their offer. The award document will have the negotiated completion date.
Required Submittals
The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.
Submittal Title Referenced By
Specification No.
Submittal Date
Schedule of Work Section F of base contract
Prior to Work Starting
Job Specific Safety Plan Section H of base contract
Prior to Work Starting
Culvert Certificates Section 105. As stated in Specifications
Rock Source Section 105 As stated in Specifications
AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held after the date of contract award. The conference will be held at Colville National Forest Supervisor’s Office, 765 South Main, Colville, Washington 99114.
Job Specific Safety Plan
Prior to the prework meeting, the Contractor shall provide a written job specific safety plan that recognizes the inherently hazardous conditions that will exist on this contract. Some of these hazardous conditions are, but not limited to: blasting, heavy equipment operation, traffic control on haul routes, Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 27 loading an unloading of materials, site security, noises and dust contract and the use of personal protective equipment (PPE) in the work area. The plan shall be in accordance with OSHA Regulations. The plan shall include all tasks and related activities anticipated to successfully complete the work.
Blasting Applicable if blasting is required.
The Contractor shall comply with State and Federal laws in regards to transportation, storage and use of explosives. The Contractor shall post a watchperson at a safe distance on all approaches to a blasting area on all approaching roads, trails or waterways.
Prior to the start of any blasting activities the contractor shall prepare and provide a safety plan for the activities involved that is consistent with the State OSHA regulations.
Safety Items
(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
(b) The following checked activities have been identified by the Government as potential safety hazards.
[] Confined Entry Space.
[X] Temporary excavation/deep trenching/slope stability.
[X] Tree Felling.
[] Fall hazard from work heights exceeding six feet.
[X] Blasting (Maybe).
[X] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
[X] Heavy equipment operation.
[] Tree climbing and/or tower climbing.
[X] Hazard materials handling.
[] Electrical hazard.
[] Hydraulic and/or pneumatic and/or other high pressure hazards.
[] Mechanical hazards such as pulleys, springs, etc.
[] Power tool operation including eye protection.
[] Overhead hazards.
FSAR 4G52.222-704 Personal Protective Equipment (FEB 2007)
1. The Contractor will train in the safe operation and use of equipment to all workers using such equipment.
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 28
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The Contractor shall provide, at no cost to the employee, to each employee who operates a chain saw, chain saw chaps and assure the chaps are worn during saw operations. These chaps must be approved by Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh to the top of the boot on each leg.
5. The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
6. The Contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.
7. The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
8. The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.
Fire Precautionary Measure 2 Communications (R6-FS-6300-54)
All Fire Precautionary Measures listed in the basic contract are applicable to this task order. This includes:
1. Fire Protection and Suppression (Eastside) Form R6-FS-6300-52),
2. Additional Fire Precautionary Measure 1 Tank Truck (R6-FS-6300-53)
3. Additional Fire Precautionary Measure 2 Communications (R6-FS-6300-54).
Contract Clauses
All basic and construction clauses in the main contract are applicable to this task order.
Wage Determination
The general wage determination applicable to this contract is attached in Section J: WA1 attached in the solicitation AG-05G1-S-09-0010 is applicable to this task order.
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 29
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
List of Attached Documents, Exhibits and Other Attachments
The following attachments are made a part of this solicitation and any resultant contract.
Title Pages
1. Specifications 62
2. AT.7 Specified Roads 1
3. Project Drawings (Attached) or (Separate) 16
Page No Description
1 Title Sheet
2 Vulcan Road Reconstruction Vicinity Map
3 Estimate of Quantities
4 Estimate of Quantities Continued
5 Estimate of Quantities Continued
6 Typical Roadway Section
7 Culvert Details
8 Drainage Details
9 Culvert Listing
10 Gate Detail Type II
11 Work Summary
12 Work Summary Continued
13 Work Summary Continued
14 Work Summary Continued
15 Work Summary Continued
16 Work Summary Continued
4. DOL Wage Decision No. WA1 (Reference Basic Solicitation)
Vulcan Road Reconstruction Project B RFQ AG-05G1-S-09-0010 Republic Rivers Ranger District Page 30
General Information about Project B Vulcan Road Reconstruction
AG-05G1-S-09-00010, Project B, Vulcan Road Reconstruction
Estimated range is between $100,000 and $250,000.
This is a construction Project.
Contractor shall submit with Business Proposal.
1. Task Order Form: Page 1 of this Package. Complete Offer’s Blocks.
2. Schedule of Items (Pages 2 through 23): Provide pricing. Must enter a price for all sub-items.
3. Bid Guarantee of 20%.
Contractor shall submit with Technical Proposal.
1. Technical Approach for the project.
2. Experience in reconstruction of Forest Service roads.
3. Expected Schedule including sequence of work items and approximate time to complete the project. The Offeror must include their completion date. The latest date the Government will accept is October 31, 2009. The Government may give preference to offeror’s who offer earlier completion dates.
All information above shall be labeled Project B and have Offeror’s firms name on top of page.